Recent activities related to EPS (operational aspects)

Similar documents
Current Issues and Challenges in Ensemble Forecasting

MSC, BMRC, KMA,CMA, CPTEC, SAWS

Ensemble of Data Assimilations methods for the initialization of EPS

Report on the Joint SRNWP workshop on DA-EPS Bologna, March. Nils Gustafsson Alex Deckmyn.

Recent Developments of JMA Operational NWP Systems and WGNE Intercomparison of Tropical Cyclone Track Forecast

The ECMWF Extended range forecasts

Model error and parameter estimation

ACCESS AGREPS Ensemble Prediction System

Activities of Numerical Weather Prediction for Typhoon forecast at Japan Meteorological Agency

Sub-seasonal predictions at ECMWF and links with international programmes

Sub-seasonal predictions at ECMWF and links with international programmes

The Use of a Self-Evolving Additive Inflation in the CNMCA Ensemble Data Assimilation System

Fernando Prates. Evaluation Section. Slide 1

Current and future configurations of MOGREPS-UK. Susanna Hagelin EWGLAM/SRNWP, Rome, 4 Oct 2016

Probabilistic Weather Forecasting and the EPS at ECMWF

The benefits and developments in ensemble wind forecasting

Have a better understanding of the Tropical Cyclone Products generated at ECMWF

ICON. Limited-area mode (ICON-LAM) and updated verification results. Günther Zängl, on behalf of the ICON development team

4DEnVar. Four-Dimensional Ensemble-Variational Data Assimilation. Colloque National sur l'assimilation de données

The Canadian approach to ensemble prediction

Center Report from KMA

MJO prediction Intercomparison using the S2S Database Frédéric Vitart (ECMWF)

TIGGE at ECMWF. David Richardson, Head, Meteorological Operations Section Slide 1. Slide 1

A review on recent progresses of THORPEX activities in JMA

Current JMA ensemble-based tools for tropical cyclone forecasters

SPECIAL PROJECT PROGRESS REPORT

Reanalyses use in operational weather forecasting

WGNE intercomparison of Tropical Cyclone Track forecast, 2007

Representing model error in the Met Office convection permitting ensemble prediction system

4.3.2 Configuration. 4.3 Ensemble Prediction System Introduction

Recent Developments of JMA Operational NWP Systems and WGNE Intercomparison of Tropical Cyclone Track Forecast

ECMWF products to represent, quantify and communicate forecast uncertainty

GPC Exeter forecast for winter Crown copyright Met Office

recent Météo-France work on AROME-EPS Robert Osinski & François Bouttier - CNRM, Toulouse

Severe weather warnings at the Hungarian Meteorological Service: Developments and progress

HFIP ENSEMBLE PLAN. Jun Du (EMC/NCEP), presenting on behalf of the HFIP Ensemble Team:

Seasonal forecast from System 4

Impact of sea surface temperature on COSMO forecasts of a Medicane over the western Mediterranean Sea

Recent developments for CNMCA LETKF

Stochastic methods for representing atmospheric model uncertainties in ECMWF's IFS model

Extended-range/Monthly Predictions. WGSIP, Trieste

1. Current atmospheric DA systems 2. Coupling surface/atmospheric DA 3. Trends & ideas

Recent Developments in Climate Information Services at JMA. Koichi Kurihara Climate Prediction Division, Japan Meteorological Agency

Convective-scale NWP for Singapore

Introduction to TIGGE and GIFS. Richard Swinbank, with thanks to members of GIFS-TIGGE WG & THORPEX IPO

Upgrade of JMA s Typhoon Ensemble Prediction System

The Canadian Regional Ensemble Prediction System (REPS)

Recent ECMWF Developments

T PARC: Impact of dropsonde (and other) aircraft data

operational status and developments

11 days (00, 12 UTC) 132 hours (06, 18 UTC) One unperturbed control forecast and 26 perturbed ensemble members. --

Numerical Weather Prediction: Data assimilation. Steven Cavallo

Model error and seasonal forecasting

ECMWF Forecasting System Research and Development

GIFS-TIGGE working group Report to ICSC. Richard Swinbank Masayuki Kyouda with thanks to other members of GIFS-TIGGE WG and the THORPEX IPO

Verification statistics and evaluations of ECMWF forecasts in

Observing System Experiments using a singular vector method for 2004 DOTSTAR cases

LAM EPS and TIGGE LAM. Tiziana Paccagnella ARPA-SIMC

The TIGGE global, medium-range ensembles

Motivation & Goal. We investigate a way to generate PDFs from a single deterministic run

C. Gebhardt, S. Theis, R. Kohlhepp, E. Machulskaya, M. Buchhold. developers of KENDA, ICON-EPS, ICON-EDA, COSMO-D2, verification

The new ECMWF seasonal forecast system (system 4)

South Asian Climate Outlook Forum (SASCOF-6)

LAMEPS activities at the Hungarian Meteorological Service. Hungarian Meteorological Service

Precipitation verification. Thanks to CMC, CPTEC, DWD, ECMWF, JMA, MF, NCEP, NRL, RHMC, UKMO

Recent achievements in the data assimilation systems of ARPEGE and AROME-France

NCEP Global Ensemble Forecast System (GEFS) Yuejian Zhu Ensemble Team Leader Environmental Modeling Center NCEP/NWS/NOAA February

Numerical Weather prediction at the European Centre for Medium-Range Weather Forecasts (2)

Application of NWP products and meteorological information processing system in Hong Kong

S e a s o n a l F o r e c a s t i n g f o r t h e E u r o p e a n e n e r g y s e c t o r

Asian THORPEX Implementation Plan

COntinuous Mesoscale Ensemble Prediction DMI. Henrik Feddersen, Xiaohua Yang, Kai Sattler, Bent Hansen Sass

25 years of ensemble forecasting at ECMWF

LATE REQUEST FOR A SPECIAL PROJECT

Application and verification of the ECMWF products Report 2007

Fleet Numerical Meteorology and Oceanography Center. Current Sub-seasonal to Seasonal Capabilities

Ensemble activitiesin COSMO

Main characteristics and performance of COSMO LEPS

North Western Pacific Tropical Cyclone (Track) Ensemble Forecast Research Project (NW Pacific TC Project)

Convective-Scale Data Assimilation

EFSO and DFS diagnostics for JMA s global Data Assimilation System: their caveats and potential pitfalls

Application and verification of ECMWF products 2016

Ensemble-variational assimilation with NEMOVAR Part 2: experiments with the ECMWF system

Quarterly numerical weather prediction model performance summaries April to June 2010 and July to September 2010

World Weather Research Program: a ten years vision. PM Ruti, F Vitart, S Majumdar IWTC VIII Dec Jeju

Medium-range Ensemble Forecasts at the Met Office

Probabilistic Weather Prediction

Clustering Forecast System for Southern Africa SWFDP. Stephanie Landman Susanna Hopsch RES-PST-SASAS2014-LAN

The Bureau of Meteorology Coupled Data Assimilation System for ACCESS-S

Scatterometer Wind Assimilation at the Met Office

Land Data Assimilation for operational weather forecasting

The ECMWF Hybrid 4D-Var and Ensemble of Data Assimilations

State of the art of wind forecasting and planned improvements for NWP Helmut Frank (DWD), Malte Mülller (met.no), Clive Wilson (UKMO)

Seasonal forecasting activities at ECMWF

South Asian Climate Outlook Forum (SASCOF-12)

March Regional Climate Modeling in Seasonal Climate Prediction: Advances and Future Directions

The hybrid ETKF- Variational data assimilation scheme in HIRLAM

South Asian Climate Outlook Forum (SASCOF-8)

T2.2: Development of assimilation techniques for improved use of surface observations

How far in advance can we forecast cold/heat spells?

Transcription:

Recent activities related to EPS (operational aspects) Junichi Ishida and Carolyn Reynolds With contributions from WGE members 31th WGE Pretoria, South Africa, 26 29 April 2016

GLOBAL 2

Operational global (weather) EPS Center Resolutions FC Range Members Initial perturbation, DA Model Uncertainty B.C. ote ECMWF (Europe) Met Office (UK) Meteo France (France) HMC (Russia) CEP (USA) RL/FMOC (USA) CMC (Canada) DWD (German) TCo639L91 TCo319L91 18/32km 33kmL70 21km T798(C2.4) L90 T169L31 25 30km TL574L64 TL382L64 T159L42 T359L60 15d 46d 7d 11+1 44 for DA 18/24, 100+ for DA 51 SV(Total energy norm) + EnDA ETKF En 4D EnVar 4d 35 SV (Total Energy orm)+ EnDA 10d 12+1+1 Breeding Hybrid (3D Var with ensamble based B 8d +8d 35d 41 Ensemble Kalman Filter + Tropical storm relocation 16d 20 local ET Hybrid 4D Var SKEB and Stochastic physics update of backscatter scheme Random Parameters (RP2) and SKEB2. A new set of 10 physical packages, new model pert. SPPT stochastic pert. to account for random model errors SKEB, SPPT, SHUM SKEB mc 0.6 L40 16d 20 Ensemble KF stochastic pert. of physical tendencies and SKEB, further pert. to the physics coupling to ocean model, EDA based land surface pert. in ES ICs Coupling to ocean SURFEX and pert.? Stochastic pert. of land, couple with ocean SST initial pert. ocean, ice, wave coupling new method to evolve SST and seaice Hindcast dataset increased Dynamical core: Euler to Semi Lgrangian 40km 180h 40 LETKF? SST random pert. Preoperational Black: current, Red: recent upgrade, green: planned or research

Operational global (weather) EPS Center Resolutions FC Range Members Initial perturbation, DA Model Uncertainty B.C. ote CPTEC/IPE (Brazil) BoM (Australia) JMA (Japan) CMA (China) KMA (Korea) T126 L28 15d 15 EOF based perturbation EnKF ~60kmL70 10d 24 ETKF Random Parameters (RP2) and SKEB2. TL479 L60 TL479L100 TL319L100 11d 18d 1month 27 SV(Total energy norm) SV+LETKF Reduce tropical initial pert. Couple with earth system model Stochastic perturbation of physics tendency T213 L31 10d 15 SV SPPT ~40kmL70 32km (p) 12d 24 44 ETKF Hybrid Ensemble 4D Var Random Parameters (RP2) and SKEB2. Rev, SST and sea ice Black: current, Red: recent upgrade, green: planned or research

Model resolution upgraded / plan Upgraded ECMWF use cubic octahedral instead of linear grid Ensemble of data assimilations 50 km 18 km (TL399 TCo639) Medium range ensemble 32 km 18 km (TL639 TCo639) with resolution change moved from Day 10 to Day 15 Extended range 64 km 32 km (TL319 TCo319) Analysis and High resolution forecast: (TL1279 TCo1279) CEP Resolution 0 192h; T254L42 TL574L64 Resolution 192 384h; T190L42 TL382L64 Plan Met Office Upgrade horizontal resolution 33km > 21km JMA Resolution 11 18days; TL319 to TL479 5

Benefit of higher resolution Black line : HRES Whisker Plot : ES Red dots : observations Old - TL639 ew - TCo639 10m Wind speed MSLP Figures from ECMWF 6

Slide from CEP 7

Planned new global EPS in DWD Slide from DWD 8

Other topics Hindcast (reforecast) ECMWF 5 members once weekly to 11 members twice weekly for past 20 years Met Office Seasonal EPS (GloSea) 4 start dates per month, 3 members per start date, each run to 7 months from 1993 to 2015 Met Office Decadal ensemble (DePreSys) 10 members out to 5 years, from 1960 to present days CEP From ESRL offline with 25 years to EMC offline with 20 years Verification DWD Experiment Verification against Analysis (EVA) CPTEC Assessing improved CPTEC probabilistic forecast on medium range timescale JMA Reports to the Lead Centre on Verification of EPS under WMO/CBS 9

Verification CPTEC EPS as of 2009 (circles) Original source : WMO/CBS Lead Centre on Verification of EPS CPTEC EPS as of 2001 (diamonds) Figures from CPTEC and JMA 10

Verification Slide from DWD 11

REGIOAL 12

Operational regional EPS Center Resolutions FC Range Members Initial perturbation, DA Model Uncertainty B.C. ote Met Office (UK) Meteo France (France) DWD (German) HMC (Russia) 2.2kmL70 1.5kmL70 120 36h 54h 11+1 18/24 High Resolution Analysis + global EPS Convective ensemble DA 2.5km 42h 11+1 Rescaled and centered from global EPS EDA or B based random noise 2.8km 27h 45h 20 40 IFS, GMS, GME, GSM Ensemble DA based on LETKF Stochastic physics using random parameter SPPT 2.2km 48h 10 COSMO S14 EPS SPPT Pert. Parameters SPPT Perturbing parameters in JULES perturbations of surface IFS, GMS, GME, GSM Add COSMO LEPS Global ICO EPS COSMO S14 EPS UM Hourly operation AROME Preoperation COSMO For renewable energy COSMO JMA (Japan) RL/FMOC (US) RL/FMOC (US) CMC (Canada) CMA (China) KMA (Korea) 5kmL48 39h 10+1 20+1 SV(Total energy norm) Hybrid DA 27/9/3km 120h 10+1 Perturbed synoptic scales Perturbed Rankine Vortex Pert. tendency 45/15/5km 72h 20+1 ETKF Parameter variations 15km 72h 20+1 Interpolated from global EPS Improved by global EPS Multi Scale Blending (GEPS and LETKF) 3kmL70 45h 23+1 Downscale from Global EPS LETKF Stochastic pert. of physics JMA global EPS Perturbed SST GEFS/AVGEM with synoptic perturbations AVGEM ensembles Global EPS Improved by global EPS JMA HM Testoperation COAMPS TC COAMPS GEM RP Global EPS UM RP Global EPS UM Black: current, Red: recent upgrade, green: planned or research

Extension of system configuration Upgraded DWD Extension of Lead time from 27h to 45h Plan Met Office Extended horizontal domain, following UKV model Extended forecast range (to T+54h) Hourly UK ensemble; combine several runs to make larger lagged ensemble Higher resolution (vertical 70L to ~120L and perhaps horizontal 2.2km to 1.5km) JMA umber of members; from 11 to 21 14

Other topics Various objectives DWD Weather warnings and renewable energy applications Meteo France help human forecasters, (later) automated weather forecast products, flood prediction, air quality, customers (energy, wind farms...) JMA Disaster prevention RL Tropical cyclone forecast using COAMPC TC and HWRF multi model ensemble CMA 1 hour EPS products for landfall typhoon forecast 15