SURFACING AGGREGATE SKID RESISTANCE PERFORMANCE

Similar documents
TECHNICAL NOTE PREDICTION OF PAVEMENT SURFACE SKID RESISTANCE AND THE EFFECT OF SMALLER CHIP SIZE

Aggregates. AAPA training

ENHANCING ROAD SAFETY MANAGEMENT WITH GIS MAPPING AND GEOSPATIAL DATABASE

Abrasion resistance of aggregates in asphalt December 2010

Construction aggregates : evaluation and specification Clive Mitchell Industrial Minerals Specialist

Geospatial Big Data Analytics for Road Network Safety Management

Rural Crash Prediction Models - The Next Generation

Hardening Concrete Pavement Against Friction Loss Due to Aggregate Polishing

Development of correlation equations between different measurements of skid resistance in pavements

Figure 1 The map shows the top view of a meandering stream as it enters a lake. At which points along the stream are erosion and deposition dominant?

Geology 12 FINAL EXAM PREP. Possible Written Response Exam Questions

=%REPORT RECONNAISSANCE OF CHISHOLM LAKE PROSPECT. October 25, 1977

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

Rock & Minerals Regents Review

Economic information for planning

Why is quartz one of the most weathering-resistant minerals?

The Casagrande plasticity chart does it help or hinder the NZGS soil classification process?

Effect of Aggregate Characteristics on Texture and Skid Resistance of Asphalt Pavement Surface

11/22/2010. Groundwater in Unconsolidated Deposits. Alluvial (fluvial) deposits. - consist of gravel, sand, silt and clay

EVALUATION OF GRAMPIAN SAND SANDSTONE

Geology 229 Engineering Geology. Lecture 6. Basic Rock Classification and Engineering Considerations (West, Chs. 2, 3, 4, 5)

B) color B) Sediment must be compacted and cemented before it can change to sedimentary rock. D) igneous, metamorphic, and sedimentary rocks

1. Base your answer to the following question on the map below, which shows the generalized bedrock of a part of western New York State.

LAB 2 IDENTIFYING MATERIALS FOR MAKING SOILS: ROCK AND PARENT MATERIALS

Topic 6: Weathering, Erosion and Erosional-Deposition Systems (workbook p ) Workbook Chapter 4, 5 WEATHERING

2 Aggregates in Indiana

Sediment and sedimentary rocks Sediment

1. The diagram below shows the stump of a tree whose root grew into a small crack in bedrock and split the rock apart.

GEOL.3250 Geology for Engineers Sedimentary & Metamorphic Rocks

EROSION, DEPOSITION AND SEDIMENTARY ROCKS. Reading: Earth Science Tarbuck and Lutgens Chapter 5: pages Chapter 3: pages 52-54, 61-69

FIRST YEAR ASSESSMENT REPORT PROSPECTING LICENCE 16512M MARYSTOWN AREA, BURIN PENINSULA NTS 1M/3

Aggregate Type and Traffic Volume as Controlling Factors in Bituminous Pavement Friction

RIPRAP ASSESSMENT VARIOUS SITES HWY 40 NEAR GRANDE CACHE, AB

Geology 229 Engineering Geology. Lecture 7. Rocks and Concrete as Engineering Material (West, Ch. 6)

Pavement surface conditions during adverse weather WG 2

Exercise 3 Texture of siliciclastic sediments

the Quarrying Industry Dewatering and the Quarrying Industry the Quarrying Industry

GEOL Introductory Geology: Exploring Planet Earth Fall 2010 Test #2 October 18, 2010

Submitted for Presentation at the 2006 TRB Annual Meeting of the Transportation Research Board

454/01 GEOLOGY GL4 EXTENSION GEOLOGY. P.M. FRIDAY, 14 June (2 Hours)

EPS 50 Lab 4: Sedimentary Rocks

Glacial Erosion Polished on front side Glacial striations (scratches) on top

Module 10: Resources and Virginia Geology Topic 4 Content: Virginia Geology Notes

ROCK CLASSIFICATION AND IDENTIFICATION

THE FIRE AND RESCUE SERVICE S ROLE IN RESPONDING TO FLOODING DAVE RUSSEL ASSISTANT CHIEF FIRE OFFICER

Engineering Geology. Igneous rocks. Hussien Al - deeky

Use of Average Least Dimension in. Surface Dressing. Brian Mulry, Chartered Engineer, PMS Pavement Management Services Ltd.

THE DEPOSITS OF TSUNAMIS WESLEY PESANTEZ, CATHERINE NIELD, COLIN WINTER

Construction Exits Rock pads

Exploring Time -Dependent Relationship between Polishing and Friction behaviour of Pavement in the Lab and in the Field on Ohio

Sedimentary Rocks. Origin, Properties and Identification. Geology Laboratory GEOL 101 Lab Ray Rector - Instructor


APPENDIX B DISTRESSES

Yoshinori KAWAMURA, Oriental Consultants Global Co., Ltd.

New Plymouth CBD Site Subsoil Class: Results from ground investigation

Rock Star 101. Introduction to Rocks.

Weathering, Erosion and Deposition

Sediment Transport Mechanism and Grain Size Distributions in Stony Bed Rivers. S.FUKUOKA 1 and K.OSADA 2

Geotechnical issues in seismic assessments: When do I need a geotechnical specialist?

13. Sedimentary Rocks I (p )

Lecture # 02 DEPARTMENT OF CIVIL ENGINEERING SWEDISH COLLEGE OF ENGINEERING & TECHNOLOGY, WAH CANTT. 14th December,

Lecture Outline Wednesday - Friday February 14-16, 2018

Lecture 3 Rocks and the Rock Cycle Dr. Shwan Omar

(Refer Slide Time: 1:25)

As compaction and cementation of these sediments eventually occur, which area will become siltstone? A) A B) B C) C D) D

Name. 4. The diagram below shows a soil profile formed in an area of granite bedrock. Four different soil horizons, A, B, C, and D, are shown.

Ch 10 Deposition Practice Questions

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

THE CHANGING SURFACE OF THE EARTH

Keywords: Fines Correction, Ic Cutoff, Liquefaction, Hamilton Ash, Waikato.

Chapter 16 Weathering, Erosion, Mass Wasting. Chapter 16 Weathering, Erosion, Mass Wasting. Mechanical Weathering

UNIT 4 SEDIMENTARY ROCKS

Peter Cenek, Opus Research. Temperature Effects on SCRIM Skid Resistance Measurements

Sedimentary Rocks. Origin, Properties and Identification. Physical Geology GEOL 100. Ray Rector - Instructor

VIBRATORY COMPACTION OF BASE COURSE AGGREGATES

The role of the Competent Person. Neil Wells, CRIRSCO Deputy Chair, Yogyakarta, 31 October 2017

Sedimentary Rocks. Origin, Properties and Identification. Physical Geology GEOL 101 Lab Ray Rector - Instructor

Palmerston North Area Traffic Model

Geology 252, Historical Geology, California State University, Los Angeles - professor: Dr. Alessandro Grippo

SOIL MECHANICS SAB1713 DR. HETTY

Earth Science - Lab #11 Geologic Time

Geology 229 Engineering and Environmental Geology. Lecture 5. Engineering Properties of Rocks (West, Ch. 6)

Chapter 6 Sedimentary and Metamorphic Rock

The Rocky Road Game. Sedimentary Rock. Igneous Rock. Start. Metamorphic Rock. Finish. Zone of Transportation. Weathering Way.

Earth Science Lesson Plan Quarter 1, Week 8, Day 1

There is a close connection between Geology and Architecture: The Study of Geology is particularly appropriate for the

ARCHIVES OF CIVIL ENGINEERING, LVIII, 4, 2012 ASSESSMENT OF SKID RESISTANCE OF ASPHALT MIXTURES IN LABORATORY CONDITIONS

STONETEK FLOOR & WALL TILES COLLECTION

Erosion and Deposition

Wikipedia.org BUILDING STONES. Chapter 4. Materials of Construction-Building Stones 1

APPENDIX III. COMPOSITION AND SOURCE OF DETRITAL SAND LAYERS FROM THE GUAYMAS BASIN 1

A. IGNEOUS Rocks formed by cooling and hardening of hot molten rock called magma (within crust or at its surface).

The last three sections of the main body of this report consist of:

Higher National Unit specification. General information for centres. Geology and Geomorphology. Unit title: Unit code: F3SL 34

Stratigraphy and structure of the Ganson Hill area: northern Taconic Allochthon

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Proposed Cemetery Thornhill Road. Tier One Hydrogeological Risk Assessment. Peter Mitchell Associates

Unit 3 Review - Surface Processes


NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

Transcription:

SURFACING AGGREGATE SKID RESISTANCE PERFORMANCE Terry Boyle, Bay of Plenty Senior Network Manager, NZTA, New Zealand Dave Whitehead, Senior Pavements Engineer, NZTA, New Zealand ABSTRACT To obtain the best whole of life aggregate selection to achieve appropriate skid resistance, the nature of polishing of individual aggregates needs to be understood. Polished Stone Value (PSV) testing, often does not provide an indication of on road performance. The requirement for PSV test contained in NZTA s aggregate specification M/6 references BS EN 1097-8:2009 Tests for mechanical and physical properties of aggregates. The objective of this presentation is to discuss the outcome of extending the second polishing stage in this test method. Existing test results and further ones to be completed by the middle of 2013, appear to confirm on road experience of aggregate performance in the Bay Of Plenty region of New Zealand. The presentation will examine any correlation with onsite skid testing with weathered and un-weathered sedimentary and igneous scoured aggregates as well as the use of this exercise to train practitioners. 1

Surfacing Aggregate Skid resistance Performance 1.0 INTRODUCTION To obtain the best whole of life cost related to skid resistance from a surfacing, the nature and performance of the aggregate needs to be understood. The former specification, NZTA T/10 (Specification for State Highway Skid Resistance) used Polished Stone Value (PSV) for procuring pavement resurfacing by contract. The lack of criteria and guidance around micro texture polishing, has led to very little attention or understanding of how individual aggregates perform. The inclusion of the Aggregate Performance Method in the 2010 revision of the T/10 specification allows some engineering decisions to override PSV. Therefore the basis for this presentation is to look at the role extended PSV polishing, the contribution of Out Of Context Curves (OCC) monitoring, plus mechanisms to raise surfacing designer awareness to better target surfacing aggregate selection. 1.1 Bay of Plenty State Highway The investigation on polishing in terms of extended PSV and onsite monitoring of Equilibrium SCRIM Coefficient (ESC) was carried out on aggregates utilised on State Highways within the Bay of Plenty Region of New Zealand. Figure 1: Bay of Plenty State Highway Map Bay of Plenty SH 760 km s of State Highway Traffic volume range: 500 to 34,000 per day Heavy Commercial Vehicle: 90 to 2300 per day Terrain; plains to mountainous NB Smaller scale version of figure 1 appended for better clarity 2

2.0 EXTENDED PSV POLISHING The requirement for PSV testing contained in the New Zealand Transport Agency s specification M/6 Notes on Specification for Sealing Chip (NZTA 2011) refers to BS EN 1097-8:2009 Test for mechanical and physical properties of aggregates. The application of this test method to derive PSV for an individual aggregate, requires the mounting of the aggregate sample on a curved mould, the surface of which, is then subject to three hours of coarse polishing, followed by three hours of fine polishing. The friction of the polished aggregate is then measured by British Pendulum Number (BPN) method (refer to test standard; BS EN 1097-8:2009). However this PSV value, derived from BPN, is only indicative and the aggregate may well polish further. So a number of aggregate types were selected and subject to a fine polishing regime of between two and 12 hours. These fine polishing times were 2, 3, 4, 6, 8 and 12 hours and at each increment the BPN was measured and therefore a PSV derived. Accelerated polishing testing machine British pendulum tester Generally there were three trends to this data, which can be associated to rock type. 3.0 ROCK TYPE For the purpose of this study various rock types, from which surfacing aggregate is sourced for State Highways in the Bay of Plenty, are volcanic (andersite), unweathered greywacke (indurated sandstone) and weathered greywacke/mudstone from Waioeka River. The averaged results are shown in Figure 2 below. 3

Figure 2: Graph of Extended PSV 12 hour testing. (NB the test results are appended) 3.1 ANDERSITE T This aggregate can be defined as a fine grained Basaltic Andesite according to the NZ Geological Map 5 2010. This volcanic Andersite aggregate had six extended polishing tests from the same quarry. The results showed an initial average polishing of 4.0 PSV units at four hours then a continuous decreasing polishing trend of another 5.4 PSV units at 12 hours, with no sign of the trend levelling off into a static state. This is consistent with the experience of this aggregate on onsite performance. 3.2 ANDERSITE P Sourced from Waitawheta Quarry and Matatoki Quarry these aggregates can be defined as Uretara Formations according to the NZ Geological Map 5 2010. Uretara Formation is Andesitic Volcanic rock, is quarried from two sources and has six extended polishing tests. The results showed an initial average polishing of 3.2 PSV units at four hours then a decreasing polishing trend of another 1.9 PSV units at 12 hours, with some sign of the trend levelling off into a static state. 4

3.3 GREYWACKE Sourced from three quarries on the west side of the Hauraki Plains from un-weathered greywacke characterised by their well-indurated, massive poorly bedded course to medium fine grained volcaniclastic sandstone, minor alternating sandstone and mudstone sequences and conglomerate; sheared locally, with common quartz and zeolite veins (Philippa Black). The three un-weathered greywacke samples and five test results showed an initial average polishing of 2.2 PSV units at four hours then a decreasing polishing trend of another 1.4 PSV units at 12 hours, with the trend levelling off. 3.4 WEATHERED GREYWACKE (FROM WAIOEKA RIVER) The Waioeka River, which discharges into the sea at Opotiki, drains a mountainous area to the south. These mountains consist of fine to medium grained sand and silt stones, which weather, erode and are mechanically sorted by the river, resulting in only the more durable boulders being deposited at the mouth of the Waioeka Gorge, from where they are taken for aggregate production. This source which has been tested five times, showed an initial average polishing of 1.6 PSV units at four hours then a decreasing polishing trend of another 0.9 PSV units at 12 hours, with a slight downward trend and levelling off into a static state. This source of surfacing aggregate has only been used for three years so onsite performance has not been confirmed other than there has been an overall improvement in the average ESC. The aggregate maintains its microtexture by fretting of 0.5 mm to 2 mm particles, exposing fresh microtexture. 3.5 DISCUSSION There appears to be a hinge point in all four rock types, which tends to indicate that the PSV test should include at least four or more hours of fine polishing. 4.0 ONSITE PERFORMANCE An associated question this extended PSV polishing posed, was could this initial and ongoing polishing trend be substantiated from onsite performance monitoring? Curves, which had been identified as Out of Context Curve (OCC), were investigated for change in their Equilibrium SCRIM Coefficient (ESC) over time. OCCs were established by the Risk Ranking of Curves on New Zealand State Highways for Skid Resistance Monitoring and Treatment by Colin Brodie of New Zealand Transport Agency. This provided a relatively consistent method of identifying OCC, in that its basis was that the approach vehicle speed over the preceding 500m, was greater than the design speed of the same curve. NB a difference of 25kph was considered a severe OCC. Once the source of the aggregate was identified the ESC of these curves, which had been surfaced for at least four years, was averaged and plotted by year, as seen by example (figure 3) below. An average ESC decay rate was derived from the site graphs. 5

Figure 3 Example of OCC ESC average over time. The rate of ESC decay per year was 0.006 and 0.014 for the left lane and right lane respectively.. Figure 4: ESC Decay Rate Versus Approach/Design speed differential. Of the 48 OOCs checked 10 showed erratic data with no clear deterioration trend. 6

Based on the above plot of decay rate of ESC versus speed change, there is no significant trend that can be derived, other than a general statement, that across the range of speed change, Andersite T appears to polish more than the other two aggregate types. The data was re-examined by weighting each site by its heavy commercial vehicle count, however no significant trends were apparent. More data capture and analysis is warranted. 5.0 RECOMMENDATIONS There is enough of an indication to warrant extending the PSV 12 testing to all aggregate sources. That the PSV value be based on at least four hours of fine polishing. The analysis of OOC may give some appreciation of how an aggregate will perform on the road. 6.0 PRACTITIONER UPSKILLING While specifications can be changed as in the case with NZTA s T/10, and a road show was organised to highlight the changes by presenting to practitioners, there still appears to be a slow uptake of the concepts. Exercises such as the extended PSV 12 testing plus the onsite monitoring as per the Aggregate Performance Method referred to, need and are reinforced by regional skid resistance reviews to develop practitioner competence and understanding. 7.0 CONCLUSION While the extended PSV 12 testing, and the aggregate performance on OCCs does have potential to enhance engineering decisions on aggregate selection, ensuring that surfacing practitioners carry out this investigation work with in their network areas, will help ensure more appropriate aggregate selection. 7

8.0 ACKNOWLEDGEMENTS Colin Brodie Elke Beca Catherine Roh Michael Moon NZ Transport Agency, Out of Context Curve Study Inroads Compiling ESC site Data, NZ Transport Agency, Assistance with analysis and paper compilation NZ Transport Agency, Waikato sampling for extended PSV data Neil Gumbley & Graham Huggins OPUS BoP, Sampling for extended PSV data Gary Bentley OPUS Central Laboratories, Extended PSV 12 Testing Methodology 8

AUTHOR BIOGRAPHIES Terry Boyle Terry has over 40 years experience with the management of State Highways in New Zealand, the last 25 of which has been spent in the asset management area. Since 2004, Terry has been a member of the NZTA s (formerly Transit New Zealand) Skid Technical Advisory Group (STAG). His special area of interest has been the on road skid resistance performance of surfacing aggregates. Dave Whitehead Dave has over 30 years of experience in a variety of roles within the highways engineering sector of which the last 25 have been in highway maintenance and asset management. He has worked largely in the UK in both the private and public sectors but prior to moving to New Zealand in 2008 had previous overseas experience in Sri Lanka. Dave currently holds the position of Senior Pavements Engineer within the Pavement Group at the NZ Transport Agency s National Office in Wellington. He has been part of the team responsible for developing the T10 specification relating to skid resistance as well as involvement in a range of technical projects related to asset management. Dave recently stepped down as the chair on the Skid Technical Advisory Group (STAG) within NZTA but still retains membership on the group. 9