PETRATHERM LIMITED ABN

Similar documents
PETRATHERM LIMITED ABN

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

Naltagua Copper District CHILE

Double Magic; A Tiger by the tail? First mover advantage in West Kimberley. April 2017 Eamon Hannon, Managing Director

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

Confirmed mineralised porphyry discovery in maiden drill hole Near surface gold (>3g/t Aueq) resource potential confirmed

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

Ausgold awarded EIS grant for Jinkas deep drilling

For personal use only

Relevance of Intra-Particle Diffusion in Modelling Hydrocarbon Transport through Dual-Porosity Porous Media in the Absence and Presence of Particles

Double Magic; A Tiger by the tail? First mover advantage in West Kimberley November 2016 Eamon Hannon, Managing Director

Annual General Meeting

ASX announcement 16 May 2016

For personal use only

SCIENCE DISCOVERY GROWTH. Investor Presentation. Miga Arc Western Victoria s newly emerging copper belt

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

For personal use only

Silver City Minerals

New Drilling Program Commences at Mutiny s Deflector Deposit

Alligator Energy Uranium Projects. 6 September 18 NT RESOURCES WEEK Greg Hall, CEO

Drilling Program Commences on Iron Oxide Copper Gold Targets

For personal use only. Geodynamics. Base-load, national scale, zero emissions 8 TH ANNUAL AUSTOCK CONFERENCE. Geoff Ward Managing Director March 2011

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT

For personal use only

For personal use only. Copper, Zinc and Uranium Projects in NT and SA ASX CODE: CXO

A newly discovered and unexplored belt scale opportunity in West Kimberley Nickel boom upon us June 2018 Eamon Hannon, Managing Director

For personal use only

HIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT

New High Grade Lode Discovered at Wagtail South

ASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011

For personal use only Heemskirk Tin Project - Tasmania

Symposium s Investor Roadshow Sydney 12 August 2014 Melbourne 13 August 2014

SILVER CITY MINERALS LIMITED ABN Silver City Minerals Investor Update

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

Graphene has a plethora of super qualities: the strongest material ever tested. the most electrically and thermally conductive material

For personal use only

AGM Presentation 12 November 2013

DRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE

For personal use only

Bielsdown Antimony Project

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

For personal use only

For personal use only

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

MARCH 2010 QUARTERLY REPORT

For personal use only

For personal use only

ASX:TLM. Closing in on world-class copper-gold deposits Annual General Meeting, November 2011

Strategy Update Presentation. MITHRIL RESOURCES LTD David Hutton Managing Director 23 April 2018

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

For personal use only

For personal use only

EMU NL Annual General Meeting

For personal use only

Queensland Mining Corporation Limited

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

For personal use only

Airborne EM Survey on the Areachap Belt, Northern Cape, South Africa completed with positive initial results.

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

COMPLETION OF PHASE 1 DRILLING AT TITIRIBI PROJECT IDENTIFIES ADDITIONAL SIGNIFICANT COAL INTERCEPTS

ASX ANNOUNCEMENT 21 MARCH 2011

Portia Gold Mine Update

For personal use only

Bass Metals records further positive drill results & progress at 3 prospects.

Helix Resources Limited A.C.N Incorporated in Western Australia

ASX Announcements & Media Release

Geothermal potential Studies Spain

For personal use only

AGM Presentation 6 November 2012

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland

New Gold Drilling Push in East Africa:

For personal use only

Highlights. 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY

For personal use only

For personal use only

JV PROJECT UPDATE JORC COAL RESOURCE

Tesorillo Project Presentation Spain. June 2013

MEDIA RELEASE. Calibre Follow-up Reverse Circulation Drilling Programme scheduled to commence 20 October October 2015

KINGSTON RESOURCES LIMITED

For personal use only

INAUGURAL FARM IN DRILL RESULTS AT CALARIE PROJECT

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

Drilling a world-class MVT zinc project in 2017

Well funded active explorer

Exploration targets identified to increase Browns Range Project s mine life

LOS CALATOS DRILLING RESULTS TD2 TARGET

Maximising Gold Resources in Senegal

For personal use only

March 26 th Expansive Exploration Target Defined at Leonora Gold Project

2018 South Australian Exploration & Mining Conference

For personal use only

GoviEx completes acquisition of African Energy s Zambian uranium assets

For personal use only

Kelly Creek Basin. EXPLORATION UPDATE June 23, Reno Office 10 Greg Street, Suite 170 Sparks, Nevada

EXPLORATION ACTIVITY TO RECOMMENCE AT KOURI GOLD PROJECT IN BURKINA FASO

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

Transcription:

ASX Release g PETRATHERM LIMITED ABN 17 106 806 884 Community consultation meetings Petratherm has recently visited the regions near the company s flagship Paralana geothermal energy project in the northern Flinders Ranges to meet with community members. The company has held meetings with key stakeholders to provide an update on the Paralana project s recent perforation and injectivity test and also to explain the upcoming main fracture stimulation stage of the project. (Planned for late March 2011) Refer attached presentation. The Community consultation was conducted by Petratherm s Managing Director, Terry Kallis and Exploration Manager, Peter Reid. A representative from the state government s Primary Industries and Resources department also attended the meetings. 10 March 2010 Yours faithfully ASX Code: PTR ABN 17 106 806 884 105-106 Greenhill Road Unley SA 5061 T: +61 8 8274 5000 F: + 61 8 8272 8141 W: www.petratherm.com.au/ E: admin@petratherm.com.au Terry Kallis Managing Director MEDIA CONTACTS: Terry Kallis Petratherm Ltd 08 8274 5000 Kieran Hall Hughes Public Relations 08 8412 4100

Community Consultation : Paralana 2 Hydraulic Stimulation Program by Managing Director Terry Kallis, and Exploration Manager Peter Reid March 2011

Disclaimer and competent persons statement Disclaimer This presentation has been prepared by Petratherm Limited (Petratherm). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties and though Petratherm has no reason to believe that it is not accurate, reliable or complete, it may not have been independently audited or verified by Petratherm. Any forward-looking statements included in this document involve subjective judgment and analysis and are subject to uncertainties, risks and contingencies, many of which are outside the control of, and maybe unknown to, Petratherm. In particular, they speak only as of the date of this document, they assume the success of Petratherm s strategies and they are subject to significant regulatory, business, competitive and economic uncertainties and risks. Actual future events may vary materially from the forward looking statements and the assumptions on which the forward looking statements are based. Recipients of this document ( Recipients ) are cautioned not to place undue reliance on such forward-looking statements. Petratherm makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or correcting any error or omission which may become apparent after this document has been issued. To the extent permitted by law, Petratherm and its officers, employees, related bodies corporate and agents ( Agents ) disclaim all liability, direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of care of Petratherm and/or any of its Agents) for any loss or damage suffered by a Recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information. All amounts in Australian dollars (AUD) unless stated otherwise. Competent Persons Statement The information in this report relating to geothermal exploration results and geothermal resources is based on information compiled by P.W. Reid, a full-time Petratherm employee. Mr Reid has sufficient experience in the style of geothermal play under consideration to qualify as a Competent Person under the Australian Code for Reporting of Exploration Results, Geothermal Resources and Geothermal Reserves (2008 edition). Mr Reid consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Petratherm overview MADRID & BARCELONA Direct use heat, EGS & hydrothermal Our company Leading Australian geothermal exploration and development company TENERIFE & GRAN CANARIA Conventional volcanic CHINA Exclusive exploration agreement Projects spanning Australia, Spain and China PARALANA & EAST GIPPSLAND EGS & HSA Projects across the spectrum of geothermal technology Flagship project Paralana in SA s northern Flinders Ranges

Our board Board Skills and capabilities Derek Carter Chairman Simon O Loughlin Director Richard Hillis Director Financial Management Legal Marketing Project Management Corporate Governance Exploration and Development Geology and Geophysics Resources and Energy Government and Stakeholder relations Richard Bonython Director Lewis Owens Director Terry Kallis Managing Director

Development Model Heat Exchanger Within Insulator Higher Permeability Chemically Stable Lower Frac Challenge? Adelaidean bedding / joint surfaces = Cheaper Power!

Paralana Project Commercial Plan Small off grid market (5-30MWe) (Heathgate) followed by potential large on grid development (260 MWe+) Expenditure well leveraged for proof of concept, then potentially fully funded to initial commercial demonstration scale 30MWe plant Funding and expertise from JV Partners, Beach Energy (up to 36 per cent for $30m) and TRUenergy (up to 30 per cent for $57m) Strong Federal Government grant support - $7 million geothermal drilling fund and $62.8 million REDP grant

Paralana Project Regional Picture *Please note Competent Persons Statement near beginning of presentation

2D seismic interpretation suggests potential faults and fractures may be regionally extensive below a thick quartzite sequence (Seismic Line 84 SPG) *Please note Competent Persons Statement near beginning of presentation

Paralana 2 Well Summary Depth 4003m (G.L. AHD) Slow ROP due to hard formations Well cased and cemented to 3720m Measured Temp. = 176 o C at 3672 m; Extrapolated bottom hole temp. is 190 ± 2 o C at 4000m depth. *Please note Competent Persons Statement near beginning of presentation

Paralana 2 Below 3400m Section Brine Intersected High torque, intervals of high ROP s, drilling breaks and increased in well bore deviation. Evidence of geothermal brines from 3670m with inflows of over-pressured brine at approximately 3750m and 3864m. Shut in pressure indicated approx. 3,300 psi, of overpressure and mud system weighted up to 13.2ppg to stop flow. Well bore stability problems limited wire line logging while drilling measurements to 3725m. Numerous large Fractures/Faults Intersected! *Please note Competent Persons statement near beginning of presentation

Passive seismic array Monitoring began April 2008 one deep borehole sonde at 1790m in Paralana 1b six borehole sondes at 200m eight surface seismometers two accelerometers MEQ - Array Managed by IESE *Please note Competent Persons Statement near beginning of presentation

Regional and Local Seismic Events Results from April 2008 to Sept. 2010

Pre-stimulation Seismic Events April 2008-Sept.2010 Relatively small local events detected Largest event 0ML Correlates with faults within the Poontana Fracture Zone

Diagnostic Fracture Injection Test - Jan 2011 Successful break down (fracturing) of rock Over 140 micro-seismic events recorded Seismic events extend ~ 300m from the well bore Evidence of potential connection to an over-pressured zone

MEQ Real time monitoring during hydraulic Stimulation Mimo Software used to detect, locate, and determine event magnitudes in near real-time Main Stimulation Planned for late March/early April 2011

Regional community consultation May 2010 / March 2011 Petratherm /Beach and PIRSA Nepabunna Port Augusta, Leigh Creek, Hawker, Nepabunna, Iga Warta, Arkaroola and Quorn Update on project and outline of next work stage fracture stimulation First round consultation well received by community Mike Malavazos PIRSA Common questions Employment and economic development opportunities Access to, and use of water Questions and Answers posted on PTR website

Natural Seismicity Historical seismic activity at Paralana is low Frequent seismic events within the Flinders Ranges. Largest event recorded close to Paralana was a ML3.7 at Christmas Well in 1971 Natural seismicity recorded by Geoscience Australia and PIRSA

Fracture stimulation programme next stage of work Fracture stimulation Inject larger volume of water at higher rates Volumes and stepped injection rates dependent on micro-seismic response Aims to create and activate natural fracture network intersected in the well. Targeting MEQ activity >500m radius from the well Injectivity flow rates, and production testing if well allows Provision for a second stimulation interval dependent on results *Please note Competent Persons Statement near beginning of presentation

Outlook for 2011 and beyond Paralana JV project planned milestones 1 st Qtr 2011: Main fracture stimulation 2 nd half 2011: drilling of the Paralana 3 deep producer well 1 st half 2012: Circulation Test Demonstration of Flows 2012: Commission first stage 3.75 MW power plant

www.petratherm.com.au