Coro Reports Maiden Resource Estimate for the Marimaca Project

Similar documents
Coro Reports a Significantly Increased Resource Estimate for the Marimaca Claim

News Release September 6, 2016 TSX SYMBOL: COP

News Release October 4, 2016 TSX SYMBOL: COP

News Release February 27, 2014 TSX SYMBOL: COP

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

BENTON ADVISED THAT CORO INTERSECTS 0.71%CuT AND 0.99%CuT AT ITS EL DESESPERADO PROJECT, IN THE CHUQUICAMATA DISTRICT, CHILE

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

Detour Gold Reports Drilling Results from Lower Detour

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

Highlights from the four holes announced in this news release include:

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Interval (meters) To (meters)

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Fortuna Updates Reserves and Resources

GoviEx completes acquisition of African Energy s Zambian uranium assets

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

News Release. Infill Drilling Program

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Orezone s Bomboré Gold Project Reaches World Class Size

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Form F3 MATERIAL CHANGE REPORT

Tahoe Resources Mineral Reserves as of January 1, 2018

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

DRILLING FURTHER EXTENDS MINERALIZATION AT EXETER S CASPICHE GOLD-COPPER PORPHYRY PROJECT IN CHILE

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

TSX.V: TR. Drilling in the Shadow of World-Class Deposits. TR: TSX.V January 2019

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

Asiamet Drilling Further Extends BKM Mineralisation

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

News Release B2Gold Announces Updated Higher Grade Gold Resource at Wolfshag Zone, Otjikoto Mine, Namibia

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

April Exploring for Canadian Gold in the Rainy River District of Ontario

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Transition Metals Acquires Advanced Stage Ni-Cu-PGM Projects

GlobeStar Mining Corporation Cumpié Sector Cumpié Hill Nickel Laterite Project in the Dominican Republic:

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference.

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

TSX: MAI NEWS RELEASE NASD-OTCBB: MNEAF. Minera Andes Reports Drill Results and Development Update for the Los Azules Copper Project

MCEWEN MINING EXPANSION DRILLING INTERSECTS 0.53% COPPER OVER 351 METERS AT THE LOS AZULES PROJECT

Fortuna provides review of Brownfields exploration programs

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Northern Dynasty Minerals Ltd.

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

Exploring for Precious and Base Metals in Sweden. Barsele Minerals Corp. (TSX.V: BME) June 2017

Press Release Thunder Bay: August 2, 2018

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Skeena Intersects g/t AuEq over metres at Eskay Creek

CAUTIONARY STATEMENT

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

(TSXV: GPLY, OTCQB: GLYXF

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. July 21, May 2013

Coeur Mining Provides Silvertip Exploration Update

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

May 16, 2012 #

Teranga s Golden Hill Drill Program Intersects High-Grade Gold and Expands Mineralized Zones at Peksou and Ma Prospects

Goldplay President and CEO Marcio Fonseca commented

LUNA GOLD INCREASES MEASURED AND INDICATED RESOURCES TO 3.63 MILLION OUNCES AND INFERRED RESOURCES TO 1.04 MILLION OUNCES AT AURIZONA

Arctic Star Commences Exploration at the Timantti Diamond Project, Finland Home 2017 Arctic Star Commences Exploration at

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

Transcription:

Suite 1280 625 Howe St Vancouver, B.C. V6C 2T6 News Release 17-02 January 12 2017 TSX SYMBOL: COP www.coromining.com Coro Reports Maiden Resource Estimate for the Marimaca Project - Pit-constrained Measured & Indicated resource of 145.5kt Cu + Inferred resource of 99.3kt Cu - Robust resource supports decision to acquire processing plant January 12 2017, Coro Mining Corp. ( Coro or the Company ) (TSX Symbol: COP) is pleased to announce the results of a maiden resource estimate completed at its Marimaca copper project, located 22km E of the port of Mejillones in the II Region of Chile, (Fig. 1). As announced on August 4 2016, Coro is finalizing the acquisition of Minera Rayrock Ltda. (Rayrock), owner of the Ivan 10ktpy Cu capacity solvent extraction/electro-winning (SXEW) processing plant, and this initial Marimaca estimate was completed with the objective of defining sufficient resources to confirm the merits of completing this acquisition. Alan Stephens, President and CEO of Coro commented, We are delighted by the results of this first resource estimate for the Marimaca deposit, which, in combination with the acquisition of the Ivan plant, indicates a very robust project. In particular, the presence of a high grade core should enhance the economics of the project, and the deposit remains open in all directions except to the west. The current drill spacing has resulted in a significant tonnage of mineralization that fell into the Inferred category or that could not be categorised as a resource. We now intend to complete the acquisition of Rayrock and continue the expansion and further definition of the Marimaca deposit. The resource estimate will form the basis of a feasibility study, which we will initiate shortly. Resource Estimate The estimate was completed at a variety of cut off grades by NCL Ingeniería y Construcción S.A., Santiago, Chile, and details are presented in the following table, where CuT means total copper and CuS means acid soluble copper; Measured Indicated Meas + Ind Inferred Cut Off kt %CuT %CuS kt %CuT %CuS kt %CuT %CuS kt %CuT %CuS >1.0 1,177 1.36 1.06 2,355 1.24 0.90 3,532 1.28 0.95 1,320 1.19 0.75 0.9 1,482 1.28 1.00 3,284 1.16 0.84 4,766 1.20 0.89 2,027 1.11 0.72 0.8 1,878 1.19 0.93 4,508 1.08 0.79 6,385 1.11 0.83 3,085 1.02 0.69 0.7 2,359 1.10 0.86 6,137 0.99 0.73 8,496 1.02 0.76 4,615 0.93 0.64 0.6 2,950 1.01 0.79 7,928 0.91 0.67 10,878 0.94 0.70 6,920 0.83 0.59 0.5 3,661 0.92 0.72 10,190 0.83 0.62 13,851 0.85 0.65 10,728 0.73 0.53 0.4 4,365 0.84 0.66 12,738 0.75 0.56 17,103 0.78 0.59 15,251 0.65 0.47 0.3 4,986 0.78 0.61 15,192 0.69 0.52 20,178 0.71 0.54 20,753 0.57 0.41 0.2 5,453 0.74 0.58 16,833 0.65 0.48 22,286 0.67 0.51 26,979 0.49 0.35

0.1 5,689 0.71 0.56 17,551 0.63 0.47 23,241 0.65 0.49 31,844 0.44 0.31 >0 5,761 0.70 0.56 18,052 0.61 0.46 23,814 0.63 0.48 39,456 0.36 0.33 An additional ~20mt of potential mineralization was identified during the modelling which could not be classified as a resource, based on the currently available drill hole information. Pit-constrained Resource In order to demonstrate the potential economic viability of the Marimaca resource, a series of Whittle pit optimizations was completed utilizing appropriate operating costs, results obtained from preliminary metallurgical test work, and a variety of copper prices. The resources were estimated only for oxide and mixed copper mineralization which can be processed by heap leaching (HL) and run of mine (ROM) leaching to produce cathode copper. No resources were estimated for enriched and primary sulphide mineralization, occurring in deeper portions of the deposit. At a $3.20/lb long term copper price, the following in pit resource, all of which is HL material, was estimated; Measured Indicated Meas + Ind Inferred Cut Off kt %CuT %CuS kt %CuT %CuS kt %CuT %CuS kt %CuT %CuS 0.2 5,301 0.74 0.59 16,198 0.66 0.49 21,499 0.68 0.51 18,769 0.53 0.39 Contained Cu kt CuT kt CuS kt CuT kt CuS kt CuT kt CuS kt CuT kt CuS 39.4 31,0 106.1 79.4 145.5 110.4 99.3 72.8 The pit resource is constrained by the Marimaca property limits, such that all blocks occurring outside the property were assigned a 0%CuT grade. The Chilean mining code permits sufficient push back of pit walls onto adjacent properties to allow for the extraction of resources present on the property. The pit contains a total of 54,436kt of waste, including mineralized blocks that did not fall into a resource category; low grade ROM material; and blocks outside the property limits, for an overall strip ratio of 1.31:1. Parameters Used in the Estimation of the Mineral Resource The NI 43-101 mineral resource estimate was based on a total of 13,681 meters of drilling in 60 holes, including 54 holes, 11,660m of reverse circulation drilling and 6 holes, 2,021m of diamond drill drilling, (Fig. 2). The mineral resource estimate has been generated from drill hole assay results and the interpretation of a geologic model which relates to the spatial distribution of copper in the deposit. Four leachable copper mineralization types were identified during geological mapping and drill hole logging, namely; brochantite, chrysocolla, and copper wad dominant oxides; and mixed oxides & sulphide. Resources were estimated for each mineralization type and later combined for the reporting of the final resource estimate. Grades were capped according to the following criteria Grade capping %CuT %CuS

Brochantite 4.5 4.0 Chrysocolla 3.5 3.2 Copper wad 1.6 1.3 Mixed Oxide and sulphide 1.8 1.5 Grade estimates were made using ordinary kriging with nominal block size measuring 5m long, 5m wide and 5m in height. A typical section through the deposit is shown on Figure 3. Resources have been classified by their proximity to sample locations and are reported according to CIM standards on Mineral Resources and Reserves. The in pit mineral resource was constructed according to the following technical and economic parameters; Mining Cost HL Processing Cost, inc G&A ROM Processing Cost inc G&A Selling Cost Heap Leach Recovery ROM Recovery Pit Slope Angle $2.8/t $10.5/t $4.6/t $0.07/lb 76% of CuT 38% of CuT 45 o The pit slope is conservatively estimated at 45 o based on the limited geotechnical information currently available, but this is anticipated to improve as more data is generated. Further definition of measured and indicated resources will require drilling on 25m and 50m centres, respectively. Qualified Persons The mineral resource estimates contained in this news have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). The technical information in this news release, including the information that relates to geology, drilling and mineralization of the Marimaca project, was prepared under the supervision of, or has been reviewed by Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than 35 years of experience and a member of the Colegio de Geologos de Chile and of the Institute of Mining Engineers of Chile, and who is the Qualified Person for the purposes of NI 43-101 responsible for the design and execution of the drilling program. The Qualified Person responsible for the independent resource estimate at Marimaca is Luis Oviedo Hannig, a geologist with more than 40 years of experience of NCL Ingeniería y Construcción S.A. He is a member of the Colegio de Geologos de Chile and the Institute of Mining Engineers of Chile and registered with the Qualification Commission of Resources and

Mining Reserves (CRISCO, CMC, Membership Number 013), and with a postgraduate degree in "Certification and Validation of Mining Assets from Queens University and PUVC. The technical information has been included herein with the consent and prior review of the above noted qualified persons, who have verified the data disclosed, including sampling, analytical and test data underlying the information or opinions contained herein. Alan Stephens, FIMMM, President and CEO, of Coro Mining Corp, a geologist with more than 40 years of experience, and a Qualified Person for the purposes of NI 43-101, is responsible for the contents of this news release. Marimaca Agreement Terms Coro has the right to earn a 75% interest in the property as follows; - 51% interest earned in Compañia Minera Newco Marimaca (CMNM) with a US$125k payment together with completion of a NI43-101 resource estimate and engineering study that demonstrates the technical and economic feasibility of producing a minimum of 1.5ktpy Cu cathode by August 6th 2018 at Coro's cost, - Additional 24% interest in CMNM earned by Coro upon obtaining financing for the project construction - The owner s interest will comprise a 15% interest free carried to commencement of commercial production and a 10% participating interest subject to dilution. The owners at their election may request Coro to loan them the equity portion corresponding to their 10% interest, if any, recoverable by Coro from 100% of the project's free cash flow after debt repayments - Coro retains a first right of refusal over the owner s interest Rayrock Agreement Terms Coro may acquire Rayock for a total purchase price of US$6.5m of which a down payment of US$0.25m has been paid. The sellers will retain a 2% net smelter return ( NSR ) on all production from the Rayrock mineral properties. Coro may acquire half the NSR for US$2m at any time and will have a right of first refusal over the NSR.

Figure 1: Location of Marimaca, Ivan SXEW Plant and Rayrock Claims News Release 17-02

Figure 2: Marimaca Drill Plan Figure 3: Block Model Cross Section

CORO MINING CORP. Alan Stephens Alan Stephens President and CEO About Coro Mining Corp Coro's strategy is to grow a mining business through the discovery, development and operation of "Coro type" deposits. These are defined as projects at whatever stage of development, that are well located with respect to infrastructure and water, which have low permitting risk, and which have the potential to achieve a short and cost effective timeline to production. Our preference is for open pit heap leach copper projects, where we will seek to minimise capital investment rather than maximise NPV, where we will prioritise profitability over production rate, and finally, where the likely capital cost is financeable relative to our market capitalization. The Company's assets include its 65% interest in SCM Berta including the Berta and Salvadora deposits; the Marimaca development project; the Planta Prat project; the Llancahue prospect; and a royalty on the San Jorge copper-gold project located in Argentina. For further information - Contact Naomi Nemeth, VP Communications at (416) 567 5151 or (604) 682 5546 or NNemeth@coromining.com - Visit our website site at www.coromining.com

- Email us at investor.info@coromining.com This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Such forward-looking statements or information, include but are not limited to production estimates. Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Coro's ability to predict or control and may cause Coro's actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, the operations of the SCM Berta, copper price volatility, and changes in debt and equity markets. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's documents filed from time to time with the securities regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick, Nova Scotia, Prince Edward Island and Newfoundland and Labrador. Accordingly, readers should not place undue reliance on forward-looking statements. Coro undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.