FFAG diagnostics and challenges

FFAG Accelerators. CERN Introductory Accelerator School Prague, September 2014

University of Huddersfield Repository

University of Huddersfield Repository

Conceptual design of an accumulator ring for the Diamond II upgrade

arxiv: v1 [physics.acc-ph] 21 Oct 2014

University of Huddersfield Repository

FFA Accelerators Fixed Field Alternating Gradient

Pros and Cons of the Acceleration Scheme (NF-IDS)

University of Huddersfield Repository

COMBINER RING LATTICE

HIRFL STATUS AND HIRFL-CSR PROJECT IN LANZHOU

Hadron cancer therapy complex using nonscaling fixed field alternating gradient accelerator and gantry design

SRF GUN CHARACTERIZATION - PHASE SPACE AND DARK CURRENT MEASUREMENTS AT ELBE*

Lattice Design and Performance for PEP-X Light Source

ILC Damping Ring Alternative Lattice Design **

NON-SCALING FFAG MAGNET CHALLENGES

Diagnostics at the MAX IV 3 GeV storage ring during commissioning. PPT-mall 2. Åke Andersson On behalf of the MAX IV team

NON-SCALING FFAG AND THEIR APPLICATIONS

Status of PAMELA an overview of uk particle therapy facility using NS-FFAG

Accelerators and Lasers In Combined Experiments Susan Smith Daresbury Laboratory

The FFAG Return Loop for the CBETA Energy Recovery Linac

Transverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21

PULSE-TO-PULSE TRANSVERSE BEAM EMITTANCE CONTROLLING FOR MLF AND MR IN THE 3-GeV RCS OF J-PARC

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

A Proposal of Harmonictron

HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study. Deliverable Report SIMULATION MODELS FOR ENERGY DEPOSITION

Low energy electron storage ring with tunable compaction factor

HEATHER. HElium ion Acceleration for radiotherapy. Jordan Taylor, Rob Edgecock University of Huddersfield Carol Johnstone, Fermilab

Choosing the Baseline Lattice for the Engineering Design Phase

PoS(EPS-HEP2015)522. The status of MICE Step IV

Low Emittance Machines

APPLICATIONS OF ADVANCED SCALING FFAG ACCELERATOR

Isochronous (CW) Non-Scaling FFAGs: Design and Simulation

1 GeV CW nonscaling FFAG for ADS, and magnet parameters

Accelerator Design and Construction Progress of TPS Project

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH

PRISM system status and challenges

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

University of Huddersfield Repository

LAYOUT AND SIMULATIONS OF THE FONT SYSTEM AT ATF2

Search for an electric dipole moment with polarized beams in storage rings

VELA/CLARA as Advanced Accelerator Studies Test-bed at Daresbury Lab.

Notes on the HIE-ISOLDE HEBT

Accelerator Physics. Tip World Scientific NEW JERSEY LONDON SINGAPORE BEIJING SHANGHAI HONG KONG TAIPEI BANGALORE. Second Edition. S. Y.

University of Huddersfield Repository

Accelerator system for the PRISM based muon to electron conversion experiment

Physics 610. Adv Particle Physics. April 7, 2014

The IBEX Paul Trap: Studying accelerator physics without the accelerator

Non-Scaling Fixed Field Gradient Accelerator (FFAG) Design for the Proton and Carbon Therapy *

Transitioning Between FFAG Arcs

Carbon/proton therapy: A novel gantry design

First commissioning of the HLS-II storage ring*

Overview of Acceleration

Electron Spectrometer for FLASHForward Plasma-Wakefield Accelerator

Status of the ESR And Future Options

DEVELOPMENT OF LARGE SCALE OPTIMIZATION TOOLS FOR BEAM TRACKING CODES*

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER

Critical R&D Issues for ILC Damping Rings and New Test Facilities

Plans for CESR (or Life Without CLEO)

Longitudinal Top-up Injection for Small Aperture Storage Rings

The optimization for the conceptual design of a 300 MeV proton synchrotron *

ERL FOR LOW ENERGY ELECTRON COOLING AT RHIC (LEREC)*

The TESLA Dogbone Damping Ring

Low slice emittance preservation during bunch compression

Compressor Lattice Design for SPL Beam

LCLS Injector Straight Ahead Spectrometer C.Limborg-Deprey Stanford Linear Accelerator Center 8 th June 2005

Abstract. 1. Introduction

Accelerator Physics. Accelerator Development

Synchrotron Based Proton Drivers

BEAM DYNAMICS ISSUES IN THE SNS LINAC

Low Emittance Machines

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC

Theory English (Official)

1.5-GeV FFAG Accelerator as Injector to the BNL-AGS

On-axis injection into small dynamic aperture

OPTIMIZATION OF COMPENSATION CHICANES IN THE LCLS-II BEAM DELIVERY SYSTEM

Tomographic transverse phase space measurements at PITZ.

Title Lattice Dedicated for Medical Use. Akira; Iwashita, Yoshihisa; Inoue,

Developments of the RCNP cyclotron cascade

BEAM TESTS OF THE LHC TRANSVERSE FEEDBACK SYSTEM

ALIGNMENT RESULT FOR MAGNET UNITS OF THE SPRING-8 STORAGE RING

ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF

Accelerator. Physics of PEP-I1. Lecture #7. March 13,1998. Dr. John Seeman

3.2 The MAX IV 3 GeV Storage Ring

S. Guiducci. Table 1 PADME beam from Linac. Energy (MeV) 550. Number of positrons per pulse Pulse length (ns)

The Luminosity Upgrade at RHIC. G. Robert-Demolaize, Brookhaven National Laboratory

Consideration for polarization in FCChh. V. Ptitsyn (BNL)

CERN Accelerator School. Intermediate Accelerator Physics Course Chios, Greece, September Low Emittance Rings

Nonlinear Single-Particle Dynamics in High Energy Accelerators

arxiv: v1 [physics.acc-ph] 18 Dec 2013

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002

Operational Experience with HERA

Short Introduction to CLIC and CTF3, Technologies for Future Linear Colliders

Tools of Particle Physics I Accelerators

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

University of Groningen. Extraction and transport of ion beams from an ECR ion source Saminathan, Suresh

STATUS REPORT ON STORAGE RING REALIGNMENT AT SLRI

SIMULATION STUDY FOR MEIC ELECTRON COOLING*

Transcription:

University of Huddersfield Repository Edgecock, R. Commissioning of the EMMA Non-Scaling FFAG Original Citation Edgecock, R. (2010) Commissioning of the EMMA Non-Scaling FFAG. In: Proceedings of the 1st International Particle Accelerator Conference. IPAC 2010. JACoW, Kyoto, Japan, pp. 3593-3596. ISBN 978-92-9083-352-9 This version is available at http://eprints.hud.ac.uk/21170/ The University Repository is a digital collection of the research output of the University, available on Open Access. Copyright and Moral Rights for the items on this site are retained by the individual author and/or other copyright owners. Users may access full items free of charge; copies of full text items generally can be reproduced, displayed or performed and given to third parties in any format or medium for personal research or study, educational or not-for-profit purposes without prior permission or charge, provided: The authors, title and full bibliographic details is credited in any copy; A hyperlink and/or URL is included for the original metadata page; and The content is not changed in any way. For more information, including our policy and submission procedure, please contact the Repository Team at: E.mailbox@hud.ac.uk. http://eprints.hud.ac.uk/

Proceedings of IPAC 10, Kyoto, Japan THXMH01 COMMISSIO I G OF THE EMMA O -SCALI G FFAG R. Edgecock, STFC Rutherford Appleton Laboratory, Didcot, UK. Abstract EMMA is the world's first non-scaling fixed field alternating gradient accelerator and is being constructed at the STFC Daresbury Laboratory. Experience from the initial commissioning phases (from early 2010) will be reported and lessons for future machines of a similar type will be discussed. The present experimental status and future plans will also be reported. Table 1: EMMA Parameters Energy range 10 to 20 MeV Cell Doublet Number of cells 42 RF 19 cavities; 1.3 GHz Cell length 394.481 mm Ring circumference 16.57 m I TRODUCTIO The EMMA accelerator has been discussed in detail elsewhere at this conference [1]. Basically, it is a linear, non-scaling FFAG (ns-ffag) which is being built to demonstrate and study in detail the unique features of this type of machine, in particular: the very small momentum compaction, approaching 0 in some regions of phase space the multiple resonance crossings during acceleration bucketless or serpentine acceleration for relativistic particles (see figure 1). In addition, it will be used to benchmark the purpose-built or modified tracking codes that are being used to model this type of accelerator for this and a variety of other applications [2]. Figure 1: Serpentine acceleration: the phase of the beam is shown with respect to that of the RF system during acceleration. EMMA is being built at the STFC Daresbury Laboratory and will accelerate electrons from 10 to 20 MeV. The parameters of the machine are summarised in table 1. It will use a doublet lattice and will have 42 magnetic cells. The electron beam will be provided by the existing ALICE accelerator [3] at the Daresbury Laboratory and a new injection line has been built to transport the beam to the EMMA ring. The layout of the facility is shown schematically in figure 2. EMMA LATTICES As the primary purpose of EMMA is to study, as fully as possible, the beam dynamics of ns-ffags, 8 different magnetic lattices [4] have been created to probe the longitudinal and transverse phase space of the machine. The properties of these lattices are summarised in table 2. To achieve the aims of the project, they have been designed to have different tune footprints, and hence cross different major resonances (see figure 3). As EMMA is flexible enough to introduce known errors, for example magnetic field errors in some magnetic cells, and asymmetries, e.g. the number of powered RF cavities, it will be possible to do detailed studies of the effect of the resonances as a function of the machine parameters. In addition, as the time-of-flight (ToF) in a non-scaling machine is not perfectly parabolic and symmetric about the central energy, it is important to check how the longitudinal beam dynamics change as the parabola changes. The lattices have been designed so that the position of the minimum in the ToF occurs at different energies and the ToF variation is different (see figure 4). The specifications for the machine have largely been determined by the needs of these 8 lattices. Table 2: Properties of the 8 EMMA lattices Lattice ToF Resonances crossed minimum 3ν x=1 ν x+2ν y=1 ν x-2ν y=0 070221b Symmetric Yes Yes No 070221c Symmetric Yes No No 070221d Symmetric No No No 070221e Symmetric Yes No Yes 070221f 14 MeV Yes Yes No 070221g 15.5 MeV Yes Yes No 070221h 14 MeV Yes No Yes 070221i 15.5 MeV Yes No Yes EXPERIME TAL PROGRAMME The experimental programme is broken into two parts: (1) commissioning, and (2) experimental studies. Each of A12 FFAG, Cyclotrons 3593

THXMH01 Proceedings of IPAC 10, Kyoto, Japan Figure 2: The layout of EMMA. Shown is a short section of the ALICE machine, with a new dipole magnet to steer the beam into the injection line (bottom of the picture). The EMMA ring, showing the 42 cells, is on the left and the diagnostics beam line at the top. these is discussed in more detail in the following subsections. Complete ring commissioning, with all 7 girders in place, but without acceleration. Acceleration commissioning. Extraction line commissioning, including the diagnostic devices in this line and the first measurement of the extracted beam parameters. Although some parts of the experimental programme described below will be undertaken during these commissioning phases, the full programme will only be possible once all the phases have been completed. Figure 3: Single cell tune footprint over the full energy range for each lattice. Straight lines are single-cell resonance lines up to third order, solid lines are upright driven (except the linear coupling resonance). Commissioning The commissioning of the EMMA has been planned in several stages, as follows: As beam is required from ALICE between 10 and 20 MeV and it does not usually run at these energies, some setting up and optimisation is required. In addition, measurements of some the beam properties in ALICE, e.g. emittance, are required. Commissioning of the injection line. The beam must be transported to the end of the line and measurements made of the beam properties. Injection into the EMMA ring. It is currently planned to inject into 4 out of the 7 EMMA girders, otherwise known as 4 sector commissioning. This will enable a number of measurements to be made without the beam making a complete turn. Figure 4: Time of flight as a function of energy for the different lattices. Experimental programme The experimental programme will also proceed in a number of stages. The first will be to measure the tunes and time-of-flight as a function of beam energy. Several methods for making these measurements have been proposed and will be studied during the commissioning phase. These measurements, in comparison to the expectations from a computer model in the Zgoubi code [5], will allow the tuning of the lattice to the baseline lattice initially required (070221b above). Once this is 3594 A12 FFAG, Cyclotrons

Proceedings of IPAC 10, Kyoto, Japan THXMH01 established, the next step will be to demonstrate serpentine acceleration and verify that this behaves as expected. Once these phases have been completed, the true experimental programme can commence. The first step in this will be to scan the longitudinal phase space in both phase and energy, measuring the beam distributions and any emittance distortion in the process. These will be compared with the computer model. The second step will be to vary the RF frequency and voltage and check the effect on the serpentine channel, in particular this channel closing. Again, the beam distributions and any emittance distortion will be measured as a function of these parameters and compared with the model. The third step will be to investigate the transverse dynamics of the accelerator. In particular, this will include measuring the dynamic aperture versus energy, as a function of phase, RF frequency and voltage, and the time-of-flight as a function of the beam transverse amplitude. Any differences in the longitudinal behaviour as the beam is accelerated at larger transverse amplitudes will also be measured. The next step will be to investigate in more detail resonance crossings for the baseline lattice. There are several ways in which this can be done. As already discussed above, it is possible to introduce significant artificial errors in EMMA and modelling has already shown that these can generate measureable effects even at the normal acceleration rates (see figure 5). However, the preferred method of study is to slow down the acceleration rate to study the emittance distortion as a function of acceleration. What will be achievable will only be known once the experimental programme has started. The final step will be to repeat these measurements with the other 7 lattices. This will allow a study of how the crossing of different resonances affects the accelerator performance, in particular the dynamic aperture and the transverse emittance growth. It will also show how changes to the time-of-flight curve affect the longitudinal beam dynamics. A detailed comparison of the results with one or more computer models will bring a better understanding of how linear, non-scaling FFAGs work and benchmark these codes for other applications. EMMA STATUS Being the first machine of its type, there have been significant challenges in the design and construction of EMMA. Further, the compactness of the machine has made some components very difficult to design and build, in particular the injection and extraction systems. The result of this is the machine is not as advanced as had been hoped and commissioning of the ring has not yet started. The current status of the machine is shown in figures 6 and 7 and summarised below. As of the middle of May 2010, the injection line is complete and the first measurements of the beam in this have been made. These will be presented below. Four of the 7 EMMA girders are complete and in place in the experimental hall. The fifth and sixth girders were installed in the middle of May 2010 and this will be followed by about a month of cabling up, testing, etc. Once this is complete, 4 sector commissioning will start. The last girder will be completed and installed later in 2010 and this will be followed by the other commissioning steps and the experimental programme described above. Figure 5: Horizontal orbit errors for 21 (top) and 14 (bottom) RF cavities. Note that the increased asymmetry with 14 cavities excites the third integer resonance. Figure 6: Part of ALICE and the EMMA injection line. A12 FFAG, Cyclotrons 3595

THXMH01 Proceedings of IPAC 10, Kyoto, Japan Figure 7: EMMA as of the beginning of 2010. This shows the end of the injection line and the 4 (out of 7) ring girders in place at the time. COMMISSIO I G STATUS As explained above, EMMA commissioning has only recently started and only the first two bullet points above have been possible. This work is on-going and short running periods have been possible during the EMMA installation process. Only some very preliminary measurements are included here from the first attempt to pass beam through the injection line. There are 6 YAG screens in the injection line and figure 8 shows images from the first and last screens in the line. An initial analysis has started of the beam energy spread and emittance in this line, as this information is very important for beam loading and space charge effects in the ring. The energy spread is being measured from the beam size on a screen in a region of high dispersion and, although the analysis is very preliminary, the result obtained is consistent with expectations. The emittance is being determined from the Twiss parameters measured in the injection line tomography section. This work is not yet complete. CO CLUSIO S The EMMA non-scaling FFAG is being constructed at the STFC Daresbury Laboratory. Due to significant technical difficulties that have been encountered during the construction is this unique accelerator, there have been delays in starting commissioning. Nevertheless, the machine is now well advanced and measurements have been made of the beam in the injection line. These measurements are on-going and it is believed that injection into the first part of the EMMA ring should begin in the near future. REFERE CES [1] R. Edgecock et al, The EMMA non-scaling FFAG, IPAC10, Kyoto, May 2010, THPEC090, (2010); http://www.jacow.org. [2] C.R. Prior & W. Chou (eds), FFAG accelerators, ICFA Beam Dynamics Newsletter, 43, 2007. [3] D.J. Holder et al, in proceedings of the 11th European Particle Accelerator Conference, Genoa, Italy, 23-27 Jun 2008, pp 1001-1003. [4] J.S. Berg et al, The EMMA Lattice Design, PAC 07, Albuquerque, 2007. [5] F. Méot, The ray-tracing code ZGOUBI, Nucl. Instrum. Meths., A 427 (1999) 353. 3596 A12 FFAG, Cyclotrons