CASE STUDY NATHPA JHAKRI, INDIA

Similar documents
CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES

CASE STUDY SOLIS, SWITZERLAND

GTU. Shantilal Shah Engineering College, Bhavnagar

SEDICON SLUICERS AS EFFECTIVE MEHOD OF SEDIMENT REMOVAL FROM DESILTING TANKS AND CHAMBERS

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

SPECIFIC DEGRADATION AND RESERVOIR SEDIMENTATION. By Renee Vandermause & Chun-Yao Yang

GEOL 1121 Earth Processes and Environments

Session: For more information:

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Study of Suspended Sediment and Its Mineral Content Analysis with Impact on Hydropower Design: A Case Study of Rahughat Hydroelectric Project

Investigation on Dynamics of Sediment and Water Flow in a Sand Trap

RESERVOIR SEDIMENTATION MANAGEMENT WITH BYPASS TUNNELS IN JAPAN. Keywords: Reservoir sedimentation, Sediment bypass, Diversion tunnel, Abrasion damage

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology

Les problèmes de la sédimentation dans les prises d'eau des centrales hydro-électriques

UGRC 144 Science and Technology in Our Lives/Geohazards

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

State Water Survey Division SURFACE WATER SECTION

Sedimentation in the Nile River

Science EOG Review: Landforms

Reservoir Sedimentation and Its Control

Suspended sediment yields of rivers in Turkey

Brief outline of the presentation

6.1 Water. The Water Cycle

3/3/2013. The hydro cycle water returns from the sea. All "toilet to tap." Introduction to Environmental Geology, 5e

Flood Inundation Mapping under different climate change scenarios in the upper Indus River Basin, Pakistan

SUSTAINABLE SEDIMENT MANAGEMENT

Summary of the 2017 Spring Flood

Data challenges in Trans-boundary River Basins: Case Study of the Upper Indus Basin

Application of SWAT Model to Estimate the Runoff and Sediment Load from the Right Bank Valleys of Mosul Dam Reservoir

mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output

From micro to macro scale the impact on the sediment discharge after construction of the Three Gorges Dam on Yangtze River (Changjiang)

VOLUME IV. Feasibility Study for the Madian Hydropower Project HYDRO - METEOROLOGICAL DATA BASE. Headrace Tunnel. Bahrain. Part 1 of 3.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

11/12/2014. Running Water. Introduction. Water on Earth. The Hydrologic Cycle. Fluid Flow

Optimal Artificial Neural Network Modeling of Sedimentation yield and Runoff in high flow season of Indus River at Besham Qila for Terbela Dam

U-Shaped Sediment Traps

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD

Prentice Hall EARTH SCIENCE

STREAM SYSTEMS and FLOODS

Precipitation Evaporation Infiltration Earth s Water and the Hydrologic Cycle. Runoff Transpiration

SEDIMENT MANAGEMENT IN HYDROPOWER PLANTS AN OVERVIEW

ENGINEERING HYDROLOGY

Sediment Deposition LET THE RIVER RUN T E A C H E R. Activity Overview. Activity at a Glance. Time Required. Level of Complexity.

Summary. Streams and Drainage Systems

Influence of the Major Drainages to the Mississippi River and Implications for System Level Management

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits

How to predict the sedimentological impacts of reservoir operations?

FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE

Lower Susquehanna River Integrated Sediment & Nutrient Monitoring Program

WATER ON AND UNDER GROUND. Objectives. The Hydrologic Cycle

Mekong Sediment from the Mekong River Commission Study

Upgrading Feasibility Study on the Upper Seti Storage Hydroelectric Project in Nepal

Complex Cascade Dams Operation The Glommen and Laagen Case

Earth Science Chapter 6 Section 2 Review

An investigation on the impacts of density currents on the sedimentation in dam reservoirs using TCM model; case study: Maroon dam

Geog Lecture 19

STUDY GUIDE FOR CONTENT MASTERY. Surface Water Movement

ICHE 2014, Hamburg - Lehfeldt & Kopmann (eds) Bundesanstalt für Wasserbau ISBN

Surface Water and Stream Development

U.S. ARMY CORPS OF ENGINEERS

Running Water Earth - Chapter 16 Stan Hatfield Southwestern Illinois College

National Hydrology committee of Afghanistan (NHCA) Sedimentation in Reservoire

Instream Sediment Control Systems

Chapter 11. Rivers: Shaping our landscape

The City School PAF Chapter

Calculating the suspended sediment load of the Dez River

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland

River Response. Sediment Water Wood. Confinement. Bank material. Channel morphology. Valley slope. Riparian vegetation.

Technical Memorandum No

Technical Memorandum

Final Report. Prepared for. American Rivers, California Trout, Friends of the River and Trout Unlimited

Floods Lecture #21 20

2. PRESENT CONDITION OF THE RESERVOIR 2.1 View of Wonogiri Reservoir (1/3)

7.3 Sediment Delivery Analysis

Appendix O. Sediment Transport Modelling Technical Memorandum

Simulation of sedimentation rates using the SWAT model A case study of the Tarbela Dam, Upper Indus Basin

Souris River Basin Spring Runoff Outlook As of March 1, 2019

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

(case study Karaj watershed)

Streams. Stream Water Flow

ES 105 Surface Processes I. Hydrologic cycle A. Distribution % in oceans 2. >3% surface water a. +99% surface water in glaciers b.

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

Available online at ScienceDirect. Procedia Engineering 154 (2016 )

Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream

2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary

Landscape Development

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

Erosion Surface Water. moving, transporting, and depositing sediment.

Analysis of Sedimentation in Wonogiri Reservoir

Simulation of Runoff and Sediment Load for Reservior Sedimentation of River Ole Dam using Swat and Wepp Models

Rock Sizing for Waterway & Gully Chutes

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan

Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California

The SedAlp Project: WP6: INTERACTION WITH STRUCTURES

ESTIMATING SNOWMELT CONTRIBUTION FROM THE GANGOTRI GLACIER CATCHMENT INTO THE BHAGIRATHI RIVER, INDIA ABSTRACT INTRODUCTION

Transcription:

SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reduce sediment production (watershed management); upstream sediment trapping; bypass channel/ tunnel; empty flushing; adaptive strategies Reservoir volume (original): 343 Mm 3 Installed capacity: 1,500 MW Date of commissioning: 2003 International Hydropower Association Chancery House, St Nicholas Way, Sutton, London SM1 IJB, United Kingdom T: +44 20 8652 5290 F: +44 20 8643 5600 E: iha@ Nathpa Jhakri hydropower plant suffered its first sediment problems a year after commissioning, in 2004. The high soil erosion during the snowmelt in the Himalayas results in large sediment loads, in particular quartz particles that can severely damage the plant s technical equipment. Protecting the hydraulic machinery from abrasion and preserving the reservoir storage in the future called for effective sediment management strategies. At 1,500 MW capacity, Nathpa Jhakri is the largest hydropower project on the Sutlej River in the state of Himachal Pradesh in northern India. The Sutlej River rises in the Tibetan Plateau at an elevation of about 4,570 masl, meeting the Chenab River to form the Panjnad River before the confluence with the Indus River. The project is owned by the SJVN Ltd, a joint venture between the government of India and the government of Himachal Pradesh. The government of India envisages a total of around 30 projects on the Sutlej River. The USD 2 billion Nathpa Jhakri project includes a 62.5 m-high concrete gravity dam, a large underground desilting complex and a hydropower plant with an installed capacity of 1,500 MW. The water flow is diverted through the intake structure, composed of four intakes and a capacity of August 2017 486 m 3 /s, to the desilting complex which comprises four chambers each of dimensions 525 m long, 16.31 m wide and 27.5 m deep. Then, the headrace tunnel of 27.4 km long conveys the water to the underground power station, where six 250 MW Francis turbines generate about 6,778 GWh annually. The water from the turbines is released back to the Sutlej River through the 982 m-long tailrace tunnel. The scheme is shown in figure 1. The 2.5 km-long reservoir is located in a very narrow valley, and has a total live capacity of 343 Mm 3 and a live storage capacity of 303 Mm 3. In addition, the flood control pool capacity is 5,660 m 3. The maximum operating level is 1,495.5 masl and the minimum drawdown level is 1,474 masl. The reservoir is normally operated at full regime to benefit from the 493 m design head.

Nathpa Jhakri dam and instake structure on the left bank Hydrology and sediment The Sutlej River basin represents a major part of the Indus River basin. It is considered a perennial river because the upper catchment contains a large glacierised area. The catchment has a high soil erosion rate as a result of its fragile geology and a steep topography, as shown in figure 2. At the location of the Nathpa Jhakri project, more than 40 per cent of the suspended sediment load has been observed as corresponding to fine fraction sediment, while only about 20 per cent corresponds to coarse fraction sediment, rising to 33 per cent during floods. Often, landslides heavily increase the sediment concentration in the river flow. The total catchment tributary to the Nathpa Jhakri dam is 49,820 km 2, of which 74 per cent is unregulated area. The river flow is comprised of glacier melt, snowmelt (estimated to be about 50 per cent of the runoff) and rainfall, and is subject to a high hydrological seasonal variability. The mean annual flow varies from 700 to 2,500 m 3 /s during snowmelt and the monsoon season, and drops to 100-150 m 3 /s during the winter months, with the mean annual inflow from inter-basin transfers accounting for 40 per cent. During the winter season, all the water inflow is required for power generation. The average total annual runoff of the Sutlej River is about 16,000 Mm 3. Sediment problems The Sutlej River is known for its high sediment loads, and the current mean annual suspended sediment load is on the order of 700,000 tons per year. However, the design sediment load was estimated at about 430,000 tons per year due to a lack of historical records and monitoring in the catchment. In 2005, a flash flood caused by an artificial lake breach increased silt load to over 25,000 ppm because of destabilisation of river banks. Twenty days after the flood the silt load was 5,000 ppm, which is the limit for power generation. As a result, the power plant had to be shut down for several weeks. After the first year of operation, all of the technical equipment (runners, guide vanes, plates and sealing rings) were severely damaged despite their plasma coating, due to the high sediment load that passed through the turbines. Some of this damage is shown in figure 3. In the monsoon season in 2004, the average monthly sediment load was

213,000 tons. The quartz content in the silt is on average 38 per cent according to historical data, but later observations have reported over 50 per cent quartz content. In 2005, the annual silt load that passed through the turbines was 850,000 tons, although the design sediment load was estimated at around half of that, at 430,000 tons per year. Sediment management strategies In the second year of operation, all units were refurbished with HVOF-type Tungsten carbide coating and the performance of the components improved by up to 90 per cent. In addition, the upper limit of 5,000 ppm at the intake was decreased to 3,500 ppm. For coarser particles above 0.2 mm, the upper limit was established at 600 ppm at the intake. Despite the HVOF coating, the limit for total silt load passing through the turbines was set to 700,000 tons. The limit for uncoated runners was 400,000 tons. The underground desilting complex, shown in figure 3, was part of the original Nathpa Jhakri project. It was designed to remove particles above 0.2 mm and up to 60 mm. Hydraulic model studies showed that the overall trapping efficiency of the prototype was about 40 per cent. The inside of the desilting chamber number IV is shown in figure 4. In order to minimise silt entry into the intakes and maintain the live storage capacity, flushing operations were adopted at the dam. Sediment is flushed effectively every year through the low-level gates at the dam. The hydraulic model estimates that 2.5 Mm 3 of sediment can be flushed out in one day with a discharge of 1,500 m 3 /s. The dams envisaged upstream of Nathpa Jhakri will trap sediment, therefore reducing the sediment inflow into Nathpa Jhakri. For example, the Khab dam will be 275 m high with a gross storage of 625 million m 3 that will be able to store silt particles for about 28 years for a storage of 340 Mm 3. Khab is mainly built for power generation, control flooding and to reduce silt damage and increase the lifespan of projects downstream. Watershed management to reduce bank erosion and the creation of a new diversion tunnel are also envisaged. The diversion tunnel could divert up to 1000 Mm 3 of excess water from about 750 metres upstream to the downstream reach. These measures would reduce the number of flushing operations needed. Catchment treatment includes reforestation by the regional forestry department, maintaining walls to prevent bank erosion and checking dams on tributaries with the help of government regional entities of the Himachal Pradesh region. Graphs and figures >

Graphs and figures Figure 1 - Nathpa Jhakri hydroelectric project layout Figure 2 - Nathpa Jhakri surroundings with fragile geology Graphs and figures cont. >

Figure 3 - turbine damage at Nathpa Jhakri Figure 4- Nathpa Jhakri desilting complex Graphs and figures cont. >

Figure 5 - inside the desilting chamber number IV This is part of a series of sediment management case studies collated by International Hydropower Association with support from the South Asia Water Initiative (SAWI), trust funds to the World Bank. www./sediment-management