NEWS RELEASE FORAN INTERSECTS 27 METRES OF CONTINUOUS MINERALIZATION

Similar documents
NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

NEWS RELEASE. Foran Completes Winter Program with High-Grade Copper and/or Zinc in All Holes Drilled at Bigstone

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

A B C PAD A HIGHLIGHTS

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Drilling Highlights: Phase II BCV Infill Drilling

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Detour Gold Reports Drilling Results from Lower Detour

The Inferred Mineral Resource Statement prepared by SRK for the Talbot Deposit is detailed below.

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Rockcliff Expands Talbot Copper Deposit to 4.2Mt at 3.4% Copper Equivalent (1.6% Copper, 1.8 g/t Gold, 1.4% Zinc, 28.0g/t Silver)

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

ET and and and

News Release. Infill Drilling Program

Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone

InZinc Intersects 6.8m of 16.5% Zinc Focuses on Western Expansion of High Grades at West Desert Project

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

(TSXV: GPLY, OTCQB: GLYXF

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Highlights from the four holes announced in this news release include:

True Width (m) Carneritos to

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Skeena Intersects g/t AuEq over metres at Eskay Creek

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Northern Dynasty Minerals Ltd.

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

FALCO ANNOUNCES INITIAL HORNE 5 DRILLING RESULTS. Confirmation Holes in Line with Historical Data

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

NEWS RELEASE November 5, 2018

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

PUMA EXPLORATION AND TREVALI MINING CORPORATION DRILLED 13.1% Zn, 4.8% Pb OVER 27.0 METERS AT MURRAY BROOK DEPOSIT

CAUTIONARY STATEMENT

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

V Sample from C.O.D vein 15 metres southwest of V

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

Goldplay President and CEO Marcio Fonseca commented

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

BK Copper Project Strong Copper Results Confirm and Extend BKM

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

NEWS RELEASE CANADIAN ZINC REPORTS REMAINING DRILL RESULTS AT LEMARCHANT DEPOSIT, SOUTH TALLY POND PROJECT, NEWFOUNDLAND

August 20, 2018 SBB NR SBB TSX

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

Cove Gold Project 2201 Discovery Update, May 2014

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

Orsu Metals hits 2.62 g/t Au over 22.2 metres and proves higher gold grades at Zone 23, Sergeevskoe Gold Project, Russia

IDAHO CHAMPION INTERSECTS 4.80 GRAMS PER TONNE GOLD OVER 5.9 METRES IN HIGHLY OXIDIZED ZONE AT THE BANER PROJECT

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

NORTHQUEST LTD. ANNOUNCES DRILLING RESULTS FROM THE PISTOL BAY GOLD PROJECT, NUNAVUT, CANADA

April Exploring for Canadian Gold in the Rainy River District of Ontario

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

Dalradian Intersects 2.48 metres Grading g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt

BARKERVILLE INTERSECTS G/T AU OVER 9.10 METRES AT ISLAND MOUNTAIN AND PROVIDES CORPORATE UPDATE

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Transcription:

NEWS RELEASE FORAN INTERSECTS 27 METRES OF CONTINUOUS MINERALIZATION Including 8.2m of massive sulphide grading 11.3% Zn Vancouver, BC (September 27, 2018) - Foran Mining Corporation (TSX.V: FOM) ( Foran or the Company ) is pleased to announce results from an additional three holes of the summer resource definition drill program at its 100% owned McIlvenna Bay zinc-copper deposit ( McIlvenna Bay ) in Saskatchewan. McIlvenna Bay is the largest undeveloped Volcanogenic Massive Sulphide ( VMS ) deposit along the 225 kilometre Flin Flon Greenstone Belt. This world class metallogenic belt is host to 29 past and present producing mines, including Hudbay Minerals Inc. s 777 and Lalor operations. Patrick Soares, President & CEO of Foran commented, We continue to intersect thick, high-grade zones of mineralization at the McIlvenna Bay deposit as indicated by these latest results. We have just wrapped up a four drill program where we have completed over 12,000m of drilling. In addition to the resource definition and in-fill drilling program, holes for metallurgical sampling, geotechnical and hydrogeological studies have been completed. This information is critical to the preparation of the feasibility study we initiated earlier this year. Highlights: The three holes included in this release all targeted the zinc-rich Zone 2 massive sulphide lens in the central portion of the deposit. Drilling continues to intersect significant widths of high-grade zinc mineralization in the massive sulphide horizons and thick zones of copper-gold enriched mineralization in the underlying Copper Stockwork Zone ( CSZ ), as highlighted by holes MB-18-217w1 and MB-18-214: MB-18-217w1 11.30% Zn, 0.25% Cu, 22.98 grams per tonne ( g/t ) Ag, 0.16 g/t Au over 8.19 metres ( m ) from Zone 2 1.37% Cu, 0.15% Zn, 6.49 g/t Ag, 0.43 g/t Au over 18.72m from the CSZ MB-18-214 9.80% Zn, 0.40% Cu, 11.55 g/t Ag, 0.17 g/t Au over 5.15m from Zone 2 1.23% Cu, 0.08% Zn, 4.72 g/t Ag, 0.11 g/t Au over 29.83m from the CSZ

Technical Information This release provides the results of three of the 36 drill holes completed during the 2018 summer drill program at McIlvenna Bay which commenced on July 1, 2018. This phase of drilling has targeted the central portion of the deposit where drill holes can be collared during summer conditions. The bulk of the program was conducted utilizing four drills with the final hole of the program completed on September 24, 2018. Logging and sampling of the final holes from the program is underway. The drill program focused on resource definition drilling, the collection of metallurgical samples and gathering further geotechnical and hydrogeological data. The McIlvenna Bay deposit consists of several distinct zones of VMS mineralization, including massive to semi-massive sulphide in Zone 2, the Upper West Zone ( UWZ ) and Lens 3, and stockwork-style sulphide mineralization in the underlying CSZ. These latest holes targeted the deposit at depths of between 300 and 550m below surface. Detailed results from these holes are provided in Table 1 below: Table 1: Significant drill intercepts from the summer drill program 1 : Hole Zone From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Cu (%) Zn (%) CuEq 2 ZnEq 2 % % MB-18-212w1 Zone 2 635.10 638.77 3.67 0.32 24.19 0.75 5.30 4.20 7.00 CSZ 638.77 646.00 7.23 0.37 11.00 1.73 0.60 1.94 MB-18-214 Lens 3 397.02 398.18 1.16 0.30 22.76 1.00 5.24 Zone 2 413.44 418.59 5.15 0.17 11.55 0.40 9.80 6.46 10.76 CSZ 423.09 452.92 29.83 0.11 4.72 1.23 0.08 1.27 MB-18-217w1 Lens 3 278.89 279.46 0.57 0.15 7.10 0.30 3.63 Zone 2 292.09 300.28 8.19 0.16 22.98 0.25 11.30 7.31 12.17 CSZ 300.28 319.00 18.72 0.43 6.49 1.37 0.15 1.60 1 True thickness is estimated to be approximately 80-85% of drill indicated. Holes MB-18-214 and MB-18-217w1 were drilled at an off section azimuth for geotechnical purposes and report true thicknesses that are estimated at 60-70% of drilled length. 2 CuEq and ZnEq calculated using the following metal prices: US$2.83/lb Cu; US$1.14/lb Zn; US$1,194/oz Au; US$14.34/oz Ag and includes provisions for metallurgical recoveries. Hole MB-18-212w1 was a wedged hole drilled off the parent hole MB-18-212 (previously released, see September 11, 2018 news release) to provide additional sample material for upcoming metallurgical testing. The wedge hole intersected a similar interval of the Zone 2 massive sulphide, approximately 2m updip from the parent hole. Both MB-18-212 and 212w1 targeted a large gap in the drilling in the central part of the deposit at a vertical depth of approximately 570m below surface. These holes successfully tightened up the drill spacing in this portion of the resource and should allow material previously classified as inferred in this part of the deposit to be upgraded to indicated. Hole MB-18-214 was drilled near the boundary between the UWZ and Zone 2 massive sulphide to better define that contact and infill a gap in the drilling in the upper part of the deposit (approximately 350m below surface). The hole was drilled at an oblique angle to the majority of the drill holes with a dual purpose of providing information for the upcoming resource estimate and detailed geotechnical information to

assist with mine planning. The hole intersected a high-grade zinc-rich massive sulphide interval of the Zone 2 massive sulphide, over 5.15m of core length grading 9.80% Zn. The massive sulphide was followed directly downhole by a thick 29.83m interval of the underlying CSZ. Hole MB-18-217w1 was another oblique hole drilled to provide both resource and geotechnical information. This hole was drilled as a wedge off of parent hole MB-18-217 (assays pending) targeting the Zone 2 massive sulphide approximately 270m below surface. As outlined in Table 1, MB-18-217w1 intersected another thick, high grade massive sulphide interval grading 11.30% Zn, followed directly downhole by an 18.72m interval of the CSZ. The summer drill program was completed on September 24, 2018, encompassing over 12,098m of drilling in 36 holes, which included 14 wedge cuts drilled to collect additional material for metallurgical samples (six of these were drilled from historic holes which were re-entered to allow special representation for metallurgical purposes). Three short holes were also drilled as part of this program to collect geotechnical information in the area of the proposed portal site and three holes were drilled to allow the installation of piezometers elsewhere in the deposit area as part of a larger hydrogeological testing program to characterize local ground water flow. Hydrogeological studies during the summer program also included seepage testing in nearby Hanson Lake and profile tracer testing in a number of drill holes to better quantify natural groundwater flow rates in the area to be included in ongoing feasibility level studies. Figure 1. McIlvenna Bay Drill Plan

Figure 2. McIlvenna Bay Long Section Quality Assurance and Quality Control Drilling was completed using NQ size diamond drill core and core was logged by employees of the Company. During the logging process, mineralized intersections were marked for sampling and given unique sample numbers. Sampled intervals were sawn in half using a diamond blade saw. One half of the sawn core was placed in a plastic bag with the sample tag and sealed, while the second half was returned to the core box for storage on site. Sample assays are being performed by TSL Laboratories Ltd. ( TSL ) in Saskatoon, Saskatchewan. TSL is a CAN-P-1579, CAN-P-4E (ISO/IEC 17025:2005) accredited laboratory and independent of Foran. Analysis for Ag, Cu, Pb and Zn is performed using atomic absorption spectrometry ( AA ) after multi-acid digestion. Au analysis is completed by fire assay with AA finish. Any samples which return results greater than 1.0 g/t Au are re-run using gravimetric finish. A complete suite of QA/QC reference materials (standards, blanks and pulp duplicates) are included in each batch of samples processed by the laboratory. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data.

About Foran Mining Foran is a zinc-copper exploration and development company with projects located along the Flin Flon Greenstone Belt. The McIlvenna Bay Project, Foran s flagship asset located within the Hanson Lake District, is part of this world class VMS belt that extends from Snow Lake, Manitoba, through Flin Flon to Foran s ground in eastern Saskatchewan, a distance of over 225 kilometres and just 65 kilometres from Flin Flon. McIlvenna Bay is one of the largest undeveloped VMS deposits in Canada. The Company has completed two resource definition and infill drilling programs in 2018 (winter and summer) in preparation for producing a feasibility study on the McIlvenna Bay deposit. On December 4, 2017, Foran announced the execution of a Technical Services Agreement with Glencore Canada Corporation ( Glencore ). Glencore has agreed to provide technical expertise and advice in order to advance the McIlvenna Bay deposit to feasibility in exchange for an off-take agreement on the metals and minerals produced from the deposit. On November 12, 2014, Foran announced a positive preliminary economic assessment ( PEA ) for McIlvenna Bay, with an estimated pre-tax NPV7% of $382M ($263M after-tax) & 22% IRR (19% after-tax) at a Zinc price of US$1.06/lb. Spot Zinc price today is US$1.40/lb. See below and Foran s news releases from November 12 and December 22, 2014 for important disclosures with respect to the McIlvenna Bay PEA. The PEA is considered preliminary in nature and includes mineral resources, including inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves have not yet demonstrated economic viability. Due to the uncertainty that may be attached to mineral resources, it cannot be assumed that all or any part of a mineral resource will be upgraded to mineral reserves. Therefore, there is no certainty that the results concluded in the PEA will be realized. Roger March, P.Geo., Vice President, Exploration for Foran and a Qualified Person within the meaning of National Instrument 43-101, has reviewed and approved the technical information in this release. Foran trades on the TSX.V under the symbol FOM. For additional information, please contact Foran Mining Corporation: Patrick Soares President & CEO 904 409 Granville Street Vancouver, BC, Canada, V6C 1T2 Phone: +1 604-488-0008 Email: ir@foranmining.com

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. Forward Looking Statements This news release contains forward-looking information which is not comprised of historical facts. Forwardlooking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, Foran s objectives, goals or future plans, statements regarding the Technical Services Agreement and, if a feasibility study will suggest an economically viable project, estimation of mineral resources, exploration results, and potential mineralization,. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, work performed under the Technical Services Agreement related to preparation of a feasibility study, the failure of such study to suggest an economically viable project, failure to convert estimated mineral resources to reserves, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in Foran s public documents filed on SEDAR. Although Foran believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Foran disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.