APPENDIX I: Traffic Forecasting Model and Assumptions

Similar documents
California Urban Infill Trip Generation Study. Jim Daisa, P.E.

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement

King City URA 6D Concept Plan

Changes in the Spatial Distribution of Mobile Source Emissions due to the Interactions between Land-use and Regional Transportation Systems

TRAVEL DEMAND MODEL. Chapter 6

Brian J. Morton Center for Urban and Regional Studies University of North Carolina - Chapel Hill June 8, 2010

APPENDIX IV MODELLING

STAFF REPORT. MEETING DATE: July 3, 2008 AGENDA ITEM: 7

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

TRAFFIC FORECAST METHODOLOGY

Technical Memorandum #2 Future Conditions

APPENDIX D FOLSOM HOLDING CAPACITY METHODOLOGY

Date: March 31, 2014 PATE; fyril 2.3,2 >H

Traffic Impact Study

APPENDIX I - AREA PLANS

6 th Line Municipal Class Environmental Assessment

III. FORECASTED GROWTH

Final City of Colusa STREETS & ROADWAYS MASTER PLAN. October J Street Suite 390 Sacramento, CA 95814

Transportation Statistical Data Development Report OKALOOSA-WALTON OUTLOOK 2035 LONG RANGE TRANSPORTATION PLAN

A Hybrid Approach for Determining Traffic Demand in Large Development Areas

2040 MTP and CTP Socioeconomic Data

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Project Level Traffic Forecasting Summary of Practices from other States. TNMUG March 6, 2008

Date: June 19, 2013 Meeting Date: July 5, Consideration of the City of Vancouver s Regional Context Statement

HORIZON 2030: Land Use & Transportation November 2005

Forecasts for the Reston/Dulles Rail Corridor and Route 28 Corridor 2010 to 2050

Transport Planning in Large Scale Housing Developments. David Knight

Updating the Urban Boundary and Functional Classification of New Jersey Roadways using 2010 Census data

Cipra D. Revised Submittal 1

Guidelines on Using California Land Use/Transportation Planning Tools

StanCOG Transportation Model Program. General Summary

MPOs SB 375 LAFCOs SCAG Practices/Experiences And Future Collaborations with LAFCOs

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes

Appendix B. Land Use and Traffic Modeling Documentation

Wesley Chapel Area Roadway Needs Study Build-Out Analysis (Beardsley Dr/Oldwoods Ave Need Study) Project Progress Meeting 1

Density and Walkable Communities

2014 Certification Review Regional Data & Modeling

APPENDIX G Halton Region Transportation Model

APPENDIX C-6 - TRAFFIC MODELING REPORT, SRF CONSULTING GROUP

TABLE OF CONTENTS Page 1.0 Introduction 2.0 Data Review 3.0 Land Use Model Development 4.0 Allocation Results 5.0 Land Use Alternative

Xiaoguang Wang, Assistant Professor, Department of Geography, Central Michigan University Chao Liu,

CLAREMONT MASTER PLAN 2017: LAND USE COMMUNITY INPUT

Expanding the GSATS Model Area into

Travel Demand Model Report City of Peterborough Comprehensive Transportation Plan Update Supporting Document

3D - Boulder Valley Comprehensive Plan. Lesli Ellis Comprehensive Planning Manager City of Boulder

Regional Growth Strategy Work Session Growth Management Policy Board

Kitsap County 2016 Comprehensive Plan Update. Appendix A: Growth Estimates

KAISER SOUTH NORTHERN VIRGINIA HUB TRAFFIC IMPACT STUDY PRINCE WILLIAM COUNTY, VIRGINIA TABLE OF CONTENTS. Section 2 BACKGROUND INFORMATION 12

Hillsborough County MPO Transit Study. Technical Team August 23, 2007

Neighborhood Locations and Amenities

Council Workshop on Neighbourhoods Thursday, October 4 th, :00 to 4:00 p.m. Burlington Performing Arts Centre

Economic Activity Economic A ctivity

The effects of impact fees on urban form and congestion in Florida

Spatial information in strategic city planning - Zagreb experience. Darko Šiško City office for strategic planning, Zagreb

SOCIOECONOMIC & DEMOGRAPHIC DATA UPDATE

Area Classification of Surrounding Parking Facility Based on Land Use Functionality

Uses of Travel Demand Models Beyond the MTP. Janie Temple Transportation Planning and Programming Division

Riocan Centre Study Area Frontenac Mall Study Area Kingston Centre Study Area

Port Cities Conference: How Regional Planning can Help Support a Competitive Port. Christina DeMarco Metro Vancouver

Table 3-1 Gallatin County Population and Employment Trends ( )

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS

Typical information required from the data collection can be grouped into four categories, enumerated as below.

Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles

Palmerston North Area Traffic Model

Appendix I: Traffic Study

GIS in Community & Regional Planning

Long Term Plan What is planned for Murchison?

Urban Spatial Scenario Design Modelling (USSDM) in Dar es Salaam: Background Information

An online data and consulting resource of THE UNIVERSITY OF TOLEDO THE JACK FORD URBAN AFFAIRS CENTER

Attachment 3. Updating UBC s Regional Context Statement. University of British Columbia CONSIDERATION MEMORANDUM OF CONSULTATION INPUT

APPENDIX (R) Committed Developments Documentation

City of Pocatello. Comprehensive Plan Update

INVITATION TO NEGOTIATE DOWNTOWN DEVELOPMENT OF CITY- OWNED SITES WITH PRIVATE SECTOR INVESTMENT PARTICIPATION

Appendix C: City of Mississauga Transportation Strategy Update

Measuring connectivity in London

Trip Generation Model Development for Albany

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference.

Appendix B.1 EMME Model Calibration Memo

The Attractive Side of Corpus Christi: A Study of the City s Downtown Economic Growth

Draft. Butte County Long-Term Regional Growth Forecasts

VHD Daily Totals. Population 14.5% change. VMT Daily Totals Suffolk 24-hour VMT. 49.3% change. 14.4% change VMT

GOVERNMENT MAPPING WORKSHOP RECOVER Edmonton s Urban Wellness Plan Mapping Workshop December 4, 2017

Urban Planning Word Search Level 1

Data Collection. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1

MEMORANDUM. Trip Generation Analysis

03 August 2016 l Public Meeting LONG-RANGE VISIONING STUDY

PIBC Annual Conference, 2016

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

Traffic Demand Forecast

CORPORATION OF THE CITY OF COURTENAY COUNCIL MEETING AGENDA

How GIS based Visualizations Support Land Use and Transportation Modeling

Regional Growth Strategy Regional Staff Committee

Douglas County/Carson City Travel Demand Model

A Method for Mapping Settlement Area Boundaries in the Greater Golden Horseshoe

MARYLAND S LAND USE/LAND COVER MAP AND ASSOCIATED ANALYSIS

PINELLAS COUNTY METROPOLITAN PLANNING ORGANIZATION FORECAST 2035 EMPLOYMENT SOCIOECONOMIC DATA FINAL REPORT

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519

RECORD OF MEETING. Region Five Development Commission

TRANSPORTATION MODELING

Transcription:

APPENDIX I: Traffic Forecasting Model and Assumptions Appendix I reports on the assumptions and traffic model specifications that were developed to support the Reaffirmation of the 2040 Long Range Plan. Among the main tasks accomplished in updating the urban travel demand model for the urban area of Rochester were to refine the Traffic Analysis Zone network to provide greater specificity in areas on the fringe of the Rochester, to incorporate the results of refinement of the 2040 population and employment forecasts in the model, and to revise highway network capacities and speed assignments as needed to incorporate any changes made during recent subarea studies. Preparation of the regional (vs urban) non-model generated traffic forecasts are based primarily on study of historic traffic volume trends for county and state roads along with review and incorporation of information from MNDOT s most recent trunk highway forecasts. In the regional study area the focus is on the state and county highway network, since these roads carry the vast majority of regional intercity traffic and there is a sufficient database of historic traffic counts and road characteristics on which future forecasts can be built. Urban Area Travel Demand Model Traffic forecasting for the Urban Study area focuses on roadways whose function is anticipated to be broader than strictly serving property access needs. All non-local State, County and city streets classified as arterial and collector roads are included on the model network. In developing the urban area travel demand model, a series of steps were completed to generate the input information needed to run the model. These included: Update Traffic Analysis Zone Boundaries Define Base Year and Horizon Year Land Use Forecasts Assign Land Use to Traffic Analysis Zones Review and refine, if needed, Trip Generation categories and trip rates Refine traffic model highway network, including adding or deleting links and confirming capacity and typical operating speeds of links in the network Calibrate the traffic model F - 1

Traffic Analysis Zones Figure I-1 highlights the Traffic Analysis Zone network for the Rochester urban area. It contains a total of 466 zones, with smaller zones resulting in a more finely grained network in the urban core and larger zones on the outer fringe, where development and traffic generation is less concentrated. Figure I-1 F - 2

Land Use Forecasts For purposes of running the traffic model, employment and population projections are converted into equivalent land use units to serve as input to the Horizon Year land use for the traffic forecasting element of the model. The Base Year uses current land use selected for a specific year. Chapter 10 reported on projected 2040 population forecasts and employment forecasts. Population forecasts are used to estimate growth in housing units by type, school enrollments and park needs. Employment forecasts are used to estimate the square footage of new development including retail, office, health care and industrial development. Table I-1 summarizes projected levels of growth by traffic model land use category. F - 3

Assignment of Land Use to Traffic Analysis Zones Following estimation of total growth in terms of housing units and square footage of nonresidential development, development must be allocated spatially across the urban study area. Figures I-3 through I-6 on the following four pages highlight the assumptions that were made regarding the distribution of new development for the 2040 forecast scenario. These assumptions give preference to undeveloped housing or non-residential acreage in General Development Plans that have been approved but not built out as the highest priority areas for future development, with secondary priority assigned to areas which either have sewer and water service available and a high level of major road accessibility. Figure I-7 then provides an overview of the 2040 traffic project volumes. For the downtown Rochester area, assumptions regarding future land use were derived from the Rochester Downtown Master Plan as approved in mid 2010. This was a major study sponsored by the City of Rochester, the Mayo Medical Center, the University of Minnesota-Rochester, the Rochester Area Chamber of Commerce and the Rochester Area Foundation. Based on the initial land use visioning completed for this project, a land use scenario, illustrated in Figure I-2 i, was developed and used to develop model inputs related to the distribution of new housing and nonresidential use in downtown Rochester. EDUCATION/ RESEARCH DISTRICT MAYO Figure I-2 MAIN STREET MIXED USE BROADWAY AVE ARTS CULTURAL DISTRICT UMR F - 4

Figure I-3 F - 5

Figure I-4 F - 6

Figure I-5 F - 7

Figure I-6 F - 8

Figure I-7: Travel Demand Model Highway Network i Figure 4-10 from Rochester Downtown Master Plan, June 2010 Open House #3 Presentation, accessed online at http://www.rochesterdowntownplan.org/worktodate.html F - 9