Analysis of Large-Scale Pit Slope Stability The Aitik Mine Revisited

Similar documents
A Strategic Rock Mechanics Study for The Kevitsa Open Pit Mine

Improved Blasting and Bench Slope Design at the Aitik Mine

Pillar strength estimates for foliated and inclined pillars in schistose material

Forensic analysis of a rock burst event at the Kiirunavaara Mine results and implications for the future

Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting

GUIDELINES FOR OPEN PIT SLOPE DESIGN EDITORS: JOHN READ, PETER STACEY # & CSIRO. J x PUBLISHING

LICENTIATE THESIS. Evaluation of rock mass strength criteria. Catrin Edelbro

Introduction and Background

Improving slope stability at Kışladağ Gold Mine

An introduction to the Rock Mass index (RMi) and its applications

Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Objectives

Application of Core Logging Data to generate a 3D Geotechnical Block Model

Blasting, fragmentation and wall quality result at West Wanagon slope stability project on Grasberg Mine

Wall Control by Blasting Optimization at Las Cruces Open Pit Copper Mine (Spain)

ENGINEERING GEOLOGY AND ROCK ENGINEERING

Ground Support in Mining and Underground Construction

Role of defects in rock mass classification

Stop 2 - aitik cu-au-ag mine. Roger Nordin Boliden Mineral AB, Boliden, Sweden. Christina Wanhainen Luleå University of Technology, Luleå, Sweden

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY

Ground support modelling involving large ground deformation: Simulation of field observations Part 1

Open Pit Rockslide Runout

Module 9 : Foundation on rocks. Content

Forensic analysis of a rock burst event at the Kiirunavaara Mine results and implications for the future

MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 1 : THEORY SUBJECT CODE: COMRMC MODERATOR: H YILMAZ EXAMINATION DATE: OCTOBER 2017 TIME:

Empirical Design in Geotechnical Engineering

Construction Technical Specifications on Rock-Foundation Excavating Engineering of Hydraulic Structures

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Name: KEY. Examine all possible answers; some may not satisfy the question criteria and should be left blank. mica crystals big enough to see

MASTER'S THESIS. Measurement While Drilling System in Aitik Mine. Shahram Mozaffari. Luleå University of Technology

ROCK MASS PROPERTIES FOR TUNNELLING

EOSC433: Geotechnical Engineering Practice & Design

I. Hulls E. Woods A. Creighton

Rock mass disturbance effects on slope assessments using limit equilibrium method

Pit Slope Optimization Based on Hydrogeologic Inputs

Two Case Studies on Soil Nailed Slope Failures

Excavation method in Goushfill mine

Estimates of rock mass strength and deformation modulus

Stability Assessment of a Heavily Jointed Rock Slope using Limit Equilibrium and Finite Element Methods

Rock Material. Chapter 3 ROCK MATERIAL HOMOGENEITY AND INHOMOGENEITY CLASSIFICATION OF ROCK MATERIAL

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects

Appendix 5-G Open Pit Geotechnical Design

Blasting damage in rock

Session 3: Geology and Rock Mechanics Fundamentals

A PARAMETER STUDY OF THE DAMAGED ROCK ZONE AROUND SHALLOW TUNNELS IN BRITTLE ROCK MASS

R.Suhasini., Assistant Professor Page 1

Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling

EXAMINATION PAPER MEMORANDUM

ROCK MASS CHARACTERISATION IN ENGINEERING PRACTICE

Landslide stability analysis using the sliding block method

Huaman A., Cabrera J. and Samaniego A. SRK Consulting (Peru) Introduction ABSTRACT

Crags, Cracks, and Crumples: Crustal Deformation and Mountain Building

GEOLOGIC STRUCTURE MAPPING using digital photogrammetry

CONTROLLING FACTORS BASIC ISSUES SAFETY IN OPENCAST MINING WITH SPECIAL REFERENCE TO SLOPE STABILITY

Open Stoping at Golden Grove Under High Stress Conditions

Analysis in Geotechnical Engineering

Curriculum Document Mining Technician: Strata Control Practitioner (Surface) Occupational Curriculum

Calibration of a Fragmentation Model for a New Mining Operation

Ring Blasting Design Modeling and Optimization

ROCKENG09: Proceedings of the 3rd CANUS Rock Mechanics Symposium, Toronto, May 2009 (Ed: M.Diederichs and G. Grasselli)

ANALYSIS OF A SLOPE FAILURE IN AN OPEN PIT MINE USING TSLOPE

SEISMIC PEAK PARTCILE VELOCITY AND ACCELERATION RESPONSE TO MINING FACES FIRING IN A LIGHT OF NUMERICAL MODELING AND UNDERGROUND MEASUREMENTS

Evaluating the role of groundwater in the stability of slopes in an open pit coal mine with shallow dipping multi-seam stratigraphy.

Which sample best shows the physical properties normally associated with regional metamorphism? (1) A (3) C (2) B (4) D

Module 5: Failure Criteria of Rock and Rock masses. Contents Hydrostatic compression Deviatoric compression

Conceptual Numerical Modeling of Large-Scale Footwall Behavior at the Kiirunavaara Mine, and Implications for Deformation Monitoring

The effect of installation angle of rock bolts on the stability of rock slopes

Page 1. Name: 1) Which diagram best shows the grain size of some common sedimentary rocks?

Some Aspects on the Design of Near Surface. Tunnels - Theory and Practice. Thomas Marcher¹, Taner Aydogmus²

Influence of foliation on excavation stability at Rampura Agucha underground mine

Rock parameters for blasting on the highway Split-Dubrovnik

ENGINEERING EVALUATION OF THE STANLEY MINE ADVENTURE PARK AREA CLEAR CREEK COUNTY, COLORADO. Prepared for:

Instituto De Ingenieros De Minas Del Peru

Rock slope rock wedge stability

GEOTECHNICAL DESIGN CONSIDERATIONS FOR THE PROPOSED OYU TOLGOI OPEN PITS, SOUTHERN MONGOLIA. 1: SRK Consulting, Perth, 2: Ivanhoe Mines Mongolia Inc.

CHAMPION BEAR RESOURCES

MULTIVARIATE ANALYSIS OF BORE HOLE DISCONTINUITY DATA

Expertise from Surface to Great Depths

The influence of various factors on the results of stability analysis of rock slopes and on the evaluation of risk

Appendix 6 Geotechnical report

Numerical Approach to Predict the Strength of St. Peter Sandstone Pillars acted upon by Vertical Loads A case study at Clayton, IA, USA.

Instructional Objectives. Why use mass classification? What is rock mass classification? 3 Pillars of empirical design and rock mass classification

ENGINEERING GEOLOGY AND ROCK ENGINEERING ASPECTS OF OPERATION AND CLOSURE OF KBS-3

The Transmission Gully Project: Method for Assessing Seismic Stability of Large Rock Cuts In Steep Terrain, Considering Topographic Amplification

Establishing a Methodology for the Assessment of Remnant Stability Using Recorded Seismic Events on Harmony Mines

An Overview of Graphite Projects from Asia to Africa. Dr Mike Cunningham SRK Consulting (Australasia) Pty. Ltd.

Effects of specific charge and EDD:s on fragmentation in an aggregate quarry, building KCO design curves

KEMESS SOUTH MAGNETIC MODELING. CONDOR CONSULTING, INC. OCTOBER 2017

Enabling Technologies

Dark Art. Ian de Bruyn

40-50 Minutes, 3 minutes per station, 13 Stations, samples provided by UWM and Pierre Couture

Practice Test Rocks and Minerals. Name. Page 1

C-3. Subsidence Analysis Report. LJS\J:\scopes\04w018\10000\FVD reports\final MPA\r-Mine Permit App appendix.doc

Influence of the undercut height on the behaviour of pillars at the extraction level in block and panel caving operations

A new design approach for highway rock slope cuts based on ecological environment protection

Stability Analysis of Hongsa Coal Mine s Pit Walls, Xaignabouli Province, Laos PDR. Thanachot Harnpa* Dr.Schradh Saenton**

3D Hydromechanical discontinuum simulation for pit slopes

Case study: How Leapfrog Geo helped improve geological understanding at Edna May Gold Mine, Western Australia

ITERAMS. WP1 (& WP2) Sampling and ore and rock properties modification

Blasting damage in rock

1. Rock Mechanics and mining engineering

Transcription:

The Spanish Mining Council is organising the 2018 International Symposium in Slope Stability in Open Pit Mining and Civil Engineering at the XIV International Congress for Energy and Resource Mining in Seville. Analysis of Large-Scale Pit Slope Stability The Aitik Mine Revisited Jonny Sjöberg Diego Lope Álvarez Patricio Gómez Per-Ivar Marklund Sara Suikki Itasca Consultants AB SKB (previously Itasca) Itasca S.A. (retired, Boliden) Itasca summer intern

Things we all know Design of overall slopes is important for open pits of all scales and further underlined by the push towards larger, and deeper pits Evolution of design tools: From simple empirical and limit equilibrium methods to sophisticated numerical computer modelling Rapid increase in computer capacity, but also an increased understanding of the behaviour of large-scale slopes Still severely data- and knowledge constrained Illustration of design development and current state-of-the-art using the Aitik open pit mine as a case in point.

Aitik Mine The Aitik Mine Owned and operated by Boliden (from the start) Mineralization discovered in the 1930s Mining commenced 1968 Boliden's first open pit Currently the largest metal open pit mine in Europe

The Aitik Mine 1968 2 Mtpa (ore)

Early 70 s 6 Mtpa (ore)

2000 18 Mtpa (ore) Mill & workshop Hangingwall Footwall

Workshop 2010 36 Mtpa (ore) Conveyor belts Mill Railway terminal Crusher

Today 40 Mtpa (ore) 3000 x 1000 m, 420 m depth, main pit + satellite pit Main pit hangingwall

Main pit footwall

Geological setting North

AMPHIBOLE-BIOTITE AMPHIBOLE GNEISS MICA GNEISS BIOTITE SCHIST DIORITE PEGMATITE SERICITE SCHIST AMPHIBOLITE TURBIDITE GABBRO ANDESITE (blank) CONGLOMERATE FELDSPAR-EPIDOTE ZONE CORE LOSS UNIDENTIFIABLE ROCK Geology & Geomechanics North Hangingwall Generally strong, metamorphic rock, with some weaker units (biotite/muscovite schist) Medium to good rock quality; poor quality in schist units 8000 7000 6000 5000 4000 3000 2000 1000 0 100 90 80 70 60 50 40 30 20 10 0 Length_RMR Mean_RMR Max_RMR Min_RMR

Structural Characteristics Well-developed foliation + cross-joints and vertical jointing Hangingwall contact = old thrust fault with clay No other large-scale structures identified NORTH END FOOTWALL NORTH HANGINGWALL NORTH FOOTWALL MIDDLE HANGINGWALL MIDDLE FOOTWALL SOUTH HANGINGWALL SOUTH SOUTH END

The early stages First major design study in 1976 with follow-up in 1985 Bench design based on structural control; Double-benching (2 x 15 m) with offset chosen to match foliation dip Catch bench width based on original Ritchie criterion 11 m for 1 m 90% of the cases Overall slopes not assessed Actual Bench Face Foliation Plane 3 m Berm 11 m 7 m Impact Zone 5.5 m 22.5 m Drilling Offset 69 Backbreak Effective Bench Face Angle = 60 Interramp slope angle = 46 11 m 30 m Double Bench

990 kg 855 280 280 311 mm 311 165 165 165 165 990 kg 990 311 311 165 165 165 Blasting can make things better Problems: Vertical blast damage PPV [mm/s] 8000 Backbreak limit Diggability limit Quality control / hole deviation Local crest failures & bench widths not attained 4000 2000 1250 Unacceptable damage Measurable heave 150 300 59 Solutions: Blast damage model (PPV) Bench crest More buffer rows Pre-split with decoupled charges 7.5 m 5 m Backbreak Heave 150 290 6.0 m

Large-scale slope stability at Aitik Issues for hard rock slopes: No failure observations = no calibration of properties possible (except that failure should not develop for current mining geometries) Failure may be rapid and uncontrollable (brittle rock) Remedies: Develop methodology for modeling and parameter assessment and apply to other slopes with failure Design methodology must be conservative => use residual strength parameters

Large-scale and 2D at Aitik Project on large-scale slope stability in hard rocks (1990s) & revision of overall slope angles: Empirical case study database Updated geomechanical model 2D numerical modeling continuum models, rock mass strength + residual strength parameters + ubiquituos joints (foliation) Results Stability assessment to 500 m depth Increase of interrramp and overall angles (+5 ) with drainage program Additional modeling for deeper (750 m) pit => additional drainage

2D and deeper and the importance of "disturbance" New strategic plan and deeper mining (2015-2016)! New analyses: Numerical modeling, Factor-of-Safety calculations, 2D (& 3D) Perfectly-plastic material model (no softening; peak strength = residual strength); Hoek-Brown material model Rock mass strength values estimated empirically using characterization (GSI) and Hoek-Brown failure criterion Experiences and practices from Itasca analysis of large pit slope used to supplement and refine estimates Acceptance criterion: FoS for the Overall Slope Angle > 1.2

2D and deeper and the importance of "disturbance" Design values for GSI and UCS: mean 0.5 std.dev Corresponds to 30-35 percentile Accounts for heterogeneity in large-scale rock masses, and the ability for the rock to fail through the weaker components (based on experience and empirical evidence) Variation of D (disturbance factor) with depth D=1.0 everywhere proven too conservative Blast damage highest close to slope face Stress relief close to slope face Possible stress damage at depth H (m) D = 1 D = 0 15 (m)

2D and deeper and the importance of "disturbance" Mine North 77.75 Geographic North +X +Y PROFILE A PROFILE Y4000 PROFILE Y4500 PROFILE B

2D and deeper and the importance of "disturbance" DESIGN PROFILE A Current Pit Previously Planned Final Pit Level 750/800/850 m Pit

2D and deeper and the importance of "disturbance" Groundwater conditions: Partly depressurized in upper portion; face seepage in lower portion Scenario 1: Depressurized 100 m horizontal distance (upper 2/3 of slope height) Scenario 2: Depressurized 150 m horizontal distance (upper 2/3 of slope height). Partially depressurized slopes (100 m) Partially depressurized slopes (150 m) Water table level Water table level H H Water table level 100 m H/3 Water table level 150 m H/3

Results & design recommendations HW overall slope angle [ ] Pit bottom [level] Depressurization [m] 48 800 m 100 (2/3 H) 52 800 m 150 (2/3 H) 50 850 m 150 (2/3 H) 54 850 m 150 (H) 54 * 600 m 100 (2/3 H) 54 * 600 m 100 (2/3 H) * Middle-southern portion (lower final slope heights) FW overall slope angle [ ] Pit bottom [level] Depressurization [m] 47 800 m 100 (2/3 H) 45 850 m 100 (2/3 H) 47 850 m 150 (2/3 H) 47* 600 m 100 (2/3 H)

2D or 3D? Or both? How conservative are 2D-analyses? 3D-check for Aitik geometry: Simplified slope, undrained conditions FoS (3D) = 2.0 FoS (2D) = 1.2 for the same case Geometry matters (a lot)!

Aitik findings. Increased reliability in bench slope design Presplit blasting on footwall (inclined, 70 ) and for modified ramp design Increased safety of benches; maintained catch bench design Revised acceptance criteria Improved interramp slope design Increase on footwall interramp slope angle from improved blasting Implemented allowed maximum interramp height = 200 m (6 7 double benches) Rock mass stability => steeper interramp angles allowed Overall pit slope design Verified overall pit slope angles: 47 for footwall; 54 for hangingwall, for a maximum pit depth of 850 m Depressurized conditions required (150 m horizontal distance)

The future Analytical methods are standard for bench-scale design Numerical modeling remains the preferred tool for large-scale stability assessment 3D models, DFN input, coupled (water-stress) modeling, etc. are all increasingly used Computational speed less of an issue cloud computing emerging!? Advances in data collection not on par with advances in modeling capabilities Are we using the right tools? Volumetric coverage? Is there "unconventional" data to be used? As "proxies" for rock mechancis parameters?

The future Validation efforts required: Partial validation is also of value! Acceptance criteria for validation Reality of Interest Confirmation Assessment Activities Modeling, Simulation & Experimental Activities Validation Simulation Outcomes Mathematical Model Computer Model Verification

The funding by Boliden is gratefully acknowledged Special thanks to Anton Bergman, Jansiri Malmgren & Mats Larsson for review of this paper