MOUNT OXIDE MINERAL RESOURCE INCREASE AND DEVELOPMENT STUDY UPDATE

Similar documents
60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

New Drilling Program Commences at Mutiny s Deflector Deposit

Caravel commences major new drilling program at Calingiri copper-molybdenum project 8,500-9,000m of RC drilling planned across multiple targets

ASX ANNOUNCEMENT 21 MARCH 2011

For personal use only

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Bass Metals records further positive drill results & progress at 3 prospects.

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast)

DECEMBER QUARTERLY REPORT

D N HARLEY MANAGING DIRECTOR Attachment: Amended Consultant Report on MG 14 Mineral Resource Estimation.

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

76,000 Ounce Gold Resource at Akoko North

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

For personal use only

Drilling program commences on Cloncurry and Mount Isa projects

Helix Resources Limited A.C.N Incorporated in Western Australia

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

Resource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent*

Drilling Program Commences on Iron Oxide Copper Gold Targets

High-grade Copper and Gold Discovered at Productora

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

Co-O MINE MINERAL RESOURCE UPDATE

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

Malachite Resources Limited ABN

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

For personal use only

High Grade Gold Drill Results Extend Buccaneer

AGREEMENT TO ACQUIRE THE MOUNT OXIDE COPPER-COBALT PROJECT IN QUEENSLAND, AUSTRALIA

MAJOR RESOURCE BOOST FOR QUEENSLAND NICKEL PROJECT

For personal use only

Exploration targets identified to increase Browns Range Project s mine life

For personal use only

For personal use only

The Manager Companies ASX Limited 20 Bridge Street

High-grade Gold in First Drilling Undertaken at Productora South

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

High Grade Gold Intercepts at Bangaba

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

Option agreement with Randgold set to commercialise Massigui Gold Project

For personal use only

RESOURCE INCREASED BY 75% TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT

BUNDARRA RESOURCE UPDATE

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

EXPLORATION SUCCESS AT COYOTE GOLD MINE

MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE

Kalman Mineral Resource Update

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

Wingina Well Gold Resource Update - 4.1g/t in high grade lodes

For personal use only

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

ASX Announcements & Media Release

For personal use only

Haoma Mining NL DALTONS-MT WEBBER DEPOSIT; UPGRADE TO INDICATED RESOURCE CATEGORY FOR MAIN SOUTHERN ZONE

Queensland Mining Corporation Limited

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

For personal use only

Additional significant gold and copper intercepts obtained in Sweden

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2008

Market Release October

For personal use only

For personal use only

For personal use only

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

For personal use only

For personal use only

China Yunnan Copper Australia. CYU Mt Dorothy Discovery and Update - Queensland and Chile. ASX:CYU

For personal use only

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

ASX/Media Announcement

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

Tel: (+61-8) Mob: (+61) (0)

Maiden Kandia Gold Resource of 107,500 Ounces

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

For personal use only

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.

Developing the +1.2Moz Pilbara Gold Project

More growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces

Magnus Copper Project exploration update

FIVE RIGS DRILLING AT KARLAWINDA

Encouraging drill results from Paroo Range

QUARTERLY ACTIVITIES REPORT

ASX Release 29 November 2017

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

For personal use only

ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA

Sipa Resources Limited ABN

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

SUMBA EXPLORATION UPDATE

For personal use only

Drilling Commences at Telfer West Gold Project

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam

Transcription:

28 April 2011 MOUNT OXIDE MINERAL RESOURCE INCREASE AND DEVELOPMENT STUDY UPDATE Perilya Limited (ASX: PEM) is pleased to announce a new mineral resource estimate for the Mt Oxide Copper Project and provide an update on the current development study program based on the results of the successful 2010 drilling campaign. The purpose of the study and drilling program is to enable the Company to make a development decision on the Mt Oxide Copper Project. NEW MINERAL RESOURCE A substantial resource definition drilling program was carried out in 2010 to define and characterise the mineralisation within the conceptual ultimate open pit volume. Geotechnical and metallurgical drilling was also performed with the results of this work being used to inform the development study. The results of the 2010 drilling campaign have been used to prepare an updated mineral resource estimate for the Mt Oxide Copper Project. The new mineral resource estimate is summarised in the following tables over a range of copper cut off grades. This new mineral resource estimate is being incorporated into the development study evaluation. The Mineral Resource is summarised in Table 1 over a range of copper cut off grades and showing a comparison to the previous model released in 2009. Table 1: Mt Oxide Mineral Resource Estimate The previous (2009) mineral resource estimate reported all material within 0.2% copper grade envelopes. The current development study has not yet determined a minimum cut off grade hence a 0.5% copper cut off grade was selected for reporting to align with the current economic evaluations. The Mineral Resource estimate summarised at a 0.5% copper cut off in Table 2. Perilya Limited Page 1 of 9

Table 2: Mt Oxide Mineral Resource Estimate at 0.5% Cu Cut off Grade DEVELOPMENT STUDY UPDATE The development study program undertaken through 2010 included a new resource definition drilling program to improve the confidence of the former Inferred and Indicated Resources. The program included approximately 10,275 metres of diamond and RC drilling. Additional drilling was also undertaken for environmental, geotechnical and metallurgical test work to support the study. Results from the 2010 drilling program have confirmed that high grade mineralisation continues at depth. Extensive environmental and heritage assessments and stakeholder consultation were undertaken as part of the study program. The outcome of consultations with stakeholders around the potential impact of an open pit development and the encouraging drill results at depth lead Perilya to undertake a conceptual underground mining assessment to attempt to lessen the impact on the environment and to take advantage of the higher grade mineralisation at depth. That assessment indicated that an underground mine development in combination with a shallow open pit may provide a more favourable economic outcome for the project compared to the stand alone open pit mining scenario that was initially the focus of the development study. Whilst an underground mining approach would recover less of the mineral resource than an open pit, it would do so at a significantly higher grade and reduced operating cost. Whilst Perilya anticipated that a development decision on the Mt Oxide Project would be made in the second quarter of 2011 based on the evaluation of an open pit mine and ore processing facility. The findings from the 2010 drilling program, recent technical evaluation and stakeholder discussion have identified the potential for an underground mining option which was initially excluded from the study scope. The potential for a favourable impact on project economics justifies further analysis of underground mining as well as a combined shallow open pit and underground mine development. Further technical and economic analysis will be performed in the coming months to fully evaluate the potential for an underground mine, either as a standalone operation or in conjunction with a open pit mine. The extended study program will require further field work to assess technical parameters associated with underground mining methods, most notably to characterise the rockmass conditions and metallurgical performance of deeper mineralisation. The favourable strike extension results from the 2010 drilling program also justify further drilling to delineate the extent and depth of the southern mineralisation extension so that proposed infrastructure sites do not prevent mining in the southern area of the deposit. Perilya Limited Page 2 of 9

This time will also be used to further liaise with stakeholders over the impact on Henry s Cave as a consequence of mining operations. A development decision is therefore expected in the first half of 2012. Recent development study activities have included: evaluation of open pit and underground mine design options continued laboratory scale metallurgical testwork assessment of bulk concentrate transport and logistics options identification of preferred site layout and facility locations assessment and recommendation of transport, water and power supply arrangements advancement of environmental baseline monitoring in support of an environmental impact statement (EIS) continued discussions with stakeholders with emphasis on management of the Project s potential heritage and environmental impacts. MANAGING DIRECTOR S COMMENTARY Perilya s Managing Director, Paul Arndt, said that the increased mineral resource and advancement of the development study continues the company s endeavour to identify the most viable development option that creates value for both shareholders and stakeholders. As a result of this work, it is being recommended that a more detailed assessment of the underground mining option at Mt Oxide be developed as part of the development study. Further drilling will resume in the current quarter to test for higher grade extensions of copper mineralisation which is still open at depth and along strike. Perilya believes that the results of the recent work justifies drilling over the 2011 field season and a study extension to determine the most favourable outcomes for both its shareholders and project stakeholders and to provide an appropriate level of confidence for an investment decision. Positive results from this extended program will further assist the project economics and a positive development decision Mr. Arndt said. For further information: Investors & Media: Paul Arndt Managing Director +61 8 6330 1000 Analysts: Angelo Christou Chief Financial Officer +61 8 6330 1000 Inquiries: Paul Marinko Company Secretary +61 8 6330 1000 Perilya Limited Page 3 of 9

Mount Oxide Copper Project (100%) Figure 1: Mount Oxide Project in the Mt Isa Region in QLD The Mount Oxide Copper Project comprises 795 km 2 of tenements and is located in the Mount Isa region in northern Queensland and within the Western Succession area that includes several major sediment hosted breccia copper deposits. The Mount Oxide deposit was intermittently mined between 1912 and 1971 by way of a small open pit and underground operation (Figures 1 and 2). The project lies 25 kilometres north of the existing Mount Gordon mine operated by Aditya Birla Limited. The copper mineralisation at the Mount Oxide deposit occurs as chalcocite and chalcopyrite veins within an array of upright northsouth, shallow sub parallel to bedding and sub-vertical east - west brecciated fault zones, within a sequence of shales, conglomerates and sandstones. Mineralisation in these areas has been affected by intense haematite alteration. Mineral Resource Estimate A diamond drill program was completed during the 2010 field season focusing on infill and targeting potentially open pitiable mineralisation around the historical Mount Oxide open pit (Figure 3). The Mount Oxide mine had previously been mined intermittently via open pit and underground methods between 1912 and 1971 producing a total of 764,000t @ 3.1% copper. The mined material has been excluded from the resource. The 2010 drilling campaign involved drilling a total of 10,275m against a plan of 13,000 metres with field activities ceasing in December and put on care & maintenance due to the wet season. Two underground diamond drillings rigs were used on surface, which allowed a number of shallow angled holes to be drilled, which could effectively test zones beneath the old pit that would have otherwise remained untested. As the underground option is now being considered drilling was resumed in April 2011 and is prioritized to test the potential to extend the higher grade portions of the resource along the south and north zones, and at depth, as the resource is still open in these areas. The previous 2009 mineral resource estimate reported the resource at a 0.2% copper cut off, which at that time was considered a natural geological boundary and potentially economic in an open pit. Although, the economic studies are progressing a preferred lower grade cut off has not been determined to date. A more conservative approach is to use a 0.5% grade cut-off, as this is currently aligned with the present economic evaluations and better utilises the underground option. Perilya Limited Page 4 of 9

Figure 2: Underground drill rig used The new Mount Oxide resource has been produced over a range of cut offs as shown below and is now being incorporated into various mining studies underway (refer Table 1). Table 1: Mount Oxide Mineral Resource Estimate at various Cu cut offs Cu% 2011 Resource Cut off Tonnes Cu% Note: Totals may not sum correctly due to rounding. Contained Copper Metal (t) 0.2 26,348,841 1.00 264,520 0.3 23,042,082 1.11 256,253 0.4 19,484,283 1.25 243,836 0.5 15,976,736 1.43 228,017 0.6 13,071,327 1.62 212,124 0.7 11,010,396 1.81 198,790 0.8 9,463,765 1.98 187,221 0.9 8,258,709 2.14 176,978 1 7,264,423 2.31 167,543 The copper grade and additional elements (Co, Ag, As, Fe and S) were estimated in a standard Surpac block model using both Ordinary Kriging (OK) and Multi Indicator Kriging (MIK) grade interpolation and constrained by domains based on structural and mineralisation envelopes prepared using a nominal 0.2% copper cut off grade. The block dimensions used in the model were 20m NS x 5m EW x 5m vertical with sub-cells of 10m x 2.5m x 2.5m. The resource is reported at various copper cut off grades. Various high grade cuts were applied to the composites values based on statistical analysis for the different domains. Perilya Limited Page 5 of 9

The Mineral Resource was classified based on drilling density, grade and geological continuity of the mineralised zones. The central portion of resource was largely classified as Indicated due to the good continuity of the main mineralised zones and adequate drill hole spacing. The deeper portions of the resource and northern extensions of all zones that are sparsely drilled have been classified as an Inferred Mineral Resource. The resource has been estimated over the 1,400m strike extent from 70,300mN to 71,700mN and from surface to 450m below surface at its deepest point. The resource estimate was based on the data from 229 surface diamond drill holes, 162 of these have been drilled by either Western Metals or Perilya since 2001. The nature of the drilling through 2010 was generally infill. 2011 drilling will focus on resource extensions. Addition drilling since the 2008 resource update has demonstrated mineralised domain continuity which contributed to the tonnage upgrade. Also the interpretation using ground truth structural domains assisted in this outcome. The upper portion of the mineral resource contains a transitional component to the mineralisation with chalcocite and malachite present and accounts for 15% of the resource tonnes. The primary sulphide mineralisation is chalcocite and bornite with a lower grade combined chalcopyrite/chalcocite zone developed predominantly to the north. Figure 3: Perspective View (looking west) of Resource area The mineral resource was estimated using Ordinary Kriging grade interpolation, constrained within wireframes based on a nominal 0.2% copper cut off grade and geological and structural contacts. Bulk density values were assigned based on host lithologies and mineralisation style. Values were determined from extensive bulk density measurements taken from drill core. QAQC samples comprising standards, blanks and duplicates have routinely been submitted with samples. No material bias is observed. A combined structural and stratigraphically controlled model has been created reflecting the previous mining and the geological information collected during the program. As a result a more robust geological model was developed, which has resulted in an increase in the confidence of the resource model. Table 2 below shows the comparison of the 2011 Resource compared to the previous resource at similar cut off grades and shows that the contained metal have increased against the previous model. Within the resource envelopes a greater tonnage has now been captured for especially for the lower grade. Perilya Limited Page 6 of 9

Table 2: Mount Oxide Mineral Resource Estimate showing comparison to previous model at various copper cut offs The previous estimate in 2009 had reported all material within 0.2% copper envelopes. Although economic studies are progressing a preferred lower grade cut-off has not been determined. A more conservative approach is to use a 0.5% grade cut off, as this is currently aligned with the present economic evaluations. The Mineral Resource estimate summarised at a 0.5% copper cut off grade Table 3 below: Table 3: Mount Oxide Mineral Resource Estimate at a 0.5% copper cut off Several low grade stock piles composing around 1% of the previous resource estimate have now been excluded from this new resource total. A drilling program in 2010 on these low grade dumps could not confirm the 0.7% copper grades produced from historical drilling and demonstrated average grades of 0.3% copper. There is however a number of higher plus 0.7% copper results, which could provide only minor additional resources should a more comprehensive drill program be carried out. Significant cobalt mineralisation exists outside the copper mineralisation in the resource area. The majority of the cobalt mineralisation is situated on the margins of the shallow domain in a zone of high pyrite content and also has a strong correlation with arsenic grades. At 0.1% cobalt cut off grade there is 4.5Mt at 0.14% cobalt in the resource area. Perilya Limited Page 7 of 9

2011 Planned Activities To assist project studies and investigate the potential to extend the higher grade zones along strike and at depth a diamond drilling program has resumed in April. Any success will assist in resource growth and project economics. Figure 4: Mount Oxide Project Old Open Pit (looking south) Attribution Statement: The information in this report that relates to mineral resources is based on information compiled by Mr Geoff Bullen who was a full-time employee of Perilya Limited and is a member of the Australian Institute of Mining and Metallurgy. Mr Bullen has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bullen consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Perilya Limited Page 8 of 9

About Perilya Perilya is an Australian base and precious metals mining and exploration company, which owns and operates the iconic Broken Hill zinc, lead, silver mine in NSW Australia and, with the successful takeover of GlobeStar Mining Corporation in December, the Cerro de Maimón copper, gold & silver mine in the Dominican Republic. The Company s operations at the iconic Broken Hill mine went through a resizing in 2008 which has resulted in significant improvement in productivity, profitability and cashflows resulting in an extension to the life of mine of in excess of 10 years. In addition to its mining operations, the Company has an active exploration and development program which includes exploration and development programs in the Broken Hill region NSW Australia and in the Flinders region of South Australia in the vicinity of its Beltana zinc silicate project. The Company also has extensive exploration programs underway on its Dominican Republic mining and exploration concessions that include a laterite nickel project and highly prospective copper, gold & silver targets near its Cerro de Maimón mine. The Company is reviewing options for the development of the Mount Oxide Copper and Cobalt Project in the Mount Isa region in Queensland. In addition, the Company has a 60% interest in the Moblan lithium project located in Quebec, Canada, which is currently undergoing a development study (the remaining 40% is held by SOQUEM, which is an investment company owned by the Quebec Government in Canada). Perilya is owned 52% by Shenzhen Zhongjin Lingnan Nonfemet Co. Ltd, (China s third largest zinc producer). For more details, visit www.perilya.com.au Perilya Limited Page 9 of 9