Torrens: Massive IOCG Copper Target

Similar documents
Torrens: Massive IOCG Copper Target

For personal use only

For personal use only

For personal use only

Managing Director s Presentation AGM 2006

Australia s Mineral Resources: A New Era of Exploration and Development

SOUTHERNGOLD. Southern Gold Limited ACN

Quarterly Activities Report For the Period Ended March HIGHLIGHTS

ACN ND DECEMBER 2005

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE

For personal use only

Mt Carrington Porphyry Copper Exploration Program Commencement of Electrical Geophysics

For personal use only

ASX RELEASE. Punt Hill Project Update

For personal use only

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.

Investigator Resources Limited

For personal use only

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Additional significant gold and copper intercepts obtained in Sweden

KalNorth Secures Nickel Rights at Grey Dam

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT

ASX RELEASE. Drilling Commenced at Monax s Punt Hill Copper-Gold Project

DECEMBER QUARTERLY REPORT

Beyond Broken Hill.. Len Jubber Chief Executive Officer. SA Resources & Energy Investment Conference 30 April 2007

2018 South Australian Exploration & Mining Conference

WOWO GAP PROJECT. Resource Mining Corporation Limited ( RMI ) 23 June 2011 EXPLORATION PROGRAM HIGHLIGHTS

For personal use only

Drilling Program Commences on Iron Oxide Copper Gold Targets

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects

For personal use only

Two New WA Projects Introduced into Newcrest Generation Alliance

ASX announcement 16 May 2016

QUARTERLY REPORT For the period ended 31 December 2007

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

For personal use only

For personal use only

For personal use only

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

Silver City Minerals

For personal use only

Vulcan- The Next Olympic Dam? Greg Solomon Chairman

SEPTEMBER QUARTERLY REPORT

SILVER CITY MINERALS LIMITED ABN Silver City Minerals

KINGSTON RESOURCES LIMITED

AURA TO COMMENCE EXPLORATION DRILLING PROGRAM ON ITS TASIAST SOUTH GOLD PROJECT COPPER AND NICKEL PROSPECTS WILL ALSO BE EXPLORED

Exploration Program planned at White Rock s Red Mountain zinc project in Alaska

SECOND DRILL HOLE IHAD2 INTERSECTS MINERALIZED TAPLEY HILL FORMATION AND MINERALIZED BASEMENT IRON FORMATION

Managing Director s Presentation

Canadian Major to Earn Back into Las Opeñas Gold Project following highly promising results

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

ASX:RDM SACOME DECEMBER 2017 RED METAL SOUTH AUSTRALIA

Woomera Mining Limited

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

China Yunnan Copper Australia. CYU Mt Dorothy Discovery and Update - Queensland and Chile. ASX:CYU

Redbank Granted IOCG Prospective Tenements in Gawler Craton, SA

For personal use only

For personal use only

ASX:LEG. Prospective Fraser Range. Investor Presentation July 2018

Nickel, Gold and Lithium Western Australia. 15 September 2016

DRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE

Positive results in a 20 million ounce Greenstone Belt. Presented by Dr Bob Beeson, Managing Director Melbourne Mining Club 18 September, 2012

Naltagua Copper District CHILE

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

Get with the Strength Invest in Western Australia

The Manager Companies ASX Limited 20 Bridge Street

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR

White Rock mobilising for its next exploration phase at its high-grade Zinc VMS Project

AMENDED ASX ANNOUNCEMENT

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

Red Metal, Black Sand, Yellow Cake

For personal use only

For personal use only

For personal use only

The Company was admitted to the Official List on 12 November 2010 and its shares commenced trading

For personal use only

Sandfire Exercises Option to Enter Joint Venture on Red Mountain

CARRAPATEENA Cu-Au Prospect. South Australia Explorers Conference

For personal use only

For personal use only

For personal use only

For personal use only Heemskirk Tin Project - Tasmania

For personal use only

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

Crescent Lake Lithium Project Ontario, Canada

For personal use only

For personal use only

SILVER CITY MINERALS LIMITED ABN Silver City Minerals Investor Update

December 2017 Quarter Activities Report

For personal use only

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

Highlights. 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY

ASX ANNOUNCEMENT 19 NOVEMBER 2015 SIGNIFICANT GOLD PROSPECT CONFIRMED AT APOLLO S SA GOLD PROJECT NEAR CHALLENGER

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

An outstanding discovery opportunity in WA s world-class Laverton district

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

Alligator commences drilling of TCC4 uranium prospect in Arnhem Land, NT 4 September 2018

Transcription:

Investor Update Torrens: Massive IOCG Copper Target LINDSAY OWLER, Director/CEO September 2017 Argonaut Resources NL ASX:ARE Suite 2, Level 10, 70 Philip St, Sydney phone (02) 9299 9690 1

CORPORATE OVERVIEW ASX Code ARE Capital structure Shares on issue: 1.135 billion Share price (12 September 2017): 1.2c Unlisted options: 164.3 million Market cap at 1.2c: A$13.6 million Cash $1.8 million raised July 2017 Directors Pat Elliott Non-Executive Chairman Lindsay Owler CEO/Executive Director Andrew Bursill Director/Company Secretary Malcolm Richmond Non-Executive Director 2

EXPLORATION FOCUS Torrens Copper, SA y Massive IOCG system y Primary focus y Access resolution coming soon Ontario Lithium Crescent Lake Qld Zinc Copper Kroombit Higginsville - Gold, WA y Multiple gold and nickel targets y Drilling September 2017 Lumwana West - Copper Cobalt, Zambia y Nyungu Deposit: JORC 2012 Exploration Target Zambia Copper Cobalt Lumwana West WA Gold Higginsville Torrens Copper South Australia 3

TORRENS COPPER PROJECT Torrens Joint Venture (Argonaut 30%, Aeris 70%) Argonaut Exploration Licence (Argonaut 100%) WA SA NT QLD NSW 1. Massive anomaly with multiple deposit-scale target zones 2. The right geological address 3. Confirmed Iron Oxide Copper-Gold (IOCG) system Olympic Dam Mine Roxby Downs Andamooka Lake Torrens Project EL 5614 VIC TAS EL 5945 EL 5937 Torrens Woomera Torrens 11 0 20 km Carrapateena Mine 4

750,000m E 755,000m E 760,000m E TORRENS: BIGGER TARGET THAN OLYMPIC DAM Torrens target zones draped over: y Olympic Dam mine site (image) y Olympic Dam ore body outline (red) In the event of discovery, there is scope for: y Very large tonnage dposit y Successive discoveries 6,605,000m N 6,600,000m N 6,595,000m N EL 5614 Olympic Dam deposit Torrens Target Zones Torrens Exploration Licence Exploration target area Torrens residual gravity targets Olympic Dam Orebody Background image of Olympic Dam Mine area 6,590,000m N Torrens 12 0 2 4 Kilometres Torrens-Olympic Dam comparison 12 September 2017

TORRENS: MASSIVE ANOMALY WITH MULTIPLE TARGETS Broad, intense geophysical anomaly y 130 km 2 massive scale y Similarities with Olympic Dam Ten individual target zones y Multiple discovery opportunities Each target is large enough to host a world-class deposit bigger than Carrapateena Olympic Dam orebody overlain on Torrens residual gravity image (below). Source Argonaut 0 2 4 Kilometres Olympic Dam Deposit Torrens 13 6

TORRENS: THE RIGHT GEOLOGICAL ADDRESS South Australia s Olympic Domain: y Host to major Iron Oxide Copper-Gold (IOCG) deposits y Olympic Dam ycarrapateena y Prominent Hill Huge discovery potential Ceduna Prominent Hill Olympic Domain Olympic Dam Roxby Downs Woomera SOUTH AUSTRALIA Torrens Project Carrapateena G2 Corridor Port Augusta Whyalla Torrens Hinge Zone GREAT AUSTRALIAN BIGHT 0 100 km Port Lincoln Moonta Hillside Kadina Edithburgh Adelaide SA_01 7

SOUTH AUSTRALIA: COPPER DISCOVERY GAP South Australia s copper discovery gap. Large gap between first and second largest copper deposits. 8

TORRENS: THE RIGHT GEOLOGICAL ADDRESS Crustal Architecture y Torrens Hinge Zone Continent-scale zone of crustal weakness y Crustal domain boundary Gawler Craton margin Deep-seeing resistivity provides best explanation for emplacement of large volumes of iron-oxide Olympic Dam Mantle plume (Crust) Pathway for mantle fluids y Intersection of O Driscoll s G2 and G9 corridors Gravity lineations predicting major deposit locations Gawler Craton Mantle TORRENS IRON OXIDE ESTIMATES from geophysical modelling: Magnetite 50 billion tonnes Hematite/Sulphide 13 billion tonnes Central Olympic Domain Magnetotelluric Section - Low resistivity in red After Heinson et al 2006 Torrens 16 9

TORRENS: CONFIRMED IOCG SYSTEM IOCG CONFIRMATION: Copper sulphides associated with abundant magnetite and/or hematite: Copper assays to 1.36% Cu Chalcopyrite and bornite present Very large volume of magnetite/hematite Alteration minerals: All diagnostic alteration minerals noted Alteration zonation Late-stage hydrothermal mineralisation: Hematite replacement Sulphides and proximal alteration minerals Accessory/indicator elements: Fluorine Rare earth elements TD4: Sulphide mineralisation TD4: Hematite - chalcopyrite mineralisation TD4: Chlorite sericite alteration 10

TORRENS: SUMMARY The right geological address y Olympic Domain, Torrens Hinge Zone y Mantle fluids pathway y Large volumes of magnetite/hematite Massive anomaly with ten distinct target zones y Bigger than Olympic Dam y Ten targets equal or greater in size to Carrapateena Confirmed IOCG mineralisation y Copper sulphides, alteration assemblages, rare earth elements THEREFORE: higher likelihood of discovery, and higher likelihood of commercial tonnages and grades. 11

ARGONAUT: TORRENS EXPLORATION EXPOSURE TORRENS JOINT VENTURE yjoint venture interests:»» 30% Argonaut Resources NL,»» 70% Aeris Resources Ltd. yoperator: Argonaut yexpenditure: Pro rata 12

TORRENS: ACCESS APPROVALS NEAR COMPLETION Native title: y ERD Court Approved access and operational rights granted on 31 March 2017 Access and compensation agreement: y Signed July 2017 Aboriginal heritage: y First granted in 2010 y Re-grant application in 2017 Mines/Environment Department y Granted Sept 2007, Mar 2010, Nov 2010 y Re-grant due shortly in 2017 13

740,000m E 760,000m E 780,000m E Torrens_15 TORRENS: ADDITIONAL REGIONAL TARGETS 6,600,000m N EL 5614 Torrens Argonaut holds a commanding land position: y Murdie anomaly 6,580,000m N EL 5937 EL 5945»» Confirmed IOCG system»» One drill hole by WMC in 1981 y West Lake Torrens anomaly Murdie»» Further testing warranted 6,560,000m N West Lake Torrens Geological setting equivalent to Torrens: y Olympic Domain LAKE TORRENS y Torrens Hinge/Craton margin 6,540,000m N Carrapateena y Mantle fluid potential Primary and secondary exploration targets held in one package 6,520,000m N 0 10 20 Kilometres Torrens JV Exploration Licence (Argonaut 30% - Aeris Resources 70%) IOCG Deposit Exploration Target Area SOUTH AUSTRALIA LAKE TORRENS PROJECT Location map 12 September 2017

TORRENS: THE RIGHT COMMODITY AT THE RIGHT TIME Copper price recovery: y >50% recovery from 2016 low y Demand growth overwhelming new supply Likely sustained upswing 15

COPPER MARKET y Structural deficit y Demand driving prices y Insufficient new supply coming»» pipeline of new supply is thin vs demand growth y Grades are declining»» low prices encouraged high-grading of mines y Reserves are depleted»» underinvestment in exploration since 2012 16

COPPER DEMAND GROWTH ACCELERATING FROM EMISSIONS REDUCTION y We are experiencing an explosion in electric vehicle demand y Hybrid and electric vehicles demand much more copper than conventional cars y Ongoing demand growth from urbanisation trends 17

DIVERSIFIED ASSETS Torrens Copper, SA Massive IOCG system Primary focus Access resolution coming soon Higginsville Gold, WA Multiple gold and nickel targets Drilling September 2017 Lumwana West Copper Cobalt, Zambia Nyungu Deposit: JORC 2012 Exploration Target: Commodity Tonnage (Mt) Grade (%) Contained metal (kt) Copper 130 to 180 0.45 to 0.65 580 to 1,150 Cobalt 15 to 20 0.08 to 0.12 12 to 24 Kroombit Zinc Copper, QLD Kroombit Deposit: JORC Inferred and Indicated Resource: 5.2 million tonnes grading at 1.9% zinc and 0.2% copper at a cut-off of 1.0% Zn 0.9 million tonnes at 1.0% copper at a cut-off of 0.5% Cu. Crescent Lake Lithium, Canada Spodumene pegmatite lithium Ontario Lithium Crescent Lake Zambia Copper Cobalt Lumwana West Qld Zinc Copper Kroombit WA Gold Higginsville Torrens Copper South Australia 18

ARGONAUT COMING SHARE PRICE CATALYSTS Drilling at Higginsville, WA gold properties Sept/Oct 2017 Final access approvals to Torrens Dec 2017 JV announcement of exploration program scope y Considering 30 hole program over 16-18 months Dec 2017 Finalisation of Torrens program funding Dec 2017 Drilling at Torrens expect to start Jan 2018 Possible economic grade intersection at Torrens?? From Mar 2018? 19

ARGONAUT SUMMARY Market Capitalisation: A$13.6 million Focus on Torrens IOCG Target: y Right geological address y Massive scale»» Larger geophysical anomaly than Olympic Dam»» Multiple targets within system y Confirmed IOCG system y Exploration access close Extreme leverage to discovery Copper demand and prices rising ARGONAUT AT TORRENS: Multiple drill targets = higher likelihood of discovery, and Huge upside potential on discovery 20