Background of Project

Similar documents
By Abdulraheem M.Baabbad. Supervisor: Dr.Bager Al-Ramadan

GIS ANALYSIS METHODOLOGY

Service Area Analysis of Portland's METRO Bus System. Andy Smith-Petersen, University of Southern Maine -

A GIS TOUR OF DES MOINES PRESENTED BY ANNA WHIPPLE, GIS MANAGER APRIL 20, 2015

presents challenges related to utility infrastructure planning. Many of these challenges

OREGON POPULATION FORECAST PROGRAM

Environmental Criminology

LOCAL GOVERNMENT ADMINISTRATION SERIES

Environmental Analysis, Chapter 4 Consequences, and Mitigation

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

Sensitivity of estimates of travel distance and travel time to street network data quality

Inclusion of Non-Street Addresses in Cancer Cluster Analysis

A Socioeconomic Analysis of the Spatial Distribution of Fire Hydrants. History of Portland Fire Hydrants

Dunn County Snow Removal Policy

Regional Performance Measures

Regional Performance Measures

By Chris Mikes and David Fleck Digital Terrain Analysis GEOG 593. Overview

APPLICATIONS OF EARTHQUAKE HAZARD MAPS TO LAND-USE AND EMERGENCY PLANNING EXAMPLES FROM THE PORTLAND AREA

EMS Hot Spot Analysis:

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:

APPENDIX IV MODELLING

Mapping Accessibility Over Time

The Use of Geographic Information Systems (GIS) by Local Governments. Giving municipal decision-makers the power to make better decisions

DCHC MPO. Socioeconomic Data (SE Data) Guide Totals. Purpose. Actions. Use of Guide Totals. Partial Counties and Map. Population Guide Totals

Technical Memorandum #2 Future Conditions

May 31, Flood Response Overview

Geodatabase for Sustainable Urban Development. Presented By Rhonda Maronn Maurice Johns Daniel Ashney Jack Anliker

THE FUTURE OF FORECASTING AT METROPOLITAN COUNCIL. CTS Research Conference May 23, 2012

The History Behind Census Geography

The Framework and Application of Geographic Information Systems (GIS)

Lee County, Florida 2015 Forecast Report Population, Housing and Commercial Demand

Bluffton Township Fire District Time Study

TABLE 4a - DETAIL OF TAXING DISTRICT LEVIES Tax Year

The spatial network Streets and public spaces are the where people move, interact and transact

Draft. Butte County Long-Term Regional Growth Forecasts

If you aren t familiar with Geographical Information Systems (GIS), you. GIS, when combined with a database that stores response information,

Population Trends Along the Coastal United States:

BROOKINGS May

Presented at ESRI Education User Conference, July 6-8, 2001, San Diego, CA

Regional Transit Development Plan Strategic Corridors Analysis. Employment Access and Commuting Patterns Analysis. (Draft)

Neighborhood Locations and Amenities

UTILIZING GIS IN NEXT GENERATION Tennessee Information for Public Safety. Presented by State of TN, OIR-GIS Services

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

Using ROI Methodology to Measures the Benefits of King County GIS

Developing and Validating Regional Travel Forecasting Models with CTPP Data: MAG Experience

Spatial Variation in Local Road Pedestrian and Bicycle Crashes

King City URA 6D Concept Plan

Rural Alabama. Jennifer Zanoni. Geography Division U.S. Census Bureau. Alabama State Data Center 2018 Data Conference Tuscaloosa, Alabama

Expanding the GSATS Model Area into

KENTUCKY HAZARD MITIGATION PLAN RISK ASSESSMENT

Taming the Modeling Monster

why is a national or regional context important?

Using GIS to Evaluate Rural Emergency Medical Services (EMS)

GIS Analysis of Crenshaw/LAX Line

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

The effects of impact fees on urban form and congestion in Florida

Crime Analysis. GIS Solutions for Intelligence-Led Policing

GIS Geographical Information Systems. GIS Management

KING GEORGE COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT

GIS Monroe Geographic Information System March 14, 2018

The History Behind Census Geography

Com munity Advisor y C ommitte e Meeting

Agenda. Johnson County. Introduction What Is GIS? Needs Assessment Strategic Plan GIS Task force What do we need from you?

SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION

Understanding Land Use and Walk Behavior in Utah

TRAVEL DEMAND MODEL. Chapter 6

Spatial Organization of Data and Data Extraction from Maptitude

Situation Manual Protective Actions

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT

SECONDARY ROADS LEVERAGING ENTERPRISE GIS. Secondary Road Department & GIS Department Linn County, Iowa April 20, 2015

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

Lee County, Alabama 2015 Forecast Report Population, Housing and Commercial Demand

GIS and Governing Anchorage. GIS Critical for Efficient, Transparent Government How is GIS Program Doing Where can GIS Program Take us

GIS and Remote Sensing Support for Evacuation Analysis

HORIZON 2030: Land Use & Transportation November 2005

Regional Centre for Mapping of Resources for Development (RCMRD), Nairobi, Kenya

Reducing Vulnerability to Extreme Heat: Science-Policy Interface

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS

Portland s regional economy is integrated

Initial Report. North Central Texas Initial Attack. Hildreth Road Dozer Accident. February 9, 2006

MPC-425 January 1, December 31, 2013

Typical information required from the data collection can be grouped into four categories, enumerated as below.

Speakers: Jeff Price, Federal Transit Administration Linda Young, Center for Neighborhood Technology Sofia Becker, Center for Neighborhood Technology

SPATIAL ANALYSIS. Transformation. Cartogram Central. 14 & 15. Query, Measurement, Transformation, Descriptive Summary, Design, and Inference

Forecasting Flood Risk at the Flood Forecasting Centre, UK. Delft-FEWS User Days David Price

Chapter 6. Fundamentals of GIS-Based Data Analysis for Decision Support. Table 6.1. Spatial Data Transformations by Geospatial Data Types

Enhancing Parcel Data In Colleton County. February 10, 2009

Developing Built Environment Indicators for Urban Oregon. Dan Rubado, MPH EPHT Epidemiologist Oregon Public Health Division

South Western Region Travel Time Monitoring Program Congestion Management Process Spring 2008 Report

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

NAME: DATE: Leaving Certificate GEOGRAPHY: Maps and aerial photographs. Maps and Aerial Photographs

Metrolinx Transit Accessibility/Connectivity Toolkit

MPOs SB 375 LAFCOs SCAG Practices/Experiences And Future Collaborations with LAFCOs

Optimizing Field Operations

THE OPTIMIZATION OF A STREET NETWORK MODEL FOR EMERGENCY RESPONSE ANALYSIS WITHIN A GEOGRAPHICAL INFORMATION SYSTEM. A Thesis.

The Leader in Landscape Solutions

Complete Weather Intelligence for Public Safety from DTN

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Application of GIS in Public Transportation Case-study: Almada, Portugal

Transcription:

RELOCATION OF GRESHAM FIRE STATION #76 Mike Shelby Annie Scriven Andrea Consalus Background of Project Wanted to do a project that was meaningful Contacted Molly Vogt, GIS Manager at City of Gresham Informed of a need for a GIS analysis with the severely underfunded Gresham Fire Department City of GRESHAM 1

Meeting with Chief Scott Lewis Have funds to relocate Station #76 starting July, 2010 Current site is too small, in disrepair Where should Station #76 be moved to? Fire station location is often a happening rather than a plan for Station 76 this time he wants it to be a plan Gresham Fire Department Multnomah County Fire District #10 service area Operates six fire stations within its service area and one shift in a shared Portland station Each engine is staffed and equipped as an Advanced Life Support (ALS) unit 2

Gresham Fire Department Provides life safety services to city residents and contract districts for residents living in the cities of Gresham, Fairview, Troutdale, Wood Village and areas of unincorporated Multnomah County Each fire station responds to calls within its fire management area (FMA) with few exceptions to assist with other areas Goal response time: FOUR MINUTES OR LESS Data Fire station locations Fire management areas City boundaries County boundaries Taxlots TAZ (Transportation Analysis Zones) current/projected population Roads 3

Vicinity Greater Portland Where should Station #76 be moved to? Management area boundaries are set Service cover own area not someone else s Incorporate SE side of Gresham without being at the cost of the unincorporated area Lot size/zoning codes do not matter Use current population and projected 2030 population 4

District #10 Fire Management Areas (FMAs) FMA 76 Current Fire Station Location 5

Analysis of Gresham Fire Service ECONorthwest (ECO) consulting company completed the report in February, 2010 Provided snapshot of service demand and response times Identified trends over the past five years Predicted future changes in demand Historical call data from every call from FY 04 05 to 08 09 provided by the City of Portland Bureau of Emergency Communications (BOEC) Location and type of call and time stamps for each step of the response: Call received Dispatched En route On scene Cleared Forecasts for population growth from MetroScope to predict where growth will occur through the year 2030 Analysis of Gresham Fire Service Station 76 in the Southwest has the largest service area, but also the area with the lowest density of incidents. Areas 75 and 76 have the lowest percent of response times under each time threshold (i.e., the slowest response times). 6

Analysis of Gresham Fire Service Analysis of Gresham Fire Service 7

Projected Population Growth Growing population leads to increased demand for public services Understanding where population growth is likely to occur can help in decision making where additional resources will be necessary Metro provides long term forecasts Do not include major shifts in population Does not predict future economic cycles that affect population changes Have limitations, but are most current and accepted projections available at this scale The eastern portion of the GFES service area is served by Station 76, and is forecast to experience slow population growth. Projected Population Growth 8

2005 Population 2030 Population 9

Population Model TAZ Edit Density of Points Population Centroid Mean Center Taxlots 10

Density Based on Taxlots Proposed Site Based on Taxlot Centroids 11

Proposed Site Based on 2005 Population Centroid Proposed Site Based on 2030 Population Centroid 12

Mean Center (Centroid) of FMA 76 Network Analyst: New Network Dataset Steps for creating a network dataset: Create new personal geodatabase Create new feature dataset Import feature classes (Gresham street data) Create new network dataset from imported street data 13

Network Analyst: Preparing Tables and Clipping Features Network Model Add MINUTES field Streets Table Streets Area Clip Clip_St New service area Build network data Gresham Network 14

Network Analyst: Service Areas Population and Response Times Select by Location used to calculate percentage values for 2030 projected population within each response time area 15

Response Times: Current Site Response Times: Proposed Site A 16

Response Times: Proposed Site B Conclusions Where should Station #76 be moved to? There are a number of locations that could work for the new fire station all in the same vicinity It may not be economically practical to move it from the current location 17

Limitations Because we don t actually know where the population will be increasing, it is difficult to predict where increased emergencies will occur in the next 20 years Information regarding future zoning We did not have access to the actual travel time data nor the data created from the consultant study Traffic Analysis Zones (TAZ) were the smallest census areas available but still very large for our area of study Most of FMA 76 is unincorporated county and therefore data was limited Knowledge: If we knew what we know now Limitations Travel Times via Network Analyst Travel Times via Actual Data (11,803 calls) 18

Further Study Spatial Analyst Incorporate land uses into 2030 population dasymetric maps Reevaluate with 2010 census data Reevaluate with actual travel times for the past ten years Consider lot size and zoning for station location Questions? 19