FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Similar documents
BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

NEWS RELEASE. March 22, 2017

NEWS RELEASE August 10, 2017

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

BALMORAL INTERSECTS 1,138 g/t (33 oz/ton) GOLD OVER 4.87 METRES, BUG LAKE FOOTWALL ZONE, DETOUR GOLD TREND PROJECT, QUEBEC

NEWS RELEASE August 8, 2018

Highlights from the four holes announced in this news release include:

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

NEWS RELEASE July 26, 2018

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Probe Metals Continues to Expand Gold Zones At Val-d Or East

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

Drilling Extending Mineralization in La Mina North Zone

A B C PAD A HIGHLIGHTS

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

V Sample from C.O.D vein 15 metres southwest of V

Drilling Extending Mineralization in La Mina North Zone

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

ITH Continues to Significantly Expand Sediment Hosted Mineralization at Livengood Gold Deposit, Alaska

FALCO ANNOUNCES INITIAL HORNE 5 DRILLING RESULTS. Confirmation Holes in Line with Historical Data

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

News Release. Infill Drilling Program

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

VR COMMENCES 2018 SURFACE EXPLORATION AT JUNCTION; GRAVITY ANOMALY CONFIRMS THE DOWN-DIP POTENTIAL OF COPPER-SILVER VEINS

Northern Dynasty Minerals Ltd.

VR SAMPLES 58.3 g/t GOLD AND 809 g/t SILVER AND STAKES NEW PROPERTY TO EXPAND ITS DANBO PROPERTY EPITHERMAL GOLD TREND IN NEVADA

Skeena Intersects g/t AuEq over metres at Eskay Creek

EXCELLON DRILLS BROAD MINERALIZED ZONES AND EXPANDS DRILL PROGRAM ON NORTHERN FRESNILLO SILVER TREND

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Diamond Drilling confirms depth potential for mineralisation at Mrima Hill.

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

TSX.V: TR. Drilling in the Shadow of World-Class Deposits. TR: TSX.V January 2019

NEWS RELEASE July 13, 2018

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

Group Eleven Opens Significant New Exploration Potential at Ballinalack via Seismic Re-interpretation

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

Detour Gold Reports Drilling Results from Lower Detour

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

InZinc Intersects 6.8m of 16.5% Zinc Focuses on Western Expansion of High Grades at West Desert Project

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

CAUTIONARY STATEMENT

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Transition Metals Acquires Advanced Stage Ni-Cu-PGM Projects

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Coeur Mining Provides Silvertip Exploration Update

Form F3 MATERIAL CHANGE REPORT

Pacific Empire Minerals Provides Copper King RC Drilling Results

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

BGM ANNOUNCES MINERAL RESOURCE UPDATE AT BARKERVILLE MOUNTAIN TO SUPPORT BONANZA LEDGE OPERATIONS

August 20, 2018 SBB NR SBB TSX

Gungnir Resources Inc.

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

U3O8 Corp. reports results of infill drilling at Aricheng C in the Kurupung Project, Guyana

The Inferred Mineral Resource Statement prepared by SRK for the Talbot Deposit is detailed below.

Goldplay President and CEO Marcio Fonseca commented

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

Saville Resources Inc. Completes Review of Work on the Niobium Claim Group, Quebec

Transcription:

For Immediate Release NR 13-10 FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT (Vancouver, BC, September 16, 2013) Falco Pacific Resource Group Inc. ( Falco Pacific or the Company ) (FPC:TSX-V) is pleased to report that data entry and computer modeling of the Horne 5 deposit and underground infrastructure is complete. The Company has commissioned a NI43-101 resource estimate for the deposit and anticipates delivery of the report within the next 90 days. Due to the exceptional historical data quality and coverage, this accelerated timeline for completion of the estimate will also not require the drilling of confirmation holes into the deposit, resulting in significant savings for the Company. The Horne 5 deposit, which is wholly owned by the Company and forms part of the Falco s Rouyn-Noranda Project, hosts a non-ni-43-101 compliant historic resource 1 of 167.83 million tonnes, grading 1.25 g/t gold, 17.14 g/t silver, 0.10% copper and 0.57% zinc (see NR 13-03, Feb. 13, 2013). A qualified person has not done sufficient work to classify any of the historical estimates as current mineral resources and the issuer is not treating the historical estimate as current mineral resources. Horne 5 Compilation Update In March of this year, Falco retained InnovExplo Inc. of Val d Or, Quebec ("InnovExplo") to complete a digital model of the Company s Horne 5 Deposit. The Horne 5 deposit is located within the southern portion of Falco Pacific s Rouyn-Noranda Project proximal to the former producing Horne Upper H and Lower H deposits and Glencore-Xstrata s Rouyn-Noranda copper smelter (May 13, 2013/NR 13-03). Phase 1 Phase 1 of the project is complete. Over 4,300 drill holes, 370 level plans, 620 crosssections, 99 longitudinal sections and over 150,000 sample assays have been incorporated into a digital model of the Horne 5 deposit, the largest massive sulphide body in the

prolific Noranda camp. Modeling also incorporates over 55,000 metres of underground development on 22 levels and 18 sublevels levels completed by Noranda in the exploration of the Horne 5 deposit between 1931 and 1976. The Company has also located several hundred historic holes from the Horne, Horne 5 and Horne West areas and is presently evaluating their state of preservation and potential application to this process moving forward. To help assess the accuracy of the current computer based modeling approach, Falco Pacific reconstructed mineralized envelopes manually defined by Noranda in 1963 and 1981. Preliminary results show a strong correlation between the two methods thus confirming the integrity of the current model. Furthermore, modeling has established the continuity of mineralization within the envelopes, including that of the internal higher grade gold domains. Distinct base metal zonation throughout the deposit is evident as is increasing copper and gold grades to depth where the deposit remains open. Table 1 contains some historic holes that display significant mineralization at depth below the deepest working level (Figure 1). Table 1. Level 65 Drill Intercept Highlights Hole I.D. From (ft) To (ft) Length (ft) Gold (g/t) Silver (g/t) Copper (%) Zinc (%) HN_65-9057 70 300 230 6.51 54.68 0.50 0.25 including 120 130 10 8.57 23.31 0.58 0.13 including 170 180 10 15.77 170.06 1.17 0.21 including 220 230 10 73.37 598.29 0.66 0.06 HN_65-9059 60 240 180 4.34 32.19 0.33 0.29 including 100 110 10 42.17 182.06 0.34 0.58 including 200 210 10 5.83 48.34 0.34 0.11 HN_65-9065 70 200 130 2.90 101.83 0.54 0.34 including 70 80 10 4.80 465.60 0.56 0.87 including 100 110 10 13.03 41.83 0.56 0.18 including 120 130 10 2.06 41.14 1.38 0.01 HN_65-9262 150 550 400 4.39 43.24 0.19 0.83 including 200 210 10 12.34 150.86 0.12 1.05 including 260 270 10 7.54 75.09 0.41 1.00 including 370 380 10 9.60 35.31 0.64 0.54 including 420 430 10 13.37 58.29 0.20 0.41 * Lengths are reported as core lengths. True widths are unknown at this time.

* The Company considers the drill results as reliable, however the reader is cautioned that the figures in this table are historic in nature and have not yet been independently validated. Phase 2 Phase 2 is now underway with the objective of further refining the model leading to the generation of a mineral resource estimate and technical report in accordance with NI43-101 ( Technical Report ) for the upper 21 levels (17-57) of the deposit and for those areas below the 57 rd levels where sufficient drill data is available to allow for resource calculations. The deposit is over 1,060 metres long and on average 90 metres wide and remains open below the 65 th level. In addition, the Company will continue to incorporate new data into the model for a number of areas surrounding Horne 5, including the Horne mine, Horne West, Quemont, and Remnor areas, in order to identify additional resource expansion opportunities and exploration targets. Dr. Michael Byron, Vice President Exploration, (P.Geo.) is the qualified person for this release as defined by NI 43-101 and has reviewed and verified the technical information contained herein. About Falco Pacific Resource Group Founded in 2012 with the acquisition of the 728 square kilometre Rouyn Noranda Project in Quebec, Falco Pacific is led by a veteran exploration team and is focused on the rapid evaluation of precious and base metal targets in one of the world s great mining camps. For more information, please go to http://www.falcopacific.com. 1 The Horne 5 Deposit hosts a non-43-101 compliant historic resource of 167.83 million tonnes, grading 1.25 g/t gold, 17.14 g/t silver, 0.10% copper and 0.57% zinc, which equates to 6.75 million ounces of gold, 92.5 million ounces of silver, 356 million lbs of copper and 2.1 billion lbs of zinc. All resources estimates identified in this news release as a historic resource, pre-date the implementation of NI43-101. The historic resource information has been obtained from internal Noranda reports which were collectively published in 1980 and which are publically available. These estimates are based on extensive underground exploration drilling and sampling, are repeated in several documents, and are believed to be highly reliable between the 19 th and 49 th levels. Data for resources below the 49 th level are also

considered to be reliable but are based on less extensive underground development and drilling. The majority of the source data is based on 10 foot (3.05 metre) assay intervals and in-house assaying by Noranda Inc. The internal Noranda reports, prepared on closing of the Horne Mine complex, is the most recent resource estimate for the Horne #5 Zone and contains no specific references to cut-off grades, capping factors and relies on global resource silver grades calculated by Bancroft in 1976. Investors are advised that no assessment of the potential for profitable extraction of the above tonnages has been made. A qualified person has not done sufficient work to classify any of the historical estimates as current mineral resources or mineral reserves as defined by NI43-101. The Company is not treating the historical estimates as current mineral resources or reserves as defined by NI43-101. Further compilation of the historic geological and drilling data, resource modeling and confirmation drilling will be necessary to convert the historic estimates outlined above to NI43-101 resources/reserves. On behalf of the board of directors of FALCO PACIFIC RESOURCE GROUP Kelly Klatik President and CEO For further information contact: Mr. Dean Linden - Business Development Falco Pacific Resource Group Ph: +1.604.638.1429 info@falcopacific.com Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release. This press release contains forward-looking statements and forward-looking information (collectively, forward looking statements ) within the meaning of applicable Canadian and United States securities laws. All statements, other than statements of historical fact, included herein, including statements regarding the completion of any proposed activities, anticipated content, commencement, duration and cost of exploration programs, anticipated exploration program results, the discovery and delineation of mineral deposits/resources/reserves, and business and financing plans and trends, are forward-looking statements. Forward-looking statements are

typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions or are those which, by their nature, refer to future events. Although the Company believes that such statements are reasonable, there can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. The Company cautions investors that any forwardlooking statements by the Company are not guarantees of future performance, and that actual results may differ materially from those in forward-looking statements. Important factors that could cause actual events and results to differ materially from the Company s expectations include those related to inaccuracy of historic information/results, third party access agreements, weather, equipment and staff availability; performance of third parties; risks related to the exploration stage of the Company s projects; market fluctuations in prices for securities of exploration stage companies and in commodity prices; and uncertainties about the receipt of regulatory approval related to the proposed transaction, availability of additional financing; risks related to the Company s ability to identify one or more economic deposits on the properties, and variations in the nature, quality and quantity of any mineral deposits that may be located on the properties; risks related to the Company s ability to obtain any necessary permits, consents or authorizations required for its activities on the properties; and risks related to the Company s ability to produce minerals from the properties successfully or profitably. Trading in the securities of the Company should be considered highly speculative. All of the Company s public disclosure filings may be accessed via www.sedar.com and readers are urged to review these materials, including the latest technical reports filed with respect to the Company s mineral properties. This news release contains information with respect to adjacent or similar mineral properties in respect of which the Company has no interest or rights to explore or mine. Readers are cautioned that the Company has no interest in or right to acquire any interest in any such properties, and that mineral deposits on adjacent or similar properties are not indicative of mineral deposits on the Company s properties.