COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

Similar documents
Highlights from the four holes announced in this news release include:

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

Probe Metals Continues to Expand Gold Zones At Val-d Or East

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

A B C PAD A HIGHLIGHTS

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Detour Gold Reports Drilling Results from Lower Detour

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

ET and and and

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

For personal use only

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

For personal use only

July Exploring for Canadian Gold in the Rainy River District of Ontario

New Drilling Program Commences at Mutiny s Deflector Deposit

Skeena Intersects g/t AuEq over metres at Eskay Creek

Colt Resources intersects 17.4% Cu over 0.42 metres (0.32 m true width) at Miguel Vacas Copper Project in its Borba exploration concession in Portugal

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

ASX Announcements & Media Release

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

For personal use only

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

May 12, 2016 News Release Valley of the Kings Infill Drilling Intersects 37,000 Grams Per Tonne Gold

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

First Cobalt Extends Iron Creek 100 Metres Downdip in Central Area

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

BK Copper Project Strong Copper Results Confirm and Extend BKM

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

NEWS RELEASE FORAN INTERSECTS 27 METRES OF CONTINUOUS MINERALIZATION

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

(TSXV: GPLY, OTCQB: GLYXF

Drilling Highlights: Phase II BCV Infill Drilling

Diamond Drilling confirms depth potential for mineralisation at Mrima Hill.

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

PROJECT 81 Lucas Gold Deposit 2018 Winter Drilling Program Assay Results

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Trading Symbol: ADA TSX-V; C2Z-Frankfurt Press Release No Shares Outstanding: 104,808,584 November 1, 2006

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

PUMA EXPLORATION AND TREVALI MINING CORPORATION DRILLED 13.1% Zn, 4.8% Pb OVER 27.0 METERS AT MURRAY BROOK DEPOSIT

NGEX DRILLS 42 METRES OF 1.13 G/T GOLD AND G/T SILVER AT FILO DEL SOL PROJECT

Goldcrest Resources Ltd.

36 Holes drilled in an approximate 100 meter by 100 meter grid covering an area of 1,000 meters long by 400 meters depth

Caravel commences major new drilling program at Calingiri copper-molybdenum project 8,500-9,000m of RC drilling planned across multiple targets

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

For Immediate Release MORE HIGH-GRADE GOLD AT ASCOT S GOLDEN TRIANGLE PROPERTY

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE

Ausgold awarded EIS grant for Jinkas deep drilling

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Northern Dynasty Minerals Ltd.

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

For personal use only

MINAURUM GOLD INC : : News Releases

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Remaining assay results Tisová Co Au Cu Project Czech Republic

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

ATLANTIC GOLD REPORTS ADDITIONAL RESULTS FROM THE PHASE 3 RESOURCE EXPANSION DRILL PROGRAM AT FIFTEEN MILE STREAM

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

Nortec Minerals reports Assays, Phase 1 drilling, Tom 1 North - Priority 1 Target, Tomboko Gold Property, Northeast Guinea, West Africa

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

For personal use only

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Transcription:

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS Vancouver, British Columbia September 19, 2018 Copper Mountain Mining Corporation (TSX: CMMC ASX:C6C) (the Company or Copper Mountain ) is pleased to announce that is has completed Phase 2 of its 3- Phase drilling program at the New Ingerbelle property, and results continue to be positive. New Ingerbelle is located adjacent to the present operations of the Copper Mountain Mine (See Appendix A for New Ingerbelle location map). Highlights from the remaining set of 14 drill holes of phase 2 include: Hole 18IG-24 returning 188 metres of 0.55% CuEq (0.38% Cu, 0.45 g/t Ag, 0.25g/t Au) which includes 114 metres of 0.71% CuEq (0.49% Cu, 0.51 g/t Ag, 0.32 Au g/t) Hole 18IG-26 returning 135 metres of 0.71% CuEq (0.49% Cu, 0.97g/t Ag, 0.32g/t Au) Hole 18IG-18 returning 339 metres of 0.37% CuEq (0.27% Cu, 0.53g/t Ag, 0.14g/t Au) Hole 18IG-27 returning 96 metres of 0.55% CuEq (0.39% Cu, 0.69g/t Ag, 0.23g/t Au), and Hole 18IG-28 returning 54 metres of 0.58% CuEq (0.42% Cu, 0.80g/t Ag, 0.23g/t Au) and 90 metres of 0.62% CuEq (0.46% Cu, 0.57g/t Ag, 0.23g/t Au) Gil Clausen, Copper Mountain s President and CEO stated, These drill results continue to demonstrate that New Ingerbelle has the potential to be of considerable size and significance to the Company. We have extended mineralization below prior resource limits, expanded it laterally and filled in the resource as planned. With the Phase 2 drilling program complete, we are now working on incorporating the results into an updated mineral resource for New Ingerbelle, which we expect to announce shortly. We believe New Ingerbelle will continue to increase in significance as a development project for the Company and will fit perfectly in our organic development pipeline of growth projects. Copper Mountain initiated a 3-Phase drilling program at the New Ingerbelle Mine last year with Phase 1, which was successful in validating and confirming historical data. Phase 2, which consists of 29 drill holes totalling approximately 10,000 metres, was designed to expand the New Ingerbelle resource area and convert Inferred Mineral Resources to the Measured and Indicated status. Having now completed the second phase, work is currently underway to update the Resource. The updated Resource estimate is planned to be announced before the end of the third quarter of 2018. Significant intercepts from the remaining 14 holes that have not yet been announced from the Phase 2 drill program, are summarized in the table below. A drill hole location map for the Phase 2 program and associated cross sections can be found in Appendix B, while a detailed listing of drill holes being reported can be found in Appendix C.

Drill hole Azimuth Dip Length (m) From (m) To (m) Interval (m) Cu % Ag g/t Au g/t CuEq % 18IG-16 118-48 426 6.0 36.0 30.0 0.16 0.37 0.08 0.22 372.0 402.0 30.0 0.22 0.42 0.11 0.30 18IG-17 32-51 540 435.0 474.0 39.0 0.24 0.45 0.13 0.33 18IG-18 77-45 439.3 31.0 370.0 339.0 0.27 0.53 0.14 0.37 incl. 157.0 211.0 54.0 0.38 0.82 0.17 0.50 incl. 220.0 265.0 45.0 0.52 0.92 0.23 0.68 incl. 271.0 328.0 57.0 0.31 0.55 0.18 0.43 18IG-19 21-51 538 51.0 84.0 33.0 0.29 1.02 0.08 0.35 402.0 456.0 54.0 0.20 0.32 0.12 0.28 18IG-22 23-51 603 120.0 135.0 15.0 0.26 1.07 0.07 0.32 330.0 384.0 54.0 0.26 0.57 0.17 0.38 468.0 522.0 54.0 0.26 0.45 0.17 0.38 18IG-23 194-45 150 12.0 39.0 27.0 0.46 1.07 0.3 0.67 18IG-24 284-55 294 19.0 36.0 17.0 0.33 0.65 0.21 0.47 102.0 291.0 188.0 0.38 0.45 0.25 0.55 incl 177.0 291.0 114.0 0.49 0.51 0.32 0.71 18IG-25 155-58 147 7.3 66.0 59.0 0.26 0.66 0.16 0.38 18IG-26 42-57 381 44.0 87.0 43.0 0.32 0.72 0.19 0.45 117.0 168.0 51.0 0.23 0.54 0.14 0.33 231.0 366.0 135.0 0.49 0.97 0.32 0.71 18IG-27 335-58 270 36.0 132.0 96.0 0.39 0.69 0.23 0.55 18IG-28 6-55 425 54.0 75.0 21.0 0.29 0.76 0.21 0.44 93.0 123.0 30.0 0.21 0.56 0.13 0.30 147.0 201.0 54.0 0.42 0.80 0.23 0.58 246.0 276.0 30.0 0.37 0.41 0.60 0.77

315.0 405.0 90.0 0.46 0.57 0.23 0.62 18IG-29 45-48 449 15.0 302.0 287.0 0.19 0.35 0.12 0.27 incl 59.0 107.0 48.0 0.27 0.48 0.21 0.41 329.0 350.0 21.0 0.53 0.97 0.34 0.76 *CuEq% is based on metal content only as historical recoveries have not yet been verified. Metal prices assumed in the calculation are US$2.75/lb Cu, US$1,250/oz Au, and US$16/oz Ag. Competent Persons Statement The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Peter Holbek, B.SC (Hons), M.Sc. P. Geo. Mr. Holbek is a full time employee of the Company and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Holbek does consent to the inclusion in this news release of the matters based on their information in the form and context in which it appears. Peter Holbek is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical content of this release. About Copper Mountain Mining Corporation Copper Mountain s flagship asset is the 75% owned Copper Mountain mine located in southern British Columbia near the town of Princeton. The Copper Mountain mine produces about 90 million pounds of copper equivalent per year with a large resource that remains open laterally and at depth. Copper Mountain also has the permitted, development stage Eva Copper Project in Queensland, Australia and an extensive 379,000 hectare highly prospective land package in the Mount Isa area. Copper Mountain trades on the Toronto Stock Exchange under the symbol CMMC and Australian Stock Exchange under the symbol C6C. Additional information is available on the Company s web page at www.. On behalf of the Board of COPPER MOUNTAIN MINING CORPORATION Gil Clausen Gil Clausen, P.Eng. Chief Executive Officer

For further information, please contact: Letitia Wong, Vice President Corporate Development & Investor Relations 604-682-2992 Email: letitia.wong@cumtn.com or Dan Gibbons, Investor Relations 604-682-2992 ext. 238 Email: dan.gibbons@ Website: www. Note: This release contains forward-looking statements that involve risks and uncertainties. These statements may differ materially from actual future events or results. Readers are referred to the documents, filed by the Company on SEDAR at www.sedar.com, specifically the most recent reports which identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements. The Company undertakes no obligation to review or confirm analysts expectations or estimates or to release publicly any revisions to any forward-looking statement.

APPENDIX A: NEW INGERBELLE LOCATION

APPENDIX B: PHASE 2 DRILL HOLE MAP

APPENDIX B: CROSS SECTIONS

APPENDIX C: 2018 New Ingerbelle Drill Holes HOLE-ID EASTING NORTHING ELEVATION (m) LENGTH (m) 18IG-16 677329 5468082 993 426 18IG-17 677136 5467666 1124 540 18IG-18 677325 5468083 993 439 18IG-19 677296 5467712 1122 538 18IG-20 677362 5467874 1014 198 18IG-21 677357 5467870 1015 116 18IG-22 677463 5467766 1104 603 18IG-23 677123 5467823 1039 150 18IG-24 677118 5467829 1040 294 18IG-25 677124 5467819 1040 147 18IG-26 677126 5467818 1040 381 18IG-27 677118 5467827 1040 270 18IG-28 677355 5467871 1015 425 18IG-29 677390 5467896 1014 449 Diamond drilling, which runs 24/7, uses NQ2 diameter rods and bits and drill core is placed in wooden boxes which are delivered to the core logging area at the end of every shift. Drill-hole collars are surveyed with differential GPS and down-hole surveys using a Reflex instrument are taken approximately every 30-80m depending on ground conditions and hole length. The core is logged, and sample tags a stapled into the boxes where samples are to be taken and the core is photographed. Core recovery is always at, or near, 100% except for fault zones. All assay samples are 3m in length. Core is split with a diamond saw, and samples are transported to the mine s analytical laboratory by members of the exploration team. Samples are sorted, weighed, dried and crushed prior to pulverizing to 75% passing -200mesh. Cu and Ag are analyzed by XRF and samples with >0.4% Cu are re-analyzed by Atomic Absorption. Sample pulps for all samples >0.1% Cu are delivered to a commercial lab for Au analysis by either fire assay or Aqua Regia digestion followed by AA analysis. Additionally, every tenth sample is analyzed by ICP-AES for a 35-element suite, which includes Cu and Ag providing checks on the mine-site laboratory, in addition to routine insertion of standards and blanks. All pulps and coarse-reject material are retained. Intercept grades are length-weighted averages using uncut grades. For additional information on project land holdings, history, production data, geology and mineralization, the reader is directed to Canadian NI:43-101 reports which a filed under the company name on the SEDAR website.