Provincial Standards for Early Exploration

Similar documents
Early Exploration Permit Activity Information

Early Exploration Plan Activity Information

On August 10, 2017, I conducted an inspection of the exploration site associated with Permit PR The inspection report is attached.

Mineral Exploration in Ontario October 2017 An overview prepared by Northwatch for the NWT Mineral Resources Act Workshop

Drilling. What is the Activity?

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

6 MACRAES MINING PROJECT MINERAL ZONE

Initial Borehole Drilling in the Hornepayne and Manitouwadge Area

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Initial Borehole Drilling and Testing in or Near Ignace

ONTARIO REGULATION 156/06. made under the CONSERVATION AUTHORITIES ACT

Swift Creek Sediment Management Action Plan (SCSMAP)

Gotechnical Investigations and Sampling

April 9, Phosphate Mining and Reclamation Overview

Roadmap to Stability

Initial Borehole Drilling and Testing in Central Huron,

Edward R. Sajecki Commissioner of Planning and Building. Conservation Authority Regulations and Mapping

(13 July 2018 to date) NATIONAL ENVIRONMENTAL MANAGEMENT ACT 107 OF 1998

WHAT IS MINERAL EXPLORATION?

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

An Introduction to Field Explorations for Foundations

Department of Energy OffIce of Worker Protection Programs and Hazards Management Radiological Control Technical Position RCTP

Defining the Limit of Regulated Areas. C.1 Defining the River or Stream Flood Hazard 138. C.2 Defining the River or Stream Erosion Hazard 139

GUIDELINES FOR OPEN PIT SLOPE DESIGN EDITORS: JOHN READ, PETER STACEY # & CSIRO. J x PUBLISHING

Common Exploration Methods.

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

Coarse Sediment Traps

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

10. GEOTECHNICAL EXPLORATION PROGRAM

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

Contents Introduction Purpose Background What is a hazardous chemical? What is the GHS?...

Copper and Zinc Production, Disciplined Growth. S I T E V I S I T O C T O B E R % Owned Projects

Rock slope rock wedge stability

Ohio Department of Transportation

Deep Borehole Disposal Performance Assessment and Criteria for Site Selection

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

Technical Standards for Reporting Assessment Work Under the Provisions of the Mining Act R.S.O. 1990

RE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H

Practical long-term planning in narrow vein mines a case study

4.12 Mineral Resources

V Sample from C.O.D vein 15 metres southwest of V

Detour Gold Reports Drilling Results from Lower Detour

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

What is a water table? What is an aquifer? What is the difference between a spring and a well?

7 Years of Cutting Edge Technology for the Mining Industry in Canada

Erosion and Sediment Control Measures 2.7 Silt Fences

NZQA unit standard New US6 to replace and version 1 Page 1 of 5

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

NUCLEAR POWER PLANT SITE SELECTION

Municipal Act, 2001 Loi de 2001 sur les municipalités

METROPOLITAN. Longwall 27 Outburst Events. Presenter Title

Hydraulic Impacts of Limestone Quarries and Gravel Pits. Jeff Green Minnesota DNR-Division of Ecological & Water Resources

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects

REPORT ON ESTIMATES OF GROUNDWATER INFLOW INTO AND DRAWDOWN AROUND THE PROPOSED OPEN PIT SOUTHDOWN IRON ORE PROJECT. Submitted to:

Table of Contents 8.1 GENERAL Overview Subsurface Exploration Methods Responsibilities... 8.

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Pressure Grouting of Fractured Bedrock to Control Acid Mine Drainage

Hydrogeology of Deep Borehole Disposal for High-Level Radioactive Waste

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

Great Atlantic Rock Samples Return up to 5.8 oz. / ton Gold Golden Promise Property in Central Newfoundland

APPLICATION FOR AUTHORITY TO DRILL A WELL (ADW)

Assessment of Concave and Linear Hillslopes for Post-Mining Landscapes 1

Curriculum Document Mining Technician: Strata Control Practitioner (Surface) Occupational Curriculum

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference.

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study

Spring 2018 Drill Program

SHORELINE PROVISIONS RESIDENTIAL LOT

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Ongoing Drilling of Kiena Deep a Zone Confirms Multiple High Grade Lenses and Extends Zone Down Dip

STAATSKOERANT, 7 APRIL 2017 No Environmental Affairs, Department of/ Omgewingsake, Departement van

NSW MINING Health, Safety, Environment & Community

U-Shaped Sediment Traps

Rock & Aggregate Drop Inlet Protection

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Fission Hits 61.09m total composite >10,000 cps with Metallurgical Drilling at R780E Zone

2016/2017 Geotechnical Investigation Work Plan

COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE

HOW. HOW vehicle mounted units portable units also available. HOW, WHEN & WHY to Geophysically Log in S.I.?

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

5.11 Geology and Soils

MINISTRY OF ENERGY AND MINES Mines and Mineral Resources. REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act)

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

April 27, Ground Water in Kingwood Township

The Owl Creek Pit Part 1: Relocating Mine Rock from Surface Stockpiles to the Pit to Mitigate Acid Drainage

ENGINEERING GEOLOGY AND ROCK ENGINEERING ASPECTS OF OPERATION AND CLOSURE OF KBS-3

Dolores Public Lands Office Highway 184 Dolores, CO Ph (970) Fax (970)

Municipality of Grey Highlands Policy

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

Environmental Assessment of Ogoniland Site Specific Fact Sheets OKULUEBU OGALE

Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots

Transcription:

Introduction Provincial Standards for Early Exploration Effective April 10, 2018 These Provincial Standards have been developed as part of the implementation of the graduated regulatory regime for early exploration under the Mining Act, R.S.O. 1990, c. M.14 as amended by Bill 173, the Mining Amendment Act, 2009, S.O. 2009, c. 21 (the Mining Act ), and the Exploration Plans and Exploration Permits regulation under the Mining Act, [O. Reg. 308/12]. There are three Parts to these Provincial Standards: I) Requirements for Carrying Out Exploration Plan Activities; II) Requirements for Carrying Out Exploration Permit Activities; and III) Requirements for Rehabilitation of Exploration Plan and Exploration Permit Activities. The requirements of Parts I and II apply when the respective early exploration activities are being carried out, while Part III Rehabilitation applies when the early exploration activities have been completed. In the event there is any conflict between the content of this document and the requirements in the Mining Act or its regulations, the requirements in the legislation will prevail. Part I and II have unique lists of early exploration activities identified in Schedule 2 and Schedule 3 of the Exploration Plans and Exploration Permit Regulations under the Mining Act. The Early Exploration Proponent ( Proponent ) will refer to the appropriate categories depending on the type of undertaking being contemplated. Part III Standards apply to both Exploration Plan and Exploration Permit Activities. These Provincial Standards are mandatory minimum requirements. Proponents are encouraged to adopt industry best practices such as those set out in the Excellence in Environmental Stewardship for Responsible Exploration (E3) guideline published by the Prospectors & Developers Association of Canada. 1.0 Definitions and Terminology Contained means to take preventative measures to ensure that early exploration materials do not make contact with a water body. Early Exploration has the same meaning as in the Exploration Plans and Exploration Permits regulation under the Mining Act, [O. Reg. 308/12]. Exploration Permit Activities means those activities that fall within Schedule 2 of the Exploration Plans and Exploration Permits regulation under the Mining Act, [O. Reg. 308/12]. Exploration Plan Activities means those activities that fall within Schedule 1 of the Exploration Plans and Exploration Permits regulation under the Mining Act, [O. Reg. 308/12]. Early Exploration Proponent has the same meaning as in the Exploration Plans and Exploration Permits regulation under the Mining Act, [O. Reg. 308/12].

Stripping means the removal of overburden Pitting and Trenching means the excavation of bedrock "Water body means lakes, rivers, creeks and streams and includes those wetlands that have a measurable or predictable response to a single runoff event.

Part I - Requirements for Carrying Out Exploration Plan Activities Early Exploration Proponents carrying out Exploration Plan Activities shall comply with the following requirements: 1.0 Geophysical Surveys 1.1 Where any geophysical survey involving a generator is being conducted, signs must be posted at exploration site access points to warn other persons of a potential electrical hazard and must remain in place for the duration of the survey activity. 2.0 Line Cutting 2.1 All line cutting is to be done using hand-held tools. 3.0 Mechanized Drilling 3.1 The following requirements apply whenever the drill rig is removed and taken to a new location: 3.1.1 Capping and Sealing of Drill Holes (a) if the drill hole is artesian or encounters underground mine openings or solution cavities the drill hole must be either: (i) sealed at the surface and into the upper bedrock by grouting the upper 30 metres of bedrock or the entire depth of the hole, whichever is the lesser; or (ii) capped with a screw-on or bolt on cap (b) if the drill hole is drilled through the bed of a water body, the drill hole must be sealed at the surface and into the upper bedrock by grouting the upper 30 metres of bedrock or the entire depth of the hole, whichever is the lesser, and the drill casing removed 3.1.2 Marking Drill Holes (a) all drill hole locations where casings are not removed are marked with durable reflective markers which are clearly visible in all seasons. 3.2 Drill core Drill Core samples must be stored not less than 30 metres from any water body.

4.0 Mechanized Surface Stripping 4.1 All stripped overburden must be stockpiled on site in a safe and stable manner, separately from waste rock and not less than 30 meters from any water body. Part II - Requirements for Carrying out Exploration Permit Activities Early Exploration Proponents carrying out Exploration Permit Activities shall comply with the following requirements: 1.0 Mechanized Drilling 1.1 The following requirements apply whenever the drill rig is removed and taken to a new location: 1.1.1 Capping and Sealing of Drill Holes (a) if the drill hole is artesian or encounters underground mine openings or solution cavities the drill hole must be either: (i) sealed at the surface and into the upper bedrock by grouting the upper 30 metres of bedrock or the entire depth of the hole, whichever is the lesser; or (ii) capped with a screw-on or bolt on cap (b) if the drill hole is drilled through the bed of a water body, the drill hole must be sealed at the surface and into the upper bedrock by grouting the upper 30 metres of bedrock or the entire depth of the hole, whichever is the lesser, and the drill casing removed 1.1.2 Marking Drill Holes (a) all drill hole locations where casings are not removed are marked with durable reflective markers which are clearly visible in all seasons. 1.2 Drill Core samples must be stored not less than 30 metres from any water body. 2.0 Mechanized Surface Stripping 2.1 All stripped overburden must be stockpiled on site in a safe and stable manner, separately from waste rock and not less than 30 meters from any water body.

3.0 Pitting and Trenching 3.1 The following requirements apply where a pit wall or vertical man-made rock face is greater than three metres in height: a) fencing that is at the minimum a high visibility barrier fence of at least one metre in height must be installed with a set back of at least 3 metres from the brow of the rock face or pit wall; b) signs stating Danger Open Pit in both English and French, measuring at least 30 centimetres by 30 centimetres, in letters that are at least 3.5 cm in size and made of durable weatherproof material must be posted in suitable locations to warn other persons of the potential hazard; and c) pits must be sloped to provide at least one ramp as a point of egress. 3.2 Disturbed bedrock must be stockpiled on site in a safe and stable manner and not less than 30 meters from any water body. Part III - Requirements for Rehabilitation of Exploration Plan and Exploration Permit Activities Early Exploration Proponents who have carried out Exploration Plan Activities or Exploration Permit Activities shall comply with the following requirements upon completion of the activity and in any event, prior to the expiry of the applicable Exploration Plan or Exploration Permit. 1.0 Drilling 2.0 Stripping 1.1 Capping and Sealing Drill Holes Drill holes must be sealed at surface and into the upper bedrock by grouting the upper 30 metres of bedrock or the entire depth of the hole, whichever is the lesser if the drill holes meet any of the following criteria: a) they produce water (artesian). b) they encounter underground mine openings or solution cavities. 1.2. Marking Drill Holes Where Casings Left All drill hole locations where casings are not removed must be marked with durable reflective markers which are clearly visible in all seasons. 1.3 Drilling Fluids and Cuttings All drilling fluids, cuttings and mud if left on site must be contained and must not be left less than 30 metres from any water body. 1.4 Drill Core Where drill core is left on the exploration site, it must be cross-piled in an orderly manner to a height not exceeding 1.5 metres and not less than 30 metres from any water body.

2.1 Disturbed overburden must be contoured to a stable angle of repose. 2.2 Stripped areas if not backfilled must be contoured to a stable angle of repose. 3.0 Pitting and Trenching 3.1 All pit walls or man-made vertical rock faces greater than three metres in height must be backfilled or contoured to a stable angle of repose. 3.2 All pits with walls greater than three metres in height if not backfilled must be sloped to provide at least one ramp as a point of egress. 3.3 Disturbed bedrock must be stockpiled on site in a safe and stable manner and not less than 30 meters from any water body.