North American Palladium Signs Option Agreement for the Sunday Lake Project and Commences New Exploration Strategy

Similar documents
North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

North American Palladium Provides Update on Lac des Iles Exploration Program

Transition Continues to Intersect Significant Platinum-rich PGM Mineralization at Sunday Lake

V Sample from C.O.D vein 15 metres southwest of V

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Transition Metals Acquires Advanced Stage Ni-Cu-PGM Projects

CHAMPION BEAR RESOURCES

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

Wallbridge Completes Successful Initial Drill Program at Beschefer

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

A B C PAD A HIGHLIGHTS

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Highlights from the four holes announced in this news release include:

For personal use only

Detour Gold Reports Drilling Results from Lower Detour

For personal use only

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

PRESENTATION BUILDING VALUE IN ARGENTINA Las Aguilas Overview

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Sudbury Platinum Discovers New Ni-Cu-PGM Mineralization at its Aer-Kidd Property

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

DENISON ANNOUNCES 2018 EXPLORATION & EVALUATION PROGRAM FOCUSED ON HIGH PRIORITY PROPERTIES

(416) Highlights include:

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

Discovering Canadian Gold and Diamonds. Oxford Lake Project, Manitoba

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

New Drilling Program Commences at Mutiny s Deflector Deposit

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

Transition Metals and Implats Make Platinum Discovery at Sunday Lake, Intersecting 20.2 meters grading 3.22 Combined PGM s HIGHLIGHTS

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Parkin Offset Properties. Sudbury, Ontario

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

News Release. Infill Drilling Program

Teranga s Golden Hill Drill Program Intersects High-Grade Gold and Expands Mineralized Zones at Peksou and Ma Prospects

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

HANNAN SEISMIC SURVEY IDENTIFIES MULTIPLE NEW DRILL TARGETS IN IRELAND

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Sudbury Platinum intersects near surface Ni-Cu-Co-PGM mineralization at Aer-Kidd

QUITO PROJECT. December Northwest Mining Association Annual Conference. Austin, Nevada BVA:TSX.V BRT: FSE

Transition Hits 42.9 metres Grading 3.43 g/t PGM at Sunday Lake

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

EXPLORING NEW GOLD FRONTIERS IN CANADA

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Photo: Jean Laforest, Qiqavik Property, Nunavik

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

Drilling Extending Mineralization in La Mina North Zone

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

Three High Priority Targets Identified Through Modeling of Electromagnetic Data From 2011 SkyTEM Survey

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

CAUTIONARY STATEMENT

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Yellowknife Gold Project

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

FOCUSED ON ACQUIRING, EXPLORING AND ADVANCING QUALITY MINING PROJECTS IN THE AMERICAS CORPORATE PRESENTATION 1

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

Rogue Resources Channel Sampling Returns Up to 99.9% SiO2 on Same Quartzite Unit G, 1.4 Km from Last Reported High Grade Results

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

Exploring for Precious and Base Metals in Sweden. Barsele Minerals Corp. (TSX.V: BME) June 2017

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

IVANHOE MINES EXTENDS HUGO NORTH GEOPHYSICAL ANOMALY FOUR KILOMETRES NORTH ADDITIONAL GEOPHYSICAL TARGETS IDENTIFIED

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

First Cobalt to Acquire 70% Interest in 190 Square Kilometres in the DR Congo

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Gungnir Resources Inc.

Transcription:

North American Palladium Signs Option Agreement for the Sunday Lake Project and Commences New Exploration Strategy Toronto, Ontario, June 20, 2017 North American Palladium Ltd. ( NAP or the Company ) (TSX: PDL) (OTC PINK: PALDF) is pleased to announce the signing of a Definitive Option Agreement (the Option Agreement ) with Impala Platinum Holdings Limited ( Implats ) and Transition Metals Corp ( Transition ) that provides the Company with the exclusive right to acquire a 75% ownership position in the Sunday Lake Project located near Thunder Bay, Ontario. The Sunday Lake Project is host to a recently discovered platinum group element ( PGE ) copper nickel sulfide deposit. The Company is also providing details on its regional exploration strategy. Highlights: Option Agreement signed with Implats and Transition, through its wholly-owned subsidiary, HTX Minerals, providing the Company with an option to acquire a 75% ownership stake in the Sunday Lake PGE-Cu-Ni sulfide project, by making cumulative total cash payments of $3.5 million and completing a minimum of $4.5 million in qualified expenditures over a five year staged earn-in period. The Sunday Lake Project is located within trucking distance of the Company s Lac des Iles mine and hosts a recently discovered magmatic sulfide deposit having typical, combined Pt + Pd grades in the 2 to 5 g/t range over true thicknesses of several metres up to a maximum of ~40 metres. The Company has commenced the implementation of a new exploration strategy, as part of its overall business plan, which features up to $10 million of annual exploration spending over the next three years on targets at the Company s Lac des Iles mine, Sunday Lake and its current Greenfields properties. We are very pleased to announce the signing of a Definitive Option Agreement with Impala Platinum and Transition Metals in connection with the Sunday Lake property. The Sunday Lake property rounds out our portfolio of early-stage to advanced exploration opportunities within our strategic exploration area of interest extending over a radius of 50 km from our Lac des Iles mill, said Mr. Jim Gallagher, the Company s President and CEO. Late last year, our board of directors approved a comprehensive exploration strategy that will potentially deliver timely resource additions on our Lac des Iles Mine property and our substantial Greenfields property portfolio. Following the recently announced increases in our mineral reserves and life of mine production plan at Lac des Iles, NAP is now well positioned to execute on this strategy, continued Mr. Gallagher. We look forward to building on the encouraging, recent exploration results on the Sunday Lake Project. Our immediate priority is to advance the project to the resource delineation stage. In addition, after a multi-year effort, we now hold mineral rights over all of the known Lac des Iles suite of intrusions and are well-positioned to translate our new insights into the ore-forming processes at Lac des Iles into future discoveries of PGE-rich magmatic sulfide deposits on a condensed timeframe, said Dr. David C. Peck, the Company s Vice President, Exploration. Sunday Lake Agreement On June 20, 2017, the Company, signed a Definitive Option Agreement (the Option Agreement ) with Impala Platinum Holdings Limited ( Implats ) and Transition Metals Corp ( Transition ) through its wholly-owned subsidiary of HTX Minerals Corp, with respect to the Sunday Lake PGE-Cu-Ni exploration project (Figure 1). The Sunday Lake property comprises approximately 2,600 hectares of mineral claims and patents and is located 25 km due north of the city of Thunder Bay and approximately 95 km by road from the Company s Lac des Iles mill. Exploration drilling completed in the period 2013-2015 under a joint venture agreement between Implats and Transition completed 20 diamond drill holes totaling 12,017 metres on the Sunday Lake property. This drilling delineated a semi-continuous zone of PGE-rich magmatic sulfide mineralization covering an area of ~800 metres 1

long and 300 metres wide and reaching ~40 metres in vertical thickness (Figure 2). Drilling highlights are provided in Table 1. Additional details on the exploration results from the Sunday Lake property are available www.transitionmetalscorp.com. The Sunday Lake PGE-Cu-Ni deposit remains open to surface and along strike. This summer, the Company will conduct geophysical and geochemical surveys in advance of its initial approximately 7,000 metre surface drilling program later in the year. Initial exploration will focus on: Determining the lateral and vertical limits of the deposit; Testing for local areas of thicker and/or higher-grade mineralization, including more massive accumulations of magmatic sulfide mineralization and more PGE-rich disseminated sulfides; and Testing for a mineralized feeder along-strike from and beneath the currently-delineated mineralization. Table 1. Selected Highlights from Recent Exploration Drilling on the Sunday Lake Property Hole From To Length 1 Pt Pd Cu Ni Number (m) (m) (m) (g/t) (g/t) (%) (%) SL-13-002 395.0 415.2 20.2 2.11 0.95 0.26 0.11 SL-15-013 849.7 892.6 42.9 1.92 1.40 0.44 0.17 including 871.4 881.5 10.1 3.18 2.28 0.71 0.28 SL-14-003 389.3 401.0 11.7 1.79 0.94 0.12 0.04 and 526.0 541.0 15.0 1.80 0.92 0.22 0.09 SL-14-008 656.6 674.4 17.8 1.17 0.70 0.27 0.11 SL-14-006 825.0 835.9 10.9 1.38 0.83 0.30 0.12 SL-15-010 723.0 738.0 15.0 1.25 0.75 0.20 0.08 Source: Transition Metals news releases on the Sunday Lake property for the period 2013-2015 (www.transitionmetalscorp.com) 1 All interval lengths have been interpreted by Transition Metals as approximating the true thickness The Option Agreement provides the Company with the exclusive right to acquire a 75% ownership in the Sunday Lake property by making cumulative total cash payments of $3.5 million and completing a minimum of $4.5 million in qualified expenditures over a five year staged earn-in period. Should Lac des Iles Mine Property complete all requirements under the Option Agreement, it will hold an undivided 75% interest in the property and Transition will retain its existing 25% interest. Thereafter, the Company and Transition will enter into an Exploration Joint Venture with Transition having no financial commitments to the Joint Venture until a Feasibility Study is completed, whereupon Transition can elect to participate in future programs at its pro-rata ownership level or have its interest diluted. 2

Figure 1. Plan view map showing the location of the Sunday Lake PGE-Cu-Ni exploration property. The background image is a colour gradient total magnetic field map based principally on government airborne magnetic survey data. The grid coordinates reflect the NAD 83 datum and the UTM Zone 16N projection. Figure 2. Plan view map showing the location of recent exploration drill holes and the currently known limits to the Sunday Lake PGE-Cu-Ni deposit. Figure modified from the image included in the Transition Metals Corp. news release dated November 16, 2015. Exploration Strategy This year the Company commenced the implementation of a new exploration strategy, which is designed to increase the Company s inventory of PGE-rich magmatic sulfide deposits within a strategic exploration area of interest extending 50 km from the Lac des Iles mill. The Company s revamped long-term exploration strategy is summarized as follows: 3

Mineral Reserves replacement on the Lac des Iles Mine Property through extension and conversion drilling adjacent to the principal Mineral Reserves and mining areas; Mineral Resource additions (both underground and at surface) on other parts of the Lac des Iles Mine Property through exploration drilling, supported by geophysical and geochemical surveys; and Delineation of new Mineral Resources on other Lac des Iles suite intrusions and on the Sunday Lake property. The Company intends to invest up to $10M annually in exploration over the next three years on targets at the Lac des Iles minesite, Sunday Lake Project and its current Greenfields properties. Lac des Iles Minesite Current priorities for exploration on the Lac des Iles Mine Property include: Underground extensions to the known orebodies and a recently added high-priority target south of the Offset Zone and the Camp Lake fault (Figure 3); and Two surface targets, including the central-east part of the Property and far southern end of the Property (South Lac des Iles intrusion), which is modelled to contain the extension of the main feeder structure to the Offset and Roby zone deposits (Figure 4). Figure 3. Oblique longitudinal projection, looking west, and showing the current priority underground resource extension and exploration targets on the Lac des Iles mine property, including: Mystery Zone; South Offset; North Offset; and, Camp Lake. 4

Figure 4. Plan view map showing the location of the two highest priority surface exploration targets on the Lac des Iles Mine Property with respect to the existing Roby pit, planned future pit operations (Roby pushback and Sheriff pit) and existing surface infrastructure. Abbreviation: TMF = tailings management facility. Greenfields Properties The Company is also increasing its investment in Greenfields exploration. The current Greenfields properties cover an area of 43,088 hectares and capture all known Lac des Iles suite intrusions (Figure 5). All of these properties are situated within 50 km of the mine site and many of them are known to host near-surface, Pd-rich magmatic sulfide mineralization having similar characteristics to the Roby and Offset zone deposits in the Mine Block intrusion at Lac des Iles. Historical exploration data for the Greenfields properties have been integrated with more recent geophysical and geochemical survey information to guide the selection and ranking of anomalous features having geological characteristics similar to the PGE deposits at Lac des Iles. The current Greenfields exploration program will focus on the search for thick, vertically-oriented PGE-rich sulfide mineralization within major, regional structures that may have acted as feeders to the Lac des Iles suite intrusions. Concurrently, the Company is preparing to resume exploration drilling on several existing targets including, but not limited to: The Tib Lake property, where the Company intends to test for the presence of a mineralized feeder structure in an area hosting Pd-rich disseminated sulfide mineralization known as the Kuhner showing; and The Shelby Lake property, where recent exploration work identified Lac des Iles-style, Pd-rich magmatic sulfide mineralization at several different locations. The Company will provide regular updates on its Lac des Iles and Greenfields property exploration programs as significant new results become available. 5

Figure 5. Location of the Company s Greenfields exploration properties (black outline polygons) with respect to the Lac des Iles Mine Property. The background image is a colour gradient total magnetic field map based principally on government airborne magnetic survey data. The grid coordinates reflect the NAD 83 datum and the UTM Zone 16N projection. Note: All dollar amounts discussed in this news release refer to Canadian dollars unless otherwise stated Technical Information and Qualified Persons Dr. David C. Peck, P.Geo., the Company s Vice President, Exploration and a Qualified Person under National Instrument 43-101, has reviewed and approved all technical items disclosed in this news release. About North American Palladium Ltd. North American Palladium Ltd. (TSX: PDL) (OTC PINK: PALDF) is a Canadian company with over 20 years of production at Lac des Iles mine, located northwest of Thunder Bay, Ontario. North American Palladium is the only pure play palladium producer in the world. With over 500 employees, Lac des Iles mine features a unique world class ore body and modern infrastructure, including both an underground mine and an open pit mine. For further information please contact: North American Palladium Ltd. Investor Relations Telephone: 416-360-7374 Email: IR@nap.com Cautionary Statement on Forward-Looking Information Certain information contained in this news release constitutes 'forward-looking statements' within the meaning of the 'safe harbor' provisions of Canadian securities laws and the United States Private Securities Litigation Reform Act of 1995. All statements other than statements of historical fact are forward-looking statements. The words target, plan, should, could, estimate, guidance, and similar expressions identify forward-looking statements. Forward-looking statements in this news release include, without limitation: information pertaining to the Company s strategy, plans or future financial or operating performance, such as statements with respect to, long term fundamentals for the business, operating performance expectations, project timelines, tailings management plan, mining method change, production forecasts, operating and capital cost estimates, expected mining and milling rates, cash balances, 6

projected grades, mill recoveries, metal price and foreign exchange rates and other statements that express management s expectations or estimates of future performance. Forward-looking statements involve known and unknown risk factors that may cause the actual results to be materially different from those expressed or implied by the forward -looking statements. Such risks include, but are not limited to: the possibility that metal prices and foreign exchange rates may fluctuate, the risk that the Lac des Iles mine may not perform as planned, that the Company may not be able to meet production forecasts, the possibility that the Company ma y not be able to generate sufficient cash to service its indebtedness and may be forced to take other actions, inherent risks associated with development, exploration, mining and processing including environmental risks and risks to tailings capacity, employment disruptions, including in connection with collective agreements between the Company an d unions, the risks associated with obtaining necessary licenses and permits and uncertainty regarding the ability to consummate the Recapitalization. For more details on these and other risk factors see the Company s most recent Annual Information Form / Form 40-F on file with Canadian provincial securities regulatory authorities and the SEC. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The factors and assumptions contained in this news release, which may prove to be incorrect, include, but are not limited to: that the Company will be able to continue normal business operations at its Lac des Iles mine, that metal prices and exchange rates between the Canadian and United States dollar will be consistent with the Company s expectations, that there will be no significant disruptions affecting operations, and that prices for key mining and construction supplies, including labour, will remain consistent with the Company s expectations. The forward-looking statements are not guarantees of future performance. The Company disclaims any obligation to update or revise any forward-looking statements, whether as a result of new information, events or otherwise, except as expressly required by law. Readers are cautioned not to put undue reliance on these forwardlooking statements. 7