Erdene Significantly Increases Resource Estimate at the Altan Nar Gold-Polymetallic Project

Similar documents
ERDENE RESOURCE DEVELOPMENT CORP.

ERDENE RESOURCE DEVELOPMENT CORP.

ERDENE RESOURCE DEVELOPMENT CORP.

ERDENE RESOURCE DEVELOPMENT CORP.

First Cobalt Drilling at Iron Creek Extends Mineralization of Waite Zone

Hannan Seismic Survey Identifies Multiple New Drill Targets in Ireland

Medgold Resources Prepares for Phase 2 Drill Program at Tlamino Gold Project in Serbia

Nighthawk Reports 24.4% Increase to 2.61 Million Inferred Ounces of Gold at Colomac

ERDENE RESOURCE DEVELOPMENT CORP.

Nevada Sunrise Locates Drill Targets on the Coronado VMS Property in Nevada

Alacer Gold Announces Additional Positive Drill Results for the Ardich Gold Prospect, Including 57.7 Meters at 3.

Macarthur Minerals Accelerates Development and Exploration of Its Iron Ore, Gold, Nickel and Lithium Projects

Drill rig set up on hole ROP-033 high on the Central Buttress Zone, viewed from the northwest

Group Ten Reports High-Grade Palladium, Platinum and Gold from the Wild West and Boulder Target Areas at the Stillwater West Project, Montana, USA

Altan Nar. Gold & Base Metal Discovery (Tsenkher Nomin Property) October 12 th, 2011

Goldplay President and CEO Marcio Fonseca commented

Erdene Resource Development Corp. The Altan Nar Gold Project Exploring for the Next Giant Ore Deposit of the Tian Shan September 2014

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

Corporate Presentation September 2017 TSX-V: RK

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

NEWS RELEASE. Evrim commences drilling at Cerro Cascaron gold and silver project with partner Harvest Gold

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Skeena Intersects g/t AuEq over metres at Eskay Creek

A B C PAD A HIGHLIGHTS

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

(TSXV: GPLY, OTCQB: GLYXF

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

EXCELLON DRILLS BROAD MINERALIZED ZONES AND EXPANDS DRILL PROGRAM ON NORTHERN FRESNILLO SILVER TREND

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Drilling Highlights: Phase II BCV Infill Drilling

Fortuna Updates Reserves and Resources

V Sample from C.O.D vein 15 metres southwest of V

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Highlights from the four holes announced in this news release include:

Drilling Extending Mineralization in La Mina North Zone

News Release. Infill Drilling Program

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Teranga s Golden Hill Drill Program Intersects High-Grade Gold and Expands Mineralized Zones at Peksou and Ma Prospects

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

North American Palladium Provides Update on Lac des Iles Exploration Program

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Drilling Extending Mineralization in La Mina North Zone

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

CAUTIONARY STATEMENT

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

The Manager Companies ASX Limited 20 Bridge Street

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

ASX ANNOUNCEMENT 21 MARCH 2011

TriAusMin Limited LEWIS PONDS PROJECT

MEXICAN GOLD INTERSECTS 7.18 G/T GOLD EQUIVALENT (2.00 G/T AU, G/T AG, 3.05 % CU) OVER 14.0 METERS AT LAS MINAS DIKE CONTACT ZONES

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

FALCO ANNOUNCES INITIAL HORNE 5 DRILLING RESULTS. Confirmation Holes in Line with Historical Data

LATEST EXPLORATION RESULTS CONFIRM GOLD AND COPPER VALUES INCREASE WITH DEPTH AT TURQUOISE HILL DISCOVERY IN MONGOLIA

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

NEWS RELEASE. Evrim drills 1.0 metre grading 20.1 grams per tonne gold at Cerro Cascaron with partner Harvest Gold

Disclaimer. Forward-Looking Statements. Competent Person s Statement

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Ausgold awarded EIS grant for Jinkas deep drilling

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Northern Dynasty Minerals Ltd.

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

New Drilling Program Commences at Mutiny s Deflector Deposit

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

SAMPLE ID SAMPLE TYPE Au (g/t) Ag (g/t) Cu (%) AuEq**(g/t)

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Canada Zinc Metals Announces Expanded Mineral Resource Estimate for the Cardiac Creek Deposit

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Teranga Gold s Golden Hill Drill Results Include More High-Grade Gold at Multiple Prospects

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

Bass Metals records further positive drill results & progress at 3 prospects.

LUNA GOLD INCREASES MEASURED AND INDICATED RESOURCES TO 3.63 MILLION OUNCES AND INFERRED RESOURCES TO 1.04 MILLION OUNCES AT AURIZONA

Transcription:

Erdene Significantly Increases Resource Estimate at the Altan Nar Gold-Polymetallic Project 10.05.2018 GlobeNewswire HALIFAX, Nova Scotia, May 10, 2018 (GLOBE NEWSWIRE) -- Erdene Resource Development Corp. (TSX:ERD) ("Erdene" or "Company"), is pleased to announce an updated mineral resource estimate ( Mineral Resource ) for its 100%-owned Altan Nar gold-polymetallic project ( Altan Nar ) in southwest Mongolia. The Khundii Gold District May 2018 Resource Areas With Significant Exploration Upside Gram-Metre Contours with Drill Highlights (looking Northwest) We are extremely pleased with the significant increase in size and grade of today s Altan Nar Resource and believe it will be an excellent complement to a Global Resource Estimate expected in Q3-2018 incorporating our near-surface, high-grade Bayan Khundii gold project, 16 kilometres to the southeast, where drilling continues, said Peter Akerley, Erdene s President and CEO. It is important to recognize that while Altan Nar has expanded significantly this remains an early-stage discovery with multiple untested targets over the 5.6 kilometre Altan Nar trend, with limited drilling at depth. This reflects the fact that no modern exploration took place in this new district prior to the Erdene discoveries. Highlights of 2018 Mineral Resource at Reported Cut-Off Grade (see accompanying figures for reference) Indicated gold equivalent ( AuEq ) resource increased by 208% and Inferred AuEq resource increased by 172%, compared to the Company s March 2015 Altan Nar maiden mineral resource estimate. Indicated Resource of 452,900 ounces ( oz ) AuEq averaging 2.8 g/t AuEq and Inferred Resource of 277,100 oz AuEq averaging 2.5 g/t AuEq, within a total resource of 5.0 million tonnes ( Mt ) Indicated and 3.4 Mt Inferred. Indicated Resource includes 317,700 oz gold (at 2.0 g/t gold), 31,600 tonnes ( t ) zinc, 29,000 t lead, and 2.35 million oz silver, while the Inferred Resource contains 185,700 oz gold (at 1.7 g/t gold), 23,700 t zinc, 22,300 t lead, and 865,900 oz silver. AuEq grade increased by 12% in the Indicated category, and 19% in the Inferred category. Gold grade increased by 18% in the Indicated category, and 13% in the Inferred category. Approximately 90% of the Mineral Resource is within 150 metres of surface with all zones open along strike and at depth. Multiple undrilled and scout-drilled prospects along the 5.6 kilometre Altan Nar trend have the potential for hosting additional gold-polymetallic resources. Overview - Altan Nar Mineral Resource Erdene announced a maiden resource estimate for Altan Nar in March 2015 incorporating results from 71 diamond drill holes totalling 10,819 metres. Subsequently, between Q3-2015 and Q4-2017, the Company completed an additional 51 diamond drill holes totaling 7,782 metres. Data from these additional holes are included in today s updated Mineral Resource estimate. The post-2015 drilling focused on expanding existing resource boundaries in the Discovery Zone ( DZ ) and Union North ( UN ) deposits, as well as expanding and exploring for additional mineralization within the remaining 16 target areas throughout the 5.6 kilometre trend. This work resulted in the discovery of a high-grade central core in the DZ area and outlined additional resources in the peripheral targets. The DZ drilling in particular has had a significant impact on the overall size and grade of the updated Mineral Resource. 01.07.2018 Seite 1/5

Altan Nar is considered to be a carbonate-base metal gold ( CBMG ) deposit that is characterized by multiple, sub-parallel, moderately to steeply dipping, epithermal vein and breccia zones that in all cases remain open at depth and along strike throughout the 5.6 kilometre long Altan Nar trend, presenting a significant opportunity for resource expansion. Mineralized zones in typical CBMG deposits are commonly restricted to fault/breccia zones that can extend for more than 500 metres vertically. The average drill depth of the 122 holes completed at Altan Nar is 157 metres (angled, not vertical) with approximately 90% of the Mineral Resource within 150 metres of surface. Statement of Mineral Resources The reported Resource Report is based on information provided to RPMGlobal ( RPM ) by Erdene and verified where possible by RPM. All statistical analysis and mineral resource estimations were carried out by RPM. Table 1 below shows the Indicated and Inferred Mineral Resource estimate for Altan Nar as at May 7, 2018. The Mineral Resource was completed by RPM in accordance with the recommended guidelines of the CIM Definition Standards referenced in NI 43-101. RPM calculated the Altan Nar Mineral Resources for a number of AuEq cut-offs, however RPM recommends reporting the Mineral Resource at a 0.7 g/t AuEq cut-off for open pit resources, and 1.4 g/t AuEq below the same pit shell (see Statement of Reportable Cut-off Grade below). Table 1 shows the variation in tonnage and metals content with variable cut-off grades above the pit shell (0.4 g/t AuEq, 1.0 g/t AuEq and 1.4 g/t AuEq cut-off grades), while keeping the 1.4 g/t AuEq below the pit shell consistent. The Company will file a NI 43-101 Mineral Resource Estimate and Technical Report on SEDAR within 45 days of this news release. Table 1- Altan Nar Project Mineral Resource Estimate Summary, May 7, 2018 Grade Contained Metal Cut-off AuEq g/t Resource Classification Quantity (Mt) Au Ag Zn Pb AuEq Au Ag Zn Pb AuEq g/t g/t g/t g/t g/t Koz Koz Kt Kt Koz 0.4 Indicated 5.6 1.8 13.5 0.6 0.5 2.6 323 2,412 33.2 29.9 464 0.4 Inferred 3.7 1.6 7.5 0.7 0.6 2.3 189 901 24.5 22.8 283 0.7 Indicated 5.0 2.0 14.8 0.6 0.6 2.8 318 2,350 31.6 29.0 453 0.7 Inferred 3.4 1.7 7.9 0.7 0.7 2.5 186 866 23.7 22.3 277 1.0 Indicated 4.2 2.3 16.6 0.7 0.7 3.2 306 2,212 28.6 27.4 431 1.0 Inferred 3.2 1.8 8.2 0.7 0.7 2.7 182 837 22.8 21.5 270 1.4 Indicated 3.3 2.7 18.9 0.8 0.8 3.8 285 2,002 24.9 25.2 398 1.4 Inferred 2.9 1.9 8.6 0.8 0.7 2.8 176 795 21.5 20.4 259 Notes: 1. The Mineral Resources have been constrained by topography and a cut-off of 0.7 g/t AuEq above a pit and 1.4 g/t AuEq below the same pit shell. 2. The Mineral Resource Estimate Summary has been compiled under the supervision of Mr. Jeremy Clark who is a full-time employee of RPM and a Member of the Australian Institute of Geoscientists. Mr. Clark has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity that he has undertaken to qualify as a Qualified Person as defined in the CIM Standards of Disclosure. 3. All Mineral Resource figures reported in the table above represent estimates as at May 7, 2018. Mineral Resource estimates are not precise calculations, being dependent on the interpretation of limited information on the location, shape and continuity of the occurrence and on the available sampling results. The totals contained in the above table have been rounded to reflect the relative uncertainty of the estimate. Rounding may cause some computational discrepancies. 4. Mineral Resource grades are reported in accordance with the CIM Standards. 5. Mineral Resources reported on a dry in-situ basis. 6. No dilution or ore loss factors have been applied to the reported Resource Estimate. 7. No allowances have been made for recovery losses that may occur should mining eventually result. 8. Gold Equivalent ( AuEq ) calculations assume metal prices of US $1,310 per ounce gold, US $18 per ounce silver, and US $2,400 per tonne lead and US $3,100 per tonne zinc and processing recoveries as per below. See the links for accompanying figures: http://resource.globenewswire.com/resource/download/c92867be-494e-4da0-a7d2-6216025ad61e http://resource.globenewswire.com/resource/download/84e8e262-4305-45b6-8fb9-d9675b38f8a5 01.07.2018 Seite 2/5

http://resource.globenewswire.com/resource/download/8e69fcae-e547-4c75-b4f6-dca89916c0ba Statement of Reportable Cut-off Grade RPM s statement of Mineral Resources has been constrained by topography and a cut-off grade of 0.7 g/t AuEq for potential open pit resources above a pit shell, and 1.4 g/t AuEq below the same pit shell. A pit shell was utilized to determine the maximum depth of potential open pit mining, within which the above cut-off grades were utilized to report the Mineral Resource using a US $1,570 per ounce gold price (20% above the US $1,310 per ounce optimization price) and the costs and recoveries listed below. The selected pit shell was generated using the following parameters, which are based on RPM s internal cost pricing within Mongolia and the preliminary metallurgical study: Metal Prices (RPM notes this is based on eventual extraction at a future date and not the long-term consensus forecast): Gold: US $1,310 per ounce Silver: US $18 per ounce Lead: US $2,400 per tonne Zinc: US $3,100 per tonne Mining Cost of US $6 per tonne rock; A block model using 10x5x5 metre blocks, which is considered the selective mining unit, with 5% dilution and 10% ore loss, was applied; Processing costs of US $20 per tonne milled; and Processing recoveries of: Gold: 88% Silver: 81% Lead: 81% Zinc: 60% RPM highlights that the pit optimizations were used to define the depth of the various cut-off grades to report the Mineral Resource, however, the cut-off grades applied were estimated based on a gold price of US $1,570 per ounce. Furthermore, it is noted that, given the long strike length and variation in grade, the potential open pit depth varies, as such, the application of a consistent depth is not appropriate and the use of a pit optimization to define variable depths is suitable. A gold price of US $1,570 per ounce was selected to determine the maximum depth of potential open pit mining based on historical prices (last 5 years). RPM notes that this price is above the current long-term forecast, however, RPM notes that the gold price was significantly higher in the past 5 years and, as such, has utilized a higher price to determine the maximum depth of potential open cut mining. To determine the potential underground mining cut-off grade an open stoping method was assumed resulting in a total mining cost of US $35 per tonne. While a detailed schedule and option analysis has not been completed to confirm the optimal mining method, given the sub-vertical continuous style of mineralization within sheet-like shears occurring near-surface within the currently defined resource areas, open pit mining is likely to be appropriate, pending the option analysis. Additional mining design along with more detailed and accurate cost estimate mining studies and testwork are required to confirm viability of extraction. RPM notes that these pit shells were completed to report the contained Mineral Resources in order to demonstrate the reasonable prospect for eventual economic extraction, and highlights that capital expenditure has not been included, and that these pits do not constitute a scoping study or a detailed mining study which, along with additional drilling and testwork, is required to be completed to confirm economic viability. RPM has utilized operating costs based on in-house databases of similar operations in the region and processing recoveries based on preliminary metallurgical test work, along with the commodity prices noted above, in determining the appropriate cut-off grade. Given the above analysis, RPM considers both the open pit and material below the pit demonstrates reasonable prospects for eventual economic extraction, however, highlights that additional studies and drilling are required to confirm economic viability. Erdene Q2-Q4 2018 Technical Program 01.07.2018 Seite 3/5

With the updated Mineral Resource now established at Altan Nar, Erdene will work toward completing a maiden mineral resource estimate at its neighboring, 100%-owned Bayan Khundii gold project, 16 kilometres southeast of Altan Nar. Erdene intends to announce a Global Resource Estimate, for both Bayan Khundii and Altan Nar, in Q3-2018. The Company is currently completing a drill program at Bayan Khundii to follow-up on high priority structural targets in advance of the maiden resource estimate. Qualified Person and Sample Protocol The Resource Estimate included in this press release was prepared under the supervision of Jeremy Clark, RPMGlobal, Hong Kong. Mr. Clark is a Qualified Person within the meaning of such term under NI 43-101; Mr. Clark is a Member of the Australian Institute of Geoscientists (MAIG) Membership No 3567. Mr. Clark has reviewed this press release and consents to the inclusion in this release of the matters disclosed based on Resource Estimate documents provide to the Company by RPM. A NI 43-101 Mineral Resource Estimate and Technical Report will be filed on Erdene s SEDAR page within 45 days of this news release. Michael MacDonald, P.Geo. (Nova Scotia), Vice President Exploration for Erdene, is the Qualified Person as that term is defined in National Instrument 43-101 and has reviewed and approved the non-resource Estimate technical information contained in this news release on behalf of Erdene. All samples have been assayed at SGS Laboratory in Ulaanbaatar, Mongolia. In addition to internal checks by SGS Laboratory, the Company incorporates a QA/QC sample protocol utilizing prepared standards and blanks. About Erdene Erdene Resource Development Corp. is a Canada-based resource company focused on the acquisition, exploration, and development of base and precious metals in underexplored and highly prospective Mongolia. The Company has interests in four exploration licenses and a mining license in southwest Mongolia, where exploration success has led to the discovery and definition of several prospects and deposits including: Bayan Khundii the Company s flagship and newly discovered, high-grade, near-surface gold project; Altan Nar an extensive, high-grade, near-surface, gold-polymetallic project located 16 kilometres northwest of Bayan Khundii; Altan Arrow an early-stage, high-grade gold-silver project 3.5 kilometres north of Bayan Khundii; Ulaan a recently acquired copper-gold porphyry prospect adjacent to Bayan Khundii; Khuvyn Khar an early-stage, copper-silver porphyry project; Nomin Tal a narrow, high-grade copper-gold discovery; and Zuun Mod a large molybdenum-copper porphyry deposit. In addition to the above projects, Erdene has an Alliance with Teck Resources Ltd. on regional copper-gold exploration in the prospective Trans Altai region of southwest Mongolia. The Bayan Khundii and Altan Nar licenses have a 2% net smelter returns royalty ( NSR Royalty ) in favour of Sandstorm Gold Ltd. with a buy-back option to reduce the NSR Royalty to 1%. For further information on the Company, please visit www.erdene.com. Erdene has 146,400,586 issued and outstanding common shares and a fully diluted position of 156,992,160 common shares. Forward-Looking Statements Certain information regarding Erdene contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other statements that are not statements of fact. Although Erdene believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. Erdene cautions that actual performance will be affected by a number of factors, most of which are beyond its control, and that future events and results may vary substantially from what Erdene currently foresees. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration results, continued availability of capital and financing and general economic, market or business conditions. The forward-looking statements are expressly qualified in their entirety by this cautionary statement. The information contained herein is stated as of the current date and is subject to change after that date. The Company does not assume the obligation to revise or update these forward-looking statements, except as may be required under applicable securities laws. NO REGULATORY AUTHORITY HAS APPROVED OR DISAPPROVED THE CONTENTS OF THIS RELEASE Erdene Contact Information Peter C. Akerley, President and CEO or Ken W. MacDonald, Vice President and CFO Phone: (902) 423-6419 E-mail: info@erdene.com Website: www.erdene.com 01.07.2018 Seite 4/5

Twitter: https://twitter.com/erdeneres Dieser Artikel stammt von GoldSeiten.de Die URL für diesen Artikel lautet: https://www.goldseiten.de/artikel/375508--erdene-significantly-increases-resource-estimate-at-the-altan-nar-gold-polymetallic-project.html Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer! Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt! Alle Angaben ohne Gewähr! Copyright by GoldSeiten.de 1999-2018. Es gelten unsere AGB und Datenschutzrichtlinen. 01.07.2018 Seite 5/5