III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

Similar documents
Plans for CESR (or Life Without CLEO)

e + e Factories M. Sullivan Presented at the Particle Accelerator Conference June 25-29, 2007 in Albuquerque, New Mexico e+e- Factories

CesrTA Status Report Mark Palmer for the CesrTA Collaboration March 4, 2009 ESR

The TESLA Dogbone Damping Ring

Lattice Design and Performance for PEP-X Light Source

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC

Accelerator Physics. Accelerator Development

Critical R&D Issues for ILC Damping Rings and New Test Facilities

ILC Damping Ring Alternative Lattice Design (Modified FODO)

CESR-c Status and Accelerator Physics

ILC Damping Ring Alternative Lattice Design **

Operational Experience with HERA

Choosing the Baseline Lattice for the Engineering Design Phase

Ultra-Low Emittance Storage Ring. David L. Rubin December 22, 2011

Optics considerations for

Electron Cloud Studies at the Cornell Electron Storage Ring. Matt Lawson

COMBINER RING LATTICE

CesrTA Program Overview

On-axis injection into small dynamic aperture

Turn-by-Turn Beam Position Measurements at ANKA with LIBERA ELECTRON

Modeling CESR-c. D. Rubin. July 22, 2005 Modeling 1

Emittance Dilution In Electron/Positron Damping Rings

Accelerator. Physics of PEP-I1. Lecture #7. March 13,1998. Dr. John Seeman

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

LIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th, 2007

Emittance Growth and Tune Spectra at PETRA III

ThomX Machine Advisory Committee. (LAL Orsay, March ) Ring Beam Dynamics

Transverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21

Conceptual design of an accumulator ring for the Diamond II upgrade

FACET-II Design, Parameters and Capabilities

Wigglers for Damping Rings

WG2 on ERL light sources CHESS & LEPP

FACET-II Design Update

2.6 Electron transport lines

Measurements and simulations of electron-cloudinduced tune shifts and emittance growth at CESRTA

Compressor Lattice Design for SPL Beam

Accelerator Design and Construction Progress of TPS Project

Beam Physics at SLAC. Yunhai Cai Beam Physics Department Head. July 8, 2008 SLAC Annual Program Review Page 1

Commissioning of PETRA III. Klaus Balewski on behalf of the PETRA III Team IPAC 2010, 25 May, 2010

CESRTA Preliminary Recommendations for the ILC Damping Rings

Low Energy RHIC electron Cooling (LEReC)

6 Bunch Compressor and Transfer to Main Linac

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

SuperB: Ring Issues. U. Wienands SLAC PEP-II. U. Wienands, SLAC-PEP-II SuperB Workshop Frascati, 16-Mar-06

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

Exploration of a Tevatron-Sized Ultimate Light Source

1.5-GeV FFAG Accelerator as Injector to the BNL-AGS

Update on Optics Modeling for the ATF Damping Ring at KEK Studies for low vertical emittance

CESR-c Wigglers. A. Temnykh for CESR operating group LEPP, Cornell University, Ithaca, NY 14850, USA

Canadian Light Source: Overview

ERL upgrade of an existing X-ray facility: CHESS at CESR

Diagnostics at the MAX IV 3 GeV storage ring during commissioning. PPT-mall 2. Åke Andersson On behalf of the MAX IV team

Accelerator Physics. Tip World Scientific NEW JERSEY LONDON SINGAPORE BEIJING SHANGHAI HONG KONG TAIPEI BANGALORE. Second Edition. S. Y.

Introduction to particle accelerators

The FAIR Accelerator Facility

On the future plan of KEK for ILC(International Linear Collider) Junji Urakawa(KEK) Contents

Overview of Acceleration

NEXT GENERATION B-FACTORIES

Beam beam simulation. S.Isaacman, A.Long,E.Pueschel, D.Rubin. October 1,

BEPC AND THE FUTURE PROGRAM AT IHEP

THE CONVERSION AND OPERATION OF THE CORNELL ELECTRON STORAGE RING AS A TEST ACCELERATOR (CESRTA) FOR DAMPING RINGS RESEARCH AND DEVELOPMENT*

Impedance & Instabilities

Overview of Energy Recovery Linacs

Low energy electron storage ring with tunable compaction factor

Preliminary design study of JUICE. Joint Universities International Circular Electronsynchrotron

The Luminosity Upgrade at RHIC. G. Robert-Demolaize, Brookhaven National Laboratory

S. Guiducci. Table 1 PADME beam from Linac. Energy (MeV) 550. Number of positrons per pulse Pulse length (ns)

Linear Collider Collaboration Tech Notes. A New Structure for the NLC Positron Predamping Ring Lattice

Jan. 5, 2006 Development of a Helical Undulator for ILC Positron Source

Lattices for Light Sources

FIRST OPERATION OF THE SWISS LIGHT SOURCE

Diagnostics Needs for Energy Recovery Linacs

Short Introduction to CLIC and CTF3, Technologies for Future Linear Colliders

e-cloud DAFNE T. Demma INFN-LNF

Collider Rings and IR Design for MEIC

3. Synchrotrons. Synchrotron Basics

Introduction to Collider Physics

STATUS REPORT ON STORAGE RING REALIGNMENT AT SLRI

Compressor Ring. Contents Where do we go? Beam physics limitations Possible Compressor ring choices Conclusions. Valeri Lebedev.

The MAX IV Thermionic preinjector

Space Charge Effects in the TESLA Damping Ring

ILC Beam Dynamics Studies Using PLACET

Tools of Particle Physics I Accelerators

STATUS OF BEPC AND PLAN OF BEPCII

LOW EMITTANCE MODEL FOR THE ANKA SYNCHROTRON RADIATION SOURCE

Linear Collider Collaboration Tech Notes

Letter of Intent for KEK Super B Factory

Boster Synchrotron COMMISSIONING RESULTS LINAC. Storage Ring. Proceedings of IPAC2011, San Sebastián, Spain

5 Damping Ring. 5.1 Introduction II-137

ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF

Longitudinal Top-up Injection for Small Aperture Storage Rings

Status of linear collider designs:

Sunday morning: Beam Dynamics Issues. Session highlights and outstanding questions. M. Pivi and D. Rubin ECLOUD10 October 8-12 Cornell University

OTHER MEANS TO INCREASE THE SPS 25 ns PERFORMANCE TRANSVERSE PLANE

Abstract. 1. Introduction

STUDIES AT CESRTA OF ELECTRON-CLOUD-INDUCED BEAM DYNAMICS FOR FUTURE DAMPING RINGS

Electron Cloud in Wigglers

HIRFL STATUS AND HIRFL-CSR PROJECT IN LANZHOU

Pretzel scheme of CEPC

Transcription:

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

Introduction Outline CESR Overview CESR Layout Injector Wigglers Modifications for CesrTA Optics for low-emittance operation July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 2

e+/e- colliding beams 1.5-5.5 GeV Circumference 768 m 45 bunches/beam in trains, electrostatic separation Currents in CESR to 2x350 ma @ 5.3 GeV >1x150 ma @1.9 GeV 120 kev gridded gun 150/300 MeV linac Full energy synchrotron (60 Hz) Flexible timing, ~20 bunches/cycle Filling rates to 100/300 ma/minute CESR Layout / Injector July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 3

RF Numerology RF frequencies critical to CesrTA bunch patterns System CESR / Synchrotron / Linac / Gun prebuncher All RF systems phase locked from common source Highest common frequency 71.4 MHz (T=14 ns) Highest common freq. Injector Prebuncher Linac Synchrotron CESR Frequency 71.4 MHz 214 MHz 2856 MHz 714 MHz 499.8 MHz Mult x h.c.f. Multiple CESR buckets on 14 ns pattern can be filled on a single injection cycle. Injector RF chain can be phase shifted between injection cycles to fill any CESR buckets. July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 4 1 3 40 10 7 Bucket Spacing 14 ns 2 ns Harmonic # in CESR 183 1281

Wiggler Magnets The OCS6 ILC Damping Ring lattice employs 80 wiggler magnets to achieve its radiation-determined parameters to meet ILC requirements. Effective length: 2.5 m Peak operating field: 1.67 T (max 2.1 T) Magnetic period: 40 cm The 12 wiggler magnets in CESR were designed for CESR-c conditions e+/e- colliding beams 1.5-2.5 GeV beam energy. The basic magnetic properties of the CESR-c wigglers closely match the ILC DR design. July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 5

Wiggler Magnets Several considerations for CESR-c operation determined the principal wiggler properties: Large vertical aperture 5 cm in warm bore w/ 2.1 T field super-ferric technology ± 2 cm horizontal pretzel orbits wide good-field region B Y = +0.0, -0.3% over aperture Flexibility in operating field Even # poles to reduce center-end pole difference effects Ring layout constraints ~1.7 m flange-flange July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 6

Wiggler Parameters Parameter Technology Peak Field Wiggler Length Number of wigglers Field period Transv. width of poles Number of poles Pole gap Operating Current (2.1 T) Wire operating margin Value Super-ferric 1.5-2.1 T 1.3 m 12 40 cm 23 cm 6-20 cm, 2-10 cm, 2-5 cm 7.6 cm 185 A 50% July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 7

CESR-c Wiggler Layout 12 damping wigglers are placed in 6 clusters according to available space in CESR. L3 Cryogen distribution Optics manipulation L0 July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 8

Pic cold mass July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 9

Pic 3 wigglers in tunnel July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 10

Wiggler Field Quality Validation Rigorous training and measurement program Most trained with 2-3 quenches to 2.3 T no operational problems with magnets. Hall probe and long flip coil, folded flip coil measurements July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 11

Wiggler Field Validation w/beam Beam based measurements confirmed field quality: Bunch length ( σ E /E 0 = 8.62 vs. 8.47x10-4 ) Betatron tunes vs beam position, wiggler field 5 Vertical and horizontal tune versus vertila beam position at three 8-pole wigglers cluster, VB 58. (ST, Aug 21 2003) Vertical and horizontal tune versus horizontal beam position at three 8-pole wigglers cluster, HB 70. (ST, Aug 21 2003) 4 4 3 dfh[khz] - measured dfv[khz] - measured dfh[khz] / model dfv[khz] / model 3 2 dfh[khz] - measured dfv[khz] - measured dfh[khz] / model dfv[khz] / model 2 1 1 0 0-1 -1-1 10 3-500 0 500 1 10 3 VB58 bump, 1000 cu ~ 10mm vert orbit shift -2-3 10 3-2 10 3-1 10 3 0 1 10 3 2 10 3 3 10 3 HB70 bump, 1000cu ~ 10mm horizontal orbit displacment July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 12

Modifications Outline CESR Overview Modifications for CesrTA L0 (CLEO detector) L3 (180 from CLEO) Arc magnets Feedback, diagnostics, survey & alignment Optics for low-emittance operation July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 13

Modification Regions July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 14

CesrTA Low Emittance Configuration Conversion for low-emittance operation: Minimize number of wiggler regions to facilitate dispersion control July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 15

L0 Modifications L0 Layout w/ wigglers, quads, steering (FY08) Remove CLEO VD, DR, RICH, ENDCAP Install elements on rails Cryogenics services from existing SC quad facilities July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 16

L3 changes L3 Modifications Remove 2 vertical separators, replace with instrumented beam pipes (FY08) Install upgraded s.r. optics (streak camera) (FY08) Install EC instrumentation in quads and drifts (FY09-10) July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 17

Arc Modifications 6 wigglers to be removed from arcs instrument replacement chambers RFA s in drifts, bends (FY08, 09) July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 18

Survey and Alignment Quad, sextupole alignment system upgrade LiCAS-II system not funded by STFC Modify alignment fixtures for better resolution (FY08) Install new target system (FY08,09) Purchase and implement laser tracker system (FY09) x2-3 speedup in survey & alignment process improved survey accuracy July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 19

Electron Cloud diagnostics Instrumentation Modifications Retarding Field Analyszers in drift and quad chambers Low profile RFA s in wigglers and bend chambers Low emittance diagnostics Upgrade BPM processing electronics higher resolution, speed High resolution X-ray beam profile monitor single pass bunch-by-bunch, extendable to 2-D Other Upgrade Synchroscan streak camera unit for 4 ns spacing, optics for 2-D recording Extend vacuum instrumentation Partial pressure analyzers, controlled leaks for selected gases, temperature monitoring, gate valves for quick changes, etc. July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 20

Feedback Systems Present CESR bunch-by-bunch feedback systems in place for bunches in 14 ns buckets. Transverse systems: Standard bpm position pickup Digital processing bunch-by-bunch, variable turns delay Strip line kickers Damping rates ~ 2000 /s Longitudinal system: Standard bpm pickup Digital processing bunch-by-bunch Low Q DAFNE style cavity to drive beam Damping rates ~ 50 /s July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 21

CesrTA Transverse Feedback CesrTA Feedback (4 ns bunch spacing) Transverse: Wideband system with direct path across tunnel diameter July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 22

CesrTA Longitudinal Feedback CesrTA Longitudinal Feedback Upgrade of processing electronics and a slightly modified cavity design and amplifier will permit feedback near present damping rates. Removal of vertical electrostatic separators in L3 is predicted to raise longitudinal instability threshold x4-5 July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 23

Optics Outline CESR Overview Modifications for CesrTA Optics for low-emittance operation CESR Optics process CesrTA in-progress optics July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 24

Optics Design Process Every quadrupole & sextupole is independently controllable No standard cell Optics realization: Several optimizer engines available Tracking with non-linearities to find partial derivatives 27 years experience using technique with CESR optics Input Lattice Linear Nonlinear Output Lattice July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 25

Wiggler modeling Wigglers are modeled using OPERA-3D, producing a 3-D field map. The field map is fit to satisfy Maxwell s equations The fit is then integrated symplectically using the Hamiltonian to a user defined order usually third order The wiggler is not varied in the optimization process, however optimizations have been done at discrete wiggler fields - 2.1T, 1.9T, 1.7T July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 26

Optics Correction Fast phase measurements system permits full (including coupled) optics correction in a few minutes. Dispersion, chromatic corrections also possible. July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 27

Preliminary optics results 2 GeV Optics ε x = 2.3 nm Q x,y = 14.57,9.62 τ damp x,y = 56.4 ms τ Touschek 12 m 50 40 30 20 beta_y beta_x CesrTA 2.0 GeV Optics (all units meters) eta_x 7 6 5 4 10 3 0 2-10 1-20 0 100 200 300 400 500 600 700 z (meters) 0 July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 28

Dynamic aperture calculations use ACTUAL physical apertures to identify lost particles. Dashed lines show losses in 20 turns (~physical aperture). Solid lines show losses in 1000 turns ( dynamic aperture ) 0, 0.5%, 1% dp/p 0 Yellow curve = 3 σ injected beam (ε x =1000 nm, ε y = ½ ε x ) Sextupole, wiggler nonlinearities included 2 GeV Dynamic Aperture July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 29

Optics Summary Development of optics at 2, 2.5, 5 GeV in progress Parameter 2.0 GeV 2.5 GeV 5.0 GeV B Wig 1.9 T 2.1 T 1.9 T ε x 2.3 nm 3.4 nm 30.7 nm Q x,y 14.57, 9.62 14.57, 9.62 14.57, 9.62 τ damp(x,y) 56.4 ms 35.7 ms 19.1 ms τ i.b.s. ~12 m ~22 m Q z @ MV RF 0.054@4.6 0.081@12.5 0.05@9 σ z 9 mm 9 mm 9 mm July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 30

Summary Most topics discussed will be described in more detail in subsequent talks. The LEPP staff have extensive experience making effective use of the optics flexibility of the CESR facility. This flexibility and the experienced LEPP staff provide an effective and economical conversion path to CesrTA. July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 31