Woodford County Erosion Prevention Plan and Permit. Application #

Similar documents
APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

Materials. Use materials meeting the following.

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Template for Sediment and Erosion Control Plan General Instructions

Specifications Whitcomb Elementary School Demolition January 15, 2016

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Sediment Trap. At multiple locations within the project site where sediment control is needed.

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Suitable Applications Sediment traps should be considered for use:

APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Rock & Aggregate Drop Inlet Protection

Pierce County Department of Planning and Land Services Development Engineering Section

Coarse Sediment Traps

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr.

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Log (SCL)

Guide to the use of the Erosion and Sediment Control Evaluation Tool

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3


Culvert and Pipe Phasing

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

CONSTRUCTION EXIT SEDIMENT BARRIER

Construction Exits Vibration grids

HILLSIDE DEVELOPMENT APPLICATION CHECKLIST C (Proposal to create lots as of 9/12/2007)

X X X X X X X X. Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist

Construction Exits Rock pads

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

TPDES: Soil, Erosion and Sedimentation Methods

Electronic Submission Format Guide Large Noncoal (Industrial Minerals) Mine Permit Application (5600-PM-BMP0315)

Memorandum. Air Sampling

Stormwater Inlet Sediment Traps

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application

Required Documents. Title: Number: AEP Administration 2017 No. 1. Provincial Wetlands and Water Boundaries Section. Effective Date: September 1, 2017

Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311)

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

Stormwater Outlet Sediment Traps

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

D. B. G R A Y E N G I N E E R I N G I N C.

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

RE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H

3.11 Floodplains Existing Conditions

North Carolina Department of Environment and Natural Resources Division Energy, Mineral, and Land Resources Land Quality Section

U-Shaped Sediment Traps

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION

**Temporary Erosion Control**

Stone Outlet Sediment Trap

Exhibit A Description of Services Section 37 Floodplain Storage Design

WELCOME Lake Wabukayne OPEN HOUSE

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

Erosion and Sediment Control Measures 2.7 Silt Fences

BENTON CLEAN AIR AGENCY 526 S. Clodfelter Road Kennewick, WA 99336

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Minimum Standards for Wetland Delineations

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

Chapter 7 Mudflow Analysis

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

Hazard Communication

Little Swan Lake. Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018

3.12 Geology and Topography Affected Environment

Chapter 7 Mudflow Analysis

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes

Chutes Part 5: Rock linings

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

GIS data classes used within the November 2013 Environmental Statement Engineering Maps

APPENDIX B WORKSHEETS & EXHIBITS

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii

Map Reading 101: Using and Reading Maps and Plans

SECTION H CHEMICAL WEAPONS DESTRUCTION FACILITIES REQUIRED UNDER PARTS IV(A) OF THE VERIFICATION ANNEX OF THE CONVENTION

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

SILT FENCE EFFECTIVENESS

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)

1.0 PURPOSE AND FORMAT OF THE FINAL EIR

NEWS RELEASE UNDER SECTION 404 OF THE CLEAN WATER ACT (33 USC 1344) ACTION NUMBER SPA ABQ

Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan

73-2 have been satisfied; and

Grant All-Detail Report 2013 Cost Share Base Grant

The following procedures describe how application managers will review chemical additives during the permit application review phase.

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year )

ONTARIO REGULATION 156/06. made under the CONSERVATION AUTHORITIES ACT

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

APPENDIX 1. Geotechnical Information and Analysis. Pacific Aggregates Inc. and Pacific Clay Products July 13, 2011 RP112 Reclamation Plan

McHenry County Property Search Sources of Information

UGRC 144 Science and Technology in Our Lives/Geohazards

December 11, 2006 File:

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

Transcription:

Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance with the Woodford County Erosion and Sediment Control Ordinance. A. Identification: Builder: Telephone: Printed Name Day time number Company Address: Property Owner: Telephone: Printed Name Day time number Current Address: B. Location of Project Assessor s Parcel No/Tax ID No: Address of Property: Directions to Site: Anticipated Start Date: Statement: I certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his/her authorized agent. We agree to grant right-of-entry to the Inspector and Zoning Administrator for the purpose of inspection and monitoring of erosion and sediment control measures. All land disturbing activities on this site will be performed according to the Woodford County Erosion and Sediment Control Ordinance, and all erosion control measures installed will be done so in accordance with the Illinois Urban Manual. Applicant Signature Date

Conditions of Erosion and Sediment Control Permit: 1. Written approval must be obtained from the Erosion Control Administrator prior to making any changes to the approved erosion and sediment control plan. 2. All control measures identified in the application shall be installed and maintained during both the construction season and any construction shutdown periods so that they are operating effectively until final stabilization has been achieved. Woodford County Erosion and Sediment Control Plan Certification This is to certify that, building on property at has completed an Erosion and Sediment Control Prevention Plan with our office, which meets our technical standards. The referencing Application Number is. Signature of Inspector Date Needs Silt Fence Needs Silt Sock Maintain 25 buffer of vegetation around perimeter of lot Woodford County SWCD Diane Freeman, Erosion Inspector 937 W. Center St. Eureka, IL 61530 (309) 467-2308 ext 3 Diane.Freeman@il.nacdnet.net

Site Plan Checklist The soil erosion and sediment control plan cannot be reviewed until all of the following information is submitted: 1. Existing site conditions and natural resources present, including: Site boundaries and adjacent lands which accurately identify site location. Buildings, roads and utilities. Topography, vegetation, drainage patterns, critical erosion areas, and any subsurface drainage tiles. Location of special management areas such as floodplains, wetlands, streams, steep slopes, and areas where trees are to be preserved. Location and identification of soil types. Adjacent areas that affect or are affecting the project site, e.g. drainage onto or through the site affecting wetlands, streams, lakes, and drainage areas downstream. Vicinity map. Map legend, including north arrow and scale on all materials submitted. 2. Final site conditions, including: An accurate depiction of post-construction appearance, e.g. roads, buildings, open space. Locations, dimensions, cross sections and elevations of all (temporary and permanent) stormwater management facilities (including sediment basins), plus inlet and outlet locations. Surface flow direction, including sheet flow and concentrated flow direction. Post-construction topography. 3. A complete soil erosion and sediment control plan, including: Location and detailed drawings of all permanent and temporary soil erosion and sediment control practices. Location and dimension of all temporary soil and aggregate stockpiles. Party responsible for permanent seeding: owner builder

Woodford County Erosion and Sediment Control Permit Procedure The builder/owner contacts SWCD office at 309-467-2308 ext 3. to make an appointment with the Inspector to fill out permit forms. The builder/owner comes into SWCD office at least 7 days prior to start of construction and draws up an erosion and sediment control plan. Measures used will be site specific, and will follow standards and specifications of the latest version of the Illinois Urban Manual. In some cases, a site visit may be needed before the plan is accepted. The builder/owner takes Certification Form to the Zoning office to show that the site plan is finished and meets our technical standards. Before construction begins, but after any needed erosion control (E.C.) measures are in place, the Inspector will make a site visit to insure proper installation of E.C. measures. If problems are found, construction will not be allowed to begin until the problems are corrected. The Inspector will make periodic visits as needed to monitor the site. Erosion control is ultimately the responsibility of the builder/owner, and they should make weekly inspections of E.C. measures and perform any maintenance on them as needed (i.e. clean out silt fences or socks when silt builds up to 1/2 of the barrier height). Any soil that ends up on a public or private roadway needs to be cleaned up at the end of the day. Stock piles of soil left for more than three days should be seeded, covered with a tarp or protected by a silt sock, fence or vegetative buffer, and kept away from sensitive areas and property lines to insure that sediment does not leave the property. If the Inspector finds a problem on site, the builder will have 48 hours to correct the problem. On the return visit, if the problem has not been corrected, the matter will be referred to the Zoning Administrator, at which time a $250 fine will be assessed to the builder and a Stop Work Order will be placed on the project until the problem is corrected. Once construction is complete, the project site is to have permanent vegetation within 6 months. Before removing any erosion control measures, the Inspector must be contacted and will perform a final site visit to assure that adequate vegetation is established. I certify that I have read and understand the Woodford County Erosion and Sediment Control Permit Procedures, and agree to follow them as written. Signature of Builder or Responsible Party Date Silt fence or sock needed Maintain 25 vegetative buffer

Erosion and Sediment Control Inspection Report Owners Name Application # Project Address Initial Inspection Date Time Current Weather Rainfall in last 24 hours Is current plan being followed? Yes No Have all required perimeter measures been installed? Yes No Do erosion problems exist on site today? Yes No Are plan modifications or additional measures needed? Yes No Comments: Note: Inspection comments above indicate deficiencies only. Deficiencies must be corrected within 48 hours, unless otherwise noted. All other BMP s on site are considered to be in good working condition. Action Taken: Verbal instructions to builder or owner Recommendations to the Erosion Control Administrator Letter written to builder/administrator (copy attatched) Signature of Inspector

Maintenance Needed? Final grade and seed? Follow-Up Inspections Date Time Comments/Action Taken Date of Final Inspection