LCWS 05 Machine Detector Interface Design Updates. Tom Markiewicz SLAC 22 March 2005

Similar documents
Simulation of the ILC Collimation System using BDSIM, MARS15 and STRUCT

Status of the TESLA Beam Delivery System Lattice Design. Deepa Angal-Kalinin Daresbury Laboratory, UK

Improved final doublet designs for the ILC baseline small crossing angle scheme

Interaction Regions, Backgrounds, IP Beam Instrumentation. Eric Torrence University of Oregon

Upstream Polarimetry with 4-Magnet Chicane

Beam Delivery System. Lunch-time accelerator lecture. Andrei Seryi SLAC. picture taken in 2001

Forward Region, Energy Spectrometer, Polarimeter. Snowmass Klaus Mönig

Beam Delivery System in the ILC Grahame A. Blair EPAC06 Edinburgh 28 th June 2006

Compensation of the effects of a detector solenoid on the vertical beam orbit in a linear collider

Upstream Polarimetry with 4-Magnet Chicane

IR and backgrounds of ILC and Super KEKB. Hitoshi Yamamoto

Nick Walker (for WG3) Snowmass, 2001

Machine Detector Interface at Electron Colliders. Hongbo Zhu (IHEP, Beijing)

Machine Parameters. Q3(LowQ),6(L*),7(VTX_R),8(2&20mr),15(Zpole),16(e-e-)

Magnet Modelling and its Various Uses at SLAC

Overview on Compton Polarimetry

Simulation Studies for a Polarimeter at the International Linear Collider (ILC)

THE ILC BEAM DELIVERY SYSTEM DESIGN AND R&D PROGRAMME

Silicon-tungsten calorimetry and the SiD forward region. David Strom University of Oregon

CLIC Detector studies status + plans

SABER Optics. Y. Nosochkov, K. Bane, P. Emma, R. Erickson. SABER Workshop, SLAC, March 15-16, /25

Higgs Factory Magnet Protection and Machine-Detector Interface

GG6 summary. Valery Telnov Snowmass, Aug.19, 2005,

Interaction Region Designs for Electron Colliders

arxiv: v1 [physics.ins-det] 1 Apr 2009

Collider Rings and IR Design for MEIC

Linear Collider Beam Instrumentation Overview

The HERA ep Interaction Regions Learned Lessons

Superconducting Magnets for Future Electron-Ion Collider. Yuhong Zhang Thomas Jefferson National Accelerator Facility, USA

Full-Acceptance Detector Integration at MEIC

Final Focus Layouts and Stability Considerations

Spin Dynamics at the NLC

Luminosity Energy Polarization Status. Documentation Status of Linear Collider Beam Instrumentation Design, D. Cinabro, E. Torrence and M.

IR status. 2009/3/19 M. Iwasaki For Super-KEKB MDI group U. Tokyo, Tohoku U., and KEK

Start-to-end beam optics development and multi-particle tracking for the ILC undulator-based positron source*

MAP MDI at SLAC. Thomas Markiewicz, SLAC Muon Collider Higgs Factory Workshop, UCLA March 22, 2013

arxiv: v3 [physics.ins-det] 7 Oct 2009

IP switch and big bend

Accelerators. Lecture V. Oliver Brüning. school/lecture5

Synchrotron Radiation a Tool for Precise Beam Energy Measurements at the ILC

RING-RING DESIGN. Miriam Fitterer, CERN - KIT for the LHeC study group

The International Linear Collider. Barry Barish Caltech 2006 SLUO Annual Meeting 11-Sept-06

6 Bunch Compressor and Transfer to Main Linac

CEPC Detector and Physics Studies

Simulation of Laser-wires at CLIC using BDSIM

Lattice Design and Performance for PEP-X Light Source

Machine-Detector Interface for the CEPC

E. Gianfelice-Wendt, for the Luminosity Upgrade Group, DESY, Hamburg, Germany

Tools of Particle Physics I Accelerators

NEXT GENERATION B-FACTORIES

Preliminary Design of m + m - Higgs Factory Machine-Detector Interface

ILC Beam Dynamics Studies Using PLACET

The low Q 2 chicane and Compton polarimeter at the JLab EIC

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH THE CLIC POSITRON CAPTURE AND ACCELERATION IN THE INJECTOR LINAC

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

Accelerator R&D Opportunities: Sources and Linac. Developing expertise. D. Rubin, Cornell University

1.1 Machine-Detector Interface

Report CERN-ACC Considerations for a QD0 with Hybrid Technology in ILC

A Photon Collider Experiment based on SLC

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC

ILC Spin Rotator. Super B Workshop III. Presenter: Jeffrey Smith, Cornell University. with

Colliders and the Machine Detector Interface

Electron Beam Polarimetry at JLab Hall C Dave Gaskell PST 2009 September 7, 2009

1.1 Report on the First ILC Workshop, KEK (Japan) November 04

Laser Wire Simulation in the ILC Beam Delivery System

The JLEIC electron low Q 2 chicane and Compton polarimeter

Polarimetry. POSIPOL 2011 Beijing Peter Schuler (DESY) - Polarimetry

SC magnets for Future HEHIHB Colliders

Jan. 5, 2006 Development of a Helical Undulator for ILC Positron Source

SuperB Status M. Sullivan ARD seminar March 17, 2009

Design of Superconducting Magnet System for SuperKEKB Interaction Region

Next Generation B-factories

Measuring very forward (backward) at the LHeC

Integrated luminosity performance studies of linear colliders with intra-train IP-FB system: ILC and CLIC

Status of Linear Collider Beam Instrumentation Design

CERN R&D on Linear Collider Detectors. Lucie Linssen CERN

The TESLA Dogbone Damping Ring

3.2.2 Magnets. The properties of the quadrupoles, sextupoles and correctors are listed in tables t322_b,_c and _d.

Beam-beam Effects in Linear Colliders

BABAR Beam Background Simulation Steven Robertson

CAIN SIMULATION STUDIES FOR e? e? COLLISIONS. Department of Physics, University of Tennessee, Knoxville, TN 37996

LHC Upgrade (accelerator)

Monochromatization Option for NLC Collisions

Status of Optics Design

ILC Laser-wires. G A Blair, RHUL Snowmass 17 th August 2005

MDI and detector modeling

IPBI-TN June 30, 2004

Operational Experience with HERA

Instrumentation of the Very Forward Region of a Linear Collider Detector. Wolfgang Lohmann, DESY

FCC-ee Machine Layout and Beam Optics + Matching with synchrotron motion

Beam loss background and collimator design in CEPC double ring scheme

LHC Luminosity and Energy Upgrade

Beam Optics design for CEPC collider ring

ERHIC - A PRECISION ELECTRON-PROTON/ION COLLIDER FACILITY AT BROOKHAVEN NATIONAL LABORATORY

Report from the Luminosity Working Group of the International Linear Collider Technical Review Committee (ILC-TRC) Chairman: Greg Loew

Case study: Energy deposition in superconducting magnets in IR7

2.6 Electron transport lines

Study of Alternative Optics for the NLC Prelinac Collimation section

Lattice design and dynamic aperture optimization for CEPC main ring

Lepton beam polarisation for the HERA experiments ZEUS and H1

Transcription:

LCWS 05 Machine Detector Interface Design Updates SLAC 22 March 2005

ILC WG4 Strawman Layout of BDS with 20 mrad and 2 mrad IRs logically complete P P P E E P E E 2/ 20

Warm LC Collimation System Design Updated to Profit from Cold Bunch Structure: Expand Beam Size at Spoilers to Make them Indestructible ITRP NLC Betatron Collimation Lattice optimized for consumable spoilers: At max β x *β y =6E4 m 2 10-3 Halo 3/ 20 ILC Lattice (FF9): At max β x *β y =6E5 m 2 suitable for passive survival spoilers Drozhdin IP

Pre-IP Chicane-based Polarimeter Plan View 45.59 GeV 250 GeV 17 GeV BD4 z=50.6 m BD1 z=0 m K Moffeit 24 Nov 04 BD2 19.1 m BD3 26.5 m Requires ~50 meters length Same B-field at Z-pole, 250 GeV and 500 GeV running Same magnet design as for upstream energy chicane Good acceptance of Compton Spectrum at all energies without changing laser wavelength Upgrade to TESLA Design: Minimal space and no special magnets required Model studies based innovative moveable laser beam, detailed vacuum chamber & detector design ongoing (Meyners) 25 GeV 35 GeV 2.5 cm Wide Cerenkov Detector 4/ 20

Hildreth Pre-IP Energy Spectrometer Developed <2004 Concept energy spectrometer chicane ΔX = 5 mm (on-energy) 5/ 20

Moffeit Detailed Layout of Energy & Polarimeter Chicanes in 20mrad Extraction Line 6/ 20 1996-2004 Concept Developed

Moffeit Electron/Positron Spin Rotation for 2-IRs 7/ 20

Final Doublet Magnet Design Successful tests of winding 7-wire cable at 10mm radius beampipe & Use of SF (1.9 K) He-II Lead to MORE COMPACT COIL CONFIGURATIONS and B. Parker open up NEW design options 2004 SC QD0 Design Single-strand at r=10mm 7-strand at r=20mm Ultra-Compact Design w/ Radial Taper in 3 z-steps New 20 mrad X-ang design has QD0 AND 1 st Extraction Quad at same L* in separate cryostats 8/ 20

B. Parker γγ accommodated within 20 mrad Straw-Man Configuration Discussions on Merits/Risks of 25mrad continue 76mm = ±10mrad around extraction line Outer Quad and Dipole Zero By at both +10mrad and -10mrad 76mm beam separation at 20 mrad COILS at IP Side of QD0 at z=3.8m 9/ 20

Anti-solenoids Reminder: A. Seryi & Y. Nosochkov showed (PRSTAB 8, 021001 (2005)) 70mm If QD0 sits in Fringe of Detector Solenoid cryostat σ y (Solenoid) / σ y (0) ~ 30-40 1.7m long Independent of crossing angle 0.3 15T Force 0.2 0.1 0-0.1-0.2 10 / 20 316mm 456mm -0.3 0 2 4 6 8 10 Four 24cm individual powered 6mm coils, 1.22m total length, r min =19cm σ y (Solenoid) / σ y (0) ~ 1.4

Maruyama VXD / Beam Pipe Tweaked for SiD New SiD VXD with 12mm radius beampipe Old SiD VXD with 10 mm radius beampipe 11 / 20 Pair region plotted for ILC Nominal IP Parameters 5 Tesla, 20 mrad Pair region plotted for NLC IP Parameters 5 Tesla, 20 mrad

Excerpt from ILC-WG1 Parameter Tables Nominal to High Lum Sets 500 GeV 11.3 MW Nominal HighLum Lum 2.0E38 4.9E38 db 2.2% 7% Ng 1.3 1.7 Upsilon 0.046 0.133 P-g 250kW 790kW 1 TeV Nominal HighLum 18.1MW Lum 2.8E38 7.9E38 db 5.0% 18% Ng 1.4 2.2 Upsilon 0.109 0.376 P-g 900kW 3.2MW Also, variation and duty factor of divergence angles, photon power, etc. as beams move into and out of collision (study loss as a function of dy) 12 / 20

20 mrad Extraction Line Modified for Magnet developments, Newest IP Parameters & Double Chicane L*=3.51 m for 1st quad in the incoming and extraction lines 1.75 m free space to fit crab cavity on incoming line Larger magnet apertures Y. Nosochkov 13 / 20

Nosochkov Particle Loss in 20 mrad Extraction Line E cm (GeV) Params Δy (nm) Max e x /y (urad) Max g x /y (urad) Emin/ E0 Power loss F-D / D-F 500 Nom. 0 530/250 370/210 0.36 0/0 500 Nom. 200 470/670 370/540 0.36 6.4/1.4W 500 High 0 1270/430 720/320 0.17 1.8/3.5 kw 500 High 120 1280/1420 780/1230 0.17 14/10 kw 1000 Nom 0 500/160 270/150 0.2 120/460 W 1000 Nom 100 420/570 420/570 0.19 3.9/2.0 kw 1000 High 0 1000 High 80 2010/490 940/300 0.063 48 / 49 kw 1730/1590 970/1200 0.062 325/274 kw 14 / 20

SLAC-BNL-UK-France Task Group First Design of Complete 2mrad IP to Dump Extraction Line Warm Panofsky Quad Shared Large Aperture Magnets QD0 SD0 QF1 SF1 BYCHIC Disrupted beam & Sync radiations QEXF1 Incoming beam 60 m Beamstrahlung Current Sheet Quad Super Septum Quad 15 / 20

First Loss Studies in 2 mrad Crossing Extraction Line 500 GeV Lattice Magnets, Chicane, Optics to Chicane focus require optimization β 1/ 2 (m 1/ 2 ) 2500. 2250. 2000. 1750. 1500. 1250. 1000. 750. 500. 250. 0.0 16 / 20 R-beta functions for on-energy particles Windows NT 4.0 version 8.23dl 16/03/05 11.51.48 βx 1/ 2 βy 1/ 2 0.0 25. 50. 75. 100. 125. 150. 175. 200. 225. 250. 275. 300. s (m) δ E/ p0c = 0. Table name = TWISS 1 TeV Lattice Collimators at 56m (1.3kW) / 84m (23kW) for low E tail of nom 250 GeV beam & cooling for SR on Beam pipe (z=30-60m, 5kW) need study Beam Losses QD0 QEXF1 500, Nom., dy=0, dy=200nm 0 0 500 GeV, High Lum, dy=0 250W 50W 500 GeV, High Lum, dy=0 350W 400W 1 TeV, Nom, dy=0, dy=100nm 0 0

Iwashita Zero mrad Crossing Angle Study RF Kicker Design and Extraction Line Analysis Keller 500 GeV Kicker Coll@86m Nom, dy=0 0 80 kw Nom, 5 kw 405 kw dy=200nm High dy=0 3 kw 735 kw High Lum, 450 kw 2.3 MW dy=120nm 17 / 20 Utility of Kicker to clean up dark current bunches MPS Issues

Effect of L*, Crossing angle & aperture size on backgrounds, electron ID Buesser Examples of Forward Detector Studies and Physics / Background Implications Mask Opening angle W-Diamond BeamCal 18 / 20 Lumi-Cal Mech. Design to insure Alignment accuracy (Lohmann) Radiative Return Measurement of E beam knowledge of detector L/R to <1E-4 (Moenig)

Tool Development: Background Studies MARS implementation for BDS: Activation, Shielding, Muons (Kostin) GEANT4 Based Beamline Simulation BDSIM with SR, muon, neutron production processes (Blair) Forward LD Geometry in GEANT4 (Buesser) 19 / 20

Concluding Remarks ILC-WG4 / WWS-MDI have been working at a furious pace since ITRP decision to understand enough detail of complete design to convert strawman to CDR baseline: Much communication ~2 months between design iterations at intl workshops June UK meeting, July Korea meeting, Snowmass, November Vienna ECFA Result is a design which, to first order, satisfies the concern of all players that we investigate layout parameter space fully Much work required to evaluate, understand and improve physics capability, performance flexibility and engineering requirements of each IR with each detector My apologies for concentrating on progress of IR layout without explicitly showing results of studies presented Opinions of the larger community, based on these studies, will be required before any baseline decision can be made 20 / 20

Interface to CF / Engineering Beginning Overall IR1 IR2 IR2 21 / 20