GRUAN Site Report for Ny-Ålesund

Similar documents
GRUAN Station Report for Ny-Ålesund

Ny-Ålesund: Site Update & Atmosphere Flagship Program. Marion Maturilli, Sandro Dahlke, Roland Neuber, Andrea Merlone

GRUAN Data Flow and RS92 Data Product v2

GRUAN Site Report for La Réunion

Field experiments at Sodankylä

Status of GRUAN certification for French sites

RIVAL Field Campaign at the ENA, NSA, & SGP ARM Sites

Lead Centre report. Ruud Dirksen, GRUAN Lead Center. Meteorological Observatory Lindenberg. ICM-7 23 February 2015

GRUAN-wide strategy for the transition away from the RS92 radiosonde

Site Report: Lauder, New Zealand

Change management for the RS92 phase out

Water vapour above Switzerland over the last 12 years

Progress and Plan of China Xilinhot GRUAN works. Zhao Peitao Meteorological Observation Center (MOC) of CMA

Tr a n s r e g i o n a l C o l l a b o r a t i v e Re s e a r c h C e n t r e TR 172

Specifications for a Reference Radiosonde for the GCOS Reference. Upper-Air Network (GRUAN)

The Payerne Meteolabor Radiosonde

P7.7 A CLIMATOLOGICAL STUDY OF CLOUD TO GROUND LIGHTNING STRIKES IN THE VICINITY OF KENNEDY SPACE CENTER, FLORIDA

NIWA s Lauder Site 45.0 S, E 370m a.s.l.

The Meisei sonde data product

Interannual variation of MODIS NDVI in Lake Taihu and its relation to climate in submerged macrophyte region

Atmospheric circulation analysis for seasonal forecasting

On the statistical significance of climatic trends estimated from GRUAN tropospheric time series

GRUAN GNSS Precipitable Water (GNSS-PW) Task Team: Accomplishment, Progress and Plan

KING EDWARD POINT OBSERVATORY MAGNETIC DATA

GROUNDBASED FTIR, OZONESONDE AND LIDAR MEASUREMENTS FOR THE VALIDATION OF SCIAMACHY (AOID 331)

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities

The Vaisala Reference Radiosonde Program: First Results and Future Plans

KING EDWARD POINT OBSERVATORY MAGNETIC DATA

GAMINGRE 8/1/ of 7

Exploitation of ground based GPS for Climate and Numerical Weather Prediction applications COST action 716

Monthly Magnetic Bulletin

KOPRI s initiative for YOPP ( )

NWS Sterling Field Support Center (SFSC)

STATISTICAL FORECASTING and SEASONALITY (M. E. Ippolito; )

Monthly Magnetic Bulletin

KING EDWARD POINT OBSERVATORY MAGNETIC DATA

The German Contribution to the WMO GAW Programme:

DAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR

M. Mielke et al. C5816

SYSTEM BRIEF DAILY SUMMARY

Four Basic Steps for Creating an Effective Demand Forecasting Process

Government of Sultanate of Oman Public Authority of Civil Aviation Directorate General of Meteorology. National Report To

Location. Datum. Survey. information. Etrometa. Step Gauge. Description. relative to Herne Bay is -2.72m. The site new level.

Location. Datum. Survey. information. Etrometa. Step Gauge. Description. relative to Herne Bay is -2.72m. The site new level.

ENGINE SERIAL NUMBERS

Long-term Water Quality Monitoring in Estero Bay

Monthly Magnetic Bulletin

Determine the trend for time series data

The Meteorological Observatory from Neumayer Gert König-Langlo, Bernd Loose Alfred-Wegener-Institut, Bremerhaven, Germany

The GRUAN Observing Station Payerne - Switzerland

Agricultural Science Climatology Semester 2, Anne Green / Richard Thompson

Tracking Accuracy: An Essential Step to Improve Your Forecasting Process

Final Report. COMET Partner's Project. University of Texas at San Antonio

List of Exposure and Dose Metrics

GRUAN management of transition away from RS92 radiosonde summary of developments to date

UWM Field Station meteorological data

Multivariate Regression Model Results

Time Series Analysis

Research Activities at Sodankylä

Monthly Magnetic Bulletin

NASA Products to Enhance Energy Utility Load Forecasting

Instrument Cross-Comparisons and Automated Quality Control of Atmospheric Radiation Measurement Data

Three main areas of work:

Jackson County 2013 Weather Data

Demonstration of the new InterMet radiosondes system installed at the Tanzania Meterological Agency, Dar-es-Salaam

REPORT OF THE CBS-LC-NOAA/NCEI FOR GCOS

Meteorological Data recorded at Armagh Observatory from 1795 to 2001: Volume I - Daily, Monthly and Annual Rainfall

Guidelines for the Submission of the World Weather Records 2011+

Drought Characterization. Examination of Extreme Precipitation Events

Monthly Magnetic Bulletin

Variability and trends in daily minimum and maximum temperatures and in diurnal temperature range in Lithuania, Latvia and Estonia

Computing & Telecommunications Services Monthly Report January CaTS Help Desk. Wright State University (937)

Monthly Magnetic Bulletin

Korean Arctic Research 2015 update

SYSTEM BRIEF DAILY SUMMARY

VAISALA RS92 RADIOSONDES OFFER A HIGH LEVEL OF GPS PERFORMANCE WITH A RELIABLE TELEMETRY LINK

DYNAMO/CINDY Sounding Network

Mountain View Community Shuttle Monthly Operations Report

Applications of Meteorological Tower Data at Kennedy Space Center

Monthly Magnetic Bulletin

Wind Resource Data Summary Cotal Area, Guam Data Summary and Transmittal for December 2011

Climatography of the United States No

Overview of Ongoing and Planned Coordination Activities for the Year of Polar Prediction

Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center

Dates and Prices ICAEW - Manchester In Centre Programme Prices

Technical Report DMI SYNOP AWS Summit. Data status March Ellen Vaarby Laursen. SYNOP weather station Summit.

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed

GLAST Large Area Telescope Monthly Mission Review

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training

CIMA Professional

5.6. Barrow, Alaska, USA

CIMA Professional

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training

Monthly Magnetic Bulletin

Bericht des GCOS Sekretariats

2016 Meteorology Summary

Extreme Weather and Climate Change: the big picture Alan K. Betts Atmospheric Research Pittsford, VT NESC, Saratoga, NY

WIND DATA REPORT. Vinalhaven

REPORT ON LABOUR FORECASTING FOR CONSTRUCTION

Transcription:

WMO/IOC/UNEP/ICSU GLOBAL CLIMATE OBSERVING SYSTEM (GCOS) Doc. 7.14 (13.IV.2018) 10th GRUAN Implementation- Coordination Meeting (ICM-10) Potsdam, Germany 23-27 April 2018 Session 7 GRUAN Site Report for Ny-Ålesund (Submitted by Marion Maturilli) Summary and Purpose of this Document Report from the GRUAN site Ny-Ålesund for the period January to December 2017.

GRUAN Site Report for Ny-Ålesund (NYA) Reporting for the period January to December 2017 Date: 27-March-2018 Primary author: Marion Maturilli (marion.maturilli@awi.de) Overview During the period January to March 2017, the RS92 was launched as standard radiosonde on a daily basis. Since April 2018, the standard radiosonde has switched to the RS41 radiosonde. In regard of change management, dual soundings with RS92-RS41 payload have been launched on a weekly basis throughout the entire reporting period. Overall, the period with weekly dual soundings will cover two complete years from March 2016 to March 2018. All RS92 and RS41 sounding and metadata are transmitted to the LC using the RSLaunchClient, thus contributing to the GRUAN data stream. During specific campaign activities, the frequency of soundings was increased to 4 per day. Dataflow of GNSS data to GRUAN LC and the GRUAN GNSS processing centre at GFZ continues. Once formal data products have been defined, the Ny-lesund site may contribute to GRUAN data streams with lidar, microwave radiometer and ozone sonde data. Change and change management The transition RS92RS41 for the standard daily radiosonde was put into praxis on 1 April 2017. This transition is embedded in a two-year period with dual soundings on a weekly basis, between March 2016 and March 2018. In parallel to the radiosonde transition, also the receiving system / data acquisition has been changed, operating the MW41 Digicora system since April 2017 also to receive the RS92 data, thus providing *.mwx files instead of *.dc3db files. All dual sounding data are transferred to the LC using the RSLaunchClient. With the change in standard radiosonde, also the payload set-up for the CFH soundings has been adapted. Since May 2017, CFH is flown with a RS41 as transmitting radiosonde, with an ECC ozone sonde attached in a compact payload set-up.

Since the handling both of the receiving hardware as of the payload assembly has become easier, these soundings are now performed by the overwintering station personal after dedicated training. Resourcing The funding situation for the daily radiosonde measurements at the AWIPEV research base in Ny- Ålesund is currently settled. For sustainable financing of the bi-monthly CFH soundings it would be helpful if the CFH soundings became a GRUAN product. Operations We currently don t see any major challenges. Site assessment and certification Anytime ready for re-certification. GRUAN-related research The Ny-Ålesund site is contributing to the Task Team Sites. Other GRUAN-related research projects rather consider the scientific analysis of the long-term data set. A recent publication referring to the Ny-Ålesund radiosonde data set is Dahlke, S. and M. Maturilli (2017) Contribution of Atmospheric Advection to the Amplified Winter Warming in the Arctic North Atlantic Region, Advances in Meteorology. doi: 10.1155/2017/4928620 A recent publication combining the Ny-Ålesund long-term radiosonde data with radiosonde data from an expedition in the sea ice North of Svalbard is Kayser, M., M. Maturilli, R. M. Graham, S. R. Hudson, A. Rinke, L. Cohen, J.-H. Kim, and M. A. Granskog(2017) Vertical thermodynamic structure of the troposphere during the Norwegian young sea ICE expedition (N-ICE2015), Journal of Geophysical Research, doi: 10.1002/2016JC026089 WG-GRUAN interface We currently have no requests to the WG.

Items for ICM-10 plenary discussions Within the scientific community I find little awareness of the high-quality GRUAN data. Now that more GRUAN data products are generated, it could be discussed how the network may become more visible. Other archiving centers The CFH data are archived at NDACC. The Ny-Ålesund RS41 radiosonde data based on the manufacturer product are stored at www.pangaea.de (search term High resolution radiosonde measurements from station Ny-Ålesund ). Participation in campaigns Regarding the radiosonde program, the launch frequency was increased to 4 radiosondes per day during the period 25 May to 21 June 2017 in the frame of the (AC) 3 campaign [(AC) 3 = Arctic Amplification: Climate Relevant Atmospheric and Surface Processes and Feedback Mechanisms]. Here, Ny-Ålesund was the land-based reference measurement site for other campaign activities by plane and on the sea ice reached by icebreaker Polarstern, with the focus on Arctic mixed-phase clouds. Simultaneous 4x daily radiosondes were also launched from the icebreaker North of Svalbard. The Ny-Ålesund campaign and long-term data are used to set the campaign period into a climatological context. Another campaign period with 4x daily radiosoundings was between 29 August to 19 September 2017, in a cooperation with Japanese colleagues for ARCROSE-2017 [ARCROSE= Arctic Research Collaboration for Radiosonde Observing System Experiment]. The aim of this collaboration is the optimization of data assimilation. Future plans Ny-Ålesund is participating in the Special Observing Periods of the Year of Polar Prediction (YOPP), increasing the radiosonde launch schedule to 4x daily soundings in the periods February and March, as well as July to September 2018. Furthermore, the AWI section Atmospheric Physics has just moved into a new building, where we will also have lab facilities to assure a profound introduction to all relevant sounding procedures to our overwintering team that operates the sounding program at the AWIPEV research base in Ny-Ålesund, Svalbard.

GRUAN Site Report for NyAlesund (NYA), 2017 Reported time range is Jan 2017 to Dec 2017 Created by the Lead Centre Version from 2018-04-06 1 General GRUAN site information Object Value Station name NyAlesund Unique GRUAN ID NYA Geographical position 78.9200 N, 11.9400 E, 5.0 m Operated by AWI Alfred-Wegener-Institut für Polarforschung, part of: HELMHOLTZ Helmholtz-Gemeinschaft Main contact Maturilli, Marion WMO no./name 01004 NY-ALESUND II Operators currently 16, changes +3 / -5 Sounding Site 1 GNSS 1 1.1 General information about GRUAN measurement systems System Name Type Setups Measurements NYA-GN-01 GNSS Site NYA2 GNSS 1 operational NYA-RS-01 Ny-Aalesund Radiosonde Launch Site Sounding Site 8 490 1.2 General comments from Lead Centre 1.2.1 General Good communications between station and GRUAN LC. Yearly training of station staff by GRUAN LC.

System NYA-GN-01 2 System: GNSS Site NYA2 (NYA-GN-01) Object System name Unique GRUAN ID System type Geographical position Operated by Instrument contact Started at Defined setups Possible streams Value GNSS Site NYA2 NYA-GN-01 GNSS (GN - GNSS) 78.5136 N, 11.5212 E, 49.1 m GFZ Deutsches GeoForschungsZentrum GFZ, part of: HELMHOLTZ Helmholtz-Gemeinschaft Ramatschi, Markus 2000-03-13 1 (HOURLY) - 2.1 Lead Centre comments 2.1.1 Dataflow Dataflow of GNSS data to GRUAN LC and the GRUAN GNSS processing centre at GFZ has started in September 2013. This GNSS station is one of two test sites to implement the GNSS dataflow in GRUAN. The current dataflow includes manufacturer raw data, converted raw data (RINEX) and instrument logs, containing all equipment changes. - 2 -

3 System: Ny-Aalesund Radiosonde Launch Site (NYA-RS-01) Object System name Unique GRUAN ID System type Geographical position Operated by Instrument contact Started at Defined setups Possible streams Value Ny-Aalesund Radiosonde Launch Site NYA-RS-01 Sounding Site (RS - Radiosonde) 78.9230 N, 11.9227 E, 15.7 m AWI-POTSDAM Forschungsstelle Potsdam, part of: AWI Alfred-Wegener-Institut für Polarforschung, part of: HELMHOLTZ Helmholtz-Gemeinschaft Maturilli, Marion - 8 (ROUTINE, OZONE, FLASH, CFH, DUAL1, ROUTINE2, OZONE2, CFH2) CFH, ECC, RS41, RS92 3.1 Lead Centre comments 3.1.1 Change management Weekly dual launches of Vaisala RS92-SGP and RS41-SGP are performed since March 2016 and submitted to the GRUAN LC. 3.1.2 Dataflow Sonde dataflow to the GRUAN LC is operational since April 2012. Now, the dataflow includes streams of the Vaisala RS41-SGP, RS92-SGP, ECC Ozone sonde, CFH water vapour, and Intermet IMET-1. All launches are promptly submitted using the RsLaunchClient. 3.1.3 General Change of operational sonde from Vaisala RS92-SGP to Vaisala RS41-SGP was on 1 April 2017. - 3 -

3.2 GRUAN data products Product Version Soundings received Available at LC Distributed by NCEI 3.2.1 Stream: CFH CFH 6 6 3.2.2 Stream: ECC ECC 66 66 3.2.3 Stream: RS41 RS41 415 415 RS41-RAW 001 413 RS41-EDT 001 413 3.2.4 Stream: RS92 RS92 122 122 RS92-INT 001 29 RS92-RAW 001 92 RS92-RAW 002 121 RS92-EDT 001 121 RS92-GDP 002 101 90-4 -

3.3 Data availability of data products Available (green): All steps of processing have been successfully completed. The data file is available at LC (e.g. unapproved or uncertified GRUAN data products) and at NCEI (approved and certified GRUAN data products). Unprocessed (yellow): The raw data file has been successfully converted to a GRUAN standardized raw data file format (NetCDF). The processing (e.g. GRUAN data processing) has not yet been done, or has not been completed. Reason may be a processing routine which does not yet exist, or software errors. Original (red): The original raw data file is available (e.g. MWX). The raw data file was not converted to a GRUAN standardized raw data file format (NetCDF). Reason may be a converting routine which does not yet exist, or a corrupt original raw data file, or software errors. 3.3.1 Stream: CFH 3.3.2 Stream: ECC - 5 -

3.3.3 Stream: RS41 3.3.4 Stream: RS92-6 -

3.4 Data quality of current GRUAN data products Month Total GRUAN Data Quality Approved Checked Rejected Issues Meta-data Process. Press Temp RH 3.4.1 Stream: RS92 (Product: RS92-GDP-002) Jan 25 23 2 2 7 Feb 20 15 5 5 10 Mar 26 25 1 1 4 Apr 3 2 1 1 May 4 4 Jun 3 2 1 1 Jul 1 1 Aug 4 4 Sep 3 3 Oct 4 3 1 2 Nov 3 3 1 Dec 5 5 1 Sum 101 90 11 10 25-7 -

3.5 Instrument combinations of NYA-RS-01 Count Instrument combination 4 CFH, ECC, RS41 2 CFH, ECC, RS92 34 ECC, RS41 26 ECC, RS92 330 RS41 47 RS41, RS92 47 RS92-8 -

3.6 Instrument ground check 3.6.1 Stream: RS41 (1) GroundCheck: GC-RI41 (2) GroundCheck: GC-SHC (3) GroundCheck: GC-SHELTER 3.6.2 Stream: RS92 (1) GroundCheck: GC-GC25-9 -

(2) GroundCheck: GC-SHC - 10 -

(3) GroundCheck: GC-SHELTER 3.7 Measurement events - 11 -