Launching Small Satellites on the H-IIA Rocket

Similar documents
Space mission environments: sources for loading and structural requirements

LAUNCH SYSTEMS. Col. John Keesee. 5 September 2003

CHAPTER 3 PERFORMANCE

Proton Launch System Mission Planner s Guide APPENDIX F. Proton Launch System Options and Enhancements

CHAPTER 3 PERFORMANCE

Launch Environment. Phase C. Date : 06/03/2008 Issue : 1 Rev : 6 Page : 1 of 23. Prepared by: Guillaume Roethlisberger. Checked by: Approved by:

CHAPTER 3 PERFORMANCE

Toshinori Kuwahara*, Yoshihiro Tomioka, Yuta Tanabe, Masato Fukuyama, Yuji Sakamoto, Kazuya Yoshida, Tohoku University, Japan

The Launch of Gorizont 45 on the First Proton K /Breeze M

Proton Launch System Mission Planner s Guide SECTION 2. LV Performance

SPACE LAUNCH SYSTEM START 1 USER S HANDBOOK VOLUME I: SPACECRAFT & LAUNCH VEHICLE INTERFACES

Orbit Design Marcelo Suárez. 6th Science Meeting; Seattle, WA, USA July 2010

EUROPE ARIANE 1 ARIANE 1

The time period while the spacecraft is in transit to lunar orbit shall be used to verify the functionality of the spacecraft.

Successful Demonstration for Upper Stage Controlled Re-entry Experiment by H-IIB Launch Vehicle

AN OVERVIEW OF THE E.C.S.S. HANDBOOK FOR SPACECRAFT LOADS ANALYSIS

INTER-AGENCY SPACE DEBRIS COORDINATION COMMITTEE (IADC) SPACE DEBRIS ISSUES IN THE GEOSTATIONARY ORBIT AND THE GEOSTATIONARY TRANSFER ORBITS

Flight Demonstration of Electrostatic Thruster Under Micro-Gravity

Individual Adapter Solutions for Multi-Spacecraft Launches on Rockot

Launch strategy for Indian lunar mission and precision injection to the Moon using genetic algorithm

Predicting Long-Term Telemetry Behavior for Lunar Orbiting, Deep Space, Planetary and Earth Orbiting Satellites

BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN. Jose Sergio Almeida INPE (Brazil)

Your Partner in Environment Monitoring

The Interstellar Boundary Explorer (IBEX) Mission Design: A Pegasus Class Mission to a High Energy Orbit

HYPER Industrial Feasibility Study Final Presentation Orbit Selection

COUPLED OPTIMIZATION OF LAUNCHER AND ALL-ELECTRIC SATELLITE TRAJECTORIES

PAYLOAD ORBITAL DELIVERY SYSTEM (PODS) The Payload Orbital Delivery System (PODS) enables frequent, cost-effective access to near GEO for SmallSats

PRACTICE NO. PD-ED-1259 PREFERRED May 1996 RELIABILITY PAGE 1 OF 6 PRACTICES ACOUSTIC NOISE REQUIREMENT

Opportunities for Small Satellites and Space Research Using the K-1 Vehicle

MISSION ENGINEERING SPACECRAFT DESIGN

Spacecraft Structures

Overview of the Current Baseline of the Solar-C Spacecraft System

EUROSTAR 3000 INCLINED ORBIT MISSION : LIFETIME OPTIMISATION IN CASE OF INJECTION WITH A LOW INCLINATION

MAE 180A: Spacecraft Guidance I, Summer 2009 Homework 4 Due Thursday, July 30.

CHAPTER 1 INTRODUCTION

LAUNCHES AND LAUNCH VEHICLES. Dr. Marwah Ahmed

Spacecraft Environment! Launch Phases and Loading Issues-1

ASTRIUM. Minimum-time problem resolution under constraints for low-thrust stage trajectory computation. Nathalie DELATTRE ASTRIUM Space Transportation

Development of Microwave Engine

SECTION 9 ORBIT DATA - LAUNCH TRAJECTORY

ROCSAT-3 Constellation Mission

Experimental Analysis of Low Earth Orbit Satellites due to Atmospheric Perturbations

Rocketplane Kistler, Inc.

Electric Propulsion System using a Helicon Plasma Thruster (2015-b/IEPC-415)

Satellite Orbital Maneuvers and Transfers. Dr Ugur GUVEN

System engineering approach toward the problem of required level of in-orbit autonomousoperation of a LEO microsatellite mission

Appendix A Satellite Mechanical Loads

Design of Attitude Determination and Control Subsystem

SELENE TRANSLUNAR TRAJECTORY AND LUNAR ORBIT INJECTION

Cluster Launches of Small Satellites on Dnepr Launch Vehicle. Vladimir A. Andreev, Vladimir S. Mikhailov, Vladislav A. Solovey, Vladimir. V.

Deep Space Test Bed. POC Deep Space Test Bed (DSTB)

Attitude Control Simulator for the Small Satellite and Its Validation by On-orbit Data of QSAT-EOS

Simplifying the Structural Verification Process to Accommodate Responsive Launch

OTSUKIMI Moon-sighting Satellite Kyushu Institute of Technology. 3 rd Mission Idea Contest UNISEC Global

CAS-ESA Call for small mission proposals - Technical annex

End of Life Re-orbiting The Meteosat-5 Experience

USA Space Debris Environment, Operations, and Modeling Updates

AEROTHERMODYNAMIC ANALYSIS OF INNOVATIVE HYPERSONIC DEPLOYABLE REENTRY CAPSULES. Raffaele Savino University of Naples Federico II

SECOND VEGA LAUNCH FROM THE GUIANA SPACE CENTER

Section 8: Getting Things into Space: Rockets and Launch Requirements

Final Examination 2015

Chapter 8. Precise Lunar Gravity Assist Trajectories. to Geo-stationary Orbits

Interplanetary Mission Opportunities

How Small Can a Launch Vehicle Be?

IAC-13,C4,P,44.p1,x17254 THE DYNAMIC OPERATON OF A HIGH Q EMDRIVE MICROWAVE THRUSTER. Roger Shawyer C.Eng. MIET. FRAeS. SPR Ltd UK

PROBA 1. F. Teston ESA/ESTEC D/TEC-EL

Design of Orbits and Spacecraft Systems Engineering. Scott Schoneman 13 November 03

The ACES Mission. Fundamental Physics Tests with Cold Atom Clocks in Space. L. Cacciapuoti European Space Agency

CHAPTER 25 SATELLITE COMMUNICATIONS # DEFINITIONS TERMS. Satellite. 1) A celestial body that orbits around a planet.

THE TRAJECTORY CONTROL STRATEGIES FOR AKATSUKI RE-INSERTION INTO THE VENUS ORBIT

Mission Design Options for Solar-C Plan-A

SOLVING THE INTERNATIONAL SPACE STATION (ISS) MOTION CONTROL LONG-TERM PLANNING PROBLEM

A BATCH LAUNCH FOR THE O3b CONSTELLATION

DE-ORBITATION STUDIES AND OPERATIONS FOR SPIRALE GTO SATELLITES

Sun Shield. Solar Paddle

No End of Push-broom Operations

Long-Term Evolution of High Earth Orbits: Effects of Direct Solar Radiation Pressure and Comparison of Trajectory Propagators

The Torque Rudder: A Novel Semi-Passive Actuator for Small Spacecraft Attitude Control

THIRD VEGA LAUNCH FROM THE GUIANA SPACE CENTER

Small Satellite Deployments From STS116 - Development Of New Manned Spaceflight Deployment Systems

MULTI PURPOSE MISSION ANALYSIS DEVELOPMENT FRAMEWORK MUPUMA

Orbit and Transmit Characteristics of the CloudSat Cloud Profiling Radar (CPR) JPL Document No. D-29695

Introduction to Satellite Orbits

1. (a) Describe the difference between over-expanded, under-expanded and ideallyexpanded

ASTRIUM. Interplanetary Path Early Design Tools at ASTRIUM Space Transportation. Nathalie DELATTRE ASTRIUM Space Transportation.

Vibration Testing of Small Satellites

Passive Orbital Debris Removal Using Special Density Materials

V. The Moon s Motion and Phases

Orbits in Geographic Context. Instantaneous Time Solutions Orbit Fixing in Geographic Frame Classical Orbital Elements

NAVIGATION & MISSION DESIGN BRANCH

The E-SAIL programme. 10th IAA Symposium on Small Satellites for Earth Observation April 20-24, 2015 Berlin LuxSpace s.à.r.

ORBITAL DECAY PREDICTION AND SPACE DEBRIS IMPACT ON NANO-SATELLITES

Biological Experiments in Space

Pico-Satellite Orbit Control by Vacuum Arc Thrusters as Enabling Technology for Formations of Small Satellites

Creating Large Space Platforms From Small Satellites

PLANETARY MISSIONS FROM GTO USING EARTH AND MOON GRAVITY ASSISTS*

PRATHAM IIT BOMBAY STUDENT SATELLITE

ESMO Mission Analysis

Exploring the Mysteries of the Cosmos on the MOST Microsatellite Mission

Modular Thermal Design Concepts: Thermal Design of a Spacecraft on a Module Level for LEO Missions

Transcription:

Launching Small Satellites on the H-IIA Rocket Shoichiro Asada Mitsubishi Heavy Industries, Ltd. 1- Oye-cho Minato-ku Nagoya Aichi Prefecture 455-8515 Japan 81-52-611-84 shoichiro_asada@mx.nasw.mhi.co.jp Naohiko Abe Mitsubishi Heavy Industries, Ltd. 12 Higashi-Tanaka Komaki Aichi Prefecture 485-8561 Japan 81-568-79-1229 naohiko_abe@e-mail.ngpsw.mhi.co.jp Koichi Andoh AeroAstro Japan Co. Ltd. 3-1-5 Nishiwaseda Shinjuku, Tokyo 169-51 Japan 81-3-5285-1275 pxx53@nifty.ne.jp Dr. Rick Fleeter AeroAstro, Inc. 2145 Ashbrook Place Ashburn, VA 2147 USA 1-73-723-98 x12 rick@aeroastro.com SSC3-II-4 Abstract. Over the last 4 years, the lowest cost transportation to space for small payloads has been achieved by utilizing excess capacity on large launches. Because the mass and volume used by small payloads on large vehicles are otherwise unused, often the pricing only needs to cover manifesting, integration and qualification of the socalled piggyback payload. Unfortunately this lack of economic incentive has suppressed supply large rocket developers and operators may have little or no incentive to invest in small payload accommodations. In taking on the management of Japan's newest and largest rocket, the H-IIA, from the National Space Development Agency of Japan (NASDA), Mitsubishi Heavy Industries has decided to aggressively pursue opportunities for comanifesting nano, micro and mini-satellites, leveraging proven capabilities developed by NASDA for small satellite launches on Japan's largest launch vehicle. This new capability, to be demonstrated on the next H-IIA launch this year, has the potential to more than double the secondary space available to small payloads worldwide, and will reduce queueing time for launching small satellites. Introduction The current state of the space industry is poor. There is little demand for telecom satellites, limited usage of the International Space Station, and minimal advanced vehicle development projects underway. In this situation, small satellites have the potential to help rejuvenate the space market. In general, small satellites do not require significant budgets and they can be developed with little technical difficulty, if a customer so chooses. These factors induce many newcomers to enter the small satellite world, with a variety of new, innovative ideas for small satellite applications. Mitsubishi Heavy Industries (MHI) is aiding the small satellite community by preparing to offer piggyback launch accommodations and services to small satellite developers. MHI plans to provide launches to Sun- Asada, Shoichiro 1 17 th Annual AIAA/USU Conference on Small Satellites

Synchronous Orbits (SSO) and other Low-Earth Orbits (LEO), as well as Geosynchronous Transfer Orbit (GTO). Accommodations range from approximately 5 kg to over 3 kg. AeroAstro and AeroAstro Japan are cooperating with MHI to supply sales, marketing, and engineering support to their secondary payload program. their desired orbits on time. Four of the eleven payloads were small satellites. Table 1 shows the flight results of the H-IIA launch vehicle to date. The data demonstrates not only the reliability but also the accurate performance of the H-IIA launch vehicle. Basic Concept of Piggyback Launch on the H-IIA This paper outlines the launch services offered aboard the H-IIA for small, piggyback payloads. In particular, the accommodations for a sample 5 kg satellite are outlined in detail. H-IIA Launch Vehicle Flight Results After two successful test flights and two operational flights, the H-IIA launch vehicle lifted off on its third operational mission on March 28, 23. The H-IIA launches have brought a total of eleven payloads to Launcher TF1 (H2A22) August 29, 21 Table 1. Flight Results of the H-IIA Launch Vehicle. TF2 (H2A224) February 4, 22 F3 (H2A224) September 1, 22 The accommodations and services offered by the H-IIA launch vehicle to a small, piggyback satellite depends heavily on that of the primary payload. Nevertheless, H-IIA aims to provide the small satellite developer with the same level of service as the primary payload, without disrupting the mission of the primary payload. A variety of services can be requested, and H-IIA will make every effort to address these requests. Detailed discussions regarding specific accommodations and services are held on a case-by-case basis prior to negotiating the launch service contract. F4 (H2A22) December 14, 22 F5 (H2A224) March 28, 23 Launch date Satellite Payload Fairing Orbit Apogee Altitude (km) Perigee Altitude (km) Orbital Inclination (deg) Argument of Perigee (deg) (Courtesy of NASDA) LRE MDS-1 DASH DRTS USERS ADEOS-II FedSat WEOS µ-labsat Government Mission (Dual) 4S 4/4D-LC 4/4D-LC 5S 4/4D-LC GTO 36,191 (36,186) 251 (251) 28.5 (28.49) 179.2 (179.1) 5.1.1 GTO (MDS-1) LEO (DASH) 35,696 (35,735) 5 (5) 28.5 (28.5) 179 (179) -39. GTO (DRTS) LEO (USERS) 36,23 (36,26) 449.5 (45.) 28.5 (28.5) 179 (179) -3 Semi- Major Axis (km) -.5 Eccentricity. Inclination SSO 7,19 (7,19 ±2).1 (.1 -.1 +.3) 96.68 (98.67±.25).1 SSO N/A Asada, Shoichiro 2 17 th Annual AIAA/USU Conference on Small Satellites

Case of 5 kg Satellite In order to demonstrate the capabilities of the H-IIA for launch of small satellites using piggyback launch accommodations, an example has been selected, studied, and detailed in the sections below. This example is for a 5 kg satellite with main dimensions of 5mm x 5mm x 45mm and a top protrusion with dimensions of Ø225mm x 5mm. Services Available for Small Satellite The following services are provided by H-IIA to the small satellite: Separation of Satellite: In order to be separated, three split springs are to be installed at the separation portion of the satellite. The maximum stress limit at the edge of the split spring is 5N. Command Signal to Initialize Satellite Equipment: A command to initialize equipment onboard the satellite can be made by the separation detector. Though the provision of the metal adapter on the rocket side is included as part of the launch services, the separation detector must be provided by the satellite developer. Umbilical Umbilical (electrical) support is provided for use by the small satellite. The level of umbilical support available is dependent on the requirements of the primary payload. External Battery Charging If the small satellite developer prepares a cable from the satellite to the exterior door of the rocket, the satellite battery can be charged from outside its fairing. Launch Environment Mechanical Environment Quasi-Static Acceleration Table 2 shows the maximum (three-sigma) quasi-static acceleration in both the longitudinal and lateral directions. The maximum quasi-static acceleration a combination of static acceleration and low-frequency dynamic acceleration is experienced at main engine (of the first stage) cutoff. The satellite structure must be designed to withstand this maximum aceeleration. Compression Tension Table 2. Quasi-Static Acceleration. Sine Wave Vibration Longitudinal Acceleration -58.84 m/s 2 (-6. g) 49.4 m/s 2 (5. g) Lateral Acceleration ±49.4 m/s 2 (±5. g) ±49.4 m/s 2 (±5. g) Table 3 shows the maximum (three-sigma) sine wave vibration limit levels in both the longitudinal and lateral directions. These levels are prescribed at the satellite interface (satellite separation plane). The vibration is applied at the base of the adapter with a 4 octave/minute sweep rate in the up and down direction so that vibration levels at the spacecraft interface are equal to the above levels. Table 3. Sine Wave Vibration Levels. Direction Frequency (Hz) Acceleration Longitudinal Direction Lateral Direction Random Vibration 5-1 24.52 m/s 2 (2.5 g) 5-1 19.62 m/s 2 Table 4 shows the random vibration levels in both the longitudinal and lateral directions. Random vibration is primarily caused by acoustic noise. The satellite must be able to endure this vibration environment for 6 seconds. Table 4. Random Vibration Levels. Frequency Width (Hz) Acoustics Acceleration (G 2 /Hz) 2-2 +3 db/octave 2-2,.32 Actual 7.8 Grms Table 5 shows the acoustic environment levels (twosigma). Random vibrations are generated by the noise of the first stage main engine and Solid Rocket Booster, and the pressure vibration caused by buffeting and boundary layer noise during the phase of the transonic flight and the high dynamic pressure. The satellite must be able to endure this environment for 8 seconds. Asada, Shoichiro 3 17 th Annual AIAA/USU Conference on Small Satellites

Table 5. Acoustic Pressure Inside Fairing (No Acoustic Blanket) Center Frequency (Hz) H2A22 Acoustic Level (db) H2A212 Acoustic Level [Reference] (db) 31.5 125. 128. 63 126.5 129.5 125 132. 135. 25 136. 139. 5 134. 137. 1, 136. 139. 2, 13. 133. 4, 121. 124. 8, 116. 119. Overall 141.5 144.5 Shock Pyrotechnic shocks are imparted to the satellite at several different points during the flight: separation of the fairing, separation of the first and second stages, and separation of the satellite from the Payload Attached Fitting (PAF). The largest shock the satellite experiences is due to the cutting of the clamp band at separation from the PAF. Thermal Environment Prelaunch Thermal Environment The air inside the fairing is conditioned to varying degrees during the various stages prior to launch. The temperature inside the fairing is set by the temperature required by the primary payload, and can range from 1 to 25C. The maximum flow rate is 1 Sm 3 /min. Note, however, that in the case of a dual launch, the maximum flow rate is 5 Sm 3 /min per satellite. The relative humidity during the maintenance periods prior to launch is 4-5%. The relative humidity after the access work is complete but prior to launch is -5%. Throughout the prelaunch phase, a Class 5 cleanliness is maintained. Flight Thermal Environment The satellite is protected by the payload fairing during initial ascent, but aerodynamic heating causes the satellite to receive a time-dependent radiation heating environment from the internal surface of this fairing prior to fairing jettison. The maximum heat flux radiated by the fairing is less than 5 W/m 2. The maximum temperature inside the fairing is 11C at the internal surface of the cylinder section of the fairing. The aerodynamic heat acceleration after separation of the fairing from the launch vehicle is less than 1,135 W/m 2. The temperature at the connection between the PAF and the satellite varies between 1C and 5C. Internal Pressure Environment The air inside the payload fairing is vented during the ascent phase through one-way vent ports. The pressure decay rate typically varies while the launch vehicle is in transonic flight, with a maximum rate of 4.51KPa/s. Interface Conditions Mechanical Interface The satellite must fit within a main envelope of 5mm x 5mm x 45mm plus a top protrusion of Ø225mm x 5mm. The center of gravity (CG) offset must be 25mm or less in longitudinal direction and 25mm or less in the orthogonal directions. The moment of intertia must be 1kgm 2 or less in each axis. The fundamental frequency of the satellite must be less than 1 Hz in the longitudinal direction and less than 5 Hz in the lateral direction. The satellite and the rocket are connected by the PAF with a clamp band. The tension in the radial direction at the connection with the clamp band is 6375 ±486 N (65 ±5 kgf). Electrical Interface There are 1 discrete command signals available from the rocket to the satellites these must be shared between the primary and the piggyback satellite. The main electrical characteristics of these signals include: Voltage: +24V to +34V Current: less than 15 ma Supply time (duration): 5 ±5ms No telemetry signal can be exchanged between the rocket and the satellite. The number of electrical umbilicals available to the small satellite is limited by the number required by the primary payload. If the satellite developer prepares a cable from the satellite to the operation door of the rocket, the satellite battery can be charged from outside its fairing. Asada, Shoichiro 4 17 th Annual AIAA/USU Conference on Small Satellites

Orbit Insertion Conditions The orbit insertion of the piggyback satellite is dependent on that of the primary payload. As a reference, the typical orbit insertions of the primary payload and its accuracy (3-sigma) are shown below. For a Geosynchronous Transfer Orbit (GTO), the typical orbital parameters are as follows: Apogee Altitude: 36.226 km Perigee Altitude: 25 km Angle of Inclination: 28.5 deg Argument of Perigee: 179. deg For the same GTO case, the corresponding injection accuracies are as follows: Apogee Altitude Accuracy: ±18 km Perigee Altitude Accuracy: ±4 km Angle of Inclination Accuracy ±.2 deg Argument of Perigee Accuracy: ±.4 deg Longitude of Ascending Node Accuracy: ±.4 deg For a Sun-Synchronous Orbit (SSO), the typical orbital parameters are as follows: Circular Orbit Altitude: 8 km Angle of Inclination: 98.9 deg Eccentricity:.1 For the same SSO case, the corresponding injection accuracies are as follows: Semi-Major Axis Accuracy: ±1 km Angle of Inclination Accuracy: ±.18 deg Longitude of Ascending Node Accuracy: ±.1 deg Required Environmental Tests The satellite developer is required to conduct tests to confirm its compatibility with the launch vehicle environment. The results of these tests must be reported to the launch vehicle provider. The required tests, for the Qualification Model, Protoflight Model, and Flight Model are shown in Table 6. (Note: DLF refers to Design Load Factor and CLA refers to Coupled Load Analyses) Test Static Load Level Analyses Acoustic Environment Level Test Duration Sine Wave Vibration Level Sweep Rate Table 6. Satellite Structural Tests, Margin, and Duration Qualification Model DLF or CLA Limit + 3dB 2 Minutes 2 Octaves/Minute Protoflight Model DLF or CLA Limit + 3dB 1 minute 4 Octaves/Minute Flight Model 1. x Limit DLF or CLA Limit Level 1 minute 1. x Limit 4 Octaves/Minute Shock Impact Number of Times 2 Times 2 Times 1 Time Integration The satellite developer can conduct a fit check of the separation system 8 months prior to launch. Access to the satellite ends at 15 hours prior to liftoff, when the doors of the fairing are closed. The battery must be charged for 5 hours of power, in order to prepare for a possible one-day postponement of liftoff due to the primary payload. Lead Time Required A set of information about the piggyback satellite must be forwarded to the launch vehicle provider 15 months prior to launch, to enable the launch vehicle provider to prepare for such launch activities as Flight Analysis, Change of Rocket Specification, etc. The specific information that needs to be provided includes the following: Asada, Shoichiro 5 17 th Annual AIAA/USU Conference on Small Satellites

Purpose of the satellite, mission, and desired orbit Satellite development plan (schedule, test plan, etc.) Satellite mass properties Special requirements for environmental conditions, interface conditions, and work at launch site Milestone Schedule The following reviews are planned prior to launch: Mission Analysis Review Time: 3 months prior to launch Purpose: To confirm if the launch vehicle meets the interface requirements for flight Satellite Interface Review Time: Just before delivery of satellite to launch site Purpose: To confirm if the satellite meets the interface requirements for flight Launch Preparation Review Time: 4 to 7 days prior to launch Purpose: To confirm launch preparation status Pricing The price to the small, piggyback satellite developers is based on the cost of the safety analysis, any special requirements (e.g., command signals, photographing, telemetry), and the share of the launch vehicle weight. Concluding Remarks A website for small satellite developers is being prepared. Just as there are a variety of small satellites, their requirements of the launch vehicle vary greatly in complexity as well. Therefore, those requirements are to be carefully reviewed by both the small satellite developer and MHI for its successful launch. Acknowledgments The authors wish to acknowledge all of the people involved in the H-IIA program. And the authors especially appreciate NASDA for use of their flight data. References 1. NASDA Mission Operations Department, H-IIA User s Manual, NASDA. Asada, Shoichiro 6 17 th Annual AIAA/USU Conference on Small Satellites