May 12, 2016 News Release Valley of the Kings Infill Drilling Intersects 37,000 Grams Per Tonne Gold

Similar documents
June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Highlights from the four holes announced in this news release include:

Los Chapitos- Copper/Silver Project

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

Detour Gold Reports Drilling Results from Lower Detour

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

Press Release Thunder Bay: August 2, 2018

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

OSISKO INTERSECTS 37.0 g/t Au OVER 5.4 METRES AT OSBORNE-BELL Infill Drilling Continues to Confirm High-Grade

News Release. Infill Drilling Program

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING

V Sample from C.O.D vein 15 metres southwest of V

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

(TSXV: GPLY, OTCQB: GLYXF

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

Coeur Mining Provides Silvertip Exploration Update

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

September 24, 2012 #

OSISKO INTERSECTS 115 g/t Au OVER 8.4 METRES AT LYNX. Interval (m)

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Drilling highlights include:

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

July Exploring for Canadian Gold in the Rainy River District of Ontario

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Los Chapitos - Copper Project

OSISKO INTERSECTS 2223 g/t Au OVER 2.0 METRES AT WINDFALL Infill Drilling Hits Bonanza Grade in Zone 27

August 20, 2018 SBB NR SBB TSX

ET and and and

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

Golden Predator Intersects 7.5 m of 33 g/t Gold at the 3 Aces Project; Discovers Significant Stockwork Mineralization

POSITIVE RESULTS FROM FIRST PHASE OF CORE DRILLING AT JEFFERSON PROJECT, SOUTH CAROLINA FOR NEAR-SURFACE GOLD MINERALIZATION

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

Skeena Intersects g/t AuEq over metres at Eskay Creek

OSISKO INFILL 38.9 g/t Au OVER 13.7 METRES AT UNDERDOG Infill Drilling Continues to Intersect High Grade

Northern Dynasty Minerals Ltd.

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

Gold Canyon Announces Completed Results of Gold Assays from its 2011 Resource Drill Program at the Springpole Gold Project

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

NEWS RELEASE. January 23, 2017 #

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

OSISKO INTERSECTS 36 g/t Au OVER 6.9 METRES AT LYNX

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

A B C PAD A HIGHLIGHTS

MCEWEN MINING ANNOUNCES NEW SILVER DISCOVERY AT THE EL GALLO COMPLEX IN MEXICO

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Pacific Empire Minerals Provides Copper King RC Drilling Results

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

Drilling Highlights: Phase II BCV Infill Drilling

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

NEWS RELEASE. Gold Canyon Encounters Meters at 1.81 Grams per Tonne Gold at its Springpole Gold Project

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

Suite West Hastings Street Vancouver BC CANADA V6C 2W2 Tel: Fax:

Goldcrest Resources Ltd.

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

No SIERRA METALS CONTINUES TO EXPAND MINERALIZATION AT ITS BOLIVAR MINE, CHIHUAHUA STATE, MEXICO

This area in SE Sullivan Gulch was never mined by previous operators

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

True Width (m) Carneritos to

Interval (meters) To (meters)

InZinc Intersects 6.8m of 16.5% Zinc Focuses on Western Expansion of High Grades at West Desert Project

MARENGO RELEASES RESULTS FOR RECENT SAMPLING AND EXPLORATION DRILLING AT RIMA PROSPECT

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

Drilling Extending Mineralization in La Mina North Zone

GOLDPLAY ANNOUNCES SIGNIFICANT SILVER VALUES OF UP T0

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

Probe Metals Continues to Expand Gold Zones At Val-d Or East

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

NGEX DRILLS 42 METRES OF 1.13 G/T GOLD AND G/T SILVER AT FILO DEL SOL PROJECT

Wallbridge Completes Successful Initial Drill Program at Beschefer

QUITO PROJECT. December Northwest Mining Association Annual Conference. Austin, Nevada BVA:TSX.V BRT: FSE

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

Dalradian Intersects 2.48 metres Grading g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt

Transcription:

May 12, 2016 ews Release 16-16 Valley of the Kings Infill Drilling Intersects 37,000 Grams Per Tonne Gold Vancouver, British Columbia May 12, 2016; Pretium Resources Inc. (TX/YE:PVG) ( Pretivm or the Company ) is pleased to report a ninth set of results from the underground infill drill program at the Brucejack Project s Valley of the Kings. Results continue to confirm the style and grade distribution of the Valley of the Kings gold mineralization in the area currently being tested, which includes the intersection of high grade and visible gold. Reported assays include three intersections grading greater than 1,000 grams per tonne gold, including the bonanza-grade intercept in hole VU-722 which encountered 37,117 grams per tonne gold uncut over 0.5 meters, the second highest grading intercept encountered to date at the Project. The highest-grading intercept was from surface hole U-452 which intersected 41,582 grams per tonne gold uncut over 0.5 meters in 2012. (ee Table 1 below for assays.) elected drill highlights include: Hole VU-722 intersected 1,161 grams of gold per tonne uncut over 16.0 meters, including 37,117 grams of gold per tonne uncut over 0.50 meters; Hole VU-715 intersected 46.08 grams of gold per tonne uncut over 23.29 meters, including 2,100 grams of gold per tonne uncut over 0.50 meters; and, Hole VU-698 intersected 29.67 grams of gold per tonne uncut over 40.0 meters, including 1,850 grams of gold per tonne uncut over 0.50 meters. Holes VU-722 and hole VU-698 were drilled from the 1270-meter drill bay while hole VU-715 was drilled from the 1350-meter drill bay. To date results from 306 holes (53,685 meters) have been reported. For a plan and section views of the reported drill fans refer to the diagrams below. The 2015/2016 infill drill program is designed to target stope areas in years one through three of the current mine plan for the Valley of the Kings. The infill drill program is now complete and the final assays are currently being processed. Roughly 200 vertical meters over a strike length of 250 meters has been drilled at 7.5 to 10-meter centers. Assay results from drilling will continue to be reported as they are received. 1

Table 1: elected Valley of the Kings Drill Results, May 2016 (VU-666 to VU-739) (1,2,3) Hole o. Dip/ Azimuth From To Interval Gold (g/t) ilver (g/t) Comments 1270 m Drill Bay - 426,663E/6,258,075-165 Azimuth VU-666-30/165 137.19 137.69 0.50 15.80 6.1 VU-676-25/165 91.01 91.51 0.50 17.10 9.20 98.26 98.76 0.50 30.60 22.70 116.00 140.00 24.00 8.32 8.39 incl 120.03 120.53 0.50 209.00 168.00 incl 139.00 140.00 1.00 55.10 31.70 198.00 199.00 1.00 40.80 36.80 VU-683-20/165 110.00 111.00 1.00 25.00 15.10 VU-688-15/165 140.49 140.99 0.50 19.40 19.50 150.45 150.95 0.50 41.40 30.50 VU-694-10/165 99.96 137.00 37.04 10.34 23.04 incl 99.96 100.46 0.50 248.00 73.70 incl 124.88 125.40 0.52 324.00 228.00 incl 136.00 137.00 1.00 19.30 23.60 VU-698-5/165 93.00 133.00 40.00 13.30 23.16 1 sample cut or 93.00 133.00 40.00 29.67 23.16 uncut incl 110.48 110.98 0.50 1,850.00 549.00 incl 119.00 119.60 0.60 23.20 27.60 incl 119.60 120.10 0.50 16.50 16.20 incl 123.63 124.13 0.50 325.00 244.00 VU-713 27.5/165 82.00 89.40 7.40 12.67 124.37 1350 m Drill Bay - 426,706E/6,258,050-130 Azimuth VU-686-23/130 112.00 113.00 1.00 10.10 16.20 157.10 158.23 1.13 14.35 807.00 VU-690-13.5/130 79.00 94.00 15.00 6.32 7.96 incl 79.00 80.00 1.00 17.10 21.30 incl 80.00 81.00 1.00 64.90 44.20 VU-695-4/130 71.00 72.00 1.00 19.60 36.80 160.00 162.40 2.40 19.64 147.97 incl 161.20 161.70 0.50 52.50 375.00 incl 161.70 162.40 0.70 21.30 169.00 VU-700 5.5/130 108.00 118.00 10.00 7.74 49.56 incl 108.00 109.00 1.00 18.80 26.90 incl 114.94 115.44 0.50 40.40 34.50 incl 117.20 118.00 0.80 29.30 35.60 VU-704 15/130 50.00 51.00 1.00 8.79 11.50 97.00 98.00 1.00 8.64 23.50 137.45 137.95 0.50 13.00 701.00 VU-707 24.5/130 54.00 55.00 1.00 6.36 98.10 81.00 82.00 1.00 8.42 43.60 1260 m outh Drill Bay - 426,529E/6,258,018-210 Azimuth 2

Hole o. Dip/ Azimuth From To Interval Gold (g/t) ilver (g/t) Comments VU-679-2/210 61.90 64.60 2.70 14.55 16.33 incl 62.90 63.40 0.50 57.60 56.50 100.00 101.00 1.00 13.65 12.50 VU-684-10/210 65.00 66.00 1.00 18.25 9.20 VU-689-18/210 81.73 82.23 0.50 10.40 17.50 120.00 121.00 1.00 9.52 13.50 VU-693-25/210 82.00 83.00 1.00 7.65 4.00 114.00 115.00 1.00 14.70 9.40 VU-697-33/210 14.50 15.00 0.50 9.05 10.10 1260 m outh Drill Bay - 426,529E/6,258,018-220 Azimuth VU-701-26/220 97.75 98.25 0.50 9.53 13.40 VU-709-18/220 79.00 80.00 1.00 14.25 13.40 137.00 137.50 0.50 10.25 14.40 VU-716-10/220 70.00 75.00 5.00 6.17 15.16 incl 71.20 71.70 0.50 46.10 73.20 128.00 129.00 1.00 6.64 7.70 1270 m Drill Bay - 426,663E/6,258,075-157 Azimuth VU-717-26/157 117.02 122.00 4.98 11.56 6.68 incl 119.42 119.92 0.50 101.50 38.20 182.00 183.00 1.00 27.00 11.10 VU-720-20/157 152.00 166.00 14.00 27.61 40.61 1 sample cut or 152.00 166.00 14.00 39.65 40.61 uncut incl 152.00 153.00 1.00 18.40 29.40 incl 158.22 158.72 0.50 131.00 76.00 incl 161.32 161.82 0.50 877.00 756.00 VU-722-14/157 67.40 67.90 0.50 57.70 27.50 165.00 181.00 16.00 17.74 671.85 1 sample cut or 165.00 181.00 16.00 1,160.77 671.85 uncut incl 165.64 166.14 0.50 37,117.00 21,301 VU-726-8/157 149.00 164.05 15.05 15.85 11.77 incl 150.06 150.56 0.50 455.00 226.00 VU-730-2/157 118.00 136.71 18.71 6.01 14.73 incl 119.13 119.63 0.50 41.70 46.50 incl 122.09 122.59 0.50 35.30 22.00 incl 134.27 134.77 0.50 28.60 11.30 incl 134.77 135.30 0.53 22.90 24.20 175.08 175.58 0.50 42.00 76.40 VU-738 20/157 55.00 56.00 1.00 5.78 8.6 VU-739 35/157 91.00 97.00 6.00 9.82 36.65 incl 94.70 95.20 0.50 96.60 96.00 1350 m Drill Bay - 426,706E/6,258,050-122 Azimuth VU-715-10.5/122 135.31 158.60 23.29 12.59 34.52 1 sample cut or 135.31 158.60 23.29 46.08 34.52 uncut 3

Hole o. Dip/ Azimuth From To Interval Gold (g/t) ilver (g/t) Comments incl 143.76 144.26 0.50 2,100.00 1,190 VU-719-1/122 138.35 142.50 4.15 49.98 49.17 incl 138.35 138.85 0.50 258.00 256.00 incl 138.85 139.35 0.50 87.80 41.90 incl 139.35 139.85 0.50 24.60 25.40 incl 140.35 140.85 0.50 25.90 23.50 VU-725 18/122 118.71 119.21 0.50 15.95 18.30 VU-731 8.5/122 72.00 80.00 8.00 17.44 26.46 incl 73.85 74.35 0.50 232.00 204.00 incl 75.35 75.85 0.50 29.10 66.30 1260 m outh Drill Bay - 426,529E/6,258,018-225 Azimuth VU-721-10/225 71.18 71.68 0.50 13.40 10.30 144.00 145.00 1.00 13.75 5.80 VU-724-22/225 94.49 94.99 0.50 96.80 81.10 (1)True thickness to be determined. (2)Unless otherwise indicated as uncut, all gold assays over 540 g/t were cut to 540 g/t. (3All samples were submitted for preparation and analysis by AL Chemex at its facilities in Terrace, B.C. All samples were analyzed using multi-digestion with ICP finish and fire assay with AA finish for gold. amples over 100 ppm silver were reanalyzed using four acid digestion with an ore grade AA finish. amples over 1,500 ppm silver were fire assayed with a gravimetric finish. amples with over 10 ppm gold were fire assayed with a gravimetric finish. One in 20 samples was blank, one in 20 was a standard sample, and one in 20 samples had a sample cut from assay rejects assayed as a field duplicate at AL Chemex in orth Vancouver, B.C. Whole core (core not split) is being assayed as part of the underground infill drill program. Kenneth C. Mcaughton, M.A.c., P.Eng., Chief Exploration Officer, Pretium Resources Inc. is the Qualified Person (QP) responsible for the Brucejack Project exploration program. About Pretivm Pretivm is constructing a high-grade underground gold mine at its Brucejack Project in northern British Columbia with commercial production targeted for 2017. For further information contact: Joseph Ovsenek President Troy hultz Manager, Investor Relations & Corporate Communications Pretium Resources Inc. uite 2300, Four Bentall Centre, 1055 Dunsmuir treet PO Box 49334 Vancouver, BC V7X 1L4 (604) 558-1784 (877) 558-1784 invest@pretivm.com (EDAR filings: Pretium Resources Inc.) 4

Forward-Looking tatements This ews Release contains forward-looking information and forward looking statements within the meaning of applicable Canadian and United tates securities legislation. tatements contained herein that are not based on historical or current fact, including without limitation statements containing the words anticipates, believes, may, continues, estimates, expects, and will and words of similar import, constitute forward-looking statements within the meaning of the U.. Private ecurities Litigation Reform Act of 1995. Forward-looking information may include, but is not limited to, information with respect to our planned exploration and development activities, the adequacy of Pretivm's financial resources, the estimation of mineral reserves and resources including the 2013 Valley of the Kings Mineral Resource estimate and the Brucejack Mineral Reserve estimate, realization of mineral reserve and resource estimates and timing of development of Pretivm's Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of approvals, consents and permits under applicable legislation, Pretivm's executive compensation approach and practice, and adequacy of financial resources. Wherever possible, words such as plans, expects, projects, assumes, budget, strategy, scheduled, estimates, forecasts, anticipates, believes, intends, targets and similar expressions or statements that certain actions, events or results may, could, would, might or will be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been used to identify forwardlooking statements and information. tatements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, those risks identified in Pretivm's Annual Information Form dated March 28, 2016 filed on EDAR at www.sedar.com and in the United tates on Form 40-F through EDGAR at the EC's website at www.sec.gov. Forward-looking information is based on the expectations and opinions of Pretivm's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. either the TX nor the YE has approved or disapproved of the information contained herein. 5

MAY 12, 2016 UDERGROUD DRILLIG REULT: PLA VIEW 1310m Drill Bay 1320m Drill Bay 1270m Drill Bay 1260m Drill Bay 176 Azimuth 13 Drill Bay 100m 1

MAY 12, 2016 UDERGROUD DRILLIG REULT: ECTIO VIEW - 15M WIDE: 1270 DRILL BAY, AZIMUTH 157 VU-739 Volcanic Fragmental VU-738 ilica Cap 1270m Drill Bay VU-734 0.5m @ 37,117 ppm Au VU-730 VU-726 VU-722 VU-720 0.5m @ 455 ppm Au 0.5m @ 877 ppm Au VU-717 2

MAY 12, 2016 UDERGROUD DRILLIG REULT: ECTIO VIEW - 15M WIDE: 1350 DRILL BAY, AZIMUTH 122 Volcanic Fragmental VU-727 VU-725 0.5m @ 232 ppm Au VU-731 13 Drill Bay VU-719 VU-715 0.5m @ 258 ppm Au 0.5m @ 2,100 ppm Au VU-712 Volcanic Porphyritic 3

MAY 12, 2016 UDERGROUD DRILLIG REULT: ECTIO VIEW - 15M WIDE: 1270 DRILL BAY, AZIMUTH 165 VU-713 Volcanic Fragmental ilica Cap VU-710 0.5m @1,850 ppm Au 1270m Drill Bay VU-705 0.5m @ 325 ppm Au VU-698 VU-694 0.5m @ 248 ppm Au VU-688 0.52m @ 324 ppm Au 0.5m @ 209 ppm Au VU-683 VU-676 VU-666 4

MAY 12, 2016 UDERGROUD DRILLIG REULT: ECTIO VIEW - 15M WIDE: 1350 DRILL BAY, AZIMUTH 130 Volcanic Fragmental VU-707 VU-704 13 Drill Bay VU-700 VU-695 VU-690 VU-686 Volcanic Porphyritic 5

MAY 12, 2016 UDERGROUD DRILLIG REULT: ECTIO VIEW - 15M WIDE: 1260 DRILL BAY, AZIMUTH 210 1260m Drill Bay ilica Cap VU-679 VU-684 VU-689 VU-693 VU-697 6

MAY 12, 2016 UDERGROUD DRILLIG REULT: ECTIO VIEW - 15M WIDE: 1260 DRILL BAY, AZIMUTH 220 ilica Cap 1260m Drill Bay Volcanic Porphyritic VU-716 VU-709 VU-701 7

MAY 12, 2016 UDERGROUD DRILLIG REULT: ECTIO VIEW - 15M WIDE: 1260 DRILL BAY, AZIMUTH 225 ilica Cap 1260m Drill Bay VU-721 Volcanic Porphyritic VU-724 8