SDH18-59, SDH18-62, SDH18-63

Similar documents
Orsu Metals doubles the strike length in Zone 23 to over 600 meters and identifies a high-grade core at the Sergeevskoe Gold Project, Russia

Orsu Metals hits 2.62 g/t Au over 22.2 metres and proves higher gold grades at Zone 23, Sergeevskoe Gold Project, Russia

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

Orsu Metals intercepted a voluminous 200-m-wide gold-mineralized stockwork in the north of the Klyuchi West zone, Sergeevskoe Gold Project, Russia

November 9, Highlights:

Orsu Metals prioritizes Zone 23, Adit 5 and Klyuchi West prospects for resource delineation at the Sergeevskoe Gold Project, Russia

V Sample from C.O.D vein 15 metres southwest of V

BK Copper Project Strong Copper Results Confirm and Extend BKM

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

(TSXV: GPLY, OTCQB: GLYXF

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

Asiamet Drilling Further Extends BKM Mineralisation

True Width (m) Carneritos to

ET and and and

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

Detour Gold Reports Drilling Results from Lower Detour

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

NEWS RELEASE August 10, 2017

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

COMPASS GOLD: FIELDWORK CONTINUES ON OUASSADA & SANKARANI PERMITS TO AID BEDROCK DRILLING TARGETING

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Highlights from the four holes announced in this news release include:

August 20, 2018 SBB NR SBB TSX

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

News Release. Canarc Continues to Intersect High-Grade Gold at Fondaway Canyon, Nevada, Including 3.24 Grams per Tonne Gold over 12.

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

NEWS RELEASE August 8, 2018

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Suite Howe Street Vancouver, British Columbia V6C 2T6 Phone: (604) Fax: (604) NEWS RELEASE

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

NEWS RELEASE. March 22, 2017

NEWS RELEASE July 26, 2018

Copper Lake Samples g/t Gold and g/t Gold from the Queen Alexandra Gold Mine Property

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Gungnir Resources Inc.

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

POSITIVE RESULTS FROM FIRST PHASE OF CORE DRILLING AT JEFFERSON PROJECT, SOUTH CAROLINA FOR NEAR-SURFACE GOLD MINERALIZATION

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

Novo Resources Corp. Suite West Georgia Street Vancouver, BC V6E 3C9

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

Aurion Provides Update on 2018 Drill Program and Reports High Grade Gold Results...

AUC.V PRESS RELEASE NO. 01/06

Great Atlantic Rock Samples Return up to 5.8 oz. / ton Gold Golden Promise Property in Central Newfoundland

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

Transcription:

FOR IMMEDIATE RELEASE TSX-V: OSU October 1, 2018 Orsu Metals hits 4.12 g/t Au over 10.25 meters near surface in drill hole SDH18-63 and grows gold mineralization over a 740 m strike length at Zone 23, Sergeevskoe Gold Project, Russia Orsu Metals Corporation (TSX-V: OSU) ( Orsu or the Company ) is delighted to announce excellent drilling results from additional holes at Zone 23, as part of the extended 12,500 meters ( m ) drilling program at its Sergeevskoe Gold Project in Russia. The program is designed to deliver an estimation of a maiden resource in Q4 2018. Highlights: The Company received the assay results for drill holes SDH18-59, SDH18-62, SDH18-63 and SDH18-64 in the western part of Zone 23 with gold mineralization in all of them Drill hole SDH18-63 returned the best intercepts: o 1. 82 g/t Au over 5.05 m from 9.75 m, o 1.19 g/t Au over 14.3 m from 34.65 m, o 2.08 g/t Au over 2.1 m from 52.5 m, o 4.12 g/t Au over 10.25 m from 57.5 m (including 7.25 g/t Au over 6.2 m from 60.10 m), o 1.96 g/t Au over 3.85 m from 81.2 m, o 1.63 g/t Au over 4.95 m from 88.75 m, o 2.37 g/t Au over 9.05 m from 104.5 m, and o 9.92 g/t Au over 0.7 m from 139.05 m The drill-proven strike length of gold mineralization at Zone 23 now reached 740 m to a variable depth of 150-250 m, averaging 1.86 g/t Au over a combined drill width of 24.4 m in the Main and Southern stockworks Dr. Alexander Yakubchuk, Director of Exploration of Orsu commented: Orsu successfully confirmed the gold mineralization over a strike length of 740 m at Zone 23 in 10 drill sections (including holes drilled in 2017). Drill hole SDH18-63, in particular, returned the best intercepts in Zone 23, in the Main and Southern stockworks, when combined including 3 m wide low grade mineralization, running 2.15 g/t Au over 33 m, just 50 m below surface. The intercepts were received in pursuit of the previously reported +2 g/t Au mineralized shoots. In addition to the Main and Southern stockworks, we identified a New stockwork at the apparent southern periphery of Zone 23. This stockwork remains open to the west, and all stockworks remain unconstrained at depth. 1

Dr Sergey V Kurzin, Executive Chairman of Orsu, commented: Excellent holes and excellent news. We reported earlier (see Orsu press-release dated August 22, 2018) drill-proven strike length of over 600 m in Zone 23 and now we have been able to grow it to 740 meters. As a reminder, Zone 23 is a major building block of the Company s maiden 43-101 resource expected in Q4 2018. The thickness and the grades behave consistently in Zone 23 and are at the higher end of our expectations. We intend to finish this year s exploration program within 3-4 weeks and will commit fully to producing a maiden resource immediately followed by the Preliminary Economic Assessment. I am quite pleased with the pace of our work on Sergeevskoe. As previously reported, the license of the Sergeevskoe Gold Project occurs immediately east from the Alexandrovskoe open pit and gold plant owned by Zapadnaya Gold Mining Ltd and to the west from the Klyuchevskoe gold license owned by Sun Gold Mining (Figure 1) 1. The Klyuchevskoe (Klyuchi) gold deposit represents a +6 Moz gold endowment (see Orsu press-release dated September 21, 2016). Orsu owns a 90% interest in the Sergeevskoe Gold Project (see Orsu press-release December 1, 2017). Figure 1. An outline of the 7.6 sq km Sergeevskoe license area with location of principal gold prospects and two adjacent open pits. 1 Business Standard, a leading Indian daily newspaper, reported on 21 September 2018 that Chinese company China National Gold will invest about $420 million in the development of the Klyuchevskoye gold deposit in Russia, while another $65 million will be invested by India's SUN Gold. The annual production volume is expected at about 6.5 metric tons of gold per year, the Russian Industry and Trade Ministry reported. 2

Orsu previously reported most promissing gold mineralization at Zone 23 in the Main and Southern stockworks (see Orsu press-release August 22, 2018) to the south of the Shirotnyi fault. The quartz-tourmaline-sulfide stockworks are hosted primarily in the pre-mineral Permian granite intrusion, whereas mineralization appears to be Jurassic in age, based on 159 million year old Re-Os dating of accessory molybdenum extracted from mineralization. Both Main and Southern stockworks are now continuously drill-proven from sections 9155E to 9620E (Figure 2). The Main and Southern stockworks change in width along the strike and downdip. The combined average drill width of the two stockworks over a 465 m strike length and 150 to 250 m downdip is 24.4 m grading 1.86 g/t Au. Orsu is confident in interpreting location of the three stockworks relative to the marker of granodiorite porphyry dyke. Figure 2. Surface expression of multiple west-east-trending gold-mineralized intervals at Zone 23, Sergeevskoe Gold Project, constrained by historical and Orsu data. Although appearing relatively narrow at surface, they become much wider at depth, forming the Main, Southern and New stockworks. In addition, drill holes SDH18-63, 64 and 59 intercepted a New stockwork (Table 1; Figures 2 and 3). It appears that its equivalents were also previously intercepted and reported in drill holes SDH18-21, 22, 23, 43, 45a, 29, 25, 26, 27, 28 and SDH17-7. The new intercepts allow tracing the New stockwork for 740 m from the east to the west, remaining open westward and downdip. The stockwork was identified to the south of the hybrid dyke, previously interpreted as a southern limit of the mineralized corridor at Zone 23. 3

Figure 3. Section 9155E (looking west) showing mineralization in holes SDH18-63 and 64. The +2 g/t Au intercepts are now received in four consecutive sections in the Main stockwork and six consecutive sections in the Southern stockwork (Figure 4). They were received pursuing the upward continuation of the higher grade shoots. 4

Figure 4. Interpretation of gold mineralization in vertical projections of the Main and Southern stockworks (looking north) with eastward-plunging +2 g/t Au mineralized shoots. The above interpretations are based on selection of the previously and newlyreported mineralized intervals, based on a 0.5 g/t Au cut-off for compositing, with maximum 2 m length of 0.3-0.5 g/t Au mineralization included into a mineralized interval. Composited intervals in drill holes are presented uncapped (Table 1). The assays for some infill drill holes are still pending. No significant intercepts were received for hole SDH18-62. Table 1. Mineralized intercepts in drill holes SDH18-63, 64 and 59 at Zone 23 (above 0.5 g/t Au cut-off). Holes SDH18-63, 64 and 59 were drilled to the south at 50 to 60 degrees. Number From To Interval True Width Gold (g/t) Stockwork Drillhole SDH18-63 (150.1 m) Section 9155E 9.75 14.8 5.05 4.0 1.82 34.65 48.95 14.3 11.0 1.19 Main 52.5 54.6 2.1 1.7 2.08 57.5 67.75 10.25 8.5 4.12 Southern 60.1 66.3 6.2 4.9 7.25 81.2 85.05 3.85 3.2 1.96 New 5

Number From To Interval True Width Gold (g/t) Stockwork 88.75 93.7 4.95 3.9 1.63 New 104.5 113.55 9.05 7.2 2.37 New 111.35 113.55 2.2 1.6 6.15 139.05 139.75 0.7 0.5 9.92 Drillhole SDH18-64 (197.2 m) Section 9155E 86.75 90.45 3.7 3.1 0.69 98.65 109.1 10.45 8.1 0.77 Main 145.6 148.65 3.05 2.4 1.56 Southern 156.8 159.8 3.0 2.4 2.02 Southern 183.65 187.35 3.7 3.0 1.64 New Drillhole SDH18-59 (270.1 m) Section 9010E 27.75 29.7 1.95 1.3 2.2 102.15 105.9 3.75 2.9 1.55 New 151.1 157.5 6.4 4.9 0.79 New 187.35 195.65 8.3 6.9 1.53 New 188.5 190.75 2.25 1.6 3.16 214.35 216.75 2.4 1.8 1.0 New 243.75 252.5 8.75 6.7 0.82 New Quality Assurance - Quality Control ( QA/QC ) Thorough QA/QC protocols are followed on the project including insertion of duplicate, blank and standard samples in all trenches. Duplicate samples were inserted after every 20 samples. All standard samples were inserted once per 20 samples. Blanks were also inserted once per 20 samples and consisted of the previously assayed barren granitoid rocks. Drill core samples were submitted directly to the SGS Vostok laboratories in Chita, Russia, which are independent from Orsu, for sample preparation and analysis. Analysis for Au is performed using fire assay method with atomic absorption ( AA ) finish and with a gravimetric finish for samples exceeding 10 g/t 6

Au. Results published are from the gravimetric finish if above 10 g/t Au and from the AA finish if lower than 10 g/t Au. Qualified Person This release and the technical data reported have been reviewed and approved by Alexander Yakubchuk, Director of Exploration of the Company, also a Qualified Person as defined in NI 43-101. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Cautionary Statement: This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forwardlooking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forwardlooking statements. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein. ENDS ------------------------------------------------------------------------------------------------------------ For further information, please contact: Alexander Yakubchuk, Director of Exploration, Orsu Metals Corporation Doris Meyer, Corporate Secretary, Orsu Metals Corporation Tel: +1-604-536-2711 ext 6 7