LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

Similar documents
West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

V Sample from C.O.D vein 15 metres southwest of V

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

Skeena Intersects g/t AuEq over metres at Eskay Creek

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

Northern Dynasty Minerals Ltd.

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Drilling Highlights: Phase II BCV Infill Drilling

NEWS RELEASE. Evrim drills 1.0 metre grading 20.1 grams per tonne gold at Cerro Cascaron with partner Harvest Gold

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Golden Predator Intersects 7.5 m of 33 g/t Gold at the 3 Aces Project; Discovers Significant Stockwork Mineralization

Probe Metals Continues to Expand Gold Zones At Val-d Or East

True Width (m) Carneritos to

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

WESDOME ANNOUNCES HIGH GRADE GOLD DISCOVERY AT KIENA COMPLEX IN VAL D OR QUEBEC

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Detour Gold Reports Drilling Results from Lower Detour

Colt Resources intersects 17.4% Cu over 0.42 metres (0.32 m true width) at Miguel Vacas Copper Project in its Borba exploration concession in Portugal

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

For Immediate Release MORE HIGH-GRADE GOLD AT ASCOT S GOLDEN TRIANGLE PROPERTY

Highlights from the four holes announced in this news release include:

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

(TSXV: GPLY, OTCQB: GLYXF

Gungnir Resources Inc.

ET and and and

July Exploring for Canadian Gold in the Rainy River District of Ontario

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Golden Predator Intersects 6.86 m of g/t Gold at the 3 Aces Project; Jack and Ace of Spades Zones Merging

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

A B C PAD A HIGHLIGHTS

Great Atlantic Rock Samples Return up to 5.8 oz. / ton Gold Golden Promise Property in Central Newfoundland

BK Copper Project Strong Copper Results Confirm and Extend BKM

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

Novo Resources Corp. Suite West Georgia Street Vancouver, BC V6E 3C9

Interval (meters) To (meters)

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

Precipitate s Geophysical Surveying Generates More Targets at Melchor and Peak Zones

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

Press Release Thunder Bay: August 2, 2018

Where Exploration Intersects Discovery

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Trading Symbol: ADA TSX-V; C2Z-Frankfurt Press Release No Shares Outstanding: 104,808,584 November 1, 2006

Timberline Resources Announces Gold and Copper Assay Results for the Elder Creek Project, Battle Mountain District, Nevada

NEWS RELEASE August 8, 2018

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Pacific Empire Minerals Provides Copper King RC Drilling Results

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Precipitate s Geophysical Surveying Generates More Targets at Melchor and Peak Zones

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Melkior retains Geologica to complete a NI report on its Launay property, Québec

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

News Release No GOLD AND COPPER MINERALIZATION DISCOVERED DURING PHASE 2 EXPLORATION AT THE MCBRIDE PROPERTY

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

Large Epithermal Quartz Veins Found in Outcrop at Shot Rock, Nova Scotia; Dozens of Large Angular Boulders Suggest Extensive System

Fission Hits Largest Composite Off-Scale Recorded at PLS 36.72m Total Composite Off-Scale (Line 600E)

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

May 12, 2016 News Release Valley of the Kings Infill Drilling Intersects 37,000 Grams Per Tonne Gold

NEWS RELEASE. Evrim commences drilling at Cerro Cascaron gold and silver project with partner Harvest Gold

The Inferred Mineral Resource Statement prepared by SRK for the Talbot Deposit is detailed below.

Goliath Reports Grams Per Tonne Gold Equivalent Over 2 Metres Channel Cut at Golddigger in the Golden Triangle; Bulk Sample Recommended

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

NORTHQUEST LTD. ANNOUNCES DRILLING RESULTS FROM THE PISTOL BAY GOLD PROJECT, NUNAVUT, CANADA

NEWS RELEASE July 26, 2018

Transition Continues to Intersect Significant Platinum-rich PGM Mineralization at Sunday Lake

NORTHERN SUPERIOR RESOURCES INC. 1351C Kelly Lake Road, Unit 7 Sudbury, Ontario, Canada P3E 5P5 Tel: (705) Fax: (705)

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

SAMPLE ID SAMPLE TYPE Au (g/t) Ag (g/t) Cu (%) AuEq**(g/t)

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Transcription:

Trading symbol: TSX-V: IBC News Release No. 15-04 2489 BELLEVUE AVENUE WEST VANCOUVER, BC V7V 1E1 TEL 604 922 2030 FAX 604 922 2037 TOLL FREE (CANADA) 1 888 888 9122 TOLL FREE (USA) 1 888 888 9123 LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of 13.58 g/t, including 10.9 m of 20.61 g/t, and as well, 11 m of 20.66 g/t West Vancouver, British Columbia August 18, 2015 International Bethlehem Mining Corp. (the Company or International Bethlehem ) is pleased to report that Magnum Goldcorp Inc. ( Magnum TSX-V: MGI), the Company s joint property partner, has announced impressive analytical results from its very successful helicopter-supported drill program recently completed on the jointly owned gold exploration property (the LH Property ). The LH Property consists of 19 contiguous crown granted claims and four mineral claims located approximately 7 km south of Silverton, British Columbia, on the east side of Slocan Lake. Access to the LH Property is via Highway 6 for 8 km south of Silverton and then via Red Mountain Road for 2 km and a four-wheel drive road along Fingland Creek for 5 km. As part of its 2015 exploration program, Magnum initiated a helicopter supported drill program to target high grade gold mineralization previously identified in the LH underground workings. As reported by Magnum, a total of 11 drill holes were completed from a single pad for a total of 693 metres, with collar information tabulated below. Hole Number Azimuth Inclination Depth Comment LH15-30 365.5-49 152.39 LH15-31 365-64 37.9 Intersected underground workings LH15-32 365.5-58 134.11 LH15-33 0-90 52.73 LH15-34 18.5-55 20.23 Intersected underground workings LH15-35 25.5-55 21.01 Intersected underground workings LH15-36 22.5-59 23.47 Intersected underground workings LH15-37 25.5-49 15.34 Intersected underground workings LH15-38 37-60 102.1 LH15-39 37-69 26.66 Intersected underground workings LH15-40 37-55 86.56 According to Magnum, the objective of the Phase I program was to confirm high grade gold mineralization reported from both previous drilling and underground chip sampling by previous operators. Previous work was interpreted to suggest gold-bearing mineralized zones are associated with intervals having elevated sulphide content. Magnum also indicated that at least two mineralized intervals are interpreted to be present (on the basis of the results tabulated below) which are moderately north dipping. As well, several of the holes intersected the underground workings and were terminated at depths less than the target depth.

- 2- Despite this fact, Magnum reported that all the holes (except LH15-33) intersected anomalous, high grade, gold mineralization, with the holes intersecting underground workings documenting shortened mineralized intervals. Furthermore, Magnum indicated that with an interpreted moderate dip to the north, many of the holes were drilled at a shallow angle to the mineralized zone(s), resulting in thickened mineralized intervals (i.e. greater than the true width). The true widths of the mineralized zones are not known at this time, however, are interpreted to be approximately 6-8 m in thickness. Further work is proposed by Magnum to ascertain probable true width(s). Magnum s analytical results for the 2015 drill holes are presented in the following table: ICP (g/t) Gravimetric (g/t) LH15-30 4.00 25.00 21.00 1.29 1.50 Including 6.00 7.00 1.00 5.15 7.44 Including 9.00 25.00 16.00 1.29 1.43 Including 9.00 10.00 1.00 2.01 2.09 Including 14.00 15.00 1.00 3.36 3.34 Including 15.00 16.00 1.00 1.60 2.25 Including 16.00 17.00 1.00 2.50 3.33 29.00 48.00 19.00 0.71 0.75 Including 40.00 41.00 1.00 3.93 3.78 63.00 64.00 1.00 2.12 2.15 LH15-31 21.00 37.90 16.90 13.58 14.31 Including 21.00 22.00 1.00 2.61 2.57 Including 27.00 37.90 10.90 20.61 21.75 Including 32.00 33.00 1.00 5.82 5.54 Including 33.00 34.00 1.00 2.75 3.79 Including 34.00 35.00 1.00 175.00 187.00 Including 35.00 36.00 1.00 33.10 31.60 LH15-32 15.63 73.00 57.37 3.81 3.73 Including 15.63 28.00 13.37 6.49 5.44 Including 33.00 55.00 22.00 5.52 5.89 Including 18.00 19.00 1.00 4.06 5.66 Including 19.00 20.00 1.00 14.70 20.00 Including 20.00 21.00 1.00 27.50 29.70 Including 25.00 26.00 1.00 2.84 2.75 Including 26.00 27.00 1.00 30.20 6.85 Including 27.00 28.00 1.00 1.95 2.01 Including 28.00 29.00 1.00 1.93 2.08 Including 34.00 35.00 1.00 2.49 2.32 Including 41.00 42.00 1.00 4.51 6.00

- 3- Drill Hole Including 42.00 43.00 1.00 15.60 11.50 Including 43.00 44.00 1.00 2.06 2.05 Including 44.00 45.00 1.00 1.95 2.27 Including 45.00 46.09 1.09 7.91 9.20 Including 50.00 51.00 1.00 11.90 14.70 Including 51.00 52.00 1.00 11.60 13.20 Including 52.00 53.00 1.00 52.90 56.00 Including 71.00 72.05 1.05 3.60 4.52 110.00 114.00 4.00 1.12 1.15 Including 112.00 113.00 1.00 3.65 3.74 LH15-34 15.95 20.23 4.28 5.64 6.16 Including 15.95 17.00 1.05 4.46 5.46 Including 17.00 18.00 1.00 5.14 5.90 Including 18.00 19.00 1.00 2.88 2.92 Including 19.00 20.00 1.00 8.15 9.75 Including 20.00 20.23 0.23 14.30 8.93 LH15-35 9.00 21.01 12.01 1.01 1.17 Including 12.00 20.00 8.00 1.37 1.60 Including 14.00 15.00 1.00 3.39 4.24 Including 19.00 20.00 1.00 2.15 2.40 LH15-36 18.00 23.47 5.47 10.20 12.59 Including 20.00 23.47 3.47 15.89 19.59 Including 20.00 21.00 1.00 5.00 3.91 Including 21.00 22.00 1.00 49.70 63.60 LH15-37 6.00 15.34 9.34 7.08 6.45 Including 6.30 11.00 5.00 12.86 11.66 Including 6.00 7.00 1.00 14.30 11.30 Including 7.00 8.00 1.00 8.17 7.03 Including 9.00 10.00 1.00 31.40 30.10 Including 10.00 11.00 1.00 9.82 9.33 Including 15.00 15.34 0.34 2.94 3.22 LH15-38 28.00 39.00 11.00 20.66 20.76 Including 36.00 39.00 3.00 3.13 3.32 Including 28.00 29.00 1.00 14.30 17.50 Including 29.00 30.00 1.00 5.77 5.83 Including 30.00 31.00 1.00 10.90 9.57

- 4- Drill Hole Including 31.00 32.00 1.00 53.00 69.50 Including 32.00 33.00 1.00 132.00 114.00 Including 36.00 37.00 1.00 4.98 5.12 Including 38.00 39.00 1.00 3.85 4.27 39.00 41.10 2.10 3.45 3.88 66.00 81.00 15.00 3.00 2.78 Including 69.00 79.00 10.00 4.36 4.04 Including 71.00 72.00 1.00 2.21 1.74 Including 78.00 79.00 1.00 35.60 32.10 LH15-39 8.00 9.00 1.00 22.60 22.10 LH15-40 10.10 10.36 0.26 10.00 11.00 11.00 14.00 3.00 13.53 14.28 Including 11.00 12.00 1.00 25.00 33.60 Including 12.00 13.00 1.00 14.20 7.76 26.00 62.00 36.00 5.92 5.97 Including 26.00 27.00 1.00 13.40 12.90 Including 28.00 29.00 1.00 2.25 2.24 Including 29.00 30.00 1.00 6.30 6.79 Including 30.00 31.00 1.00 16.40 18.40 Including 31.00 32.00 1.00 2.42 3.39 Including 32.00 33.00 1.00 48.50 46.10 Including 33.00 34.00 1.00 63.90 47.60 Including 34.00 35.00 1.00 4.77 6.60 Including 35.00 36.00 1.00 8.87 17.10 Including 36.00 37.00 1.00 3.05 3.55 Including 37.00 38.00 1.00 1.56 2.24 Including 38.00 39.00 1.00 7.35 7.98 Including 44.00 45.00 1.00 1.08 3.32 Including 45.00 46.00 1.00 2.93 2.70 Including 48.00 49.00 1.00 2.24 2.05 Including 50.00 51.00 1.00 3.52 3.95 Including 55.00 56.00 1.00 5.16 5.62 Including 58.00 59.00 1.00 3.74 4.86 Including 59.00 60.00 1.00 1.67 2.37 *True width not known at this time.

- 5- Magnum views the results of its Phase I program to be very significant and noteworthy. Phase II of Magnum s planned 2015 program will undertake additional testing of high grade gold mineralization previously identified and associated with the underground workings of the LH Mine and/or along the Ridge Zone. According to Magnum, core from drill hole LH-15-30 was split in its entirety. Sampling in subsequent holes was restricted to mineralized intervals having approximately 2% sulphide content (predominantly pyrrhotite and/or subordinate arsenopyrite) over greater than 1 metre. Drill core was split at approximately 1 metre intervals, with one half sent to AGAT Laboratories in Burnaby, BC for initial preparation. The remaining core was returned to the core box and stored, with the core from the 2012 and 2014 programs, in Crescent Valley, BC. Samples were crushed to 75% passing 2 mm and a 250 gram subsample was riffle split then pulverized to 85% passing 75 microns. Each sample was subjected to Aqua Regia digestion and analyzed by Inductively Coupled Plasma Optical Emission Spectrometry ( ICP-OES ). Samples returning gold values in excess of 0.5 ppm were re-analyzed using Fire Assay on a 30 gram sample with an Atomic Absorption Spectrometry ( AAS ) finish. Samples returning gold values in excess of 10 ppm were further analyzed using Fire Assay on a 30 gram sample with a Gravimetric Finish. This news release has been reviewed and approved by Rick Walker, P. Geo., who is acting as the Company s Qualified Person for the LH Property project, in accordance with regulations under NI 43-101. By option agreement dated September 6, 2012, Magnum was granted an option by the Company to acquire a 51% interest in the LH Property (the Option ). Under the Option, Magnum has agreed to incur expenditures on the LH Property totaling $500,000 and to issue 3,000,000 shares to International Bethlehem. By purchase agreement dated February 24, 2015, Cobra Venture Corporation (TSX-V: CBV) purchased one half (25.5%) of Magnum s 51% interest in the LH Property for $300,000. Under that agreement, Magnum is required to spend $200,000 in exploration expenditures on the LH Property, which requirement was completed as a result of the Phase I program described above (see Magnum s News Release dated March 5, 2015 for further information on the agreements with the Company, Magnum and with Cobra Venture Corporation). The LH Property is subject to certain net smelter return royalties. For further information, contact Mr. Clive Shallow, Shareholder Communications, at 604-922 2030. International Bethlehem Mining Corporation Douglas L. Mason Douglas L. Mason, President and CEO Neither the TSX Venture Exchange nor its Regulation Services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release includes certain statements that may be deemed forward-looking statements within the meaning of applicable securities legislation. All statements, other than statements of historical facts, that address such matters as future exploration, drilling, exploration activities, potential mineralization and resources and events or developments that the Company expects, are forward looking statements and, as such, are subject to risks, uncertainties and other factors of which are beyond the reasonable control of the Company. Such statements are not guarantees of future performance and actual results or developments may differ materially from those expressed in, or implied by, this forward-looking information. Factors that could cause actual results to differ materially from those in forward-looking statements include such matters as market prices, exploitation and exploration results, continued availability of capital and financing, and general economic, market or business conditions. Any forward-looking statements are expressly qualified in their entirety by this cautionary statement. The information contained herein is stated as of the current date and subject to change after that date and the Company does not undertake any obligation to update publicly or to revise any of the forward-looking statements, whether as a result of new information, future events or otherwise, except as may be required by applicable securities laws.