Gesellschaft für Schwerionenforschung mbh (GSI), Planckstrasse 1, D Darmstadt, Germany

Similar documents
Schroeder, C., Walter, F., Marzouki, F., Stafiniac, A., Floch, E., Schnizer, P., Moritz, G., Xiang, Y., Kauschke, M., Meier, J., Hess, G.

Analysis of Coupled Electromagnetic-Thermal Effects in Superconducting Accelerator Magnets

DEVELOPMENT AND PRODUCTION OF SUPERCONDUCTING AND CRYOGENIC EQUIPMENT AND SYSTEMS FOR ACCELERATORS BY IHEP

Heat generation by eddy currents in a shell of superconducting bus-bars for SIS100 particle accelerator at FAIR

Feasibility of HTS DC Cables on Board a Ship

THE GSI FUTURE PROJECT: AN INTERNATIONAL ACCELERATOR FACILITY FOR BEAMS OF IONS AND ANTIPROTONS

FAST-PULSED SUPERCONDUCTING MAGNETS

HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study. Milestone Report. Cryogenic Scenarios for the Cold Powering System

CURRENT LEADS FOR THE LHC MAGNET SYSTEM

Analysis of capacitance of a cryogenic by-pass line for SIS100 particle accelerator at FAIR

The Design and Fabrication of a 6 Tesla EBIT Solenoid

Cryogenic and Electrical Test Results of a 30 M HTS Power Cable

Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses

COLD TESTING OF RAPIDLY-CYCLING MODEL MAGNETS FOR SIS 100 AND SIS 300 METHODS AND RESULTS*

Journal of Physics: Conference Series. Related content. To cite this article: E Fischer et al 2010 J. Phys.: Conf. Ser

Accelerators. Table Quadrupole magnet

The SIS100 Superconducting Magnets

Magnet and Cryostat Configurations For a Multi-port Quadrupole Array*

Superconducting Magnets for Future Electron-Ion Collider. Yuhong Zhang Thomas Jefferson National Accelerator Facility, USA

Innovative fabrication method of superconducting magnets using high T c superconductors with joints

Supercritical Helium Cooling of the LHC Beam Screens

Helium two-phase flow in a thermosiphon open loop

HTS Magnets for Accelerator Applications

Latest Status of High Temperature Superconducting Cable Projects

Current Leads, Links and Buses

The development of a Roebel cable based 1 MVA HTS transformer

EDIPO Test Facility User Specification

Material, Design, and Cost Modeling for High Performance Coils. L. Bromberg, P. Titus MIT Plasma Science and Fusion Center ARIES meeting

Lecture 2: Training, fine filaments & cables

New European Accelerator Project EuCARD: Work Package on High Field Magnets

Commissioning testing of a 1 MVA Superconducting transformer featuring 2G HTS Roebel cable

To be published in the Proceedings of ICEC-22, Seoul Korea, July 2008 MICE Note 232 1

3 rd ILSF Advanced School on Synchrotron Radiation and Its Applications

New Regenerator Design For Cryocoolers

Experiences with Superconducting Cable & Fault Current Limiter in a German City Center Mark Stemmle

Impact of the forces due to CLIQ discharges on the MQXF Beam Screen. Marco Morrone, Cedric Garion TE-VSC-DLM

Retraining of the 1232 Main Dipole Magnets in the LHC

Thermal Field in a NMR Cryostat. Annunziata D Orazio Agostini Chiara Simone Fiacco

CRYOGENIC CONDUCTION COOLING TEST OF REMOVABLE PANEL MOCK-UP FOR ITER CRYOSTAT THERMAL SHIELD

THE CERN CRYOGENIC TEST FACILITY FOR THE ATLAS BARREL TOROID MAGNETS

Antiproton Decelerator at CERN, another advanced CCC for the FAIR project at GSI is under construction and will be installed in CRYRING. This

Optimization of Electrically Cooled Complex HPGe Detector

Physics of fusion power. Lecture 14: Anomalous transport / ITER

Experimental Investigation of High-Temperature Superconducting Magnet for Maglev

JOINTS FOR SUPERCONDUCTING MAGNETS

LHC HTS CURRENT LEADS

Technische Universität Dresden Lehrstuhl für Kälte- und Kryotechnik Dresden, 01062, Germany

HIMARC Simulations Divergent Thinking, Convergent Engineering

CB FDHMT. Contract No GSI Helmholzzentrum für Schwerionenforschung GmbH Planckstraße Darmstadt. 15. December /11

Lecture #2 Design Guide to Superconducting Magnet

R&D ON FUTURE CIRCULAR COLLIDERS

PUBLICATION. Thermal Design of an Nb3Sn High Field Accelerator Magnet

Status and Progress of a Fault Current Limiting HTS Cable To Be Installed In The Consolidated Edison Grid

Chapter 1 Introduction

Critical Current Properties of HTS Twisted Stacked-Tape Cable in Subcooled- and Pressurized-Liquid Nitrogen

A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU

JT-60 SA Toroidal Field coil structural analysis

Insertion Devices Lecture 6 The Application of Superconductors. Jim Clarke ASTeC Daresbury Laboratory

13000 A HTS CURRENT LEADS FOR THE LHC ACCELERATOR: FROM CONCEPTUAL DESIGN TO PROTOTYPE VALIDATION

Analytical and Experimental Studies on the Hybrid Fault Current Limiter Employing Asymmetric Non-Inductive Coil and Fast Switch

MAGNET DESIGN ISSUES & CONCEPTS FOR THE NEW INJECTOR

The LHC: the energy, cooling, and operation. Susmita Jyotishmati

EuCARD-2 Enhanced European Coordination for Accelerator Research & Development. Journal Publication

A high intensity p-linac and the FAIR Project

Engines of Discovery

Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory

SUPERCONDUCTIVITY APPLIED TO PARTICLE ACCELERATOR MAGNETS

Magnetic and Cryogenic Design of the MICE Coupling Solenoid Magnet System

Precise Thermometry for Next Generation LHC Superconducting Magnet Prototypes

Superconducting Magnet Design and R&D with HTS Option for the Helical DEMO Reactor

High Temperature Superconductor. Cable Concepts for Fusion Magnets. Christian Barth. \iyit Scientific. ^VI I Publishing

REFRIGERA TION OPTIONS FOR THE ADVANCED LIGHT SOURCE SUPERB END DIPOLE MAGNETS

Russian Development Program on HTS Power Cables

Status of the LHC Machine

The Large Hadron Collider Lyndon Evans CERN

NR/RR. Set No. 2 CODE NO: NR/RR210204

Loss analysis of a 1 MW class HTS synchronous motor

Hydra Fault Current Limiting HTS Cable to be Installed in the Consolidated Edison Grid

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Laboratory for Particle Physics

Large Hadron Collider at CERN

Measurements of temperature on LHC thermal models

The Booster has three magnet systems for extraction: Kicker Ke, comprising two identical magnets and power supplies Septum Se

The Present Status and Prospective of the power transmission by Superconductors in China

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

Superconducting Cables

Thermal Stability of Yttrium Based Superconducting Coil for Accelerator Application

Thermo-structural and heat load analysis of SST-1 Superconducting coils

Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory

Experience in manufacturing a large HTS magnet for a SMES

Thermal analysis of superconducting undulator cryomodules

The Superconducting SIS100 Synchrotron for High Intensity Proton and Heavy Ion Beams

EPRI Technology Watch 2010 Superconducting Cables Fault Current Limiters

HT-7U* Superconducting Tokamak: Physics design, engineering progress and. schedule

The LHC Collider. STOA lecture, Brussels, 27 th November 2012 Steve Myers Director of Accelerators and Technology, CERN

Superconducting Magnet with a Minimal Steel Yoke for the Future Circular Collider Detector

Design of a Sector Magnet for High Temperature Superconducting Injector Cyclotron

Challenges of the FAIR Vacuum System

Accelerators. Lecture V. Oliver Brüning. school/lecture5

Superconducting Fault Current Limiters

Superconducting cables Development status at Ultera

Transcription:

Proceedings of ICEC 22ICMC 2008, edited by HoMyung CHANG et al. c 2009 The Korea Institute of Applied Superconductivity and Cryogenics 9788995713822 Cold electrical connection for FAIR/ SIS100 Kauschke, M., Shim, S.Y., Quack 1, H. Gesellschaft für Schwerionenforschung mbh (GSI), Planckstrasse 1, D64291 Darmstadt, Germany 1 Lehrstuhl für Kälte und Kryotechnik, Technische Universität Dresden, 01062 Dresden, Germany The Facility of Antiproton and Ion Research (FAIR) will be an international centre for atomic, plasma and nuclear physics, located next to Gesellschaft für Schwerionenforschung (GSI), Darmstadt. FAIR will be composed from two synchrotrons and four storage rings. Both synchrotrons, SIS100 and SIS300, are designed with superconducting magnets. For radiation protection reasons and landscaping restrictions the synchrotrons will be placed underground, whereas the power supplies will be placed within three service buildings above ground level. To save space and refrigeration power a superconducting electrical connection will be implemented. The mechanical and thermal design of this connection will be presented in the paper. INTRODUCTION The Facility of Antiproton and Ion Research (FAIR) will be constructed next to the existing heavy ion accelerator laboratory at Gesellschaft für Schwerionenforschung (GSI), Darmstadt. FAIR, in its final stage, will be comprised from two synchrotrons, four storage rings and approximately 1.4 km of beam transport, requiring different types of magnets and cooling regimes. Both synchrotrons, SIS100 and SIS300, are designed with superconducting magnets [1]. For SIS100 an iron dominated magnet is foreseen. For the coil winding a hollow conductor is used where liquid helium is throttled along the full coil winding. This magnet will be operated at a current of 13 ka. SIS300 will use cosinφ magnets with a cored Rutherford cable, which are cooled by supercritical helium. The refrigeration power will be supplied by three refrigerators [2], whereof two will be build in the starting phase of FAIR. To achieve a radiation protection, that is adapted to the surrounding landscape, the tunnel housing both synchrotrons is build approx. 24 m below ground level. The synchrotrons will be supplied from three building placed around the tunnel. The main building (building 1) is housing the refrigerator, the reference magnets and the main part of power converters. Two smaller buildings are housing the distributed power converters for the synchrotrons. Even if all dipoles and each quadrupole family are electrically connected in one loop the power converters have to be distributed in all three building due to the high inductance of each magnet. Therefore 24 electrical connections in 12 circuits between warm power converters and cold ring magnets are required [3]. The reference magnets are electrically in one loop with the ring magnets, but cryogenically independent from the ring. For reference magnets easy access is required, therefore they are placed in a radiation free area in building 1. For the electrical transition between 4.2K and ambient HTS current leads are designed. The current leads are gas cooled between shield temperature (~55K) and ambient. The current leads for each building and synchrotron are combined in one current lead box. This current lead box will be placed at the same floor than the power converter to reduce the electrical losses due to ohmic heating in the resistive warm cable. Between the current lead box and the synchrotrons a cold electrical link is required. A schematic view on the installation of this link is given in Figure 1. For the radiation protection and the positioning requirements of other components several bends are necessary in the link. In principle there are two 759

Figure 1 Schematic view of the installation of the cold link between the current lead box within the supply building and the synchrotron tunnel. possibilities for such link; a rigid design or a flexible design. The rigid solution would require soldering and therefore a box in each bend. Therefore a flexible link would allow a more reliable installation. For the feasibility of such a flexible cold link there are three main points, which have to be investigated before the production of a prototype: the producibility the thermal stability and the occurring electromechanical forces and the induced voltages. For the foreseen new design option of the SIS100 dipole magnets these three aspects are investigated. The magnets will be operated at 13 ka. The required superconducting cable will be made from 23 superconducting wires, which will be twisted around a CuNi tube with an inner diameter of 4.7mm. The full cable will have an outer diameter of 8.38 mm [1]. PRODUCIBILITY The maximum number of cables, which are required in one cold link, is 16 (4 for the dipoles, 12 for Quadrupoles [3]). The maximum length that is required with in FAIR for such a link is in building 1, where the total length of link is 110 m. The idea for such a flexible link is to produce a stranded structure out of the cable and to place this into a flexible cryostat. The producibility of this solution was checked by industry and approved to be reasonable [4]. For symmetry reasons during production it is necessary to Table 1 Geometric data of the cold electrical connection.163 Figure 2 Schematic view on the 19 cable version of the cable with correct ratio of SCcable to structure [4] Number of electrical circuits 3 8 Number of cable 6 16 Number of tubes for returning gas 1 3 Outer diameter [m].143.163 Bending radius <= 3 bends [m] 1.3 1.4 > 3 bends [m] 1.8 1.9 760

add dummy cable or tubes. A schematic view on the cross section of such cable is given in Figure 2. The geometric data that derive from this design are summarized in Table 1. The flexible connection will be supplied on a standard cable drum (4.2m diameter). For the connection to the local feed box on the machine side and the current lead box on the other end a termination is needed that connects the helium supply for the different temperature levels. The first design of this required termination is given in Figure 3. 50 K He outlet/coupling Nuclotrons with LHe flow Line vacuum Magnet vacuum Line vacuum Figure 3 Design for the termination of the cold electrical connection [4] THERMAL STABILTY For the save operation of the cold link enough cooling has to be provided to ensure a temperature below the critical temperature for the superconducting wire. In Figure 4 the helium supply for the cold link and the current feed box is presented for one circuit. 300 K current lead box transfer line from building 1 local feed box cold electrical connection ground level/ service building tunnel level Table 2 System parameters for the calculations 4 K 50 K Current leads 0.11 W/ ka 0.065 g/s /ka 13kA 1.4 W 0.85 g/s Box 20 W 150 W Per cable 3 W 22 W Link 0.011 W/m 1.2 W/m AC losses (triangular 5.52E2 W/m cycle) Eddy current losses negligible negligible Length 110 m Difference of level 26 m Total load /cable ~ 7 W Total load/ circuit ~ 23.5 W connection line to feedin point Figure 4 Schematic flow diagram for the 4K flow of one exemplary current circuit and the 50 K flow required for shielding and the current leads 761

For all buildings the same flow scheme should be used. For landscape protection the transfer lines for the helium supply of the local feed boxes in building 2 and 3 is via the tunnel. Therefore the required helium for the cold link will be supplied from the local feed box, therefore from the tunnel level. In addition a helium flow at 55 K and refrigeration power at 4.4K for the HTS current leads has to be supplied. In Table 2 the system parameters for the calculations of the thermal stability are summarized. The heat load for the cold electrical connection consists of two main parts, heat conduction from the outside and AC losses in the cable. The heat conduction to the 4.4 K level will be of 80 mw/m for 7 cables and 100 mw/m for 19 cables. The heat inleak to the outer shielding gas with a temperature difference from room temperature to 50 K will be in the range of 1.2 W/m for 7 cables and 1.5 W/m for 19 cables. These data are based on measurements on existing transfer lines with the same design principle. In Figure 5 the calculation model for one circuit is given. The pressure drop calculation is using Gnielinski equations for the friction factor [5]. The geodetic pressure change is assumed within the flow, if the void fraction is below 0.1. For the heat transfer a heat transfer coefficient of 20 W/m 2 K is assumed. The value is representing the heat transfer through the insulating Kapton foils and the thermal resistances for the contact between the cables. m in m out m in m out Heat inleak AC losses Heat transfer Figure 5 Model for one circuit for the calculation by the Finite Volume Method (FVM) Within the SIS100 magnets the cables are cooled by subcooled helium that will be throttled into the twophase region along the coil [1]. For the link this cooling regime seems not to be reliable. Due to large geodetic changes along a straight section the twophase flow will separate, and some sections will accumulate liquid helium whereas others are not enough cooled. Therefore the cable in the cold link will be cooled by supercritical helium at the supply pressure of the distribution system. In Figure 6 the Ts diagram for the cooling with supercritical helium is shown. The temperature evolution within a link, being installed on one level is compared with a link of a 15m inclination. The temperature and pressure profiles along the length of the link are compared in Figure 7. Temperature [K] 5,7 5,5 5,3 5,1 4,9 same level 15 m rise Q current lead box p=3.0 bar p=2 bar p=2.3 b p=2.5 b 4,7 p=1.5 b 4,5 p=1.25 bar 4,3 3,5 4 4,5 5 5,5 6 6,5 7 7,5 Entropy [J/gK] Figure 6 Ts Diagram fort he helium flow through one current circuit using supercritical flow (p in =2.95 bar) 762

5,7 3 5,5 2,9 5,3 2,8 Temperature [K] 5,1 4,9 4,7 2,7 2,6 2,5 pressure [bar] 4,5 4,3 4,1 0 10 20 30 40 50 60 70 80 90 100 110 length [m] same level Temperature Pressure 15 m rise Temperature Pressure Figure 7 Temperature and pressure profile along the cold electrical connection for supercritical cooling. The dotted line represents the profile for a uniform 15 m rise. From these temperature profiles one can expect a save operation of the system will be achieved by supercritical cooling of the link. 2,4 2,3 2,2 ELECTRO MECHANICAL FORCES The structure of the cable has to withstand the electro mechanical forces with in the cable. For the calculation of the forces all possible distributions of current during operation has to be examined. All dipoles will be operated maximal at 13 ka, the quadrupoles at 4.6 ka. All magnets will be ramped in parallel. Therefore the cable distribution can be optimized due to the electro mechanical forces and the 5544 possible combinations for the 4 dipole and 12 quadrupole cables can be reduced to 4 equally low force solutions. One possible distribution is given in Figure 8. The two cables supplying the dipole circuits are placed in that way, that the distance is maximized and therefore the force is minimized. The calculation of the forces is done by FEM calculations. The structure of the cable is simplified in that way, that the superconducting wires are reduced to an equivalent ring of superconductor surrounding the cooling tube. The simplified cable model is shown in left hand side in Figure 8. frame : Dipole no frame : Quadrupole 3 dummy cables wires 0.2 mm kapton tape 0.28 mm fiber glass tape 4.19 mm 4.19 mm Figure 8 Calculation model for the mechanical force analysis indicating the polarities for each cable assigned for the calculation by the Finite Element Method (FEM) In the following Figure 9 and the Table 3 the electro mechanical forces for each cable in the structure are given. Comparing the values with the coil winding the link structure should resist the upcoming forces. 763

5 1 6 Table 3 Electro mechanical forces on each cable 3 7 11 8 12 9 13 10 14 4 Cable Force [N/m] Cable Force [N/m] 1 5,08E03 9 2,65E03 2 5,08E03 10 1,82E03 3 2,26E03 11 1,82E03 4 2,26E03 12 2,65E03 5 8,00E02 13 1,96E03 6 1,92E03 14 1,25E02 7 1,25E02 15 1,92E03 8 1,96E03 16 8,01E02 15 2 16 Figure 9 Electro mechanical forces on the cable structure The induced voltage on the cable during operation is governed by the ratio of magnetic flux and time, where the magnetic flux can be calculated from the product of integrated magnetic field and the length. With these equations a corresponding voltage 2.7033 102 V/m and 2.6058 102 V/m can be found with a time interval of 0.412 sec. CONCLUSION The theoretic investigations have shown that this design for a cold electrical connection is a reliable approach for connecting the current feed box with the SIS100 machine at FAIR. For the further validation of the design a prototype have to be produced and investigated by testing to approve the heat transfer and the mechanical stability in any of the operating cycles. ACKNOWLEDGEMENT We acknowledge the support of the European Community Research Infrastructures Action under the FP6 programme: Structuring the European Research Area Specific Design Study (contract 515873 DIRACsecondaryBeams). REFERENCES 1. FAIR Technical design report, GSI, Spring 2008 2. Kauschke, M., Xiang, Y., Schroeder, C.H., Quack, H., Kutzschbach, A., Cryogenic Distribution System for FAIR, International Cryogenic Engineering Conference 21, Praha, Czech Republic (2006) 3. Floch, E., Quench detection protection and electrical connections applied to SIS100. Internal Note, GSI (2008) 4. Nexans Deutschland Industries GmbH & Co KG, Study: Cryogenic Bus Bar for SIS100 Magnets, Internal Note GSI, (2007) 5. VDI Wärmeatlas, Springer Berlin (2002) 764