CesrTA Status Report Mark Palmer for the CesrTA Collaboration March 4, 2009 ESR

Similar documents
THE CONVERSION AND OPERATION OF THE CORNELL ELECTRON STORAGE RING AS A TEST ACCELERATOR (CESRTA) FOR DAMPING RINGS RESEARCH AND DEVELOPMENT*

CESRTA Preliminary Recommendations for the ILC Damping Rings

Detailed Characterization of Vacuum Chamber Surface Properties Using Measurements of the Time Dependence of Electron Cloud Development

CesrTA Program Overview

ILC November ILC08 Chicago November 2008

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

Measurements and simulations of electron-cloudinduced tune shifts and emittance growth at CESRTA

Plans for CESR (or Life Without CLEO)

Critical R&D Issues for ILC Damping Rings and New Test Facilities

Electron Cloud Studies at the Cornell Electron Storage Ring. Matt Lawson

Sunday morning: Beam Dynamics Issues. Session highlights and outstanding questions. M. Pivi and D. Rubin ECLOUD10 October 8-12 Cornell University

Emittance Dilution In Electron/Positron Damping Rings

The TESLA Dogbone Damping Ring

STUDIES AT CESRTA OF ELECTRON-CLOUD-INDUCED BEAM DYNAMICS FOR FUTURE DAMPING RINGS

NEXT GENERATION B-FACTORIES

Electron Cloud Induced Beam Dynamics at CesrTA. Kiran Sonnad

Lattice Design and Performance for PEP-X Light Source

ILC Damping Ring Alternative Lattice Design (Modified FODO)

Emittance Growth and Tune Spectra at PETRA III

Ultra-Low Emittance Storage Ring. David L. Rubin December 22, 2011

Electron Cloud Issues for the Advanced Photon Source Superconducting Undulator

e + e Factories M. Sullivan Presented at the Particle Accelerator Conference June 25-29, 2007 in Albuquerque, New Mexico e+e- Factories

WG2 on ERL light sources CHESS & LEPP

Linear Collider Collaboration Tech Notes

Report from the Luminosity Working Group of the International Linear Collider Technical Review Committee (ILC-TRC) Chairman: Greg Loew

FIG. 5: Voltage scan in TiN coated chicane chamber: 1x45x1.25mA e+, 5.3GeV, 14ns.

Update to ECLOUD Calculations for the 3.2 and 6.4 km ILC Damping Ring Lattice Designs

Status of Fast Ion Instability Studies

e-cloud DAFNE T. Demma INFN-LNF

STUDIES OF THE ELECTRON-CLOUD-INDUCED BEAM DYNAMICS AT CESR-TA

TRAPPING OF ELECTRON CLOUD IN ILC/CESRTA QUADRUPOLE AND SEXTUPOLE MAGNETS

A New Resonance for Ecloud Physics in the ILC DR Wiggler

ELECTRON CLOUD MODELING RESULTS FOR TIME-RESOLVED SHIELDED PICKUP MEASUREMENTS AT CesrTA

Electron cloud mitigation strategy in SuperKEKB

LER 2010 Workshop Summary

Beam Physics at SLAC. Yunhai Cai Beam Physics Department Head. July 8, 2008 SLAC Annual Program Review Page 1

Measurement and Modeling of Electron Cloud Trapping in the CESR Storage Ring

Studies of Electron Cloud Growth and Mitigation in a Field Free Environment Using Retarding Field Analyzers

INVESTIGATION INTO ELECTRON CLOUD EFFECTS IN THE ILC DAMPING RING DESIGN

Optics considerations for

Choosing the Baseline Lattice for the Engineering Design Phase

Accelerator Physics at Cornell. Jeff Smith October 6th, 2006

SPPS: The SLAC Linac Bunch Compressor and Its Relevance to LCLS

Update on Optics Modeling for the ATF Damping Ring at KEK Studies for low vertical emittance

Construction Status of SuperKEKB

Upstream Polarimetry with 4-Magnet Chicane

Simulations of synchrotron-radiation-induced electron production in the CESR vacuum chamber wall

CYCLOTRON RESONANCES IN ELECTRON CLOUD DYNAMICS*

Studies of Electron Cloud Growth and Mitigation in a Field Free Environment Using Retarding Field Analyzers

Low-Emittance Beams and Collective Effects in the ILC Damping Rings

Electron Cloud Studies for KEKB and ATF KEK, May 17 May 30, 2003

Numerical study of FII in the ILC Damping Ring

n low emittance rings

Transverse Field Profile of the NLC Damping Rings Electromagnet Wiggler

Plans for HG Breakdown Effort at LBNL

Commissioning of PETRA III. Klaus Balewski on behalf of the PETRA III Team IPAC 2010, 25 May, 2010

Electron Cloud Modeling for CesrTA

Introductory Lecture: Overview of the Electron Cloud Effect in Particle Accelerators

ILC Damping Ring Alternative Lattice Design **

Linear Collider Collaboration Tech Notes

LCLS Accelerator Parameters and Tolerances for Low Charge Operations

Possible Remedies to Suppress electron cloud in ILC damping ring

Next Generation B-factories

Accelerator Physics. Accelerator Development

SuperB: Ring Issues. U. Wienands SLAC PEP-II. U. Wienands, SLAC-PEP-II SuperB Workshop Frascati, 16-Mar-06

Impedance and Collective Effects in Future Light Sources. Karl Bane FLS2010 Workshop 1 March 2010

Charge for WG2 (Optics and Beams)

Accelerator Design and Construction Progress of TPS Project

Vacuum and mechanical design of ILC DR

Alignment of the Dipole Magnets in the Cornell Electron-Positron Storage Ring

On-axis injection into small dynamic aperture

1. Fifth electron-cloud workshop, ECLOUD'12, June 5 to 8, 2012 La Biodola (Isola d'elba), Italy 2. Perspectives for positron operation at PETRA III

BEAM - BEAM TAILS STUDY FOR DAΦNE. D. Shatilov (BINP), M. Zobov

A Bunch Compressor for the CLIC Main Beam

Electron cloud effects in KEKB and ILC

Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory

Electron-Cloud Studies for the NLC and TESLA

CESR-c Status and Accelerator Physics

ANALYSIS OF SYNCHROTRON RADIATION USING SYNRAD3D AND PLANS TO CREATE A PHOTOEMISSION MODEL

Developments for Cornell's X Ray ERL

e + e - Linear Collider

Wigglers for Damping Rings

ILC Beam Dynamics Studies Using PLACET

Status of Optics Design

THE SPEAR3 UPGRADE PROJECT AT SLAC *

Tools of Particle Physics I Accelerators

RF System Calibration Using Beam Orbits at LEP

EXPERIMENTAL OBSERVATIONS OF IN-SITU SECONDARY ELECTRON YIELD REDUCTION IN THE PEP-II PARTICLE ACCELERATOR BEAM LINE a

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC

Electron-Cloud Theory & Simulations

Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses

Summary Report: Working Group 2 Storage Ring Sources Future Light Source Workshop SLAC, March 1-5, S. Krinsky and R. Hettel

COMBINER RING LATTICE

First Collective Effects Measurements in NSLS-II A. Blednykh Accelerator Physicist, BNL/NSLS-II Sep , 2014

Modeling CESR-c. D. Rubin. July 22, 2005 Modeling 1

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

STATUS OF KEKB PROJECT

LAST YEAR OF PEP-II B-FACTORY OPERATION*

FACET-II Design, Parameters and Capabilities

Status of the ESR And Future Options

Transcription:

CesrTA Status Report Mark Palmer for the CesrTA Collaboration March 4, 2009 ESR

Outline Recent Updates January run/february Down Overview Optics & LET xbsm Electron Cloud Studies Tune Data-Simulation Comparisons RFA Data Status and Plans Will cover a few things expect that some topics will be covered in talks from other labs March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 2

CesrTA Run & Down Recap Completed experimental run 2/2/2009 Low emittance correction in 2.085 GeV baseline optics X-ray Beam Size Monitor (xbsm) commissioning EC Measurements RFA & TE wave measurements Dynamics General instrumentation/feedback tests/commissioning 13 visitors LET - J. Jones, A. Wolski xbsm J. Flanagan, H. Sakai EC S. De Santis, R. Holtzapple, K. Shibata, L. Wang Feedback D. Teytelman, M. Tobiyama CLIC H. Schmickler Instrumentation A. DellaPenna, I. Pinayev 2 nd upgrade down is just concluding (first beam in CESR stored early this morning) Installation of PEP-II experimental hardware Installation of photon stop chamber for 5GeV operation of the CesrTA L0 wiggler straight Planned Contingency item: Replacement of SRF cavity that failed during summer 2008 Installation of xbsm beam line front end for electron beam Continue with instrumentation upgrade for 4ns bunch train operation New Contingency item: Repair of 15BW dipole coils (overheating bus-bar connection) March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 3

Optics and LET-January Run Low emittance 2.085 GeV optics loaded and corrected Correction methods tested Beam-based alignment measurements Coupling and dispersion bumps created for tuning Emittance measurements begun Touschek lifetime measurements initially used to characterize beam size xbsm measurements as detector and optics were characterized Ongoing program of magnet alignment to improve emittance Alignment work continued throughout the run 2 anomalous locations in the ring have been identified which are being scrutinized. March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 4

First Detailed Optics Correction Touschek Study xbsm Measurement (Preliminary) A. Wolski 1 1 ibunch τ = d + b Touschek Parameter Measured energy acceptance ~ 0.7% ε v ~ 32pm From xbsm σ v ~ 15±5 µm ε v ~ 38pm Appear to be within a factor of ~2 of the 20pm target March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 5

xbsm Snapshots (Preliminary) Scan of coupling knob Coded aperture measurements Smallest recorded size: ~15 µm (but further calibration work needed) Simulations Fresnel Zone Plate Coded Aperture Measurement <20µm beam size March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 6

EC Data-Simulation Updates Simulations of tune shifts in POSINST at Cornell and LBNL, using a new option in POSINST for offseting the bunches, have shown that the tune shifts of a single bunch are different if the whole train is oscillating coherently, than if just the single bunch is oscillating. Horizontal tune shifts in a dipole are much smaller when the whole train is oscillating coherently. This is particularly relevant for the tune shift measurements at CesrTA, since we kick the whole train coherently to do the measurement. Tune shifts calculated for a coherently oscillating beam give better agreement with measurements: see following three slides. January run Studies of systematic effects in the tune shift measurements were carried out. Measurements of tune shift vs. current for long trains (10, 20, 45 and 116 and 145 bunches) were carried out (evidence of instability developing at the end of the 116 and 145 bunch trains) RFA and TE wave measurements to characterize EC density in drifts, dipoles and wigglers Work on comparisons between RFA and TE wave measurements as well as systematics checks for both March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 7

10 Bunch Train with Trailing Witness Bunch(es) Data-POSINST Comparison (Preliminary) Experimental Procedure: 10 bunch leading train which generates the cloud Witness bunches placed at various delays behind the initial train Measure tunes of all bunches simultaneously Positron Beam Blue Vertical Q Red Horizontal Q Squares Simulation Circles Data March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 8

10 Bunch Train with Trailing Witness Bunch(es) Data-POSINST Comparison (Preliminary) Electron Beam Blue Vertical Q Red Horizontal Q Squares Simulation Circles Data March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 9

45 Bunch Train: Data-POSINST Comparison (Preliminary) Positron Beam Blue Vertical Q Red Horizontal Q Squares Simulation Circles Data March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 10

Drift vs Dipole Contributions Comparison of drift (red) and dipole (blue) contributions to tune shifts in each dimension Horizontal Positrons Vertical March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 11

L0 RFA Data 2E Segmented RFA Wiggler with RFAs and TiN-coated VC e+ e- Wiggler with RFAs and uncoated Cu VC 2/3/08 2W Segmented RFA March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 12

Cu wiggler (pole center) Electron-Positron Comparisons (1x45 Current Scans) 2W detector downstream of wigglers for e+ beam Segmented drift Positrons Cu wiggler (pole center) Electrons 2E detector downstream of wigglers for e- beam Segmented drift March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 13

Long Train Data 1x145 e+ 14 ns spacing 79% of ring filled Multipacting stripe Strongly visible in dipole Weaker in L0 wiggler and drift regions Dipole (Al VC) Cu wiggler, pole center Drift (Cu VC) March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 14

Machine Status and Plans All major CESR layout modifications are now complete! 4 Experimental areas for EC build-up and mitigation studies L0 wiggler straight Configured for RFA and TE Wave measurements of EC build-up 4 wiggler comparisons planned (CU-KEK-LBNL-SLAC collab.)» Cu vacuum chamber (installed)» TiN coated vacuum chamber (installed)» Grooved vacuum chamber ( summer 09 installation)» Clearing electrode vacuum chamber ( fall 09 installation) L3 straight w/pep-ii chicane and SEY sample station Sample station tests (CU-FNAL-SLAC collab.) Grooved chamber tests (CU-SLAC collab.) 15E/W Flexible location for testing chambers with dipole synchrotron radiation Presently planned comparisons (summer/fall 09)» Al vacuum chamber Segmented RFA» α carbon coated VC (CERN-CU collab.)» Enamel chamber with electrode (Project X collab.)» TiN-coated Al vacuum chamber Detailed beam dynamics studies at ultra low emittance Mid-2009 end of program Characterize instability thresholds High resolution bunch-by-bunch beam size measurements to characterize incoherent emittance growth Witness bunch studies for flexible control of EC interaction with beam Shielded Pickups 15E/W test chamber design for coating tests March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 15

L3 Experimental Region e+ Ion Detector (ERL) SEY Station e- PEPII Chicane EC VC West East Configured for In Situ SEY Measurements Sample 1: Radial outside Sample 2: 45 from radial outside Sample March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 16

CesrTA Information Next WebEx Meeting: Tuesday, March 10, 9am US EDT - details at: https://wiki.lepp.cornell.edu/ilc/bin/view/public/cesrta/collabmeetings Schedule Details at: https://wiki.lepp.cornell.edu/ilc/bin/view/public/cesrta/cesrtaschedule Startup period until March 16 Some CesrTA machine studies - focused on: 4ns instrumentation and feedback 5 GeV optics Parasitic Machine Studies throughout CHES run will be used to bring newly installed hardware on-line in preparation for spring-summer running periods Next Experimental Runs and Downs May 12 June 16, 2009 Experimental Run June 16 July 22, 2009 Down (NOTE: down has been extended to allow contingency for possible gun structure replacement) Startup and CesrTA Experimental Period through September 7 2009 CesrTA Workshop June 25-26 at Cornell Please mark your calendars! March 4, 2009 CesrTA Status Report - ILC Damping Rings Monthly WebEx 17