ENHANCED PRODUCTION PROJECT SEPTEMBER 2012

Similar documents
Australian Securities Exchange Notice

Iluka Resources. Murray Basin Site Visit September 2013

l ASX:ILU

Coburn Zircon Project

For personal use only

Australian Securities Exchange Notice

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

Australian Securities Exchange Notice

Addressing the Deficit Tom O Leary Managing Director, Iluka Resources. 13 November 2018

World Class Zircon Developments in the Eucla basin

The World s Newest Mineral Sands Producer Presentation to TZMI Conference 18 November 2015

Citi Conference Sydney October 2009

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

Tom O Leary, Managing Director, Iluka Resources

Australian Securities Exchange Notice

2017 as at 30 June 2017 Project Tonnes HM HM SL OS HM Assemblage Tonnes HM HM SL OS HM Assemblage

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

BMG SECURES LOW COST OPTION TO ACQUIRE ADVANCED HEAVY MINERAL SANDS PROJECT IN AUSTRALIA

New Drilling Program Commences at Mutiny s Deflector Deposit

ASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011

Australian Securities Exchange Notice

Iluka Resources Limited RBC Capital Markets Global Mining & Materials Conference, Toronto

MINDARIE MINERAL SANDS PROJECT South Australia

KINGSTON RESOURCES LIMITED

Iluka Resources Limited

ASX:TLM. Closing in on world-class copper-gold deposits Annual General Meeting, November 2011

Aspire Mining Limited

Murray Zircon Emerging Zircon and Titanium-Dioxide Producer and Active Explorer in Murray Basin

Resourcing a renewable. Corporate Presentation August 2016

For personal use only

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

Iluka Resources Limited Mineral Sands Exploration & Project Development in NSW. August 2011

Annual General Meeting

For personal use only

Ausgold awarded EIS grant for Jinkas deep drilling

For personal use only

Sierra Rutile Limited. Sierra Rutile to start Gangama Dry Mine Project

Iluka Resources Heavy Mineral Exploration in the Eastern Eucla Basin, South Australia. AESC July 7th 2010

ASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike

For personal use only Heemskirk Tin Project - Tasmania

For personal use only

ASX ANNOUNCEMENT 21 MARCH 2011

For personal use only

For personal use only

ASX announcement 16 May 2016

Iluka Resources Limited

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts

For personal use only

EMU NL Annual General Meeting

Inferred Resource Estimate of the Muster Dam Magnetite Fe Deposit

2018 South Australian Exploration & Mining Conference

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

For personal use only

THUNDELARRA EXPLORATION

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

DIAMOND DRILLING TO COMMENCE AT WODGER AND FORREST PROSPECTS

Highlights. 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY

ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

Oposura Scoping Study Nearing Completion

For personal use only

For personal use only

For personal use only

Portia Gold Mine Update

Highlights ASX ANNOUNCEMENT 28 JUNE 2017

Mindarie Mineral Sands Project: A New Beginning

THE MULLAQUANA URANIUM PROJECT

The Manager Companies ASX Limited 20 Bridge Street

COKAL ANNOUNCES POSITIVE RESULTS FROM SCOPING STUDY OF UNDERGROUND MINING AT BBM COAL PROJECT INDONESIA

For personal use only

FIVE RIGS DRILLING AT KARLAWINDA

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

24 October Dear Shareholders, 2014 ANNUAL REPORT

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

STANDARD DEFINITIONS

For personal use only

Disclaimer. Forward-Looking Statements. Competent Person s Statement

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

For personal use only

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

Option agreement with Randgold set to commercialise Massigui Gold Project

For personal use only

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

For personal use only

For personal use only

HIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT

The Yamarna Gold Belt:

For personal use only

Annual General Meeting. 23 November 2011

Presentation April 2009

Reguibat surface uranium project, Mauritania

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

TZMI CONGRESS 2016 Hong Kong Emerging mineral sands developer

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

Well funded active explorer

For personal use only

Transcription:

ENHANCED PRODUCTION PROJECT SEPTEMBER 2012 OVERVIEW OF ILUKA S ENHANCED PRODUCTION APPROACH Iluka commenced an exercise in 2011, referred to as the Enhanced Production Project (EPP), with the objective to evaluate internal mineral sands production opportunities, capable of providing the company with additional zircon, rutile and (mainly) chloride ilmenite production, including ilmenite suitable for upgrading to synthetic rutile. The EPP involved the initial optimisation of all known deposits within Iluka s existing JORC Mineral Resource base, based primarily on higher long term pricing assumptions for the company s key products of zircon, rutile and synthetic rutile ilmenite feed. Aspects of the initial analysis included: the ranking and choice of optimum project development and production profiles; and the overlay of economic development options by the utilisation, or expansion, of existing Iluka infrastructure, including mineral separation plant capacities. The outcome was 30 net present value (NPV) positive development opportunities. These were subsequently reduced to a smaller, although still material number of development options (currently 16, including four at feasibility assessment stage), considered to display suitable financial and risk characteristics to warrant further evaluation, potentially in some cases to feasibility study stage. CHARACTERISTICS OF ILUKA S PRODUCTION OPTIONS Of the production options, all are based in Australia, with the exception of two in the United States (Virginia and North Carolina). Most also represent near field tie-in opportunities, expected to be capable of utilising either existing concentrating facilities and one of the company s three mineral separation plants (two in Australia and one in Virginia). Accordingly, the production options are on the whole expected to be capital-efficient, relatively quick to execute and bring to market, and display low jurisdictional and generally lower technical risk. Regulatory approvals risk, in terms of environmental approvals and associated time frames, constitutes a key part of project evaluation and assessment. Work initially completed provided key physical and financial metrics for individual and sequenced deposits. Since the beginning of 2012, all production opportunities have had project management, planning and evaluation resources committed to enable them to proceed through evaluative stages 1

from scoping to, in a number of cases, commencement of feasibility studies. The expectation is that the projects ultimately assessed as warranting development, based on market supply and demand conditions and appropriate financial characteristics, should be capable of being executed within a period of five years. The majority of project expenditure is expected to occur in the latter stages of an individual project, which is after the completion of pre-feasibility studies. As such, up-front expenditures and commitments are not significant, allowing the capital flexibility in terms of capital deployment decisions. Iluka s internal development options are assessed relative to the modelled economic characteristics of non Iluka mineral sands projects or opportunities. Enhanced Production Options, Exploration and Product & Technical Development Optionality PRODUCTION OPPORTUNITIES The production opportunities which are being assessed include the following listed below for each of the main Basins in which Iluka operates. The Balranald and Nepean deposits in New South Wales and the Cataby deposit in Western Australia are currently at pre-feasibility study stage, as are the two United States deposits of Hickory and Auerlian Springs. The production response options outlined below exclude the potential to re-activate Iluka s two idled synthetic rutile kilns (with a notional additional synthetic rutile production capacity of 200 to 250 thousand tonnes combined). Eucla Basin, South Australia Production opportunities being considered in the Eucla Basin relate to the following: the potential upgrade to the Jacinth-Ambrosia wet concentration plant, with the ability to increase the capacity from 1,000 tonnes per hour (tph) to 2,000 tph. This will enable the processing of additional ore from Jacinth-Ambrosia (as grade declines) and also the potential to concentrate ore from one or more of the satellite deposits of Typhoon, Atacama and Sonoran, as well as the more remote Tripitaka deposit. The need to pursue the upgrade at Jacinth-Ambrosia is in large part dependent on the nature of the HM ore grade mined at any period. The current mining from a lower grade section of the ore body, to reduce production in light of market conditions, may defer the need for this upgrade (and the associated capital expenditure); potential tie-in of the Typhoon, Sonoran and Atacama mineral sands deposits. These deposits are within 10 kilometres of Jacinth-Ambrosia infrastructure, and are predominantly ilmenite deposits. This provides the opportunity to enable Jacinth-Ambrosia zircon production to be flexed 2

depending on market conditions, by allowing a higher level of titanium dioxide production as required; and Tripitaka - the potential pre-concentration of the high zircon assemblage Tripitaka deposit (approximately 200 kilometres from Jacinth-Ambrosia) with concentration occurring at Jacinth- Ambrosia. Eucla Basin, South Australian Deposits Iluka has existing wet concentration facilities at the Jacinth-Ambrosia mining operation, plus an established logistics system for heavy mineral concentrate to be transported to the company s Hamilton (Victoria) or Narngulu (Western Australia) mineral separation facilities. Murray Basin, Victoria and New South Wales Development opportunities within the Murray Basin include the following: the Balranald and Nepean deposits which are currently at pre-feasibility study stage. The combined contain valuable heavy minerals, including rutile, zircon and ilmenite. The purpose of the pre-feasibility study is to determine the most appropriate method for the commercial development of the two deposits. The ore removed from eventual mining operations will be concentrated on site, using gravity separation methods, with the heavy mineral concentrate transported to Iluka s mineral processing facilities at Hamilton, Victoria. The Balranald deposit, if proceeded with, will form a part of Iluka s overall Murray Basin operations, which has involved the mining of multiple deposits in Victoria. Balranald is indicatively planned to follow the completion of mining at the Woornack, Rownack and Pirro group of deposits, and form a major part of Iluka s rutile production stream. The expected mine life is at least ten years; Euston deposits a series of four deposits which are capable of development post the planned Balranald development. Based on current assessment, these deposits may have an economic mine life of approximately seven years. The deposits display similar assemblage characteristics to the northern Murray Basin deposits accessed by Iluka (that is, a high rutile assemblage); and Bondi East Far North deposit potential heavy mineral ore feed source to existing infrastructure. 3

Murray Basin Mineral Sands Operations and Deposits Perth Basin, Western Australia Development opportunities within the Perth Basin include the following: Cataby deposit which is currently at pre-feasibility study stage. Cataby is predominantly a chloride ilmenite deposit, with zircon and rutile credits, located in Western Australia, 150 kilometres north of Perth. The pre-feasibility study is expected to be complete in 2013 and, subject to successful completion and a decision to proceed, production is expected from around 2014/15. The proposed ore mining method involves excavating the ore which is processed into heavy mineral concentrate (HMC) by wet gravity and magnetic concentration at the mine site. The HMC will be a feedsource to Iluka s Narngulu and Capel mineral separation plants where it will then be processed into final products of rutile, zircon and ilmenite. The ilmenite is likely to be a major feedsource for Iluka s synthetic rutile operations. The expected mine life, based on the initial development approach, is at least six years; Yarloop deposit located in the south west of the state. Yarloop could potentially be sequenced after the Tutunup mine (see below); Yoganup extended deposit in the south west of the State. This deposit is an extension of a deposit previously mined and rehabilitated by Iluka and is capable of utilising an existing wet concentrator plant from Iluka s Australian operations; Tutunup deposit, subsequent to the completion of the Tutunup South deposit around 2016; and additional Eneabba deposits, following the reactivation of mining at Eneabba in late 2011, with the deposits of IPLN, South Tails and Allied Tails being evaluated. Combined, these deposits could provide approximately ten years of production. Perth Basin, Western Australian Mineral Sands Operations and Deposits 4

Iluka operates mining activities at Tutunup and Eneabba. The company has a mineral separation plant ay Narngulu, as well as dry processing capacity at Capel. The company s four synthetic kilns (two active) are located in Western Australia. It is expected that ilmenite feed from EPP projects may be capable of underpinning production from all four kilns, dependent on market conditions. United States The United States operation is evaluating two deposits which represent economic life extensions of the existing Virginia operations. Currently permitted mines will reach the end of their economic lives in 2018. The two new deposits are: Hickory deposit, Virginia; and Aurelian Springs, North Carolina. The Hickory deposit is located adjacent to the area mined in 1987. Re-optimisation of remnant ore and the addition of significant new resources made possible through recent landowner approvals, are estimated to support a ten year mine life. This third, new mining and concentrating facility will operate in parallel to Iluka s two other mines. Both new mines will provide a chloride ilmenite and zircon production stream. The ilmenite will be available for sale or as a feed source to Iluka s synthetic rutile kilns in Australia, capable of producing a high grade titanium dioxide product, tested to date and referred to as Ultra SR. Iluka s existing concentrating assets at Concord and Brink will be relocated to the Aurelian Springs deposit. The new mines are within the economic haul radius of the Stony Creek mineral separation plant, located 64 kilometres to the north, allowing utilisation of existing infrastructure. Together with concentrate from the new Hickory mine, Iluka expects to be able to continue to produce chloride ilmenite and zircon in the United States beyond 2025. United States Mineral Sands Operations and Deposits 5

PRODUCTION IMPLICATIONS Based on proceeding with all projects, the following are indicative production profiles for zircon and rutile. The indicative profiles suggest that zircon and rutile production can be grown appreciably and/or production maintained at recent levels well beyond 2021. (Note the charts below show a notional 550kt and 250kt of zircon and rutile production capacity in 2012 this is indicative current capacity but does not represent targeted production for this year, as this will be dependent on market conditions. Iluka advised its expected 2012 production profile in ASX Releases 8 May 2012 and 23 August Production Response section of Iluka Half Year Results announcement). *Subject to caveats and disclaimers detailed in November 2011 Mineral Sands presentation. Refer pages 2, 3 and 4 of presentation) IMPLICATIONS FOR ILMENITE PRODUCTION AND SYNTHETIC RUTILE KILN OPERATION Subject to the economics of the zircon and rutile expansion options available to Iluka, the company has the potential to produce sufficient ilmenite to support a four kiln synthetic rutile operation. The internal options, including the two United States planned operations, are also capable of providing sufficient chloride or sulphate ilmenite to support the potential expansion of upgrading capacity, that is the construction of an additional kiln, or for material to be available for sale into the market (refer Synthetic Rutile Briefing Paper, June 2012). CAPITAL, CASH COST AND MARGIN IMPLICATIONS Potential capital expenditure estimates for the development options, while still largely at scoping study stage, are expected to be within Iluka s ability to fund through operating cash flow, based on current assessment. As indicated previously, most are essentially brownfield development in nature, with many expected to be able to utilise existing spare equipment (for example concentrators) available within the company. Technological advancements are being pursued in relation to development options for some of the opportunities, with the intent of providing lower capital solutions than would be associated with conventional development approaches The cash cost and margin implications associated with the potential production opportunities have not as yet been determined with a sufficient level of confidence for disclosure purposes. Cash cost determination will be subject to detailed technical and economic assessment by project. As would be expected, based on some of the deposits being marginal at historical pricing assumptions, cash costs per tonne of the new production sources is expected to be higher than Iluka s existing production base. Capital expenditure and operating cost determination will flow from more detailed evaluation through PFS and DFS work. Further details are expected to be provided in association with formal project capital approval and commencement decisions. 6

For further information, please contact: Dr Robert Porter, General Manager, Investor Relations Phone: +61 3 9600 0807 Mobile: + 61 (0) 407 391 829 Email: robert.porter@iluka.com Competent Person s Statement Production potential is predominantly based on a combination of Proved and Probable Ore Reserves and Measured and Indicated Mineral Resources that have been subjected to project studies (Enhanced Production Project) using Iluka s long-term cost and pricing estimates and an assessment of risk, including access, approval and development timing. A very small portion of the production potential is based on Inferred Mineral Resources totalling approximately zero to four per cent of the production potential. The information in this document that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Greg Jones and Chris Lee who are Members of the Australasian Institute of Mining and Metallurgy. Each of Messrs Jones and Lee is a full time employee of Iluka and has sufficient experience which is relevant to the style of mineralisation and the type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Messrs Jones and Lee consent to the inclusion in this documentation of the matters based on their information in the form and context in which it appears. Disclaimer This briefing paper contains information that is based on projected and/or estimated expectations, assumptions and outcomes. These forward-looking statements are subject to a range of risk factors associated, but not exclusive, with potential changes in: Exchange rate assumptions product pricing assumptions mine plans and/or resources equipment life or capability current or new technical challenges market conditions management decisions Iluka makes no representation that any or all of the production options referred to in this briefing paper will occur nor that the indicative cash and capital costs will apply, being subject as indicated to further evaluation and ultimate investment decision making. While Iluka has prepared this information based on its current knowledge and understanding and in good faith, there are risks and uncertainties involved which could cause results to differ from projections. Iluka shall not be liable for the correctness and/or accuracy of the information nor any differences between the information provided and actual outcomes, and furthermore reserves the right to change its projections from time to time. Except for statutory liability which cannot be excluded, Iluka, its officers, employees and advisers expressly disclaim any responsibility for the accuracy or completeness of the material contained in this presentation and exclude all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error or omission there from. Iluka accepts no responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information made available to a person nor any obligation to furnish the person with any further information. All currency referred to is Australian denominated unless otherwise indicated. 7