Atico Mining Provides Exploration Update

Similar documents
Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

A B C PAD A HIGHLIGHTS

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

VR COMMENCES 2018 SURFACE EXPLORATION AT JUNCTION; GRAVITY ANOMALY CONFIRMS THE DOWN-DIP POTENTIAL OF COPPER-SILVER VEINS

NEWS RELEASE August 10, 2017

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Continues to Expand Gold Zones At Val-d Or East

News Release No GOLD AND COPPER MINERALIZATION DISCOVERED DURING PHASE 2 EXPLORATION AT THE MCBRIDE PROPERTY

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

V Sample from C.O.D vein 15 metres southwest of V

Drilling Extending Mineralization in La Mina North Zone

VR SAMPLES 58.3 g/t GOLD AND 809 g/t SILVER AND STAKES NEW PROPERTY TO EXPAND ITS DANBO PROPERTY EPITHERMAL GOLD TREND IN NEVADA

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

NEWS RELEASE July 26, 2018

Interval (meters) To (meters)

In addition, the survey has defined:

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Drill hole DC12B575 cut 4.0 m true width of Veta del Contacto averaging 709 g/t silver and 2.12% lead.

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG

Drilling Extending Mineralization in La Mina North Zone

Highlights from the four holes announced in this news release include:

NEWS RELEASE. March 22, 2017

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

NEWS RELEASE August 8, 2018

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Goldcrest Resources Ltd.

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

Orsu Metals intercepted a voluminous 200-m-wide gold-mineralized stockwork in the north of the Klyuchi West zone, Sergeevskoe Gold Project, Russia

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

Nortec Minerals reports Assays, Phase 1 drilling, Tom 1 North - Priority 1 Target, Tomboko Gold Property, Northeast Guinea, West Africa

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

Figure 1. Location of Boreal s Key Projects

HANNAN SEISMIC SURVEY IDENTIFIES MULTIPLE NEW DRILL TARGETS IN IRELAND

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Timberline Completes Technical Reports on the Elder Creek and Paiute Porphyry Copper-Gold Projects, Nevada

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

NEWS RELEASE. Foran Completes Winter Program with High-Grade Copper and/or Zinc in All Holes Drilled at Bigstone

(TSXV: GPLY, OTCQB: GLYXF

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

ET and and and

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

NEWS RELEASE FOR IMMEDIATE RELEASE: MARCH 5, 2018

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

36 Holes drilled in an approximate 100 meter by 100 meter grid covering an area of 1,000 meters long by 400 meters depth

Colt Resources intersects 17.4% Cu over 0.42 metres (0.32 m true width) at Miguel Vacas Copper Project in its Borba exploration concession in Portugal

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Saville Resources Inc. Completes Review of Work on the Niobium Claim Group, Quebec

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

True Width (m) Carneritos to

Pacific Empire Minerals Provides Copper King RC Drilling Results

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

PROJECT 81 Lucas Gold Deposit 2018 Winter Drilling Program Assay Results

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

IVANHOE MINES EXTENDS HUGO NORTH GEOPHYSICAL ANOMALY FOUR KILOMETRES NORTH ADDITIONAL GEOPHYSICAL TARGETS IDENTIFIED

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

NEWS RELEASE For immediate distribution

Transition Metals Acquires Advanced Stage Ni-Cu-PGM Projects

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

Bellhaven Expands the Middle Zone Prospect with New Drilling: Advances toward New Resource in First Half of 2012

Revelo Completes Geological Review of its Montezuma Copper-Gold Project & Defines Priority Targets

MINERAL MOUNTAIN CONFIRMS PROOF OF CONCEPT IN THE HOMESTAKE GOLD BELT

Great Atlantic Rock Samples Return up to 5.8 oz. / ton Gold Golden Promise Property in Central Newfoundland

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

Novo Resources Corp. Suite West Georgia Street Vancouver, BC V6E 3C9

NEWS RELEASE CANADIAN ZINC REPORTS REMAINING DRILL RESULTS AT LEMARCHANT DEPOSIT, SOUTH TALLY POND PROJECT, NEWFOUNDLAND

Transcription:

Atico Mining Provides Exploration Update Vancouver, July 11, 2018 -- Atico Mining Corporation (TSX.V: ATY OTC: ATCMF)( Atico or the Company ) is pleased to announce the completion of two IP-DAS surveys covering the area from northwestern Archie prospect through the mine to the southern Estrella target area, which have indicated exciting new exploration targets near and below the mine. Fernando E. Ganoza, CEO, commented: The exploration work and drilling we have completed since late 2017 have returned encouraging results for the occurrence of massive sulphide mineralization at the El Roble property. These results confirm the need to continue drill testing the anomalous targets and merits scaling-up the drill program for the remainder of the year. We continue to believe the property remains highly prospective to host additional massive sulphide mineralization. Exploration Update During the first quarter the Company completed 315 stations on 120 channels of IP-DAS geophysics over an area 2 km x 1 km covering an area from the Archie prospect in the north, through the El Roble Mine area and over the Estrella area southeast of the mine. (Figure 1) The IP-DAS has a depth penetration capability exceeding 700 m and has outlined several linear trends of combined chargeability and resistivity anomalies coincident with the mapped black chert lithology. These trends are designated as the Eastern trend, the Central or Mine trend, and the Western trend. Each trend contains several, distinct, strong chargeabilityresistivity anomalies similar to that expressed over the mine area. More significantly, the IP-DAS shows an intense anomaly associated with the immediate mine area, which is part of a linear northwest-southeast trend of anomalies coincident with the black chert unit. A second, linear trend of anomalies appears coincident with eastern occurrence of the black chert in the Archie area. The IP-DAS anomalies clearly show fault offsets. The IP-DAS has outlined 6 targets (18 anomalies inside all) on the Mine trend Western and the Eastern trend which warrant drill testing (Figure 2). Of particular significance is a strong anomaly offset by faulting to the SE of the mine workings as well as strong anomalies in the Archie area and Eastern trend. The IP-DAS anomalies in the Eastern and Central trends are coincident with Ag and Zn trace element vector anomalies and narrow massive sulfide intersections. A major re-interpretation of the structural geology based on recent drilling and surface mapping suggests that the Zeus mineralization is faulted off at depth and the favorable contact geology offset some 140 meters to the east. The IP-DAS data shows similar offsets but also shows the chargeability-resistivity anomaly continuing at depth. Page 1 of 7

Structural logging of the drill core and integration of the results into the regional mapping program has refined the Company s understanding of the local structural geology and its relationship to mineralization. The local structure is now interpreted as a southwest verging recumbent fold with the steeper limb hosting the El Roble mine mineralization and the shallower limb cropping out on the east side of the El Roble ridge. The anticlinal fold has been offset by an array of N-S and ENE-WSW faults and NW-SE strike-parallel thrusts, which offset the mineralization by up 140 meters (Figure 3). The recent drilling clearly demonstrated a thickening of the black chert unit over a strike length of approximately 600 meters indicative of a sub-basin favorable for the deposition and preservation of massive sulfides. The sub-basin appears to be bounded by faults which may have acted as feeders for mineralization. The black chert unit contains 5-10% beddingparallel stringers and blebs of pyrite-pyrrhotite suggesting a more distal sulfide depositional environment. Hole ATSA-005, drilled on the northern margin of the sub-basin intersected two intervals of highly anomalous gold (3.9 meters at 2.25 g/t Au from 114.80 meters and 5.3 meters at 2.31 g/t Au from 138.55 meters) supporting the alteration and pathfinder element vectors. The multi-element geochemistry vectors are concentrated with the sub-basin and trend toward the northern margin of the basin. During Q1-2018, 1,245 meters of underground drilling were completed at the El Roble mine. The Company anticipates that by the end of Q2-2018 the underground drill program will return to the schedule of 3,000 meters drilled per quarter. The program uses one underground rig to test for massive sulfide bodies adjacent to and down-dip of currently known mineralization and to extend the deposit at depth and along strike. At the Archie target area, approximately 500 meters northeast of the El Roble mine, 1,970 meter of core drilling program was completed in Q1-2018. A second drill rig is being mobilized to accelerate the testing of IP-DAS anomalies in the Eastern and Central trends. A first program of 5,000 meters of core drilling is planned to test IP-DAS anomalies below and to the southeast of the mine mineralization (Zeus plunge target) and an additional 10,000 meters of drilling is planned to test the Eastern trend where previous drilling following trace element vectors intersected thin massive sulfide mineralization in the black chert horizon. The Company is highly encouraged by these results, which have outlined several strong IP- DAS anomalies within three parallel trends within the black chert unit are supported by trace element vectors and a re-interpretation of the structural geology. A program of 15,000 meters in 36 diamond core holes from the surface is planned for the remainder of 2018 and 2019 to test these targets, in addition to the 3,000 meters of underground drilling to test the down-dip Zeus plunge target Page 2 of 7

El Roble Mine The El Roble mine is a high-grade underground copper and gold mine with nominal processing plant capacity of 800 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate. Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a nominal capacity of 400 tonnes per day. The mine has a continuous operating history of twenty-two years, with recorded production of 1.5 million tonnes of ore at an average head grade of 2.6% copper and an estimated gold grade of 2.5 g/t. Copper and gold mineralization at the El Roble property occurs in volcanogenic massive sulfide ( VMS ) lenses. Since entering into the option agreement in January 2011 to acquire 90% of El Roble, Atico has aggressively explored the mine and surrounding claims. The Company has completed 31,377 meters of diamond drilling and identified numerous prospective targets for VMS deposits on the 6,679-hectare property. This exploration led to the discovery of high-grade copper and gold mineralization below the 2000 level, the lowest production level of the El Roble mine. Atico has developed a new adit access from the 1880 elevation to develop these new resources. El Roble has a measured and indicated resource of 1.87 million tonnes grading 3.46% copper and 2.27 g/t gold, at a cut-off grade of 0.93% copper equivalent. Mineralization is open at depth and along strike and the Company plans to further test the limits of the resource. On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified 15 prospective target areas for VMS type mineralization occurrence, which is the focus of the surface drill program at El Roble. Qualified Control Dr. Demetrius Pohl, Ph.D., AIPG Certified Geologist, a qualified person under NI 43-101 standards and independent of the Company, is responsible for ensuring that the information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico Mining Corporation. Dr. Pohl has approved the scientific and technical content of this news release Page 3 of 7

About Atico Mining Corporation Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company operates the El Roble mine and is pursuing additional acquisition opportunities. For more information, please visit www.aticomining.com. ON BEHALF OF THE BOARD Fernando E. Ganoza CEO Atico Mining Corporation Trading symbols: TSX.V: ATY OTC: ATCMF Investor Relations Igor Dutina Tel: +1.604.633.9022 Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No securities regulatory authority has either approved or disapproved of the contents of this news release. The securities being offered have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the U.S. Securities Act ), or any state securities laws, and may not be offered or sold in the United States, or to, or for the account or benefit of, a "U.S. person" (as defined in Regulation S of the U.S. Securities Act) unless pursuant to an exemption therefrom. This press release is for information purposes only and does not constitute an offer to sell or a solicitation of an offer to buy any securities of the Company in any jurisdiction. Cautionary Note Regarding Forward Looking Statements This announcement includes certain forward-looking statements within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein, without limitation the use of net proceeds, are forward-looking statements. Forward- looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company s expectations include uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs; the need to obtain additional financing to maintain its interest in and/or explore and develop the Company s mineral projects; uncertainty of meeting anticipated program milestones for the Company s mineral projects; and other risks and uncertainties disclosed under the heading Risk Factors in the prospectus of the Company dated March 2, 2012 filed with the Canadian securities regulatory authorities on the SEDAR website at www.sedar.com Page 4 of 7

FIGURE 1 Page 5 of 7

FIGURE 2 Page 6 of 7

FIGURE 3 Page 7 of 7