North American Palladium Provides Update on Lac des Iles Exploration Program

Similar documents
North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

North American Palladium Signs Option Agreement for the Sunday Lake Project and Commences New Exploration Strategy

V Sample from C.O.D vein 15 metres southwest of V

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Detour Gold Reports Drilling Results from Lower Detour

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Press Release Thunder Bay: August 2, 2018

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Transition Continues to Intersect Significant Platinum-rich PGM Mineralization at Sunday Lake

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Prophecy: Pacamayo, Paca North and El Abra Return Anomalous Silver, Zinc, Lead and Antimony Assay Results

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Sudbury Platinum Discovers New Ni-Cu-PGM Mineralization at its Aer-Kidd Property

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

CHAMPION BEAR RESOURCES

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Drilling Extending Mineralization in La Mina North Zone

(416) Highlights include:

AuRico Metals Intersects 628m Grading 0.53 g/t Au and 0.41% Cu at Kemess East And Announces Results from Successful 2016 Drill Program

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

News Release. Infill Drilling Program

POSITIVE RESULTS FROM FIRST PHASE OF CORE DRILLING AT JEFFERSON PROJECT, SOUTH CAROLINA FOR NEAR-SURFACE GOLD MINERALIZATION

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

KIRKLAND LAKE GOLD REPORTS WIDE, HIGH-VALUE GOLD INTERCEPTS AT SWAN ZONE UP TO 200 METRES FROM CURRENT MINERAL RESERVES

Drilling Extending Mineralization in La Mina North Zone

Transition Metals Acquires Advanced Stage Ni-Cu-PGM Projects

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Goldgroup Drilling Continues to Extend the La Paila Zone at Caballo Blanco

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

New Drilling Program Commences at Mutiny s Deflector Deposit

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

MARENGO RELEASES RESULTS FOR RECENT SAMPLING AND EXPLORATION DRILLING AT RIMA PROSPECT

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

Toronto, Canada March 4, 2013

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Photo: Jean Laforest, Qiqavik Property, Nunavik

HANNAN SEISMIC SURVEY IDENTIFIES MULTIPLE NEW DRILL TARGETS IN IRELAND

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

September 24, 2012 #

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

a growth oriented precious metals producer LDI Exploration Update

KIRKLAND LAKE GOLD EXTENDS HIGH-GRADE GOLD MINERALIZATION AT MACASSA, NEW GOLD SYSTEM DISCOVERED AT DEPTH

Highlights from the four holes announced in this news release include:

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

Ongoing Drilling of Kiena Deep a Zone Confirms Multiple High Grade Lenses and Extends Zone Down Dip

Goldsource Completes Winter Drill Program At Border; 34 Holes Contain Aggregate Coal Intercepts Ranging From 10 to 100 Meters

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

36 Holes drilled in an approximate 100 meter by 100 meter grid covering an area of 1,000 meters long by 400 meters depth

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

Wallbridge Completes Successful Initial Drill Program at Beschefer

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

QUITO PROJECT. December Northwest Mining Association Annual Conference. Austin, Nevada BVA:TSX.V BRT: FSE

Interval (meters) To (meters)

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

BK Copper Project Strong Copper Results Confirm and Extend BKM

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

MEXICAN GOLD SAMPLES 5.11 G/T GOLD & 7.15 % ZINC OVER 2.0 METRES AND G/T GOLD OVER 1.4 METRES AT CHANGARRO ZONE, LAS MINAS PROJECT

U3O8 Corp. reports results of infill drilling at Aricheng C in the Kurupung Project, Guyana

Transcription:

North American Palladium Provides Update on Lac des Iles Exploration Program 4/5/2018 TORONTO, April 05, 2018 (GLOBE NEWSWIRE) -- North American Palladium Ltd. ("NAP" or the "Company") (TSX:PDL) (OTC PINK:PALDF) today announced results from its exploration program at its Lac des Iles mine ( LDI ), located 90 km north of Thunder Bay, Ontario. 2018 Offset South Zone Drilling Results Hole 18-801 intersected 149 metres averaging 1.8 g/t Pd, including 17 metres averaging 2.9 g/t Pd and 33 metres averaging 3.1 g/t Pd. Hole 18-802 intersected 92 metres averaging 1.3 g/t Pd, including 8.0 metres of 3.5 g/t Pd and another 79 metre interval averaging 1.49 g/t Pd with 3.9 metres of 6.0 g/t Pd. Hole 18-803 intersected 49 metres averaging 1.43 g/t Pd, including 3.0 metres of 5.0 g/t Pd. Hole 18-901 intersected 159 metres averaging 1.5 g/t Pd, including 8.0 metres of 3.5 g/t Pd. Hole 18-902 intersected 65 metres averaging1.4 g/t Pd, including 20 metres of 2.0 g/t Pd. Previously announced drill results included several holes with higher grade palladium mineralization, for example, hole 17-803 intersected 10.0 metres averaging 6.9 g/t Pd and hole 17-807 intersected 10.0 metres averaging 6.1 g/t Pd. The reported intersections also contain Pt, Au, Ni and Cu concentrations that are approximately the same as those currently being mined in the central part of the Offset zone, where byproduct metal sales account for ~20% of total revenue. We are excited that the latest results from the Offset South zone, which is located directly adjacent to our primary underground mining operations, confirm the zone has the widths required for mass mining with our wellestablished, low-cost, sub-level shrinkage method. Infill drilling is now required to determine the average grade within this highly prospective zone. Future resource gains from this and our many other near-mine exploration targets can extend the life of the mine at a very low capital cost, said Jim Gallagher, President and CEO of North American Palladium. 1

The recent drilling results for the Offset South zone confirm its status as the top-ranked opportunity for a significant, near-term resource addition at LDI. In addition, we are pursuing resource gains on several other underground exploration targets, all of which occur in close proximity to current mining activity in the Roby and Offset zones. We are also exploring for new near-surface resources, with this year s program focusing on two targets in the eastern part of the mine property, said Dr. Dave Peck, North American Palladium s Vice-President, Exploration. Offset South Zone The southern part of the Offset zone (Figure 1) has been a focus for exploration drilling at LDI since mid-2017. Fifteen holes and 7,762 metres have been completed since the current program began. The results confirm the presence of a large, tabular area of greater than 1 g/t Pd mineralization occurring directly south of the sub-level shrinkage mining area (Figure 2). The Offset South zone typical varies from 50 to 100 metres in true thickness and contains multiple higher-grade sections, including several intersections exceeding 3 g/t Pd over core lengths of up to 41 metres and a smaller number of 2 to 10 metre intervals averaging 5 to 7 g/t Pd. All significant drilling intersections from the 2017 and 2018 Offset South zone drilling program are provided in Table 1. The recent drilling has confirmed that the southern end of the Offset zone splits into two divergent mineralized trends collectively referred to as the pantleg structure. Both trends are composed of palladium-rich magmatic breccia and varitextured norite. They are separated by a sporadically mineralized equigranular norite unit and include the thicker, southwest-trending Offset South zone (the western pantleg ) and a narrower and less well defined, southeast trend (the eastern pantleg ) (Figure 2). The eastern trend includes the modelled down-plunge extension of the B2 zone. Both trends remain open along strike and at depth and represent the highest ranked targets for adding palladium resources at LDI. Plans for the Remainder of 2018 Future drilling in the Offset South zone will focus on delineating indicated resources (see gap target, Figure 3) and establishing the continuity and distribution of higher-grade areas. Additional 2018 underground exploration drilling targets at LDI include (Figure 3): The down-plunge extension of the B2 zone; The Offset deep footwall target; and The Mystery zone target. Surface exploration at LDI resumed this month at the Creek zone target, where an outcropping of approximately 2

200 metres by 150 metres south-plunging target area was recently defined (Figure 4). Additional surface drilling is planned for the Shorty Lake target, which has a similar geometry and size to the Creek zone target, and in the Roby Southwest zone, remains open below and to the southwest of the currently defined mineral resources (Figure 4). Additional drilling on the down-plunge extension of the Sheriff South zone may also occur later in the year. Table 1. Selected drilling results for the 2017-2018 Offset South zone exploration program, including previously released results. True thickness is estimated to represent 30 to 85% of the interval length. 3

From To Length Pd Pt Au 4

Hole # From To Length Pd Pt Au 5

Hole # From (m) To (m) Length (m) Pd (g/t) Pt (g/t) Au (g/t) 6

(m) (m) (m) (g/t) (g/t) (g/t) 17-801 179.0 183.0 4.0 3.33 0.42 0.30 7

17-801 179.0 183.0 4.0 3.33 0.42 0.30 and 237.0 324.0 87.0 1.76 0.22 0.17 8

and 237.0 324.0 87.0 1.76 0.22 0.17 including 292.0 299.0 7.0 3.08 0.36 0.27 9

including 292.0 299.0 7.0 3.08 0.36 0.27 17-802 42.0 47.0 5.0 3.91 0.35 0.44 10

17-802 42.0 47.0 5.0 3.91 0.35 0.44 and 214.0 345.0 131.0 1.29 0.14 0.11 11

and 214.0 345.0 131.0 1.29 0.14 0.11 including 255.0 257.0 2.0 6.43 0.61 0.25 12

including 255.0 257.0 2.0 6.43 0.61 0.25 including 316.0 320.0 4.0 3.62 0.33 0.33 and 416.0 475.0 59.0 1.24 0.15 0.05 including 431.0 435.0 4.0 3.40 0.30 0.07 17-803 14.0 17.0 3.0 4.23 0.39 0.19 and 136.0 191.0 55.0 2.19 0.26 0.15 including 165.0 170.0 5.0 4.65 0.52 0.35 and 212.0 249.0 36.0 3.46 0.50 0.26 including 232.0 242.0 10.0 6.98 0.86 0.52 17-804 141.0 269.0 128.0 1.56 0.20 0.16 including 151.0 163.0 12.0 3.40 0.42 0.36 with 154.0 159.0 5.0 6.57 0.80 0.70 including 183.0 192.0 9.0 3.81 0.53 0.43 including 240.0 268.0 28.0 2.81 0.34 0.27 including 252.0 260.0 8.0 5.77 0.66 0.45 17-805 167.0 231.0 64.0 1.07 0.13 0.11 including 204.0 209.0 5.0 3.41 0.46 0.37 and 246.0 321.0 75.0 1.03 0.12 0.09 including 297.0 300.0 3.0 4.72 0.51 0.50 and 350.0 358.0 8.0 2.54 0.30 0.21 17-806 54.0 79.0 25.0 1.19 0.13 0.07 and 243.0 282.0 39.0 1.07 0.13 0.10 including 273.0 277.0 4.0 3.67 0.43 0.41 and 408.0 456.0 48.0 1.00 0.14 0.14 17-807 171.0 212.0 41.0 3.23 0.37 0.30 including 174.0 180.9 6.9 5.30 0.57 0.44 and 199.0 209.0 10.0 6.15 0.66 0.59 17-808 194.0 208.0 14.0 1.91 0.24 0.21 including 194.0 200.0 6.0 2.90 0.35 0.33 and 284.0 300.0 16.0 2.08 0.36 0.17 17-809 13.0 19.0 6.0 1.85 0.18 0.14 and 54.0 57.0 3.0 2.85 0.30 0.19 17-812 435.0 500.0 65.0 1.13 0.13 0.08 including 435.0 448.0 13.0 1.93 0.22 0.15 with 444.0 447.0 3.0 4.65 0.53 0.46 and 492.0 496.0 4.0 3.49 0.40 0.26 18-801 259.0 408.6 149.6 1.83 0.20 0.18 including 319.0 336.0 17.0 2.93 0.31 0.29 including 367.5 401.0 33.5 3.13 0.34 0.30 18-802 373.0 465.7 92.7 1.30 0.15 0.11 including 401.0 409.0 8.0 3.54 0.43 0.19 and 477.1 557.0 79.9 1.49 0.18 0.15 including 477.1 481.0 3.9 6.06 0.79 0.55 including 551.0 557.0 6.0 3.25 0.41 0.38 18-803 198.0 247.0 49.0 1.43 0.16 0.15 including 200.0 207.0 7.0 2.52 0.31 0.31 including 221.0 224.0 3.0 5.00 0.60 0.33 18-901 128.0 287.0 159.0 1.51 0.15 0.14 including 136.0 144.0 8.0 3.57 0.29 0.36 and 320.0 347.0 27.0 1.36 0.19 0.06 including 338.0 343.0 5.0 2.94 0.39 0.14 and 457.8 489.0 31.2 1.41 0.18 0.09 including 464.3 468.0 3.8 3.56 0.46 0.20 18-902 209.0 274.0 65.0 1.42 0.17 0.12 including 219.0 239.0 20.0 2.05 0.25 0.17 and 291.0 323.5 32.5 1.90 0.20 0.15 including 294.0 300.0 6.0 2.80 0.30 0.18 including 311.0 322.8 11.8 2.74 0.29 0.25 13

The analyses reported in this news release were performed by ALS Global in Vancouver, British Columbia. The Company s rigorous internal quality control and quality assurance protocols are described in detail in the current Technical Report for its Lac des Iles mine (June 2017 available on SEDAR). Qualified Person The technical content of this news release was reviewed and approved by the Company s Vice-President, Exploration, Dr. Dave Peck. Dr. Peck is a Qualified Person under the meaning of National Instrument 43-101 and a registered Professional Geoscientist with the Association of Professional Geoscientists of Ontario, the Association of Professional Engineers and Geoscientists of British Columbia, and the Association of Professional Engineers and Geoscientists of Manitoba. About North American Palladium Ltd. North American Palladium Ltd. (TSX:PDL) (OTC PINK:PALDF) is a Canadian company with over 20 years of production at Lac des Iles mine, located northwest of Thunder Bay, Ontario. North American Palladium is the only pure play palladium producer in the world. With over 500 employees, Lac des Iles mine features a unique world class ore body and modern infrastructure, including both an underground mine and an open pit mine. For Further Information North American Palladium Ltd. Investor Relations Telephone: 416-360-7374 Email: IR@nap.com Cautionary Statement on Forward-Looking Information Certain information contained in this news release constitutes 'forward-looking statements' and forward-looking information within the meaning of applicable Canadian securities laws. All statements other than statements of historical fact are forward-looking statements. The words 'target', 'plan', 'should', 'could', 'estimate', 'guidance', and similar expressions identify forward-looking statements. Forward-looking statements in this news release include, without limitation: information pertaining to the Company s future results at LDI; information pertaining to the Company's strategy, plans or future financial or operating performance, such as statements with respect to, long term fundamentals for the business, operating performance expectations, project timelines, tailings management plan, mining method change, production forecasts, operating and capital cost estimates, expected mining and 14

milling rates, cash balances, projected grades, mill recoveries, metal price and foreign exchange rates and other statements that express management's expectations or estimates of future performance. Forward-looking statements involve known and unknown risk factors that may cause the actual results to be materially different from those expressed or implied by the forward-looking statements. Such risks include, but are not limited to: the possibility that metal prices and foreign exchange rates may fluctuate, the risk that the Lac des Iles mine may not perform as planned, that the Company may not be able to meet production forecasts, the possibility that the Company may not be able to generate sufficient cash to service its indebtedness and may be forced to take other actions, inherent risks associated with development, exploration, mining and processing including environmental risks and risks to tailings capacity, employment disruptions, including in connection with collective agreements between the Company and unions and the risks associated with obtaining necessary licenses and permits. For more details on these and other risk factors see the Company's most recent management s discussion and analysis and the Company s annual information form on file with Canadian securities regulatory authorities on SEDAR at www.sedar.com under the heading Risk Factors. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The factors and assumptions contained in this news release, which may prove to be incorrect, include, but are not limited to: that the Company will be able to continue normal business operations at its Lac des Iles mine, that metal prices and exchange rates between the Canadian and United States dollar will be consistent with the Company's expectations, that there will be no significant disruptions affecting operations, and that prices for key mining and construction supplies, including labour, will remain consistent with the Company's expectations. The forward-looking statements are not guarantees of future performance. The Company disclaims any obligation to update or revise any forward-looking statements, whether as a result of new information, events or otherwise, except as expressly required by law. Readers are cautioned not to put undue reliance on these forward-looking statements. Photos accompanying this announcement are available at http://resource.globenewswire.com/resource/download/95980d9a-3538-49cb-a692-d525c6afa10e http://resource.globenewswire.com/resource/download/6c214679-eb5f-4be0-a8f8-33cd16f74b1f http://resource.globenewswire.com/resource/download/5056eb37-335a-4d73-b7d0-4a2e2b9e1877 http://resource.globenewswire.com/resource/download/7e96f820-c968-42a3-82ea-d410f01154cb 15

Longitudinal projection, looking northwest, and showing pierce points for the 2017-2018 Offset South zone exploration program. Plan view geological interpretation at the 950 metre level, showing the pantleg structure in the southern part of the Offset zone and recent exploration drill holes through the Offset South target at this depth. Plan view geological interpretation at the 950 metre level, showing the pantleg structure in the southern part of the Offset zone and recent exploration drill holes through the Offset South target at this depth. Current near-surface exploration targets at Lac des Iles. Source: North American Palladium 16