International Journal of Supply and Operations Management

Similar documents
7.1 INTRODUCTION. In this era of extreme competition, each subsystem in different

Fuzzy Inventory Model for Imperfect Quality Items with Shortages

An Integrated Inventory Model with Geometric Shipment Policy and Trade-Credit Financing under Stochastic Lead Time

Optimal lot sizing for deteriorating items with expiration date

Mixture inventory model in fuzzy demand with controllable lead time

An Integrated Just-In-Time Inventory System with Stock-Dependent Demand

CHAPTER IX OPTIMIZATION OF INTEGRATED VENDOR-BUYER PRODUCTION INVENTORY MODEL WITH BACKORDERING WITH TRANSPORTATION COST IN AN UNCERTAIN ENVIRONMENT

2. Assumptions and Notation

Optimal production lots for items with imperfect production and screening processes without using derivatives

Research Article Investing in Lead-Time Variability Reduction in a Quality-Adjusted Inventory Model with Finite-Range Stochastic Lead-Time

Decision Sciences, Vol. 5, No. 1 (January 1974)

An Inventory Model for Time Dependent Deteriorating Items and Holding Cost under Inflations When Vendor Credits To Order Quantity

Coordinated Replenishments at a Single Stocking Point

Buyer - Vendor incentive inventory model with fixed lifetime product with fixed and linear back orders

Research Article A Partial Backlogging Inventory Model for Deteriorating Items with Fluctuating Selling Price and Purchasing Cost

Retailer s Optimal Ordering Policy for Deteriorating Items with Ramp-Type Demand under Stock-Dependent Consumption Rate

Maximum-Profit Inventory Model with Stock-Dependent Demand, Time-Dependent Holding Cost, and All-Units Quantity Discounts

An Optimal Rotational Cyclic Policy for a Supply Chain System with Imperfect Matching Inventory and JIT Delivery

AN EOQ MODEL FOR TWO-WAREHOUSE WITH DETERIORATING ITEMS, PERIODIC TIME DEPENDENT DEMAND AND SHORTAGES

Research Article Optimal Inventory Policy Involving Ordering Cost Reduction, Back-Order Discounts, and Variable Lead Time Demand by Minimax Criterion

An EOQ model for weibull distribution deterioration with time-dependent cubic demand and backlogging

EOQ Model for Weibull Deteriorating Items with Linear Demand under Permissable Delay in Payments

Decision Science Letters

Integrating Quality and Inspection for the Optimal Lot-sizing Problem with Rework, Minimal Repair and Inspection Time

An easy approach to derive EOQ and EPQ models with shortage and. defective items

Chapter 2 Analysis of Pull Postponement by EOQ-based Models

Research Article A Deterministic Inventory Model of Deteriorating Items with Two Rates of Production, Shortages, and Variable Production Cycle

An inventory model with shortages for imperfect items using substitution of two products

A Multi-Item Inventory Control Model for Perishable Items with Two Shelves

Designing distribution networks of perishable products under stochastic demands and routs

Production Inventory Model with Different Deterioration Rates Under Linear Demand

Stochastic inventory system with two types of services

COMPUTATIONAL PROCEDURE OF OPTIMAL INVENTORY MODEL INVOLVING CONTROLLABLE BACKORDER DISCOUNTS AND VARIABLE LEAD TIME WITH DEFECTIVE UNITS

Flexible Setup Cost and Deterioration of Products in a Supply Chain Model

An Alternative Solution Technique of the JIT Lot-Splitting Model for Supply Chain Management

FUZZY CONTINUOUS REVIEW INVENTORY MODEL WITHOUT BACKORDER FOR DETERIORATING ITEMS. Ajanta Roy *, G.P. Samanta

CHAPTER-3 MULTI-OBJECTIVE SUPPLY CHAIN NETWORK PROBLEM

THIELE CENTRE. The M/M/1 queue with inventory, lost sale and general lead times. Mohammad Saffari, Søren Asmussen and Rasoul Haji

A Two-Warehouse Inventory Model with Quantity Discounts and Maintenance Actions under Imperfect Production Processes

Fuzzy Inventory Model for Deteriorating Items with Time Dependent Demand and Partial Backlogging

An EOQ Model with Time Dependent Weibull Deterioration, Quadratic Demand and Partial Backlogging

Received 14 August 2009; Revised 26 January 2010; Accepted 5 March 2010

EOQ Model For Deteriorating Items Under Two And Three Parameter Weibull Distribution And Constant IHC With Partially Backlogged Shortages

Inventory Management of Time Dependent. Deteriorating Items with Salvage Value

Effect of repair cost on the rework decision-making in an economic production quantity model

Closed-form equations for optimal lot sizing in deterministic EOQ models with exchangeable imperfect quality items

M.Sc. (Final) DEGREE EXAMINATION, MAY Final Year. Statistics. Paper I STATISTICAL QUALITY CONTROL. Answer any FIVE questions.

Research Article An Optimal Returned Policy for a Reverse Logistics Inventory Model with Backorders

Coordinating Inventory Control and Pricing Strategies with Random Demand and Fixed Ordering Cost: The Finite Horizon Case

The Single and Multi-Item Transshipment Problem with Fixed Transshipment Costs

A Comparative Study Between Inventory Followed by Shortages and Shortages Followed by Inventory Under Trade-Credit Policy

Supply planning optimization for linear production system with stochastic lead-times and quality control

Stochastic Optimization

Multi level inventory management decisions with transportation cost consideration in fuzzy environment. W. Ritha, S.

An Alternative Fuzzy EOQ Model with Backlogging for Selling Price and Promotional Effort Sensitive Demand

Chapter 5. Statistical Models in Simulations 5.1. Prof. Dr. Mesut Güneş Ch. 5 Statistical Models in Simulations

Computer Science, Informatik 4 Communication and Distributed Systems. Simulation. Discrete-Event System Simulation. Dr.

Slides 8: Statistical Models in Simulation

Neutrosophic EOQ Model with Price Break

Inventory systems with variable capacity. Ilkyeong Moon and Byung-Hyun Ha*

Research Article An EPQ Model for Deteriorating Production System and Items with Rework

Inventory optimization of distribution networks with discrete-event processes by vendor-managed policies

Structural Reliability

Production Planning and Control

Cost models for lot streaming in a multistage flow shop

A multi-item multi-echelon inventory system with quantity-based order consolidation Kiesmuller, G.P.; de Kok, A.G.

Optimal Control of Stochastic Inventory System with Multiple Types of Reverse Flows. Xiuli Chao University of Michigan Ann Arbor, MI 48109

International Journal of Industrial Engineering Computations

Replenishment Planning for Stochastic Inventory System with Shortage Cost

Research Article Technical Note on Q, r, L Inventory Model with Defective Items

Notes for Math 324, Part 20

Manufacturing Lot Sizing with Backordering, Scrap, and Random Breakdown Occurring in Inventory-Stacking Period

Optimal Control of an Inventory System with Joint Production and Pricing Decisions

Dynamic Linear Production Games under Uncertainty

(s, S) Optimality in Joint Inventory-Pricing Control: An Alternate Approach*

An application of fuzzy set theory for supply chain coordination

A Probability Primer. A random walk down a probabilistic path leading to some stochastic thoughts on chance events and uncertain outcomes.

STA 584 Supplementary Examples (not to be graded) Fall, 2003

An EOQ Model with Temporary Stock Dependent Demand with Random Lag

Cost-Effective Optimization on a Two Demand Classes Inventory System

Final Exam # 3. Sta 230: Probability. December 16, 2012

Operation management

An Order Quantity Decision System for the Case of Approximately Level Demand

Session 4: Money. Jean Imbs. November 2010

Optimality Results in Inventory-Pricing Control: An Alternate Approach

Optimal ordering policies for periodic-review systems with replenishment cycles

Preservation of Supermodularity in Two Dimensional Parametric Optimization Problems and its Applications

THE COMPLETE SOLUTION PROCEDURE FOR THE FUZZY EOQ INVENTORY MODEL WITH LINEAR AND FIXED BACK ORDER COST

Economic lot-sizing games

Economic Order Model With Quadratic Backorder Costs

CENTER FOR MULTIMODAL SOLUTIONS FOR CONGESTION MITIGATION (CMS)

Replenishment Decision Making with Permissible Shortage, Repairable Nonconforming Products and Random Equipment Failure

Stochastic (Random) Demand Inventory Models

Practice Examination # 3

Fuzzy Inventory Control Problem With Weibull Deterioration Rate and Logarithmic Demand Rate

Preliminary Statistics Lecture 2: Probability Theory (Outline) prelimsoas.webs.com

Week 04 Discussion. a) What is the probability that of those selected for the in-depth interview 4 liked the new flavor and 1 did not?

An Uncertain Bilevel Newsboy Model with a Budget Constraint

Research Article A Data Envelopment Analysis Approach to Supply Chain Efficiency

Section 1.3: A Simple Inventory System

Transcription:

International Journal of Supply and Operations Management IJSOM May 08, Volume 5, Issue, pp. 6-8 ISSN-Print: 8-59 ISSN-Online: 8-55 www.ijsom.com The Quadratic Approximation of an Inflationary Bi-objective Integrated Vendor-buyer Inventory Model with an Imperfect Manufacturing Process and Fixed and Variable Lead Time Crash Costs A. Gholami a and A. Mirzazadeh a,* a epartment of Industrial Engineering, Kharazmi University, Tehran, Iran Abstract In this paper, we develop an integrated bi-objective model of a two-stage supply chain composed of a vendor and a buyer under an imperfect production process. In the stochastic inflationary condition the first objective is to minimize the expected costs of the proposed supply chain model and the second objective is to minimize buyer s shortage variance. We assume lead time and ordering cost are controllable parameters and lead time crashing cost is considered as a function of both order quantity and reduced lead time. An effective solution procedure is developed to determine the optimal policy of the proposed model. Finally, a numerical example and sensitivity analysis are proposed to show the performance of the model. Keywords: Supply chain; Integrated vendor-buyer inventory model; Lead time; Inflation; Stochastic; Multiobjective programming.. Introduction Considering both classical economic order quantity (EOQ) and economic production quantity (EPQ) models, the vendor and buyer minimize their own inventory costs individually. This independent decision maing for inventory problem usually cannot satisfy the optimal policy for both the vendor and buyer. However, the recent inventory control literature has shown that integrating the EOQ model of buyer and the EPQ model of vendor may lead to lower inventory total costs for the supply chain system rather than obtaining optimal policies for chain members separately. The first paper on an integrated model of the vendor and buyer was written by Goyal (976). Subsequently, many researchers have investigated this important issue considering various assumptions. For instance, Banerjee (986) expanded the model of Goyal (976) by assuming a finite vendor s production rate. Goyal (988) assumed that the vendor s production quantity is a multiple of the order size of the buyer. Ha and Kim (997) further extended Goyal (988) s model and proposed an integrated lot-slitting model for facilitating multiple shipments in small lots. Yang and Wee (000) developed an integrated inventory model for deteriorating items. A novel method was proposed by Hans et al. (006) wherein the joint economic lot size for the distribution system with multiple shipment policies is obtained. Hariga and Al-Ahmari (0) constructed a two-layer supply chain model with hybrid vendor-managed inventory and consignment stoc policy and stoc dependent demand at retailer s shelf space. In the majority of the mentioned studies on integrated inventory models of vendor and buyer, researchers concentrated on the deterministic demand of the system. However, when demand is considered as a stochastic variable, the lead time becomes an important issue and shortening it reduces safety stoc as well as the stoc-out loss and improves the customer service level so as to gain competitive advantages in business. If it is assumed that lead time can be decomposed into several components, such as setup time, process time, and queue time, it can be considered that each component might be reduced to its minimum duration with Corresponding author email address: mirzazadeh@hu.ac.ir 6

The Quadratic Approximation of an Inflationary Bi-objective Integrated Vendor-buyer Inventory Model with... an extra crashing cost. Liao and Shyu (99) were first who proposed a deterministic variable lead time inventory model. The authors assumed that lead time can be decomposed into its elements which in turn can be reduced to their minimum duration. Under the assumption that the demand is normally distributed, they calculated the optimal decision variable lead time and showed that reducing lead time may result in lower expected inventory costs. In another study, Pan and Yang (00) considered lead time to be a decision variable and obtained a lower joint total expected cost and shorter lead time for a supply chain. Ouyang et al. (00) extended Pan and Yang (00) s model considering an allowable shortage model where the reorder point is treated as a decision variable. Later, Pan and Hsiao (005) proposed an integrated inventory model with bacorder price discount and controllable lead time wherein lead time crashing cost is a function of both ordering quantities and reduced lead time. Yedes et al. (0) studied a joint vendor-buyer inventory model wherein the production unit is assumed to randomly shift from an in-control to an out-of-control situation. They considered production, inventory, and maintenance policies simultaneously. On the other hand, almost all of the mentioned papers on the supply chain models did not investigate ordering/setup cost reduction. However, studies on ordering/setup cost reduction have shown that investment in ordering/setup cost can lower system s cost meaningfully. Porteus (985) was first to present a mathematical model with setup cost reduction without bacorders. Lin (009) presented a model with bacorder price discount and ordering cost reduction conditions. Gloc (0) considered a single-vendor single-buyer inventory model with lot-size-dependent lead time and lead time reduction and assumed vendor s set up cost can be decreased with an extra crash cost with a piece-wise linear function. Giri and Sharma (07) studied a mathematical model with an imperfect production process wherein ordering cost can be reduced with extra investment. Inflationary condition has been observed in many countries, especially in developing countries and considering the effect of this phenomenon in inventory/production models improves the performance of the models. Reviewing the literature on inflationary condition, it is observed that two methods have been applied to consider inflationary condition in inventory/production models. The first method computes optimal variables by minimizing the average annual cost and the second approach calculates optimal variables by optimizing the discounted future costs. Hadley (96) showed that there is a negligible difference between the average annual cost and the discounted cost methods. Mirzazadeh (0) studied an inventory model considering shortages and deterioration in uncertain environments. Sarar et al. (000) developed a supply chain model to determine an optimal ordering policy for deteriorating items under inflation, permissible delay in payment and allowable shortage. Lo et al. (007) studied an integrated inflationary productioninventory model in which the deterioration rate follows the Weibull distribution. They used the discounted cash flow (CF) approach and a classical optimization technique to determine the optimal production and replenishment policy. Mirzazadeh et al. (009) considered an inventory model with shortage and finite time horizon and replenishment in which inflation is a random variable. Gholami-Qadiolaei et al. (0) studied a stochastic (Q, r) inventory model under inflationary condition using an average annual cost method for buyer facility and proposed different inspection scenarios for the model. Ghoreishi et al. (0) proposed an inventory system for deteriorating items and allowable shortage and considered inflationary conditions in the model. More recently, Kumar and Kumar (06) built an economic order quantity model for a two-warehouse system with deterioration, inflation, and stoc dependent demand. Nasrabadi and Mirzazadeh (06) provided an inventory model with shortage and deterioration considering marovian inflationary conditions. Wan and Chen (07) developed a supply chain model with perishable product under inflationary conditions. One of assumptions of the studies is related to the quality of the product in a lot which is imperfect. In real environments, usually an arrived lot may contain some imperfect items. Therefore, if there are imperfect items in a lot, the firm may order a larger amount than the originally planned amount to meet the customer demand. Salameh and Jabber (000) developed an EOQ model where imperfect quality items are salvaged at a discount price. The received raw material which includes imperfect quality items is a probabilistic variable. Huang (00) extended the model in Salameh and Jaber (000) and proposed a single-buyer single-vendor model for imperfect items. In the aforementioned study, it is considered that the defective rate is independent of lot-size. However, in some other research, it is assumed that defective unites is dependent on lot-size and follows beta-binomial random variables (for instance see Gholami-Qadiolaei et al (0), Gholami-Qadiaolei et al. (05), Ho et al. (009)). As stated before, often in practice, we observe inflationary conditions when maing decisions about ordering policy of an inventory/production system; ignoring this important issue in modeling of systems in such areas might result in incorrect optimizations of decision variables and could cause great financial loss for the inventory/production systems. Hence, in this regard, proposing a mathematical model which considers inflationary conditions in order to simulate a real environment regarding an inventory/production system is very important. Also, integrating ordering decisions on supply chain different parties to diminish the total cost of inventories is of growing interest to inventory managers. Therefore, based on the above-mentioned conditions, we extend the previous research by proposing an inflationary biobjective integrated vendor-buyer inventory model with stochastic demand and controllable lead time and ordering cost in which allowable shortage is a mixture of bacorder and lost sale. Lead time crashing cost is considered a function of both lead time and order quantity. We also utilize the quadratic approximation for mathematically formulizing defective units in the proposed inflationary inventory system. We first minimize the joint expected annual cost as a main objective when ordering cost, ordering quantity, reorder point, number of shipment and lead time are the decision variables, and Int J Supply Oper Manage (IJSOM), Vol.5, No. 6

Gholami and Mirzazadeh then reduce shortage variance as a second objective. We also propose a numerical example with sensitivity analysis to illustrate and validate the results of the proposed model.. Terminology The following terminology is used throughout the paper: Q Buyer s order quantity (decision variable) r Buyer s Reorder point (decision variable) Safety factor (decision variable) L Lead time (decision variable) p efective rate in an order lot, pε[0,) (random variable) g(p) Probability density function (p.d.f.) of p Annual demand for buyer (random variable) n V Vendor s number of cycle (random variable) n b Buyer s number of cycle (random variable) T b Buyer s cycle time (random variable) r T b Reorder point time (random variable) π Buyer s stoc out cost per unit short at the time zero π Buyer s Marginal profit per unit at the time zero β Bacorder rate, βε[0,] Vendor s production cost per unit at the time zero C pr C pu Buyer s purchasing cost per unit at the time zero I Inflation rate per unit time (random variable) M The number of lots in which the product is delivered from the vendor to the buyer in one production cycle, a positive integer, as a decision variable h V Buyer s holding cost per year per unit at the time zero h b Buyer s holding cost per year per unit at the time zero S Vendor s set up cost per set up at the time zero I(A) Buyer s capital investment required to achieve ordering cost A, 0 < A A 0 b Percentage decrease in ordering cost A per dollar increase in investment I(A) θ Fractional opportunity cost of capital investment per year A Buyer s ordering cost per order at the time zero, as a decision variable C(L) Total lead time crashing cost per order at the time zero Y Number of imperfect items in an order lot (random variable) X Lead time demand (random variable) X + Maximum value of x and 0 E( ) Mathematical expectation. The mathematical model This investigation concentrates on a cooperative two-layer inventory model including a single vendor who provides one type of product to a single buyer. The buyer orders a lot of size Q and the vendor manufactures an order of size MQ with a finite production rate, P, at one set-up but ship in quantity Q to the buyer over M times. The vendor incurs a set-up cost, S, for each production run and the buyer incurs an ordering cost, A, for each order of quantity Q. This study assumes vendor s manufacturing system is imperfect and the number of defective items in an arriving lot, Y, is a beta-binomial random variable, where p (0 p ) shows the defective rate (see the appendix). Once an order quantity is reached, all items are inspected by the buyer and all of the defective ones are given bac to the vendor at the same time. Thus, once the vendor produces the first Q units, he or she will deliver them to the buyer. After the buyers inspection, the vendor plan deliveries every Q y units of time until the inventory level falls to zero. Therefore, the length of each production cycle for the vendor is equal to T V = M(Q y) and the length of each ordering cycle is equal to T b = Q y (see Fig. ). Also, it is mentioned that inspection is error free and the inspection time is negligible. The cost of transportation from the vendor to the buyer and the buyer s inspection cost are constant and thus independent of the ordering quantity. So, we relinquish the total transportation and inspection costs of the model. Int J Supply Oper Manage (IJSOM), Vol.5, No. 6

The Quadratic Approximation of an Inflationary Bi-objective Integrated Vendor-buyer Inventory Model with... Figure. Inventory level for vendor Buyer s lead time demand (LT) follows a normal distribution, so that lead time demand, X, has a pdf, f x (X), with mean L and standard deviation σ L. Buyer s inventory is continuously reviewed and a lot-size is ordered whenever the inventory level hits the reorder point. Also, the replenishment rate is infinite. Reorder point, r, is equal to the sum of buyer s expected demand during lead time, L, and safety stoc, σ L, where is safety factor. A partial bacorder system is considered for unsatisfied demand and the expected number of bacordered per cycle is equal to ( β)e(x r) +. The bacordering rate is dependent on the expected shortage quantity with a negative exponential function, β = νe θe(x r)+, wherein, 0 ν, θ 0, are bacorder parameters. Ordering cost is controllable and capital investment, I(A) = bln ( A 0 ), is a logarithmic function of ordering cost for A (0, A A 0 ]. under the assumptions that:. The lead time L consists of n mutually independent components. The zth component has a normal duration T z and minimum duration t z, z =,,, n.. For the zth component of lead time, the crashing cost per unit time c z, depends on the ordering lot size Q and is described by c z = a z + b z Q, where a z > 0 is the fixed cost, and b z > 0 is the unit variable cost, for z =,,, n.. For any two crash cost lines c z = a z + b z Q and c j = a j + b j Q, where a z > a j, b z < b j, for z j and z, j =,,, n, there is an intersection point Q S such that c z = c j. These intersection points are arranged in ascending order so that Q S 0 < Q S < < Q S S w < Q w+, where Q S S 0 = 0,Q w+ = and w n(n ). For any order quantity range (Q S S z, Q z+ ), c z s are arranged such that c c c n, and the lead time components are crashed one at a time starting with the component of least c z, and so on. n. Let L 0 j= T j and L z be the length of lead time with components,,, z crashed to their minimum duration, then z L z can be expressed as L z = L 0 j= (T j t z ), z =,,, n and the lead time crashing cost per cycle C(L) is given z by C(L) = c z (L z L) + c j (T j t j ), where Lε[L z, L z ], and c j = a j + b j Q for j =,,, z. j= This investigation considers that the lead time crashing cost is a function of both order quantity and reduced lead time. Int J Supply Oper Manage (IJSOM), Vol.5, No. 65

Gholami and Mirzazadeh.. Vendor s expected annual cost As mentioned before, this paper aims to optimize decision variables of an integrated vendor-buyer inventory system in order to minimize the joint expected annual cost with inflation (JEACWI). Therefore, the calculation of vendor s yearly expected inventory cost with inflation is needed. The total inventory for the vendor is a random variable and can be expressed as follows: [MQ ( Q Q y + (M ) P ) M Q y) ] [Q(Q ( + + + (M ))] P = MQ P Q(Q y) + [M(M ) ] M Q y) [Q(Q M(M )] P Hence, dividing the total inventory per cycle into vendor s cycle time, M(Q y), the average inventory level can be calculated as follows: { MQ Q(Q y) + [M(M ) ] M Q y) M(Q y) [Q(Q M(M )]} P P = Q P(Q y) MQ (M )Q + P(Q y) After taing the expected value, the expected average inventory level for the vendor is obtained as follows: Q P E ( Q y ) MQ P E ( (M )Q ) + = [( Q Q y P E ( Q y ) ( M (M )Q )) + ] () The vendor s total holding cost per year in the average annual cost method is dependent on the average inventory level. Thus, the buyer s total holding cost per year with inflation can be computed as follows ( T V = ): = M(Q y) n V () () n V T V [ h V [( Q P ( Q y ) ( M (M )Q )) + ] ( + it)dt] 0 = h V ( + i ) [(Q P ( Q y ) ( M (M )Q )) + ] () Considering that the probabilistic variables, (I, Y), are independent, the expected value of the holding cost per year with inflation (EHCWI V) is computed by: EHCWI V = h V ( + E(i) ) [(Q P E ( Q y ) ( M (M )Q )) + ] (5) According to the computation of the vendor s inventory costs with inflation, this study assumes the set-up cost for the vendor is paid at the beginning of the cycle. So, the total set-up cost can be calculated as follows ( T V = ): [S + S( + T V i) + S( + T V i) + + S( + (n V )T V i)] n V = S ( + T V ij) = S [n + j=0 M(Q y) = M(Q y) n V i n V(n V ) ] (6) Considering that the probabilistic variables, (I, Y), are independent, the expected value of the set-up cost per year for vendor (ESUCWI V) is reduced to: ESUCWI V = S [ M E ( E(i) ) ( + Q y ) E(i) ] (7) Also, this study assumes that the production cost is paid at the beginning of the vendor s cycle. Hence, the average production cost per unit is calculated as follows ( T V = ): = M(Q y) n V Int J Supply Oper Manage (IJSOM), Vol.5, No. 66

The Quadratic Approximation of an Inflationary Bi-objective Integrated Vendor-buyer Inventory Model with... (C pr + C pr ( + T V i) + C pr ( + T V i) + + C pr ( + (n V )T V i)) n V j=0 n V = C pr ( + T n V ij) = C pr [ + i M(Q y) ( )] V (8) Considering that the probabilistic variables are independent, the vendor s expected production cost per year with inflation (EPCWI V) is as follows: C pr E(i) MQ( E(p)) EPCWI V = [ + ( )] E(p) Then, the expected annual cost for buyer with inflation is the sum of Eqs (5), (7) and (9) as follows: (9) EACWI V (Q, M) = ESUCWI V + EHCWI b + EPCWI V (0).. Buyer s expected annual cost In this subsection, the continuous review inventory model for the buyer is considered. The inventory level of an item for the buyer will be diminished due to the random demand and a partial bacorder system is assumed for the model. The buyer places an order with the amount of Q and QY items are defective. The shortage quantity per cycle is probabilistic, because X (lead time demand) is probabilistic which is as follows. (x r) + x r, x r = Max(x r, 0) = { 0, x r () We assume that the buyer s shortage cost is calculated at the end of cycle. Hence, the average shortage cost per unit with inflation is calculated by ( T b = = Q y ): n b ((π + π ( β))(x r) + ( + T b i) + (π + π ( β))(x r) + ( + T b i) + + (π + π ( β))(x r) + ( + n b T b i)) = (π + π ( β))(x r) + ( + T b ji) = (π + π ( β))(x r) + [ Q y ( + i ) + i ] () Considering that the probabilistic variables, (I, X, Y), are independent, ESCWI is transformed as: ESCWI b = (π + π ( β)) [E ( E(i) ) ( + Q y ) + E(i) ] E(x r)`+ () This investigation assumes that the buyer s ordering cost will be paid at the time of replenishment. Hence, T r is the b reorder point time and can be expressed by: T r b = I max r, I max = Q y + r x + ( β)(x r) + Q y x + ( β)(x r)+ T r = b () n b j= The buyer s total ordering cost per year paid at the time of order placing is computed as follows ( T b = n b = Q y ): [(A + C(L))( + T b r i) + (A + C(L))( + (T b r + T b )i) + + (A + C(L))( + (T b r + (n b )T b )i)] n b = [(A + C(L)) ( + T r b i + T b ij) ] = [(A + C(L)) (n b + n b T r b i + Ti n b(n b ) )] j=0 Considering (I, X, Y) as independent variables, the expected ordering cost per year with inflation for buyer (EOCWI b) can be expressed by: (5) Int J Supply Oper Manage (IJSOM), Vol.5, No. 67

Gholami and Mirzazadeh EOCWI b = θbln ( A 0 E(i) ) + [A + C(L)] [E ( ) ( + A Q y ) E(i) ] + [A + C(L)] [ ((E(x) ( β)e(x r) + )E ( ))] E(i) Q y (6) where θ is the fractional opportunity cost of capital per year. The buyer s total holding cost with inflation based on the average annual cost method can be obtained as below( n b = = ): T b Q y n b T b Q y [ h ( + r x + ( β)(x r) + ) ( + it)dt] = h ( + i y ) (Q + r x + ( β)(x r) + ) (7) 0 Hence, considering (I, X, Y) as independent, the expected value of the holding cost per year with inflation (EHCWI b) for the buyer is computed by: EHCWI b = h ( + E(i) y) ) [E(Q + r E(x) + ( β)e(x r) + ] (8) Similarly, the expected purchasing cost per year with inflation (EPCWI b) is as follows: EPCWI b = C pu [ + E(i) Q( E(p)) ( )] (9) So, the expected annual cost for the buyer with inflation is the sum of Eqs (), (6), (8) and (9) as follows: EACWI b (Q, A, r, L) = ESCWI b + EOCWI b + EHCWI b + EPCWI b (0).. Normal lead time demand distribution for buyer We assume that lead time demand X follows a normal distribution with mean E(x) = L and standard deviation σ x = σ L, and having the reorder point r = L + σ L, the expected shortage, E(x r) +, is as follows: E(x r) + = (x r)f(x)dx r, = r E(x) σ x, z = x E(x) σ x () E(x r) + = σ x (z )f(z)dz E(x r) + = σ L [ zf(z)dz Φ() ], [ zf(z)dz Φ() ] = [φ() Φ() ] = ψ() E(x r) + = σ Lψ() 0 () For the above formulation, φ denotes the probability density function of standard normal distribution and Φ denotes the complementary cumulative function of standard normal distribution. Considering r = L + σ L, E(x r) + = σ Lψ() and β = νe θσ Lψ(), the expected stocout cost of the normal lead time demand distribution is changed as follows: ESCWI N b = [π + π ( νe θσ Lψ() )] [E ( E(i) ) ( + Q y ) + E(i) ] σ Lψ() () Also, the expected holding cost with inflation of the normal distribution can be written as follows: Int J Supply Oper Manage (IJSOM), Vol.5, No. 68

The Quadratic Approximation of an Inflationary Bi-objective Integrated Vendor-buyer Inventory Model with... EHCWI b N = h ( + E(i) y) ) [E(Q + σ L + ( νe θσ Lψ() )σ Lψ()] () Besides, the expected ordering cost with inflation is as follows: EOCWI N b = θbln ( A 0 E(i) ) + [A + C(L)] [E ( ) ( + A Q y ) E(i) ] + [A + C(L)] [ ((L ( νe θσ Lψ() )σ Lψ()) E ( Q y ))] E(i) (5).. Joint expected annual cost with inflation In this subsection, a situation is proposed in which the vendor and the buyer match their production and inventory strategies to specify their optimal strategy for the continuous review inventory supply chain system. Thus, the joint expected annual cost with inflation is obtained, as given below: JEACWI(Q, A,, L, M) (6) = EOCWI b N + EHCWI b N + ESCWI b N + EPCWI b + EHCWI V + ESUCW V + EPCWI V Q 0, 0, Aε(0, A 0 ] and L ε [L z, L z ].5. Reducing shortage variance as a second objective In case of probabilistic demand, as a consequence of high demand uncertainty, it is important to control shortage variation in order to eep the service in higher level. The shortage variation can be reduced with increasing the safety factor and accordingly the reorder point level. Therefore, the paper aims to reduces buyer s shortage variance which is obtained as follows Var(x r) + = E [(Max(x r, 0)) ] [E(Max(x r, 0))] (7) E [(Max(x r, 0)) ] = (x r) f(x)dx, = (x r) f(x)dx r and r r E(x) σ x, z = x E(x) σ x = (zσ x σ x ) f(z)dz = σ x (z ) f(z)dz, P(x r) = p(z ) [E(Max(x r, 0))] (9) = σ x [ zf(z)dz Φ() ] (8) Hence, variance of shortages is as follows: Var(x r) + = σ x { (z ) f(z)dz [ zf(z)dz Φ() ζ() = { (z ) f(z)dz Var(x r) + = σ L ζ() 0 [ zf(z)dz Φ() ] } ] } (0) () ().6. The multi-objective model and the solution As mentioned in the previous sections, the paper aims to minimize the joint expected annual cost of vendor and buyer with inflation as a first objective and shortage variance as a second objective as follows: Int J Supply Oper Manage (IJSOM), Vol.5, No. 69

Gholami and Mirzazadeh min JEACWI(Q, A,, L, M) = θbln ( A 0 A ) i + [A + a i (L i L) + a i (T j t j ) i j= + Q (b i (L i L) + b i (T j t j ))] [E ( E(i) ) ( + Q y ) E(i) ] j= i + [A + a i (L i L) + a i (T j t j ) + Q (b i (L i L) + b i (T j t j ))] [ j= ((L ( νe θσ Lψ() )σ Lψ()) E ( ))] E(i) Q y + h ( + E(i) y) ) [E(Q + σ L + ( νe θσ Lψ() )σ Lψ()] + [π + π ( νe θσ Lψ() )] [E ( E(i) ) ( + Q y ) + E(i) ] σ Lψ() + C pu [ + E(i) E(Q y) ( )] + C pr E(p) [ + E(i) i j= ME(Q y) ( )] + h V ( + E(i) ) [(Q P E ( Q y ) ( M (M )Q )) + ] + S [ M E ( E(i) ) ( + Q y ) E(i) ] min Var(x r) + = σ L ζ() Q 0, 0, Aε(0, A 0 ] and L ε [L z, L z ] () Where ψ() = [φ() Φ() ] E ( Q y ) Q( E(p)) + QE(p( p)) + Q Var(p) (Q( E(p))) Q y Q( E(p)) E ( ) = In order to solve the proposed multi-objective model in this paper, we present an algorithm where in the first step, the second objective (minimizing the variance of shortage) is eliminated. uring this step, we obtain the minimum values of model () numerically because its partial derivatives are very complicated functions. It is noted that for any given (Q, A, ), JEACWI(Q, A,, L) is concave in L [L z, L z ], because JEACWI(Q, A,, L) L 0 () Therefore, for fixed (Q, A, ), the minimum expected cost is at the end of intervall [L z, L z ]. Thus, for fixed L [L z, L z ], the minimum value of JEACWI(Q, A,, L, M) will occur at the point (Q, A, ) which satisfies JEACWI(Q,A,,L) Q = 0, JEACWI(Q,A,,L) = 0 and JEACWI(Q,A,,L) A = 0 simultanuously. Therefore, we can use the proposed algorithm for finding the optimal (Q, A, r, L, M ). Step. Set M =. Step. Compute the intersection points Q s of the crash cost lines c z = a z + b z Q and c j = a j + b j Q, for all z and j, where a z > a j, b z < b j, z j and z, j =,,, n. Arrange these intersection points such that Q s < Q s < < Q w s and let Q 0 s = 0, Q w+ s = Step. For each order quantity range (Q j s, Q j s ), j =,,, w, rearranged c z such that c c c n, do: Step.. For each L z, z = 0,,,, n, perform step -- to step --. Int J Supply Oper Manage (IJSOM), Vol.5, No. 70

The Quadratic Approximation of an Inflationary Bi-objective Integrated Vendor-buyer Inventory Model with... Step... Input the values of A, S,, h b, h V,, π, π 0, C pu, C pr, i,, θ, b, ν, θ and P. Step... Compute JEACWI(Q, A ) in terms of different and ψ() and find JEACWI(Q z, A z) = JEACWI(Q z, A z, z ) as follows: JEACWI(Q z, A z) < Min{JEACWI(Q z ξ, A z ξ ), JEACWI(Q z+ξ, A z+ξ )} JEACWI(Q z, A z) JEACWI(Q z ξ, A z ξ ) ε JEACWI(Q z, A z) JEACWI(Q z+ξ, A z+ξ ) ε Step... If Q z Q s s j, let Q z = Q j compute JEACWI (A z, z ). and if Q j s Q z let Q j s = Q z. Using Q z as a constant, Step.. Put MIN z=0,,,n JEACWI(Q z, A z, z, L z, M) = JEACWI(Q j, A j, j, L j, M) for the order quantity range (Q j s, Q j s ). Step. Set MIN j=,,..,w JEACWI(Q j, A j, j, L j M) = JEACWI(Q M, A M, M, L M ) Step 5. Set M = M +, perform Step to to find JEACWI(Q M+, A M+, M+, L M+ ). Step 6. If (Q M+, A M+, M+, L M+ ) JEACWI(Q M, A M, M, L M ), then go to step 7, otherwise go to step 5. Step 7. Set JEACWI(Q M, A M, M, L M+ ) = JEACWI(Q, A,, L, M ). And hence the optimal reorder point is r = μ L + σ L and the optimal bacorder rate is β = νe θσ L ψ( ). Also, JEACWI(Q, A,, L, M) is convex in M, for fixed Q, A, and L, because JEACWI(Q,A,,L) M 0. Moreover, to ensure the convexity of the disscussed model, the optimal values of (Q, A,, L ) must satisfy the following sufficient conditions. For a given value of L ε [L z, L z ], we obtain the Hessian matrix H for the objective function as follows: JEACWI(Q, A, ) Q JEACWI(Q, A, ) Q A JEACWI(Q, A, ) Q H = JEACWI(Q, A, ) JEACWI(Q, A, ) JEACWI(Q, A, ) A Q A A JEACWI(Q, A, ) JEACWI(Q, A, ) JEACWI(Q, A, ) [ Q A ] The first, second, and third principal minors of H must be positive for the optimal values (Q, A, ) as follows: H = JEACWI(Q, A, ) Q 0 H = JEACWI(Q, A, ) Q And JEACWI(Q, A, ) Q JEACWI(Q, A, ) H = A Q JEACWI(Q, A, ) Q JEACWI(Q, A, ) A JEACWI(Q, A, ) Q A JEACWI(Q, A, ) A JEACWI(Q, A, ) A ( JEACWI(Q, A, ) ) 0 A Q JEACWI(Q, A, ) Q JEACWI(Q, A, ) 0 A JEACWI(Q, A, ) The above mentioned algorithm helps to find minimum values of the joint expected annual cost with inflation (JEACWI) as a first objective. However, to minimize the variance of shortage as a second goal of the corresponding inventory system, a heuristic method is proposed that reduces the shortage standard deviation in a distance of first objective s Int J Supply Oper Manage (IJSOM), Vol.5, No. 7

Gholami and Mirzazadeh optimum point. As can be seen in the following, the standard deviation of shortage is dependent on the reorder point. The shortage standard deviation, therefore, can be reduced by increasing the reorder point in a distance (η) of optimum point of the first objective which is given below. min Var(x r) + = σ L ζ() Subject to: JEACWI JEACWI + η 5. The numerical example To illustrate the behavior of the model developed in this paper, we consider an inventory problem with the following data: = 600 unit year, A 0 = $00, h b = $0, σ = 7 unit wee π = $50, π 0 = $50 ν =, θ = 5 h V = $5, S = $0, b = 800, θ = 0., P = 000 unit/year Also, we consider α = and β = for defective rate which follows the Beta distribution and the p.d.f of p is given by g(p) = ( p), 0 < p < Therefore, we have: E(p) = α α + β = 0., α(α + β) E(p ) = = 0.066 and Var(p) = 0.066 (α + β)(α + β + ) Besides, we tae C pr = $0, C pu = $60. Table. Lead time data Lead time component z Normal duration T z (days) 0 0 6 Minimum duration t z (days) 6 6 9 Unit fixed crash cost a z ($/day) 0.5. 5. Unit variable crash cost b z ($/unit/day) 0.0 0.00 0.00 Table. The values of Q s, order quantity ranges and crash sequence Inspection points (Q s ) Order quantity range Crash sequence of components (0, ],, 6 (, 6],, 57 (6, 57],, --- (57, ),, The data of lead time s components are listed in Table. The data are first used to evaluate the intersection points, order quantity range interval, and component crash priorities in each interval. Table shows the crash sequence corresponding to each order quantity range. The inflation rate has a normal distribution function. The results of using the first step of the algorithm are shown in Table () for E(i) = 0.00, 0.0, 0.08, 0. and 0.6. Moreover, the summary of results are given in Table (), and to see the effects of set-up cost reduction, we provide the optimal results of the fixed set-up cost model in the same table. The associated results reveal that the larger inflation rate, the larger order quantity (see Fig. ). Also, from Table () and Fig. (), it is observed that the cost performance of the fixed ordering cost model is improving as the inflation rate increases. Table shows that the optimal number of shipments is decreased when the inflation rate grows. Besides, according to the solution procedure, the optimal JEACWI values obtained in Table are tabulated in Table 5 for various safety factor () quantities. The outcomes show that JEACWI is convex in terms of various safety factor amounts (see Fig for i=0.08, L=8, M=). In addition, for instance, the optimal values obtained for the variable ordering cost model in Table are tabulated for different lead times and respective crashing costs and order quantity ranges (C L (0,], C L (,6]) in Table 6. Considering ξ = 0$ in the second step of the solution procedure, the effective solutions are tabulated in Table 7 for the variable ordering cost model. Moreover, performance of the multiobjective inventory model for variance of shortages is shown in Fig 5 where a larger amount of safety factor results in a smaller amount of variance of shortages. This article assumes the quadratic approximation in order to show the influence of defective item in analyzing the first objective function. To illustrate that this obligation is satisfied in evaluating the first objective function, the values of E ( ) and E(Q y) are given in Tables and 8. Results reveal that using the corresponding approximation, effect of Q y Int J Supply Oper Manage (IJSOM), Vol.5, No. 7

The Quadratic Approximation of an Inflationary Bi-objective Integrated Vendor-buyer Inventory Model with... the standard deviation of the defective item on its mean is negligible and the computed expected values are precise, and the expected additional joint expected annual cost with inflation for considering defective units as a probabilistic variable is justifiable. For instance, in Table, for E(i)=0.00, M=, the values are obtained as follows E ( ) = 0.05, E(Q y) = Q E(y) = 8.85 and E(y) = QE(p) Q y We now that: Var(y) (E(Q y)) E ( Q y ) = 0.05 0.0 = 0.000 E(Q y) E(i) M (Q, A, L,, r) E(Q y), E ( Q y ) Table. Results of first step of solution procedure (Lead time in wees) EOCWI b, EHCWI b, ESCWI b, EPCWI b ESUCWI V, EHCWI V, EPCWI V JEACWI 0.00 5 99.6, 00.00, 6,.8, 09.0 8.77, 0.8, 8,.98,.0.6, 9., 8,.08, 5.8 0.56, 7.6, 8,., 6.6 85., 6.5, 8,.9, 7.5 9.69, 0.00 5., 0.007 05., 0.0098 8.85, 0.05 68., 0.05 6.5, 00.9, 96., 6000 800.0, 0.5, 05., 6000 980.9, 878.5, 99., 6000 5.5, 676.9, 99.87, 6000.5, 55.5, 99.8, 6000 606.66, 877.8, 0000 9., 6., 0000 979.6, 588.8, 0000 887.68, 7.80, 0000 8.5, 8., 0000 7.7 7658.7 756.5 750.80 * 756.66 0.0 5 6.8, 00.00, 6,.78, 08.5 0.78,.50, 6,.9,.6 5.5, 0.5, 8,.05,.58.5, 80.7, 8,., 5.97 9.57, 66.68, 8,.7, 6.96 6.6, 0.009 6., 0.006 6., 0.0089 9.6, 0.0 75.66, 0.07 578., 9.,.8, 606. 865.9, 5., 9.78, 655. 9.09, 06.97, 0.9, 6580.0 067.9, 79.0, 99.96, 660.0 75.08, 69.08, 99., 669.0 7.6, 976.8, 08.5 9.80, 55.0, 075.5 806.08, 79.0, 050.75 70.65, 9.57, 0.8 667.0, 05., 0.69 70.7 7590.0 78.00 767.6 * 786.56 0.08 5 6.9, 00.00, 6,.75, 08.00 7.6, 56.6, 6,.9, 0.7 6.7,., 8,.0,.99 9., 89.56, 8,.09, 5.7 06.76, 7., 8,., 6.6 89., 0.006 8.8, 0.0057 0.97, 0.0079 0.9, 0.0 85., 0.0 50.0, 65.8, 0.08, 676. 808., 57.6, 9.7, 700.6 877.68, 95.8, 05.5, 75.66 9.86, 96.8, 0.0, 79.09 5.88, 770.60, 0.7, 75.0 07.,.6, 06.76 77., 77.67, 07.7 6.6, 055.06, 0.5 5.6,., 07.6 8.0, 5.7, 05.89 795. 77.66 788.55 78.09 * 706.5 0. 07.79, 00.00 6,.7, 07. 6.5, 76., 6,.86, 09.89 9.6, 0., 6.96,.60 50., 0.6, 8,.0,.9 6., 0.00 09., 0.009 5.09, 0.0067 0.08, 0.006 96.5, 08.77, 07., 6985.55 75.58, 896.65,.0, 706.8 9.8, 7.78, 9.07, 7605.5 95.05, 6.77,.5, 777.68 969.7, 65.75, 08.9 5.95, 079.0, 05.7 7.6, 6., 0. 9.66, 67.8, 058.9 7570.7 7585.8 75.5 * 758.85 0.6 7.89,00.00, 6,.66, 06.6.0, 00.00, 6,.80, 08.86.8, 5.0, 6,.90, 0.57 86.8,.8, 6,.97,.77 79.9, 0.007 9.9, 0.00 86.5, 0.0055 9.0, 0.0069 5.9, 7.99,., 7056. 6.96, 69.59, 06.07, 7680. 89.8, 77.79, 99.57, 7985.95 957.99, 0.96, 95.8, 86.66 695.69, 50.7, 0880. 69.9, 50.5, 000.58 7.8, 05.7, 06.89 05., 7.77, 005.56 765. 75999.98 75950.7 * 75975. Int J Supply Oper Manage (IJSOM), Vol.5, No. 7

Gholami and Mirzazadeh Table. Summary of optimal solution for first step of solution procedure (Lead time in wees) Variable ordering cost model E(i) Q r ( ) A L m β ζ(), Var(x Fixed ordering cost model (A=00) JEACWI E(δ) Q r ( ) L m β JEACWI r) + 0.00 0.0 0.08 0.5 6.5 6.6(. ) 5.97(. ) 7.6 80.7 89.56 8 8 0.5 6 0.5 0.00757 66,.7 0.0099 8,.56 750.80 767.6 0.00 0.0 6.7 60.5 9.58(.0 5).99(.0 ) 8 8 0. 7 0. 5 7698. 765.0 0. 0.6 9. 9.6.8 5.7(.0 9).60(.9 6) 0.57(.9 0) 0. 5. 0 8 6 6 0.5 0. 0. 8 0.0067 9,.7 0.00696,.88 0.007590 9,. 78.09 75.5 75950.7 0.08 0. 0.6 8. 05.9 8.6.77(.9 7).09(.9 ) 0.(.8 8) 6 6 6 0. 5 0. 0. 6 780.68 757.89 75968.8 Table 5. Optimal JEACWI values in terms of different safety factor () ψ() i=0.00 EACWI L=8,M= i=0.0 EACWI L=8,M= i=0.08 EACWI L=8,M= i=0. EACWI L=6,M= i=0.6 EACWI L=6,M= 0.00 0.0 0.80.0.0.60.80.00.0.....5.6.7.0.0.60.80.00.50.00 0.9899 0.09 0.007 0.0560 0.06668 0.0 0.076 0.0089 0.00668 0.00690 0.0069 0.00595 0.005787 0.00568 0.0057 0.0050 0.00887 0.0070 0.005 0.00080 0.0008 0.000058 0.000007 78655. 766.97 77.99 750.06 7.56 7808.8 76.77 759.5 750.0 750.57 750.9 750.9 750.80 * 750.8 750.97 750.7 7505. 759.0 7599. 7669.68 77.0 799. 77.58 0.00 0.0 0.80.0.0.60.80.00.08.09.0.....5.0.0.60.80.00.50.00 790.0 77099.5 7585.98 779.70 7007. 77.5 7559.9 778.8 768.65 768.7 767.85 767.66 767.6 * 767.7 768.0 768.9 77.7 75. 757.0 766.98 77.6 79.77 7.86 0.00 0.0 0.80.0.0.60.80.00.05.06.07.08.09.0...0.0.60.80.00.50.00 795.0 776.9 767.96 7577.0 78.6 760. 75.67 787.87 78.95 78.5 78. 78.0 78.09 * 78. 78.6 78.9 790.8 7.80 750. 7576. 765.9 7858.69 7506. 0.00 0.0 0.80.0.0.60.70.90.9.9.9.95.96.97.98.99.00.0.0.0.00.50.00 7865.7 7780. 768.97 756.6 75.8 7508.9 7565.9 75.96 75.87 75.5 75.7 75.6 75.5 * 75.7 75.7 75.80 75. 75.55 7550. 750.8 7550.0 75685. 75866.87 0.00 0.0 0.80.0.0.60.70.80.86.87.88.89.90.9.9.9.00.0.0.0.00.50.00 7888.88 77658.98 7680. 767.80 76. 76005.6 7597.5 75956.6 7595.57 7595.9 75950.9 75950.75 75950.7 * 75950.77 75950.9 7595. 75956.87 75970.9 7599. 7606.78 7655. 769.60 766.7 Table 7. Results of second step of solution procedure (Lead time in wees) Variable ordering cost model E(i) Q F r F ( F ) A F L F m F β F ζ(), Var(x r) + JEACWI F 0.00 0.0 0.08 0. 0.6 0.6. 7.87 90.6 0.00 8.9(.7) 8.5(.5) 7.75(.).00(.0).97(.0) 7.9 79.96 88.70 9.0 5.8 8 8 8 6 6 0.67 0.65 0.6 0.57 0.5 0.00560, 0.98 0.006787,.05 0.0000,.8 0.009,. 0.0050666,.8 755.96 778.0 79.97 75.90 75960.6 Int J Supply Oper Manage (IJSOM), Vol.5, No. 7

The Quadratic Approximation of an Inflationary Bi-objective Integrated Vendor-buyer Inventory Model with... Table 6. Optimal values in terms of different lead time and respective crashing cost and order quantity range (Lead time in wees) L z 8 6 E(i) Range (0,] C L (,6] C L (0,] C L (,6] C L (0,] C L C L (,6] (0,] C L C L (,6] 0.00 Q r ( ) A m JEACWI 6.56(.5) 7.60 7505.7 0.56 6.6(.) 7.6 750.80 *.5(.) 7.60 7558.86 06.8.5(.) 76.9 7550.0 8.5(.) 7.60 7588.68 07.5 80.6(.09) 76.8 7577. 6.(.09) 7.60 778.98.80 6.09(.07) 80.79 775.98 0.0 Q r ( ) A m JEACWI 6.56(.5) 70.50 7505.8.5 5.97(.) 80.7 767.6 *.5(.) 70.8 7560.7 7.66.8(.09) 8.80 750. 8.5(.) 70.6 759.8 8.7 80.98(.07) 8. 759.89 6.(.09) 70.0 7790..57 6.7(.0) 87. 7679. 0.08 Q r ( ) A m JEACWI 6.56(.5) 69. 7506.0 9. 5.7(.09) 89.56 78.09 *.5(.) 69.0 756.9.5.(.06) 9.60 707.5 8.5(.) 68.97 7595.9. 80.56(.0) 9.86 7.0 6.(.09) 68.85 7798.0 0.05 6.6(.0) 96.0 7558.66 0. Q r ( ) A m JEACWI 6.56(.5) 68.0 7595. 89.5.00(.97) 8.9 755.99.5(.) 68.06 7600.58 9.6.60(.96) 0. 75.5 * 8.5(.) 67.7 7605.8 9.6 79.6(.9) 0.07 75.0 6.(.09) 67.56 765. 00. 6.7(.9).9 7509. 0.6 Q r ( ) A m JEACWI 6.56(.5) 67.9 7708. 9..0(.9) 5.75 7596.7.5(.) 66.95 77095.85.8 0.57(.90) 5.0 75950.7 * 8.5(.) 66.5 77..0 78.(.88) 5. 75968.99 6.(.09) 66. 77.8.7 6.55(.86) 58.06 7606.0 Figure. Optimal order quantity in terms of various inflation rates Int J Supply Oper Manage (IJSOM), Vol.5, No. 75

Gholami and Mirzazadeh Figure. Effect of changes in inflation rates for ordering cost reduction and fixed ordering cost model Figure. JEACWI values in terms of different safety factors () Figure 5. Multi-objective model performance for variance of shortages Int J Supply Oper Manage (IJSOM), Vol.5, No. 76

The Quadratic Approximation of an Inflationary Bi-objective Integrated Vendor-buyer Inventory Model with... In order to study how various parameters affect the optimal solution of the proposed inventory model, a sensitivity analysis is performed. Holding all other parameters fixed and varying a single parameter at a time, we analyze the results. Results of the sensitivity analysis are shown in Table 8. The following interpretations are obtained from it: M (Q, A, L,, r, β, M ) E(Q y), E ( Q y ) θ 0 5 0 00 8.08, 0.5, 8,.,.5,.00,.89, 80.99, 8,.9,.0, 0.8,.5, 80.76, 8,., 5.97, 0.5,., 80.68, 8,.6, 8.7, 0.,.7, 80.6, 8,., 50.,0.00,.7, 80.6, 8,., 50.,0.00, Table 8. Effect of changes in various parameters (Lead time in wees) EOCWI b, EHCWI b, ESCWI b, EPCWI b 8.7,0.0087 9.9, 0.0 9.6, 0.0 9.55, 0.0.50, 0.0 99.50,0.0 9.0, 790.0, 79.7, 6577.8 066.7, 7.8,.99, 6609.69 067.9, 79.0, 99.96, 660.0 068.6, 88.0, 96.67, 660. 068.70, 90.85, 9., 660.9 068.70, 90.85, 9., 660.9 ESUCWI V, EHCWI V, EPCWI V 77., 8.06, 0.58 75.9, 99.67, 0. 70.65, 9.57, 0.8 7.0, 9.0, 0.77 7.09, 90.85, 0.99 7.09, 90.85, 0.99 JEACWI 7.6 799.90 767.6 75.0 756.75 756.75 σ 5 7 9.9, 79.6, 8,.0,., 0.7,.7, 80.7, 8,.09,.55, 0.6,.5, 80.76, 8,., 5.97, 0.5, 9.5, 05.0,,.05, 88.90, 0.5, 50.65, 05.79,,.07, 0.68, 0., 90.5, 0.05 90.97, 0.0 9.6, 0.0 9.6,0.0087 0.5,0.0086 075.7, 75.,.88, 66.57 07.9, 5.65, 70.7, 660.8 067.9, 79.0, 99.96, 660.0.77, 97., 87.9, 6576. 8.6,.7,.6, 6575.7 75.9, 96.57, 08.56 7., 99.7, 06.08 70.65, 9.57, 0.8 756.9, 80.9, 0.0 7.76, 85.6, 08. 790.67 78.6 767.6 77.0 7006.86 b 000 500 800 000 5000 90.8, 5.7, 8,.9, 7.5, 0.60,5.8, 7.0, 8,., 6.7, 0.55,.5, 80.76, 8,., 5.97, 0.5, 5.69, 5.70, 8,.0,.8, 0.7, 60.59, 00.00, 8,.0,.99, 0.5, 7.65, 0.0 90.6, 0.05 9.6, 0.0.95,0.008 8.7,0.008 990.5, 66.0, 95.7, 66.8 07.67, 78.06, 97.5, 66.68 067.9, 79.0, 99.96, 660.0 5., 079.7, 0.7, 657.5 989.9, 8.09, 05.08, 6565.8 77.0, 96.8, 06.7 77.0, 9.57, 08.9 70.65, 9.57, 0.8 708.78, 89., 0. 6.5, 977.0, 0.57 78.6 709.5 767.6 759.9 765.0 h V 7 0 5 0 6 07., 7.5, 8,.5, 6.56, 0.57,7 5.55, 8.6, 8,., 6.7, 0.55,5.5, 80.76, 8,., 5.97, 0.5, 8.60, 90.6, 8,.09, 5.7, 0.5, 6., 5.6, 8,.0,.79, 0., 87.70, 0.0 9., 0.0 9.6, 0.0 0.88,0.00.,0.0079 05., 7.5, 9.89, 667.5 06.98, 80.8, 95., 6609.06 067.9, 79.0, 99.96, 660.0., 89.8,.7, 6596.5 866.8, 5., 06.78, 656. 0.55, 57.09, 0000.07 60.6, 666.5, 7.78 70.65, 9.57, 0.8 06.6, 0.8, 09.5 07.9, 76.5, 07.7 75.6 775.78 767.6 70.9 760.96 S 500 700 0 700 09.59, 77., 8,., 6.7, 0.55, 5., 88., 8,.0, 5.57, 0.5,.5, 80.76, 8,., 5.97, 0.5, 8.0, 90.5, 8,.09, 5.7, 0.5, 8.58, 8.59, 8,., 5.97, 0.5,5 87.65, 0.08.5,0.00 9.6, 0.0 0.,0.00 9.86, 0.009 09.7, 755.,., 66.8 07.60, 87.0, 98.8, 6599.69 067.9, 79.0, 99.96, 660.0 5.56, 890.,.60, 6597.07 08.5, 85.00, 96.56, 6606.6 0.6, 8.68, 07.0 70.60, 5.67, 099. 0.65, 9.57, 0.8 997.69, 7.98, 090. 5., 56.76, 05.67 75. 7900.69 767.6 795.9 759. Int J Supply Oper Manage (IJSOM), Vol.5, No. 77

Gholami and Mirzazadeh Figure 6. Optimal joint expected annual cost and bacorder rate in terms of various bacorder parameters θ. If the value of θ increases, the bacorder rate, β, decreases, then the optimal reorder point, r, and the optimal expected annual cost, JEACWI, are increasing simultaneously. A simple economic viewpoint is as follows. A smaller bacorder rate amount shows a larger shortage cost. Therefore, the optimal reorder point, r, and the optimal expected annual cost, JEACWI, get larger because a smaller bacorder rate indicates a larger lost sales (see Fig 6).. For a fixed lead time, L ε [L z, L z ], a higher standard deviation of demand, σ, increases the safety stoc. Also the order quantity and the ordering cost escalate with increasing the standard deviation.. ue to higher, b, the ordering quantity and the ordering cost are higher, resulting in an increasing joint expected annual cost with inflation, JEACWI. Also, safety factor and reorder point decrease with increasing, b.. A higher vendor s holding cost reduces the number of shipment. Also, as most of the cost factors are higher, the joint expected annual cost with inflation, JEACWI, increases automatically. 5. A higher vendor s ordering cost reduces the number of shipment. Also, For a fixed number of shipment, with an escalation in vendor s ordering cost, order quantity and buyer s ordering cost increase, but the safety factor and safety stoc are reduced. 6. Conclusion With the current high inflation in many business environments, especially in developing countries, it is very important to adapt mathematical models in this direction especially in uncertain areas. To achieve this goal, we adjusted the lotsize reorder-point inventory model with stochastic demand with inflation where the lead time is a function of both reduced lead time and order quantity, and considered an integrated vendor-buyer cooperative inventory model instead of analyzing the optimal policy of one facility. The behavior of our model was illustrated in a numerical example. A sensitivity analysis with respect to the important system parameters was also performed. As regards future research, one line of inquiry would be to include some constraints in the model. We are also interested in finding optimal policy for the periodic review inventory model. Investigating optimal policies when LT follows other distribution functions or a mixture of distributions would also be a challenging tas for researchers. Acnowledgment The authors acnowledge the constructive comments made by the anonymous referees on an earlier version of the paper. Appendix It is assumed that imperfect items in a lot is a probabilistic variable, with beta-binomial distribution with parameters (Q, α, β) as follows. P(y p) = ( Q y ) py ( p) Q y, y = 0,,,, Q (A.) Int J Supply Oper Manage (IJSOM), Vol.5, No. 78

The Quadratic Approximation of an Inflationary Bi-objective Integrated Vendor-buyer Inventory Model with... f(p) = Γ(α + β) Γ(α)Γ(β) p(α ) ( p) β, 0 p (A.) f(y) = f(p)p(y p)dp 0 = ( Q Γ(α + β) ) y Γ(α)Γ(β) py+α ( p) Q y+β 0 dp f(y) = ( Q Γ(α + β)γ(α + y)γ(q + β y) ) y Γ(α)Γ(β)Γ(Q + α + β) Therefore: E(y p) = Qp Var(y p) = Qp( p) Thus, the expected value of Y is computed by: E(y) = E(E(y p)) = QE(p) Also, the variance of Y is calculated as follows:, y = 0,,,, Q (A.) (A.) (A.5) (A.6) Var(y) = E(Var(y p)) + Var(E(y p)) (A.7) E(Var(y p)) = E (Q(p( p))) = QE(p( p)) (A.8) Var(E(y p)) = E(Q p ) (E(p)) = Q E(p ) Q E (p) = Q Var(p) Var(y) = QE(p( p)) + Q Var(p) (A.9) (A.0) Considering the quadratic approximation, E(g(x)) g(μ) + g (μ) σ x, the expected value of g(y) = Q y, g (y) = (Q y) E ( Q y ) Q( E(p)) + Var(y) = QE(p( p)) + Q Var(p) (Q( E(p))) It is mentioned that the above approximation is accurate when the standard deviation is small. Besides, the expected value of Q y is: Q y Q( E(p)) E ( ) = Q y is calculated by: (A.) (A.) References Banerjee, A. (986). A joint economic lot size model for purchaser and vendor. ecision Science, Vol. (7), pp. 9-. Gholami-Qadiolaei, A., Mirzazadeh, A., Tavaoli-Moghaddam A. (0). A stochastic multiobjective multiconstraint inventory model under inflationary condition and different inspection scenarios, Proc-IMechE-Part B- Journal of Engineering Manufacture, Vol. (7), pp. 057-07. Gholami-Qadiolaei, A., Mirzazadeh, A., Tavaoli-Moghaddam, R. (05). Lead time and ordering cost reductions in budget and storage space restricted probabilistic inventory models with imperfect items, RAIRO-Operations Research, Vol. (9), pp. 5-. Gholami-Qadiolaei, A., Mohammadi, M., Mirzazadeh, A. (0). A continuous review inventory system with controllable lead time and defective items in partial and perfect lead time demand distribution information environments, International Journal of Management science and Engineering Management, Vol. (7), pp. 05-. Int J Supply Oper Manage (IJSOM), Vol.5, No. 79

Gholami and Mirzazadeh Ghoreishi, M., Weber, G. W., Mirzazadeh, A. (0). An inventory model for non-instantaneous deteriorating items with partial baclogging, permissible delay in payments, inflation and selling price demand and customer returns, Annals of Operations Research, Vol. (6), pp. -8. Giri, B. C., Sharma, S. (07). Integrated model for an imperfect production-inventory system with a generalized shipment policy, errors in quality inspection and ordering cost reduction, International Journal of System Science, Vol. (), pp. 60-7. Gloc, C. H. (0). Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand, International Journal of Production Economics, Vol. (6), pp. 7-. Goyal, S. K. (988). A joint economic-lot-size model for purchaser and vendor: A comment. ecision Science, Vol. (9), pp. 6-. Goyal, S. K. (976). An integrated inventory model for a single supplier single customer problem. International Journal of Production Research, Vol. (5), pp. 07-. Ha,., Kim, S. L. (997). Implementation of JIT purchasing: An integrated approach. Production Planning and Control, Vol. (8), pp. 5-57. Hadley, G. A. (96). Comparison of order quantities computed using the average annual cost and discounted cost. Management Science, Vol. (0), pp. 7-67. Hans, S., Raafat, N. I., Paul, B. L. (006). Joint economic lot size in distribution system with multiple shipment policy. International Journal of Production Economics, pp. 0-6. Hariga, M. A., Al-Ahmari. (0). An integrated retail space allocation and lot sizing models under vendor managed inventory and consignment stoc arrangement. Computers and Industrial Engineering, Vol. (6), pp. 5-55. Ho, C. H. (009). A minimax distribution free procedure for an integrated inventory model with defective goods and stochastic lead time demand. International Journal of Information and Management Science, Vol. (0), pp. 6-7. Huang, C. K. (00). An integrated vendor-buyer cooperative inventory model for items with imperfect quality. Production Planning and Control, Vol. (), pp. 55-6. Kumar, N., Kumar, S. (06). Inventory model for non-instantaneous deteriorating items, stoc dependent demand, partial baclogging and inflation over a finite time horizon. International Journal of Supply and Operations Management, Vol. (), pp. 68-9 Liao, C. J., Shyu, C. H. (99). An analytical determination of lead time with normal demand. International Journal of Production Management, Vol. (), pp. 7-78. Lin, Y. J. (009). An integrated vendor-buyer inventory model with bacorder price discount and effective investment to reduce ordering cost. Computers and Industrial Engineering. Vol. (56), pp. 597-606. Lo, S. T., Wee, H. M., Huang, W. C. (007). An integrated production-inventory model with imperfect production processes and weibull distribution deterioration under inflation. International Journal of production Economics, 007, 06, 8-60 Mirzazadeh, A., SeyedEsfehani, M. M., FatemiGhomi, S. M. T. (009). An inventory model under uncertain inflationary condition, finite production rate and inflation-dependent demand rate for deteriorating items with shortages. International Journal of Systems Science, Vol. (0), pp. -. Mirzazadeh, A. (0). A comparison of the mathematical modelling methods in the inventory systems under uncertain conditions. International Journal of Engineering Science and Technololgy, Vol. (), 6-6. Nasrabadi, M., Mirzazadeh, A. (06). The inventory system management under uncertain conditions and time value of money. International Journal of Supply and Operations Management, Vol. (), pp. 9-. Ouyang, L. Y., Wu, K. S., Ho, C. H. (00). Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. International Journal of Production Economics. Vol. (9), pp. 55-66. Int J Supply Oper Manage (IJSOM), Vol.5, No. 80