EASTSIDE CATCHMENTS GIBRALTAR, GI

Similar documents
Debris Flow & Shallow Landslide Protection

LENK, BERNESE ALPS, CH

OLT VALLEY, KM , RO

Consolidamento di versanti

Rock Scaling Recommendations Logan Creek Drive Cut Slope

MEI Mechanics 1. Applying Newton s second law along a line

CHAPTER FIVE 5.0 STABILITY OF CUT SLOPES IN THE STUDY AREA. them limited by a thick canopy of vegetation and steep slope angles.

A design approach to residual rockfall hazard of drapery systems: example from Clifton Hill, Sumner

Introduction to Geohazard Standard Specification for Simple Drapery

US82 ROCKFALL MITIGATION PROJECT May, BY Mohammed Ghweir Engineering Geologist Geotechnical Design Section New Mexico DOT

Erosion and Sediment Control Measures 2.7 Silt Fences

Early Exploration Permit Activity Information

KINGS COLLEGE OF ENGINEERING ENGINEERING MECHANICS QUESTION BANK UNIT I - PART-A


BAUER MeBo Sea Bed Drill Rig

GEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE ANALYSIS AND DESIGN OF RETAINING STRUCTURES

August 10, 2007 File:

Debris flow mitigation with flexible ring net barriers field tests and case studies

WORK, ENERGY AND POWER P.1

Assembly Manual for the Brevard Astronomical Society 16 inch F4.5 Dobsonian Telescope Brevard Astronomical Society P.O. Box 1084 Cocoa, FL 32922

Q16.: A 5.0 kg block is lowered with a downward acceleration of 2.8 m/s 2 by means of a rope. The force of the block on the rope is:(35 N, down)

HATZIC SECONDARY SCHOOL

Phys 111 Exam 1 September 19, You cannot use CELL PHONES, ipad, IPOD... Good Luck!!! Name Section University ID

Woodford County Erosion Prevention Plan and Permit. Application #

General. High Winds. High winds are a common hazard in the UAE.

EDEXCEL NATIONAL CERTIFICATE/DIPLOMA FURTHER MECHANICAL PRINCIPLES AND APPLICATIONS UNIT 11 - NQF LEVEL 3 OUTCOME 4 - LIFTING MACHINES

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

Facts and figures MULTILIFT SELECT 15

VALLIAMMAI ENGINEERING COLLEGE SRM NAGAR, KATTANKULATHUR DEPARTMENT OF MECHANICAL ENGINEERING

Department of National Defence B-Jetty Reconstruction

Oktoberforum 2005: Case Histories in Engineering Geology and Geotechnical Engineering,, 4 th Oct. 2005, Petaling Jaya

September 18, 2017 Project No.: 5077

Applying Newton s Laws

STATICS. Friction VECTOR MECHANICS FOR ENGINEERS: Eighth Edition CHAPTER. Ferdinand P. Beer E. Russell Johnston, Jr.

Proceedings, 2012 International Snow Science Workshop, Anchorage, Alaska

A force is a push or a pull.

Equilibrium Notes 1 Translational Equilibrium

Tension, Compression, and Shear

acceleration weight load

Appraisal of Soil Nailing Design

Saving on the Geotechnical Investigation A False Economy

AP Q1 Practice Questions Kinematics, Forces and Circular Motion

M1. (a) increases 1. increases 1. (c) (i) all points correctly plotted all to ± ½ small square one error = 1 mark two or more errors = 0 marks 2

abc Standardisation Mark Scheme Additional Science 4463 / Physics 4451 PHY2H Unit Physics 2 General Certificate of Secondary Education

Mass Movements. Rock Weathering. Accumulation of Debris on Slopes. Landslides 12/8/2014

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

HSC PHYSICS ONLINE B F BA. repulsion between two negatively charged objects. attraction between a negative charge and a positive charge

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Stormwater Inlet Sediment Traps

EXAM 3 MECHANICS 40% of the final grade

How to Prepare for a Tornado

VISUAL PHYSICS ONLINE DYNAMICS TYPES OF FORCES FRICTION

Forces. A Force is a push or a pull on an object. Forces can cause a resting object to move

Motion in a straight line

Protection systems against debris flows

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

Forces & Newton s Laws FR Practice Problems

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Coarse Sediment Traps

RESPONSE OF MICROPILES IN EARTH SLOPES FROM LARGE-SCALE PHYSICAL MODEL TESTS

Engineering Mechanics. Friction in Action

Statics deal with the condition of equilibrium of bodies acted upon by forces.

STATICS. Bodies. Vector Mechanics for Engineers: Statics VECTOR MECHANICS FOR ENGINEERS: Design of a support

REINFORCEMENT DESIGN AND CONTROL OF ROCK SLOPES ABOVE TUNNEL PORTALS IN NORTHERN ITALY

TUTORIAL SHEET 1. magnitude of P and the values of ø and θ. Ans: ø =74 0 and θ= 53 0

Rock & Aggregate Drop Inlet Protection

Topic 4 Forces. 1. Jan 92 / M1 - Qu 8:

Rock Fall Study Warm Springs Village Warm Springs Avenue Boise, Idaho

January 17, 2008 File:

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Check-Q-meter. Table of contents. Features. Functions. RE 27551/ /10 Replaces: Type FD

SEARCHING FOR SEDIMENT SOURCES IN SPRING CREEK

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

2D - STRIP ANCHOR LIFTING SYSTEM

Canadian Consulting Engineering Awards 2017 Southern Alberta Rock Slope Stabilization & Other Work Amec Foster Wheeler

U-Shaped Sediment Traps

Previewer Tools Hide All

Electromagnetism Notes 1 Magnetic Fields

TEST REPORT. Question file: P Copyright:

Closure of Remote Historic Underground Mines in Desert Environments

Unit 2 ~ Learning Guide Name:

Dynamics. Newton s First Two Laws of Motion. A Core Learning Goals Activity for Science and Mathematics

Equilibrium: Forces and Torques

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Dept of ECE, SCMS Cochin

Chapter Four Holt Physics. Forces and the Laws of Motion

Calculate the force F needed to produce a horizontal component of 300 N on the sledge (1)

Fraser Heights Secondary Physics 11 Mr. Wu Practice Test (Dynamics)

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

Physics 201 Exam 3 (Monday, November 5) Fall 2012 (Saslow)

Last-night s Midterm Test. Last-night s Midterm Test. PHY131H1F - Class 10 Today, Chapter 6: Equilibrium Mass, Weight, Gravity

PHYSICS - CLUTCH CH 07: WORK & ENERGY.

March 10, P12 Inclined Planes.notebook. Physics 12. Inclined Planes. Push it Up Song

CPO Science Foundations of Physics

Calculation and analysis of internal force of piles excavation supporting. based on differential equation. Wei Wang

SPH3U Practice Test. True/False Indicate whether the statement is true or false.

9 MECHANICAL PROPERTIES OF SOLIDS

Lecture Presentation. Chapter 4 Forces and Newton s Laws of Motion. Chapter 4 Forces and Newton s Laws of Motion. Reading Question 4.

Review PHYS114 Chapters 4-7

Transcription:

Steinschlagschutz EASTSIDE CATCHMENTS GIBRALTAR, GI

EASTSIDE CATCHMENTS GIBRALTAR Steinschlagschutz Projekt Projektnummer Strasse PLZ Ort Land/Region Eastside Catchments Gibraltar 160919-GI Sir Herbert Miles Road GX11 1AA Gibraltar Vereinigtes Königreich (UK) Installationsjahr 2017 Kunde Planer Ausführende Firma Government Of Gibraltar Golder Associates CAN Geotechnical Ltd. Ausgangslage Following rockfall in 2015 Golder Associates undertook a design for rockfall mitigation measures to protect the road and residential properties below. The detailed rockfall analysis showed a requirement for protection from a 5000 kj impact with a system height of 7 m. Massnahme In December 2016 CAN Geotechnical were awarded the project to complete phase 1 of the works, a 40 m long and 7 m high 5000 kj rockfall barrier. We supplied a RXE-5000 barrier. To enable future works to be completed more easily and without deconstructing the existing fence, we provided a solution for the end post to alllow for this. Over several years and many projects Geobrugg has worked with both Golders Associates and CAN Geotechncial and a good relationship has developed. This enabled all of the involved parties to work together to find a cost effective and buildable solution. The ground conditions on the eastside catchments are well known and extremly difficut to work within. To enable the works to be completed CAN Geotechnical had to carry out lots of temporary works and to use enlarged concrete bases for the fence posts. Additionally CAN Geotechnical opted to terminate all ground anchors into reinforced concrete bases with wire rope eyes protruding for connection to Geobrugg U-brakes. In Januray 2018 CAN returned to site to instal the remaining 48m of barrier. The customised solution installed on the previous section worked perfectly enabling a smooth instalation and transition between the two barriers. For this phase of works CAN built upon their knowledge of the ground conditions encountered last time and in conjunction with the designer were able to use a more conventional anchoring solution avoiding the need for the large concrete foundations beams and the temporary soil nailing required in the previous phase. This was no easy task however as it required drilling with a 115mm bit to install R51 Hollow bar, with the requirement to install permanent casing in the upper part to provide extra stability. Steinschlagschutz Eastside Catchments Gibraltar, GI 2/9

Geschützte Objekte Systeme Strasse, Touristische Infrastruktur, Wohngebiet, Infrastruktur RXE-5000 Korrosionsschutz Verzinkt, GEOBRUGG SUPERCOATING Energieaufnahmevermögen Systemhöhe Systemlänge 5000 kj 7.0 m 88 m Steinschlagschutz Eastside Catchments Gibraltar, GI 3/9

RXE-5000 rockfall barrier - 7 m high and 40 m long spectacular structure. View from up slope after completion of phase 1 RXE-5000 rockfall barrier - 7 m high and 40 m long installation process. View from up slope at the end of Phase 1 RXE-5000 separation post to connect the next phase of the project: visible transmission ropes and U-brake elements Steinschlagschutz Eastside Catchments Gibraltar, GI 4/9

CAN Geotechnical IRATA (Industrial Rope Access Trade Association) operatives pulling the ringnet panels to meet ready for connecting together with shackles RXE-5000 rockfall barrier ring net panels being disconnected from the posts and banding being cut off ring nets Post and mesh panels were lifted into position by crane. Visible the old small and insufficient barriers being replaced by the RXE-5000 Steinschlagschutz Eastside Catchments Gibraltar, GI 5/9

RXE-5000 rockfall barrier border post tensioning of the top support ropes to the anchor blocks. Visible scale of rockfall danger behind the barrier Another view of the RXE-5000 rockfall barrier installation during phase 1 RXE-5000 rockfall barrier post base showing running wheel attached and one running wheel loose for connection. This unique technology protects ropes and allows their almost frictionless movement Steinschlagschutz Eastside Catchments Gibraltar, GI 6/9

View of the completed RXE-5000 rockfall barrier after completion of phase 2 Ring nets and ropes on the RXE-5000. Visible secondary mesh behind ring net End post of the RXE-5000 Steinschlagschutz Eastside Catchments Gibraltar, GI 7/9

Lateral anchors, note the special casing around the top of the bar. View of the completed RXE-5000 at the end of phase 2 View of the completed RXE-5000 at the end of phase 2 Steinschlagschutz Eastside Catchments Gibraltar, GI 8/9

Für Fragen steht Ihnen unser Geobrugg Spezialist gerne zur Seite Alexander Bittendorfer Project Manager Germany South Tel. +41 71 466 84 29 Mobil +41 78 601 06 14 Alexander.Bittendorfer@geobrugg.com Geobrugg info@geobrugg.com www.geobrugg.com A company of the BRUGG Group Certified to ISO 9001 Steinschlagschutz Eastside Catchments Gibraltar, GI 9/9