For personal use only

Similar documents
For personal use only

For personal use only

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

For personal use only

For personal use only

Drilling Commences at Telfer West Gold Project

For personal use only

For personal use only

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

For personal use only

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

For personal use only

Victory plans gravity survey for Bonaparte after encouraging rock-chip results

For personal use only

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

Queensland Mining Corporation Limited

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

QUARTERLY ACTIVITIES REPORT ENDING 30 SEPTEMBER 2010 HIGHLIGHTS

High Grade Gold Intercepts at Bangaba

For personal use only

For personal use only

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

For personal use only

For personal use only

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

For personal use only

For personal use only

ASX RELEASE. Monax Signs Option Deal Over Four Queensland Gold Mining Leases

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

For personal use only

For personal use only

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

For personal use only

For personal use only

For personal use only

For personal use only

Acquisition of Kilfoyle Project, Northern Territory

For personal use only

For personal use only

For personal use only

Ni-Cu-Au-U TYPE AIRBORNE ANOMALIES OUTLINED

Magmatic completes acquisition of the Mt Venn Copper-Nickel-Cobalt Project in Western Australia

For personal use only

Pursuing Large Gold Discoveries in WA s Eastern Goldfields

Bass Metals records further positive drill results & progress at 3 prospects.

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

New Zone of High Grade Gold Discovered at Balogo

For personal use only

ASX Release. 16 December 2010 LIMITED. EXPLORATION UPDATE Highlights

Two New WA Projects Introduced into Newcrest Generation Alliance

For personal use only

Aurora Tank Gold Drilling Update

December 2017 Quarter Activities Report

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY

For personal use only

For personal use only

Magnus Copper Project exploration update

Sipa Resources Limited

TRENCHING CONFIRMS HIGH GRADE GOLD AT SUMBA

For personal use only

COARSE GRAINED MAGNETITE DISCOVERED NORTH OF YORK

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2008

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2018

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE

Quarterly Report Quarter ended 30 June 2010

For personal use only

Growth Through Exploration

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

24 September Best results achieved at U40 Prospect (West Arnhem JV with Cameco Australia): o 1.34% eu 3 O 8

CAMBRIDGE NICKEL PROSPECT EXPLORATION UPDATE. XRF analysis of reconnaissance drill holes at Cambridge has been completed

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam

For personal use only

Drilling Program Commences on Iron Oxide Copper Gold Targets

New High Grade Lode Discovered at Wagtail South

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

CRATER MOUNTAIN MAJOR MULTIPLE MINERALISATION EVENTS POTENTIAL ASSOCIATED WITH PORPHYRY SYSTEM NOW IDENTIFIED

Exploration targets identified to increase Browns Range Project s mine life

For personal use only. Copper, Zinc and Uranium Projects in NT and SA ASX CODE: CXO

Significant New Mineralised Zone Paroo Range (RGU:100%)

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

Commencement of Targeted RC Drilling Nabarlek Project

2018 Drilling Underway at Juruena Gold Project

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

For personal use only

HIGH GRADE GOLD-BEARING QUARTZ VEIN DISCOVERED AT MIAREE, KARRATHA AREA WESTERN AUSTRALIA

For personal use only

For personal use only

June 2017 Quarterly Report

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT HIGHLIGHTS

Quarterly Activities Report For the Period Ended March HIGHLIGHTS

Ausgold awarded EIS grant for Jinkas deep drilling

Transcription:

ABN 77 141 335 364 ASX: AAJ For the quarter ending 30 September 2014 HIGHLIGHTS Bulloo Downs Copper Project exploration 2,000km 2 HyMap survey at Bulloo Project completed Increased lengths of mineralisation at all prospects Widths of gossans up to 10m Historical workings and gossans define extensions Glandore 2,519m in 68 holes of aircore drilling completed on lake Composites submitted Corporate Cash of $1.9M (as at 30 September) (ASX: AAJ) (Aruma), an active Western Australian gold and copper explorer, has increased the area of its Bulloo Downs Copper Project (in WA s Ashburton region) to near 2,800km 2. A total of over 2,800 km 2 (with some surrounding ground overlap) has now been flown with HyMap mineral mapping with over 10 prospects identified to date with more probable in the new mapping. The Company considers Bulloo Downs Copper Project to be a premier project. It contains extensive high grade copper outcrops and is considered to be highly prospective for gold, silver, lead and zinc. Additional leases are being negotiated with other leaseholders and Aruma pegged an ELA (ELA52/3172) in the north western area after the end of the Quarter (Figure 1). Aruma is now the major landholder in the area and has secured all the identified mineralised structures. With the granting of E52/2887 after the close of the quarter the full area of identified mineralisation is open for evaluation. The surrounding leases contain the extensions of the previously announced structures as well as the additional Mountain Maid, Ned's Gap, Koode Magi and Keep it Dark copper prospects. Page 1

Previously announced sampling at Scotties returned copper values to 42.9%, 1.51 g/t gold and 10.3 g/t silver. The historic data is now being collated and augmented with new surveys to give comprehensive magnetics and HyVista maps. The databases have been placed with a specialist company for restructuring to allow maximum value to be gained from all the data. Sampling by hand-held XRF and rock chip sampling was completed along the Scotties, Keep It Dark, and Hard to Find prospects on part of the recently acquired tenement holding outside of the original Bulloo Downs lease holding of E52/2024. Figure 1 The Bulloo Downs leases with structures, prospects and geology (GSWA 250K) RC Drilling planned Page 2

Current Exploration Program Gaining access to a larger landholding with multiple targets has required a major data accumulation and additional geophysics in HyVista and magnetics to be flown. So that the project area can be evaluated as a whole, with targets ranked for drilling, the previously proposed drilling will now take place in the December quarter. The areas will again be Heritage cleared for drilling where necessary (with some 15km in first order targets already done), including the high grade gossan at the east end of Madison and the high values at Lachlan and Chandra. The other prospects will be evaluated and sampled prior and during the drilling programme. Location Action Length m Width m Cu% Au ppm Heritage Status Scotties DRILL 100 2 42.93 1.5 Old workings Madison DRILL 3000 3 42.6 1 Cleared Lachlan DRILL 600 3 32.97 <0.1 Cleared Chandra DRILL 8000 2 7.63 <0.1 Cleared Terry s DRILL 800 2 0.57 <0.1 Cleared Koode Maji DRILL 100 2 15.9 <0.1 Old workings Ned s Gap DRILL 1100 2 16.7 <0.1 Old workings Table 1 Drilling targets with tenor and dimensions The dimensions of the gossans, together with grade and proven continuance at depth (in previously reported BMRC 13) make the targets attractive and these will be drilled in a 3,000 to 5,000m RC program in the coming December 2014 quarter. Page 3

Figure 2 Aruma exploration areas in Western Australia Page 4

Regional Projects EASTERN GOLDFIELDS Glandore Hub Glandore Gold Project - 40km east of Kalgoorlie-Boulder 2,519m of air core drilling completed Awaiting assays Clinker Hill Gold Lease - 35 km east of Kalgoorlie-Boulder PoW submitted Jundee South Gold Project - 20km south of Jundee Mine Status - RC drilling completed with strong mineralisation found JV discussion in progress Bulloo Downs Copper Project 10km south of Newman Status RC drilling of 6 tier 1 targets planned HyMap and magnetics reprocessing completed Table 2 Area increased to 2,800km 2 Aruma Project Status with descriptions and activities Glandore The air core programme announced in mid-september was completed during that month with 68 holes for 2,519m which covered the HyMap and Fluid Flow targets on the lake. Glandore is considered to be both highly prospective for gold as well as highly amenable for the development and exploitation of new deposits. In late June Aruma were informed that the Native Title Claimants had dropped their claim, negating any need for Heritage Agreements and heritage surveys. This also allowed the previously disputed leases P25/2215 and P25/2216 to be granted in the quarter. Figure 3 below shows the area drilled and the relationships with the lake and the geology, with the targets and drilling being done on the Fluid Flow areas previously reported in various quarterly, half yearly, and annual reports and also public presentations. Page 5

Figure 3 Google image with Fluid Flow drilling targets at Glandore. The completed holes are blue. The pink areas are >1.0g/t Au outlines from previous work and Fluid Flow. The yellow dashes are the Steves Line trend. Page 6

Clinker Hill Drill Hole Figure 4 Proposed RC drilling on geochemistry and geology at Clinker Hill The PoW was completed and submitted at the start of the December 2014 quarter for approximately 1,500m of RC drilling on the strong gold soil sampling results (Figure 4 above). Page 7

Jundee South No work was completed in the quarter. Proposed Exploration Activities for Q2 FY2014-15 Aruma's lease holdings are constantly being appraised and are currently approximately 2,900km 2 including lease applications. All of Aruma s projects have strong metal indicators and proven high grade potential. The ongoing work comprises: Bulloo Downs Copper Project Interpretation of Magnetics and HyMap surveys for major RC drilling programme in November Glandore Assays and re-assays to be received recent aircore drill programme on Lake Yindarlgooda Glandore Hub Clinker Hill - PoW and RC drilling to be completed in December 2014 quarter Jundee South - JV discussions in progress The Company started preparation of the the R&D refund documentation in the quarter, which is expected to net some $600K. With cash of $1.9M at 30 September 2014, Aruma is funded for the coming exploration year. Aruma will also be appraising leases that are becoming available in the Wiluna-Kalgoorlie terrain, especially where adjacent to current projects or with resources or intersections. In addition to its current projects in Western Australia, Aruma continues to evaluate potential project opportunities. For further information please contact: Peter Schwann Managing Director Ph: +61 8 6389 1799 Mobile: +61 417 946 370 info@arumaresources.com Page 8

FOR THE QUARTER ENDING 30 September 2014 Competent Person s Statement The information in this release that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Peter Schwann who is a Fellow of the Australasian Institute of Mining and Metallurgy and Chartered Professional (Geology). Mr Schwann is a full time employee of the Company. Mr Schwann has sufficient relevant experience to qualify as a Competent Person as defined in the JORC Code (2012) and consents to the inclusion of this information in the form and context in which it appears All exploration results reported have previously been released to ASX and are available to be viewed on the Company website www.arumaresources.com.au. The Company confirms it is not aware of any new information that materially affects the information included in the original announcement. The Company confirms that the form and context in which the Competent Person s findings are present have not been materially modified from the original announcements. Table 3 SUMMARY OF TENEMENTS AUSTRALIA Interest at beginning of Quarter Interest at end of Quarter Glandore (Gold) M25/327 M25/329 M25/330 P25/2089 P25/2090 P25/2091 P25/2092 P25/2093 P25/2094 P25/2103 P25/2117 P25/2118 P25/2119 P25/2153 P25/2154 P25/2199 P25/2202 P25/2203 P25/2204 P25/2073 P25/2074 P25/2075 P25/2076 P25/2215 P25/2216 100% Aruma Exploration Pty Ltd (wholly owned subsidiary of Aruma Resources Limited) 100% Aruma Exploration Pty Ltd under transfer from Plasia Pty Ltd Nil 100% Aruma Exploration Pty Ltd 100% Aruma Exploration Pty Ltd 100% Aruma Exploration Pty Ltd under transfer from Copley Pty Ltd Page 9

AUSTRALIA Interest at beginning of Quarter Interest at end of Quarter Clinker Hill (Gold) P25/2201 100% Aruma Exploration Pty Ltd 100% Aruma Exploration Pty Ltd Bulloo Downs Copper Project E52/2024 Option to farm-in for up to a 90% interest (Dynasty) Option to farm-in for up to a 90% interest (Dynasty) E52/2283 E52/2317 E52/2327 E52/2328 Nil Option to farm-in for up to a 90% E52/2332 Nil Option to farm-in for up to a 90% E52/2337 E52/2351 E52/2464 Option to farm-in for up to a 90% interest (Dynasty) Option to farm-in for up to a 90% interest (Dynasty) E52/2802 Nil Option to farm-in for up to a 90% - Under application. E52/2803 100% Aruma Exploration Pty 100% Aruma Exploration Pty Ltd. E52/2887 Ltd. Under application and Under application and transfer from transfer from Plasia Pty Ltd. Plasia Pty Ltd. Option to acquire JV Option to acquire JV interest. interest. E52/3096 Nil 100% Aruma Exploration Pty Ltd Jundee South (Gold) E53/1461 100% Aruma Exploration Pty Ltd 100% Aruma Exploration Pty Ltd Page 10