Marcos Dracos IPHC-IN2P3/CNRS Strasbourg. 2 December 2008 M. Dracos, BENE 1

Similar documents
Horn R&D. S. Gilardoni. Speaker A. Fabich CERN AB

LHC Status and CERN s future plans. Lyn Evans

Technological challenges of future Super Beam projects

Physics Potential of existing and future LBL ν beams

The ESS neutrino facility for CP violation discovery

The High-Power-Target System of a Muon Collider or Neutrino Factory

NEUTRINO FACTORY / MUON STORAGE RING

Current and Future Developments in Accelerator Facilities. Jordan Nash, Imperial College London

UPGRADE ISSUES FOR THE CERN ACCELERATOR COMPLEX

slhc-project-report-0034

Marcos Dracos IPHC, Université de Strasbourg, CNRS/IN2P3, F Strasbourg, France

International Scientific Spring 2010, March 1-6, 1. R. Garoby. slhc

Introduction to the Neutrino Factory

Muon Front-End without Cooling

Study of possible opportunities for leptonic CP violation and mass hierarchy at LNGS

Long & Very Long Baseline Neutrino Oscillation Studies at Intense Proton Sources. Jeff Nelson College of William & Mary

Tools of Particle Physics I Accelerators

Eric Baussan IPHC, Université de Strasbourg, CNRS/IN2P3, F Strasbourg, France

Overview of HEMC Scheme

Application of GLoBES: GLACIER on conventional neutrino beams

OPTIMIZED CAPTURE MECHANISM FOR A MUON COLLIDER/ NEUTRINO FACTORY TARGET SYSTEM. HISHAM SAYED 1 X. Ding 2, H. Kirk 1, K.

CERN Neutrino beams CERN Neutrino platform

THE EUROnu PROJECT: A High Intensity Neutrino Oscillation Facility In Europe. Elena Wildner, CERN Rob Edgecock, STFC/RAL

Large Hadron Collider at CERN

1.5-GeV FFAG Accelerator as Injector to the BNL-AGS

Update on MOMENT s Target Station Studies

The MERIT High-Power Target Experiment

A final report of the Interna/onal Design Study for a Neutrino Factory

General Considerations

Proposal for a lepton CP violation discovery experiment using a neutrino Super Beam from ESS

Proof for ν τ appearance in the atmospheric sector (ν Measurement of m 2 23 and θ 23 (MINOS, OPERA)

RESEARCH AND DEVELOPMENT OF FUTURE MUON COLLIDER*

The CNGS neutrino beam

Concepts and R&D for beta beam facilities

BNL Very Long Baseline Neutrino Oscillation Expt.

Accelerator development

Advanced Neutrino Sources

REPORT OF THE HIGH INTENSITY PROTONS WORKING GROUP

HARP a hadron production experiment. Emilio Radicioni, INFN for the HARP collaboration

ERL FACILITY AT CERN FOR APPLICATIONS

Short Introduction to CLIC and CTF3, Technologies for Future Linear Colliders

LIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th, 2007

(a) (b) Fig. 1 - The LEP/LHC tunnel map and (b) the CERN accelerator system.

Theory English (Official)

A lepton CP violation discovery experiment using a unique neutrino Super Beam

LHC upgrade based on a high intensity high energy injector chain

Compressor Ring. Contents Where do we go? Beam physics limitations Possible Compressor ring choices Conclusions. Valeri Lebedev.

A high intensity p-linac and the FAIR Project

Particle production vs. energy: how do simulation results match experimental measurements?

Higgs Factory Magnet Protection and Machine-Detector Interface

PoS(NuFact2017)088. EMuS in CSNS. Guang Zhao 1. Institute of High Energy Physics Beijing, China

Particle Physics Columbia Science Honors Program

The T2K experiment Results and Perspectives. PPC2017 Corpus Christi Mai 2017 Michel Gonin On behalf of the T2K collaboration

Review of ISOL-type Radioactive Beam Facilities

The achievements of the CERN proton antiproton collider

JHFnu at J-PARC neutrino oscillation experiment

Hadron Production cross-sections

Long Baseline Neutrinos

Accelerator design concept for future neutrino facilities

Diagnostic Systems for Characterizing Electron Sources at the Photo Injector Test Facility at DESY, Zeuthen site

Accelerator Neutrino Experiments News from Neutrino 2010 Athens

A new underground laboratory at Frejus

FUTURE HIGH-INTENSITY PROTON ACCELERATORS

Superconducting RF Accelerators: Why all the interest?

CERN Ideas and Plans for a Neutrino Factory


PoS(NOW2016)003. T2K oscillation results. Lorenzo Magaletti. INFN Sezione di Bari

Optimization of the Buncher and Phase Rotator for Neutrino Factory

Hadron Production cross-sections

STUDIES OF MATERIAL PROPERTIES UNDER IRRADIATION AT BNL LINEAR ISOTOPE PRODUCER (BLIP) N. Simos, H. Kirk, H. Ludewig; BNL

BNL Very Long Baseline Neutrino Oscillation Expt.

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

High Power Targets Workshop

Final results from K2K and status of T2K

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The NuMAX Long Baseline Neutrino Factory Concept *

STATUS OF CERN K. Hübner, CERN, Geneva, Switzerland

Preliminary AD-Horn Thermomechanical and Electrodynamic Simulations

LITHIUM LENS FOR EFFECTIVE CAPTURE OF POSITRONS

arxiv: v1 [physics.acc-ph] 11 Jul 2007

NO A. Karol Lang. University of Texas at Austin. For the NOvA Collaboration. XII International Workshop on Neutrino Telescopes

How Will We See Leptonic CP Violation? D. Casper University of California, Irvine

LHC Detectors and their Physics Potential. Nick Ellis PH Department, CERN, Geneva

Longbase Neutrino Physics. Neil McCauley University of Liverpool Birmingham February 2013

Particle Accelerators

Status and Neutrino Oscillation Physics Potential of the Hyper-Kamiokande Project in Japan

Recent Results from Alysia Marino, University of Colorado at Boulder Neutrino Flux Workshop, University of Pittsburgh, Dec 6 8,2012

LHC Luminosity and Energy Upgrade

Recent Results from K2K. Masashi Yokoyama (Kyoto U.) For K2K collaboration 2004 SLAC Summer Institute

New Hadroproduction results from the HARP/PS214 experiment at CERN PS

THE MERIT HIGH-POWER TARGET EXPERIMENT AT THE CERN PS

Future Experiments with Super Neutrino Beams

TLEP White Paper : Executive Summary

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002

Compressor Lattice Design for SPL Beam

SC magnets for Future HEHIHB Colliders

First neutrino beam and cosmic tracks. GDR neutrino

OVERVIEW OF THE LHEC DESIGN STUDY AT CERN

Linear Collider Collaboration Tech Notes. Design Studies of Positron Collection for the NLC

LBNF Neutrino Beam. James Strait Fermi National Accelerator Laboratory P.O. Box 500, Batavia, IL , USA. on behalf of the LBNF/DUNE Team

Transcription:

Marcos Dracos IPHC-IN2P3/CNRS Strasbourg 2 December 2008 M. Dracos, BENE 1

Staging neutrino facilities towards the NF Cover "high" 13 range Cost effective facility Low intensity SPL already approved, Detector could already be approved to cover other physics subjects (proton life-time, cosmological neutrinos ) 2 December 2008 M. Dracos, BENE 2

Linac2 Linac4 Proton flux / Beam power Stage 1 (2013) PSB (LP)SPL Stage 2 (2017) PS SPS LHC / SLHC PS2 SPS+ DLHC (LP)SPL: (Low Power) Superconducting Proton Linac (4-5 GeV) PS2: High Energy PS (~ 5 to 50 GeV 0.3 Hz) SPS+: Superconducting SPS (50 to1000 GeV) SLHC: Superluminosity LHC (up to 10 35 cm -2 s -1 ) DLHC: Double energy LHC (1 to ~14 TeV) Stage 3 (>2017): HP-SPL June 23-27, 2008 2 December 2008 M. Dracos, BENE 3 3 R.G.

Linac4 (160 MeV) SC-linac (5 GeV) 3 MeV 50 MeV 102 MeV 180 MeV 643 MeV 5 GeV Length: 540 m 352.2 MHz 704.4 MHz Option 1 Option 2 June 23-27, 2008 Energy (GeV) 2.5 or 5 2.5 and 5 Beam power (MW) 3 MW (2.5 GeV) 4 MW (2.5 GeV) or and 6 MW (5 GeV) 4 MW (5 GeV) Rep. frequency (Hz) 50 50 Protons/pulse (x 10 14 ) 1.5 2 (2.5 GeV) + 1 (5 GeV) Av. Pulse current (ma) 20 40 Pulse duration (ms) 1.2 0.8 (2.5 GeV) + 0.4 (5 GeV) 2 December 2008 M. Dracos, BENE 4 4 R.G.

H- linac 2.2, 3.5 or 5 GeV, 4 MW p Accumulator ring + bunch compressor proton driver to be studied in EURO WP2 Magnetic horn capture (collector) Target p, μ decay tunnel hadrons ~300 MeV μ beam to far detector to be studied by LAGUNA 2 December 2008 M. Dracos, BENE 5

(http://doc.cern.ch/yellowrep/2006/2006-006/full_document.pdf) (SPL 3.5 GeV) 2 December 2008 M. Dracos, BENE 6

Ion species H - Kinetic energy 3.5 GeV Mean current during the pulse 40 ma Mean beam power 4 MW Pulse repetition rate 50 Hz Pulse duration 0.57 ms Bunch frequency 352.2 MHz Duty cycle during the pulse 62 (5/8) % rms transverse emittances 0.4 mm mrad Longitudinal rms emittance 0.3 deg MeV Length 430 m butch compressor to go down to 3.2 μs (important parameter for hadron collector pulsing system) (possible energy upgrade to 5 GeV could be the subject of a 3rd CDR) 2 December 2008 M. Dracos, BENE 7

300-1000 J cm -3 /pulse Severe problems from : sudden heating, stress, activation Safety issues! Baseline for Super-Beam is solid target, mercury is optional (baseline for NF) Extremely difficult problem : need to pursue two approaches : Liquid metal target (Merit experiment) Solid target (extensive R/D program at STFC and BNL) Envisage alternative solutions 2 December 2008 M. Dracos, BENE 8

He OUT CC target Horn Helium cooling of target some ideas Proposed rotating tantalum target ring (realistic?) He IN fluidised jet of particles Liquid Mercury (MERIT) cooling is a main issue Work at BNL and RAL Experience on T2K target (750 kw) very useful 2 December 2008 M. Dracos, BENE 9

proton beam horn target 300 ka 8.5 4 cm 3.7 cm 16.6 cm 40 cm 80 cm taking into account the proton energy and collection efficiency, the target must be inside the horn 2 December 2008 M. Dracos, BENE 10

2.2 GeV protons Particles coming out of the target p T distribution not the same for all targets the choice of the target could influence the hadron collection system (horn shape) p T From now on Hg will be considered 2 December 2008 M. Dracos, BENE 11

2.2 GeV protons + momentum disagreement between models (Monte Carlo production, interaction and transport codes) more development is needed (simulation, measurements) 2 December 2008 M. Dracos, BENE 12

interesting region for SPL SB 1GeV E kine (GeV) cos 2GeV pions per proton on target. Kinetic energy spectrum 2.2 GeV: <E k >=300MeV 3.5 GeV: <E k >=378MeV hadrons boosted forward -1 0 1 2 December 2008 M. Dracos, BENE 13

for pions coming out of the target 500 < p < 700 MeV/c + angle + momentum horn region for a Hg target, 30 cm length, 15 mm (x10 16 /sec) relatively better collection when p proton the target must be inside the horn 2 December 2008 M. Dracos, BENE 14

2.2 GeV proton beam : <p > = 405 MeV/c < > = 60 3.5 GeV proton beam : <p > = 492 MeV/c < > = 55 r(m) I = 300 kamp r(m) I = 300 kamp B~1/r B~1/r B must be 0 B must be 0 4 cm target 4 cm target 30 cm z(m) 30 cm z(m) 2 December 2008 M. Dracos, BENE 15

600 ka reflector horn+reflector proton beam horn Hg target 300 ka 8.5 4 cm 3.7 cm 16.6 cm 12.9 20.3 cm 4 cm 40 cm 80 cm 70 cm very high current inducing severe problems 2 December 2008 M. Dracos, BENE 16

Horn : as thin as possible (3 mm) to minimize energy deposition, Longevity in a high power beam (currently estimated to be 6 weeks!), 50 Hz (vs a few Hz up to now), Large electromagnetic wave, thermo-mechanical stress, vibrations, fatigue, radiation damage, Currents: 300 ka (horn) and 600 ka (reflector) design of a high current pulsed power supply (300 ka/100 μs/50 Hz), cooling system in order to maintain the integrity of the horn despite of the heat amount generated by the energy deposition of the secondary particles provided by the impact of the primary proton beam onto the target, definition of the radiation tolerance, integration of the target. 2 December 2008 M. Dracos, BENE 17

values considered by CERN 2 December 2008 M. Dracos, BENE 18

schematic versions at the capacitors ends option 1 at the capacitors ends option 2 in the charge option 3 μs 2 December 2008 M. Dracos, BENE 19

67kW 48.2 kw MARS 78.7kW +8kW from Joule effect 14.9kW 4MW, 2.2GeV proton beam (1MeV = 1.82 kw) 2 December 2008 M. Dracos, BENE 20

simulation inputs Detector: Water Cerenkov 440 kt at Fréjus (130 km from CERN) Run: 2 years with positive focusing. 8 years with negative focusing. Computed with CP =0 (standard benchmark) and 13 = 0 parameter m 23 = 2.5 10-3 ev 2 m 12 = 7.1 10-5 ev 2 sin 2 (2 23 ) =1 sin 2 (2 12 ) =0.8 2 December 2008 M. Dracos, BENE 21

m 2 23 10-2 90%CL 95%CL 99%CL A.Cazes thesis Minimum: 13 = 1.2 (90%CL) 10-3 10-4 10-3 10-2 10-1 sin 2 2 13 no strong dependence on proton energy for 2.2<p<5 GeV 2 December 2008 M. Dracos, BENE 22

S. Gilardoni: Horn for Neutrino Factory and comparison with a solenoid http://doc.cern.ch/archive/electronic/cern/preprints/thesis/thesis-2004-046.pdf http://newbeams.in2p3.fr/talks/gilardoni.ppt A. Cazes: Horn for SPL http://tel.ccsd.cnrs.fr/tel-00008775/en/ http://slap.web.cern.ch/slap/nufact/nufact/nf142.pdf http://slap.web.cern.ch/slap/nufact/nufact/nf-138.pdf 2 December 2008 M. Dracos, BENE 23

(120 GeV) (8 GeV) In operation In operation completed (12 GeV) Super-Beam (3.5 GeV) (400 GeV) CERN horn prototype for SPL In operation MiniBooNE NUMI CNGS 2 December 2008 M. Dracos, BENE 24 K2K

Flux vs decay tunnel length (2.2 GeV option) short decay tunnel 2 December 2008 M. Dracos, BENE 25

For the horn skin AA 6082-T6 / (AlMgSi1) is an acceptable compromise between the 4 main characteristics: Mechanical properties Welding abilities Electrical properties Resistance to corrosion Same for CNGS but Al not compatible with Mercury! Electrical and water connections tests done with: 30 ka and 1 Hz, pulse 100 μs long new tests to be done with 50 Hz 2 December 2008 M. Dracos, BENE 26

2.5 m minimize power dissipation and radiation problems (pulser problems remain as before) protons protons protons 2.5 m protons same decay tunnel Ø 3 m to be studied in EURO 2 options: send at the same time 1 MW per target/horn system send 4 MW/system every 50/4 Hz possibility to use solid target? 2 December 2008 M. Dracos, BENE 27

use a cryogenic horn (toroidal coil) superconducting wire (1 mm Ø) in superfluid He, DC power supply blow gas He to avoid quenching problems No problem with power supply (pulser no more needed) Proton compressor no more needed to be studied in EURO 2 December 2008 M. Dracos, BENE 28

LP-SPL already approved, HP-SPL possible before 2020. Many studies needed on targets. Collector studies are necessary to increase the system lifetime. Target/horn integration to be considered since the beginning. New studies have started in the framework of EURO FP7 project. Studies on detector side by LAGUNA. 2 December 2008 M. Dracos, BENE 29

2 December 2008 M. Dracos, BENE 30

Sin 2 2 13 10-1 Double CHOOZ CNGS combined CHOOZ excluded 10-2 Beta Beam Disappearance BNL T2K SPL 5y SPL 1y+4y 10-3 SPL 2y+8y Beta Beam (5y+5y) 10-4 -150-100 -50-0 50 100 150 CP (deg.) 2 December 2008 M. Dracos, BENE 31

cooling system Current of 300 ka Protons To decay channel Hg Target B 1/R B = 0 initial design satisfying both, neutrino factory and super-beam 2 December 2008 M. Dracos, BENE 32