Bald Mountain APPENDIX A

Similar documents
Kinross Gold Corporation 25 York Street, 17 th Floor Toronto, ON Canada M5J 2V5

ET and and and

Drilling highlights include:

Classification Tonnage (t) Grade Au (g/t) Grade Ag (g/t)

For personal use only

NEWS RELEASE November 5, 2018

Kinross Gold Corporation

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

Drilling Extending Mineralization in La Mina North Zone

Goliath Reports Grams Per Tonne Gold Equivalent Over 2 Metres Channel Cut at Golddigger in the Golden Triangle; Bulk Sample Recommended

ASX Announcement 29 July 2015

Yorbeau identifies two new exciting exploration targets at the Rouyn Property

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Continues to Expand Gold Zones At Val-d Or East

NEWS RELEASE August 8, 2018

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

Drilling Extending Mineralization in La Mina North Zone

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

CALIFORNIA GOLD COMMENCES RESOURCE EXPANSION DRILLING AT NEW ZONE ON ITS FREMONT PROPERTY

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT PROVEN AND PROBABLE MINERAL RESERVES

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Skeena Intersects g/t AuEq over metres at Eskay Creek

NEWS RELEASE July 26, 2018

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

High Grade Gold Intercepts at Bangaba

IAMGOLD REPORTS FURTHER HIGH-GRADE INTERSECTIONS FROM INFILL AND EXPANSION DRILLING AT SARAMACCA

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

NEWS RELEASE August 10, 2017

COMPASS GOLD: DRILLING SUCCESS AT FIRST OUASSADA BEDROCK GOLD TARGETS

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

Where Exploration Intersects Discovery

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

IDAHO CHAMPION INTERSECTS 4.80 GRAMS PER TONNE GOLD OVER 5.9 METRES IN HIGHLY OXIDIZED ZONE AT THE BANER PROJECT

Golden Predator Intersects 6.86 m of g/t Gold at the 3 Aces Project; Jack and Ace of Spades Zones Merging

BANANGHILIG GOLD DEPOSIT: STERILISATION DRILLING UPDATE

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

76,000 Ounce Gold Resource at Akoko North

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

Golden Predator Intersects 7.5 m of 33 g/t Gold at the 3 Aces Project; Discovers Significant Stockwork Mineralization

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

2016 Annual Mineral Reserve and Resource Statement

First Phase Metallurgical Optimization Program Initiated

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

Pershing Gold Reports a 2.24 Ounce per Ton Gold Intercept Along With Other High-Grade Gold Intercepts at Relief Canyon

PELANGAN GOLD PROSPECT - WEST LOMBOK PROJECT PHASE 2 DRILLING DIAMOND DRILL HOLE STATISTICS

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE

IAMGOLD INTERSECTS MINERALIZATION ALONG STRIKE OF THE SARAMACCA DEPOSIT AND REPORTS FIRST DRILL RESULTS FROM BROKOLONKO

Figure 1: Coarse Visible Gold in Pan (combined from multiple drill holes; staple = 1 cm length)

Trading Symbol: ADA TSX-V; C2Z-Frankfurt Press Release No Shares Outstanding: 104,808,584 November 1, 2006

July Exploring for Canadian Gold in the Rainy River District of Ontario

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

InZinc Intersects 6.8m of 16.5% Zinc Focuses on Western Expansion of High Grades at West Desert Project

RESOURCE INCREASED BY 75% TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

For personal use only

Thick, high-grade gold intercepts at Bongou Prospect. Highlights: ASX Announcement 2 nd December 2013

This area in SE Sullivan Gulch was never mined by previous operators

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

13 March 2017 Georgian Mining Corporation Further drill results from Kvemo Bolnisi East Gold Discovery

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

For personal use only

Detour Gold Reports Drilling Results from Lower Detour

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER

Auger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast)

For personal use only

Aurelian Intersects Metres Grading 7.71 g/t of Gold in Infill Drilling and Metres Grading 8.13 g/t of Gold at the Eastern Edge of FDN

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

Remaining assay results Tisová Co Au Cu Project Czech Republic

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

Narembeen Drilling Result. Assay results have been received from the diamond drilling program at Narembeen.

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

ASX Announcement ASX Code: MAR 10 April 2018

For personal use only

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Bellhaven Expands the Middle Zone Prospect with New Drilling: Advances toward New Resource in First Half of 2012

LUNA GOLD INCREASES MEASURED AND INDICATED RESOURCES TO 3.63 MILLION OUNCES AND INFERRED RESOURCES TO 1.04 MILLION OUNCES AT AURIZONA

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

Transcription:

Bald Mountain APPENDIX A Figure 1 (Bald Mountain): Plan map of the Bald Mountain property outlined in blue (North and South areas) and black (JV area) highlighting 2016 drill programs at Saga, Vantage, Top and Redbird (circled in red). 1 Kinross provides update on organic development projects and exploration Appendix A

Figure 2 (Bald Mountain): Section 20600N of the Saga deposit host rock and mineralization relationship, highlighting the current pit outline, the extension of mineralization down dip and the $1400 pit shell generated from the 2016 mineral resource estimate update by the Bald Mountain exploration team. 2 Kinross provides update on organic development projects and exploration Appendix A

Figure 3 (Bald Mountain): Cross-section N22 W of the Vantage deposit highlighting the relationship of oxide and carbonaceous mineralization in the bedrock. Locations of 2016 metallurgical drill core holes and representative intersections at bottom left of image are included for reference. Refer to Explanatory Notes available on page 4 and Appendix B for detailed drill results, available at http://www.kinross.com/files/doc_news/2017/02/appendix- B_Q4-YE-2016-Exploration-Drill-Results_February-15.xlsx 3 Kinross provides update on organic development projects and exploration Appendix A

Explanatory Notes Bald Mountain exploration results Results are reported for 130 diamond core and reverse circulation (RC) drill holes completed at Bald Mountain: 7 at Top, 11 at Redbird and 112 at the Vantage Complex (28 at Gator, 6 at Luxe, 7 at Saddle and 71 at Vantage). All 7 Top holes are RC drill holes. The 11 Redbird holes are diamond drill core holes of HQ diameter with RC pre-collars of variable depth. The Vantage Complex drill holes consist of RC holes, HQ diameter diamond core holes and PQ diameter diamond core holes (the latter are used to collect metallurgical material). Collar locations are reported in the Bald Mountain Local Grid, in survey-metres. The HQ diamond core samples are typically sampled on nominal 5 foot (~1.5 metre) intervals. Samples are sawed in half, along the length, with half placed in a clean sample bag and sent to the lab, with the remaining half stored on site in core boxes. Reverse Circulation samples are collected at the drill rig on 5-foot intervals, passed through a rotary splitter to reduce sample size to around 5 kg, and collected in canvas or micropore sample bags. A small split is washed and collected in plastic chip trays for geological logging and storage on site. PQ diamond core holes at Vantage were drilled to obtain material for metallurgical test work. Chipsamples were collected on nominal 10-foot intervals with one 1-inch diameter chip collected every foot. Assays for chip-sampled metallurgical core are only used to define intervals for metallurgical composites and are not used for resource or reserve calculations. QAQC samples including certified standards, blanks and field duplicates are included on an average of 4 per 40 sample batch (10%). All samples were sent to ALS Minerals in Reno, Nevada, USA, an ISO/IEC 17025:2005 certified laboratory. A nominal 30 g pulp is fire assayed with AAS finish. Samples with fire assay values >3.4 ppm have a second pulp split assayed by gravimetric method. All samples with fire assay values >0.13 ppm will have gold by cyanide leach and AAS (30 g nominal sample weight). All results for the Bald Mountain drill campaigns are reported on the attached table as Au grams per metric tonne (Au g/t). No more than 20 feet (~6 metres) of internal waste (<0.13 g/t) is included in composite calculations and high grade samples were not cut. Only downhole intercept widths (instead of true widths) are reported due to the irregular nature and/or preliminary understanding of the mineralization. The technical information about the Company s drilling and exploration activities at Bald Mountain contained in this news release has been prepared under the supervision of the Officer with the Company who is a qualified person within the meaning of National Instrument 43-101. The drill hole database, including collar, survey, geology and assay information, were reviewed by the qualified person and the composite assay information independently calculated and verified for accuracy of reporting. Assay certificates for the information disclosed in this news release were verified by the Site Exploration Manager but not by the Officer as the qualified person. 4 Kinross provides update on organic development projects and exploration Appendix A

Round Mountain Figure 4 (Round Mountain): Cross section of the 2016 Round Mountain Phase W drill programs, Phase 1 (red) and Phase 2 (blue), relative to the current life of mine pit outline (black). Block model of Phase W mineral resource estimate showing continuity of mineralization and grade (Moz/T) down-dip. 5 Kinross provides update on organic development projects and exploration Appendix A

Kupol Figure 5 (Kupol): Surface map showing 2016 Minex targets, including the South Zone Hanging Wall, Big Bend Deep, Zone 650 SE and North Extension, relative to Kupol Main Vein and surface mine infrastructure. 6 Kinross provides update on organic development projects and exploration Appendix A

Figure 6 (Kupol): Long section of Kupol Vein looking west. Mineralization remains open in certain zones with the greatest potential for near-term extensions at 650 zone in the south, Big Bend Deep, and North Extension (Star) with a geochemical anomaly that extends approximately 1.8 kilometres north. 7 Kinross provides update on organic development projects and exploration Appendix A

Dvoinoye Figure 7 (Dvoinoye): Plan map of the Dvoinoye Zone 1 area, highlighting mineralization (projected to surface) and locations of 2016 drill holes. Inset plan map (bottom left) shows location of Zone 1 relative to Dvoinoye mine. The location of the cross-section in Figure 8 is shown in white (A- A ) 8 Kinross provides update on organic development projects and exploration Appendix A

Figure 8 (Dvoinoye): Cross section A-A of Dvoinoye Zone 1 mineralization, showing locations of selected results from the 2016 infill drill program (bottom right, #4-6). The 2016 Zone 1 infill drill program was designed as a short-hole program to upgrade the shallow resources below the existing pit floor to the current mineral reserve estimate. Drill holes and significant intercepts from 2015 and 2013 drill programs are included to highlight continuity of mineralization at depth. Refer to Explanatory Notes available on page 10 and Appendix B for detailed drill results, available at http://www.kinross.com/files/doc_news/2017/02/appendix-b_q4-ye-2016-exploration-drill-results_february-15.xlsx 9 Kinross provides update on organic development projects and exploration Appendix A

Explanatory Notes Dvoinoye exploration results The six drill holes reported from Dvoinoye were drilled from 2013, 2015 and 2016, and are included in this report as representative of the Zone 1 mineralization. These are diamond drill core holes all of HQ diameter. Collar locations are reported in UTM. Composite assay intervals reported for diamond drill core results are calculated by taking a weighted average of all gold fire assay values equal to or above 1.0 gram per tonne Au equivalent for the 2015 samples, and equal to or above 2.0 g/t Aueq for the 2013 and 2016 samples. No more than three consecutive metres of internal waste (<1.0 g/t Aueq in 2015, and <2.0 g/t Aueq in 2013 and 2016) is accepted, and high grade samples are not capped. Down hole widths are reported, with true widths included for certain drill intersections where the true width is less than 89% of the down-hole interval. The reader is referred to the Kupol & Dvoinoye NI 43-101 Technical Report dated March 31, 2015, available under the Company s profile at www.sedar.com, for a full description of drilling methods, sampling procedures and QA/QC protocols. The technical information about the Company s drilling and exploration activities at Dvoinoye contained in this news release has been prepared under the supervision of the Officer with the Company who is a qualified person within the meaning of National Instrument 43-101. The drill hole data base including collar, survey, geology and assay information were reviewed by the qualified person and the composite assay information independently calculated and verified for accuracy of reporting. Assay certificates for the information disclosed in this news release were verified by the Regional Director Exploration and the Site Exploration Manager but not by the Officer as the qualified person. 10 Kinross provides update on organic development projects and exploration Appendix A

Kettle River Figure 9 (Kettle River): Plan map highlighting the location of the historic K2 Mine area, in the Curlew district relative to the Kettle River Mill and currently operating Buckhorn Mine area. 11 Kinross provides update on organic development projects and exploration Appendix A

Figure 10 (Kettle River): Cross section looking west of historic K2 Mine workings (blue), including East Vein, Stealth Vein and Emmanuel Creek, relative to significant 2016 target areas, the Lower Portal (yellow) and K5 Zone (red). 12 Kinross provides update on organic development projects and exploration Appendix A

Tasiast Figure 11 (Tasiast): Geological map of the 2016 Tasiast and Tasiast South (Tamaya) targets, especially Prolongation, Piment and the Tasiast South Sadraya target. Red and magenta dots indicate grade x metre results greater than 30 and 50, respectively. Refer to Explanatory Notes available on page 14 and Appendix B for detailed drill results, available at http://www.kinross.com/files/doc_news/2017/02/appendix-b_q4-ye-2016-exploration-drill-results_february-15.xlsx 13 Kinross provides update on organic development projects and exploration Appendix A

Explanatory Notes Tasiast exploration results A total of 24 reverse circulation (RC) drill holes and two diamond drill holes are reported for a single target in the Tasiast South area called Sadraya. The diamond drill holes are of HQ core diameter. Collar locations are reported in UTM WGS84. Abbreviations used are: NSI - No Significant Intersections. Samples from Tasiast are prepared and analyzed by fire assay using a 50 gram charge with an AAS finish at ALS Minerals (at ISO-accredited laboratories at the Tasiast mine site). Field duplicate samples are taken, and blanks and standards are added to every batch submitted according to industry standards. Diamond drill core is sampled according to lithological boundaries and vein widths, but the maximum sample interval does not exceed 1.50 m in length. For RC core, sampling is conducted at every 1.0 m drilled interval, then the sample is weighed, sieved and split into 2-3 kg batches from which sub-samples for analysis are taken. Composite intervals for reverse circulation and diamond core holes were calculated by taking a weighted average of all gold fire assay values equal to or above 0.3 grams per tonne, with no more than 3 metres of internal waste (<0.3 g/t gold) and no top cutting. All assay intervals are reported with downhole thickness only, as there is insufficient information on this new district target to provide estimates of true thickness. The reader is referred to the Tasiast Project, Mauritania National Instrument 43-101 Technical Report dated March 31, 2014, available under the Company s profile at www.sedar.com, for a full description of drilling methods, sampling procedures and QA/QC protocols. The technical information about the Company s drilling and exploration activities at Tasiast contained in this news release has been prepared under the supervision of the Officer with the Company who is a qualified person within the meaning of National Instrument 43-101. The drill hole data base including collar, survey, geology and assay information were reviewed by the qualified person and the composite assay information independently calculated and verified for accuracy of reporting. Assay certificates for the information disclosed in this news release were verified by the Regional Director Exploration and Site Exploration Manager but not by the Officer as the qualified person. 14 Kinross provides update on organic development projects and exploration Appendix A

Fort Knox Figure 12 (Fort Knox): Aerial view of the Fort Knox open pit mine, highlighting the 2016 East and South Wall drill program with collar locations shown in red. 15 Kinross provides update on organic development projects and exploration Appendix A