GENERAL NOTES FOR THE YODOCK 2001M WITH STEEL RAIL KIT DESIGN NOTES FOR THE YODOCK 2001M WITH STEEL RAIL KIT 1.

Similar documents
GENERAL NOTES FOR THE YODOCK 2001 WITH STEEL RAIL KIT DESIGN NOTES FOR THE YODOCK 2001 WITH STEEL RAIL KIT

Insulated Bearings MEGAOHM TM Series

AASHTO "A Policy on Geometric Design of 4A. Hydraulic Design Reference for these plans is the: 6-16 PROPOSED PLANS FOR PROJECT ID XXXXXX

Reasons to Build a Hydraulic Model

2 x 8 2 x 2 SKILLS Determine whether the given value is a solution of the. equation. (a) x 2 (b) x 4. (a) x 2 (b) x 4 (a) x 4 (b) x 8

Supporting information

MINNETONKA, MN C0.1 LAKE WEST DEVELOPMENT DEVELOPER AREA LOCATION MAP MINNETONKA, MN MUNICIPALITY PROJECT SHEET INDEX

Motion in Two Dimensions

Materials selection The materials index

The geometric construction of Ewald sphere and Bragg condition:

(a) Unde zeo-bias conditions, thee ae no lled states on one side of the junction which ae at the same enegy as the empty allowed states on the othe si

15 B1 1. Figure 1. At what speed would the car have to travel for resonant oscillations to occur? Comment on your answer.

Electrostatics (Electric Charges and Field) #2 2010

Relative motion (Translating axes)

Physics 107 TUTORIAL ASSIGNMENT #8

4/18/2005. Statistical Learning Theory

To Feel a Force Chapter 7 Static equilibrium - torque and friction

2.5 Traffic Flow between Intersections Assuming Structured Platoons

( ) ( ) Review of Force. Review of Force. r = =... Example 1. What is the dot product for F r. Solution: Example 2 ( )

Safety variations in steel designed using Eurocode 3

Uniform Circular Motion

Roof Support 1. Stand-Up Time (RMR):

EELE 3331 Electromagnetic I Chapter 4. Electrostatic fields. Islamic University of Gaza Electrical Engineering Department Dr.

7.2.1 Basic relations for Torsion of Circular Members

Annihilation of Relativistic Positrons in Single Crystal with production of One Photon

MODULE 5a and 5b (Stewart, Sections 12.2, 12.3) INTRO: In MATH 1114 vectors were written either as rows (a1, a2,..., an) or as columns a 1 a. ...

, and the curve BC is symmetrical. Find also the horizontal force in x-direction on one side of the body. h C

F g. = G mm. m 1. = 7.0 kg m 2. = 5.5 kg r = 0.60 m G = N m 2 kg 2 = = N

Physics: Work & Energy Beyond Earth Guided Inquiry

Chapter 5. Uniform Circular Motion. a c =v 2 /r

Module 7. Limit State of Serviceability. Version 2 CE IIT, Kharagpur

Substances that are liquids or solids under ordinary conditions may also exist as gases. These are often referred to as vapors.

Chapter 22: Electric Fields. 22-1: What is physics? General physics II (22102) Dr. Iyad SAADEDDIN. 22-2: The Electric Field (E)

VECTOR MECHANICS FOR ENGINEERS: STATICS

3.6 Applied Optimization

Physics 1114: Unit 5 Hand-out Homework (Answers)

Potential Energy and Conservation of Energy

PHYS 1410, 11 Nov 2015, 12:30pm.

Math 451: Euclidean and Non-Euclidean Geometry MWF 3pm, Gasson 204 Homework 9 Solutions

Polar Coordinates. a) (2; 30 ) b) (5; 120 ) c) (6; 270 ) d) (9; 330 ) e) (4; 45 )

INTRODUCTION. 2. Vectors in Physics 1

Physics 101 Lecture 6 Circular Motion

is the instantaneous position vector of any grid point or fluid

Unit 6 Practice Test. Which vector diagram correctly shows the change in velocity Δv of the mass during this time? (1) (1) A. Energy KE.

Galilean Transformation vs E&M y. Historical Perspective. Chapter 2 Lecture 2 PHYS Special Relativity. Sep. 1, y K K O.

c) (6) Assuming the tires do not skid, what coefficient of static friction between tires and pavement is needed?

Motithang Higher Secondary School Thimphu Thromde Mid Term Examination 2016 Subject: Mathematics Full Marks: 100

MATH 415, WEEK 3: Parameter-Dependence and Bifurcations

21 MAGNETIC FORCES AND MAGNETIC FIELDS

COLD STRANGLING HOLLOW PARTS FORCES CALCULATION OF CONICAL AND CONICAL WITH CYLINDRICAL COLLAR

End of Semester Details: Final Exam

DYNAMICS OF UNIFORM CIRCULAR MOTION

16.1 Permanent magnets

International Journal of Mathematical Archive-3(12), 2012, Available online through ISSN

Identification of the degradation of railway ballast under a concrete sleeper

MCV4U Final Exam Review. 1. Consider the function f (x) Find: f) lim. a) lim. c) lim. d) lim. 3. Consider the function: 4. Evaluate. lim. 5. Evaluate.

Markscheme May 2017 Calculus Higher level Paper 3

Sides and Angles of Right Triangles 6. Find the indicated side length in each triangle. Round your answers to one decimal place.

A NEW VARIABLE STIFFNESS SPRING USING A PRESTRESSED MECHANISM

Physics 111 Lecture 5 Circular Motion

SUBJECT: Remittance Advice Remark Code and Claim Adjustment Reason Code Update

Pulse Neutron Neutron (PNN) tool logging for porosity Some theoretical aspects

PHYSICS 151 Notes for Online Lecture #20

Flux. Area Vector. Flux of Electric Field. Gauss s Law

Preliminary study for implementations of long lasting flexible road pavements in Romania

SAMPLE QUIZ 3 - PHYSICS For a right triangle: sin θ = a c, cos θ = b c, tan θ = a b,

Current Balance Warm Up

Graphs of Sine and Cosine Functions

T x. T k x. is a constant of integration. We integrate a second time to obtain an expression for the temperature distribution:

Cartesian Coordinate System and Vectors

Test 2, ECON , Summer 2013

JCRD501: RURAL COUNTY ROADWAY SPECIFICATIONS

Chapter 5. really hard to start the object moving and then, once it starts moving, you don t have to push as hard to keep it moving.

EN40: Dynamics and Vibrations. Midterm Examination Thursday March

( ) ( ) Review of Force. Part 1, Topic 1 Force Fields. Dr. Sven Achenbach - based on a script by Dr. Eric Salt - Outline. Review of Force. F r.

Web-based Supplementary Materials for. Controlling False Discoveries in Multidimensional Directional Decisions, with

Recap. Centripetal acceleration: v r. a = m/s 2 (towards center of curvature)

Sonoma County Water Agency

Practice Problems Test 3

ELECTROSTATICS::BHSEC MCQ 1. A. B. C. D.

PHYSICS. Time allowed: 90 minutes. Section A is a set of questions on data analysis. It requires work on graph paper.

CHAPTER IV RADIATION BY SIMPLE ACOUSTIC SOURCE. or by vibratory forces acting directly on the fluid, or by the violent motion of the fluid itself.

Unit 6 Practice Test. Which vector diagram correctly shows the change in velocity Δv of the mass during this time? (1) (1) A. Energy KE.

Exam 3, vers Physics Spring, 2003

DEVIL PHYSICS THE BADDEST CLASS ON CAMPUS IB PHYSICS

Related Rates - the Basics

MEASURING CHINESE RISK AVERSION

Chap 5. Circular Motion: Gravitation

Chapter 1: Introduction to Polar Coordinates

Current, Resistance and

Motion along curved path *

5. Pressure Vessels and

LINEAR AND NONLINEAR ANALYSES OF A WIND-TUNNEL BALANCE

Easy. r p 2 f : r p 2i. r p 1i. r p 1 f. m blood g kg. P8.2 (a) The momentum is p = mv, so v = p/m and the kinetic energy is

Circular Motion & Torque Test Review. The period is the amount of time it takes for an object to travel around a circular path once.

Phys102 Second Major-182 Zero Version Monday, March 25, 2019 Page: 1

General. Eqn. 1. where, F b-bbf = Allowable bending stress at the bottom of the beam bottom flange, ksi.

Uniform Circular Motion

Title. Author(s)Y. IMAI; T. TSUJII; S. MOROOKA; K. NOMURA. Issue Date Doc URL. Type. Note. File Information

Analytic Evaluation of two-electron Atomic Integrals involving Extended Hylleraas-CI functions with STO basis

Transcription:

GENEAL NOTES FO THE YODOCK 2001M WITH STEEL AIL KIT 1. 2. 3. 4. 5. 6. 7. 8. 9. THE LONGITUDINAL TAFFIC BAIE SYSTEMS PESENTED ON THIS STANDAD DAWING (INDEX) AND THE LABEL YODOCK AE POPIETAY DESIGNS BY YODOCK WALL COMPANY AND AE MAKETED UNDE THE TADE NAME YODOCK BAIE. THIS INDEX POVIDES GENEAL SCHEMATICS AND INFOMATION NECESSAY TO FIELD IDENTIFY THE WATE FILLED POLYETHYLENE SEGMENTAL BAIE MODULE (ENEGY DISBUSEMENT CELL) AND THE MODULE FAME AND BASIC CONNECTIONS, BUT DOES NOT IDENTIFY THE INCOPOATION OF THE MODULES AND THE FAME CONNECTIONS INTO A WHOLE SYSTEM. ANY USE OF THE YODOCK BAIE MUST BE IN ACCODANCE WITH DETAILS ON THE PLANS O BY SHOP DAWING APPOVAL O BY THE ESIDENT ENGINEE IN ABSENCE OF PLAN DETAIL. THE MODEL 2001M BAIE SYSTEM IS APPOVED FO USE ON HIGHWAYS WITH DESIGN SPEEDS < 45 MPH. THE YODOCK LONGITUDINAL TAFFIC BAIE SYSTEM CAN BE USED ONLY IN A STAND-ALONE SYSTEM. Ie. NOT CONNECTED TO OTHE TYPES OF BAIE SYSTEMS. THE YODOCK LONGITUDINAL TAFFIC BAIE SYSTEM MUST HAVE A MINIMUM OF SEVEN (7) LONGITUDINALLY CONNECTED MODULES IN ADVANCE OF LENGTH OF NEED: IN NO CASE CAN THE LONGITUDINAL UN OF BAIE BE LESS THAN 25 MODULES. THE YODOCK LONGITUDINAL TAFFIC BAIE SYSTEM MUST BE PLACED ON A COSS SLOPE NOT EXCEEDING 1:10, AND LOCATED TO POVIDE A DEFLECTION DISTANCE BETWEEN THE SYSTEM AND HAZADS IN ACCODANCE WITH THE OFFSET AND DEFLECTION TABLE. YODOCK MODEL 2001M BAIE WITH STEEL AIL KIT weights: Full: 970 lbs. Empty: 305 lbs. THE YODOCK 2001M WITH STEEL AIL KIT IS FEE STANDING AND MUST BE PLACED ON A CONCETE O ASPHALT FOUNDATION. THE FOUNDATION MUST NOT BE ALLOWED TO BE UNDEMINED BY WATE O EOSION O SLIDE. TAFFIC CONTOL DEVICES AND BAIES AT INTESECTIONS MUST POVIDE SIGHT DISTANCES FO THE OAD USE TO PECEIVE POTENTIAL CONFLICTS TO TAVESE THE INTESECTION SAFELY. DESIGN NOTES FO THE YODOCK 2001M WITH STEEL AIL KIT 1. 2. SYSTEMS INCLUDED IN ANY MAINTENANCE OF TAFFIC PLAN WILL EQUIE DETAILED LOCATION AND PLACEMENT INFOMATION. CUENTLY THE DEPATMENT DOES NOT ECOGNIZE OTHE POPIETAY ITEMS AS BEING EQUALLY SUITABLE ALTENATIVES TO THE YODOCK BAIE, AND UNTIL SUCH ALTENATIVES AE AVAILABLE, THE YODOCK BAIE NEED NOT BE BID AGAINST OTHE POPIETAY ITEMS. DAWN: evision 10. THE YODOCK 2001M BAIES HAVE BEEN TESTED TO NCHP 350 TL-3 (62 MPH) AT A 25 ANGLE OF IMPACT. DO NOT SCALE DAWING ECO Date ev By Chk. DAWING: EV: ENG-FE-048 ev E, 1/22/2016

YODOCK 2001 M BAIE 11" STEEL SPLICE TAVELWAY FLEXIBLE O IGID PAVEMENT O ASPHALT PAD LATEAL OFFSET MEDIAN ASSEMBLY OFFSET TAVELWAY TAVELWAY 3/4" X 4 1/2" LONG BOLT, NUT & WASHE AIL JOINT 3/4" X 9" LONG CAIAGE BOLT, NUT & WASHE 3 1/2 X 3 1/2 X 1/4 STUCTUAL TUBING AIL DETAIL C FOKLIFT POT TAVELWAY YODOCK 2001 M BAIE LATEAL OFFSET FLEXIBLE O IGID PAVEMENT O ASPHALT PAD SLOPE 1:10 O FLATTE ABOVE GOUND HAZAD DOP-OFF HAZAD ABOVE GOUND HAZAD C10X15.3 CHANNEL 1'-8" LONG 3 1/2 X 3 1/2 X 1/4 STUCTUAL TUBING AIL 3/4" X 9" LONG CAIAGE BOLT, NUT & WASHE DETAIL B DOP-OFF HAZAD 4X4X10 WOOD BLOCK OADWAY ASSEMBLY C10X15.3 CHANNEL 1'-8" LONG DETAIL A EQUIEMENTS 16 1/2" 8 1/8" 6'-0" (NOM.) YODOCK 2001M BAIE INSTALLATION SHIELDING WOK ZONE SPEED IGHT SHOULDE/ MEDIAN ABOVE GOUND HAZADS DOP-OFF HAZADS 45 mph O LESS 45 mph O LESS a. DOP-OFFS < 4' WITH NO TAFFIC BELOW b. ALL DOP-OFF CONDITIONS OTHE THAN "a" DEFLECTION SPACE DAWN: evision AIL 31 1/2" 10" 17 3/4" 21 3/4" END VIEW MODEL 2001M A FABICATION DETAILS NOT SHOWN DO NOT SCALE DAWING ECO Date ev By Chk. B MODEL 2001M WITH V.1 AILS DAWING: C EV: ENG-FE-048 ev E, 1/22/2016

YODOCK 2001M BAIE LATEAL OFFSET MODEL 2001M FABICATION DETAILS NOT SHOWN OFFSET 619830 YODOCK AIL/ BACKET ASSY DETAIL D (2) 1/2" X 1 3/4" LONG CAIAGE BOLT, NUT & (2) WASHES TAVELWAY TAVELWAY FLEXIBLE O IGID PAVEMENT O ASPHALT PAD C10X15.3 CHANNEL 1'-8" LONG 1/2" X 3/4" LONG BOLT, NUT & WASHES TAVELWAY MEDIAN ASSEMBLY YODOCK 2001 M BAIE LATEAL OFFSET FLEXIBLE O IGID PAVEMENT O ASPHALT PAD SLOPE 1:10 O FLATTE ABOVE GOUND HAZAD DOP-OFF HAZAD DOP-OFF HAZAD ABOVE GOUND HAZAD FOKLIFT POT 2 1/2 X 2 1/2 X 1/4 STUCTUAL TUBING SPLICE 3/4" X 4 1/2" LONG BOLT, NUT & WASHE AIL JOINT DETAIL E CONNECTO CHANNEL DETAIL F 3/4" X 5 1/2" LONG BOLT, NUT & WASHE AIL JOINT 3 1/2 X 3 1/2 X 1/4 YODOCK AIL/BACKET WELDMENT OADWAY ASSEMBLY EQUIEMENTS 16 1/2 8 1/2 TOP VIEW 6'-0" (NOM.) YODOCK 2001M BAIE INSTALLATION SHIELDING WOK ZONE SPEED IGHT SHOULDE/ MEDIAN ABOVE GOUND HAZADS DOP-OFF HAZADS 45 mph O LESS 45 mph O LESS a. DOP-OFFS < 4' WITH NO TAFFIC BELOW b. ALL DOP-OFF CONDITIONS OTHE THAN "a" DEFLECTION SPACE DAWN: evision 31 1/2 AIL 9 D 17 3/4 23 1/2 END VIEW DO NOT SCALE DAWING ECO Date ev By Chk. E SIDE VIEW WITH V.2 AILS DAWING: F EV: ENG-FE-048 ev E, 1/22/2016

MODEL 2001M FABICATION DETAILS NOT SHOWN YODOCK 2001M BAIE AIL JOINT 3/4" X 5 1/2" LONG BOLT, NUT & WASHE AIL JOINT 3 1/2 X 3 1/2 X 1/4 YODOCK AIL/BACKET WELDMENT LATEAL OFFSET OFFSET TAVELWAY FLEXIBLE O IGID PAVEMENT O ASPHALT PAD TAVELWAY TOP VIEW MEDIAN ASSEMBLY YODOCK 2001M BAIE ABOVE GOUND HAZAD 619106G YODOCK AIL/ TAVELWAY LATEAL OFFSET FLEXIBLE O IGID PAVEMENT O ASPHALT PAD SLOPE 1:10 O FLATTE DOP-OFF HAZAD DOP-OFF HAZAD ABOVE GOUND HAZAD 1/2" X 1 3/4" LONG BOLT, NUT & WASHES YODOCK AIL/BACKET WELDMENT DETAIL G 2 1/2 X 2 1/2 X 1/4 STUCTUAL TUBING SPLICE 3/4" X 4 1/2" LONG BOLT, NUT & WASHE (2) 1/2" X 1 3/4" LONG CAIAGE BOLT, NUT & (2) WASHES OADWAY ASSEMBLY FOKLIFT POT DETAIL H AIL JOINT DETAIL I EQUIEMENTS INSTALLATION SHIELDING WOK ZONE SPEED IGHT SHOULDE/ MEDIAN ABOVE GOUND HAZADS DOP-OFF HAZADS 45 mph O LESS 45 mph O LESS a. DOP-OFFS < 4' WITH NO TAFFIC BELOW b. ALL DOP-OFF CONDITIONS OTHE THAN "a" DEFLECTION SPACE DAWN: evision AIL 31 1/2 9 16 1/2 8 1/2 G 17 3/4 END VIEW 22 DO NOT SCALE DAWING ECO Date ev By Chk. 6'-0" (NOM.) YODOCK 2001M BAIE SIDE VIEW DAWING: H WITH V.3 AILS I EV: ENG-FE-048 ev E, 1/22/2016

CLEA ZONE LIMIT BACK OF HAZAD O BACK OF WOK ZONE AEA INSIDE CLEA ZONE APPOACH DEPATUE LINE EXTEND BAIES 7 UNITS PAST CLEA ZONE LINE(TYP.) TANGENT/PAELLEL TO OADWAY EXTEND YODOCK BAIE WALL 7 UNITS BEYOND WOK AEA TAILING DEPATUE LINE NEA LANE LINE O NEA TAFFIC LANE IN USE. SEE 600 SEIES INDEXES FO APPLICATIONS OF TAFFIC CONTOL DEVICES. OFFSET VAIES 1 PAELLEL TO OADWAY APPOACHING TAFFIC BACK OF HAZAD OUTSIDE OF CLEA ZONE CLEA ZONE LIMIT APPOACH DEPATUE LINE EXTEND BAIES 7 UNITS PAST CLEA ZONE LINE(TYP.) TANGENT/PAELLEL TO OADWAY EXTEND YODOCK BAIE WALL 7 UNITS BEYOND WOK AEA TAILING DEPATUE LINE NEA LANE LINE O NEA TAFFIC LANE IN USE. SEE 600 SEIES INDEXES FO APPLICATIONS OF TAFFIC CONTOL DEVICES. OFFSET VAIES 1 PAELLEL TO OADWAY APPOACHING TAFFIC THE APPOACH DEPATUE LINE LOCATION IS DETEMINED BY THE LINE INTESECT WITH THE BACK OF THE HAZAD O THE AEA TO BE SHIELDED, HOWEVE THE INTESECT OFFSET DISTANCE IS NOT TO BE BEYOND THE CLEA ZONE LIMIT. THE DEPATUE LINE IS DETEMINED BY THE LINE INTESECT WITH THE FONT OF THE DOWNSTEAM END OF THE HAZAD O THE AEA TO BE SHIELDED. THE LENGTH OF BAIE WALL NEED IS THE DISTANCE FOM THE APPOACH DEPATUE LINE INTESECT WITH THE UPSTEAM TOE OF THE YODOCK BAIE WALL TO THE TAILING DEPATUE LINE INTESECT WITH THE DOWNSTEAM TOE OF THE YODOCK BAIE WALL. WHEE YODOCK BAIE WALL END UNITS SHALL BE LOCATED AT O OUTSIDE THE CLEA ZONE O SHIELDED BY OTHE STUCTUE, EATH EMBEDMENT O A CASH CUSHION. POPIETAY EDIECTIVE CASH CUSHIONS DESIGNED FO USE WITH TEMPOAY BAIES HAVE THE BEGINNING LENGTH OF NEED AND DEPATUE LINE INTESECT POINT INDICATED ON THE ESPECTIVE APL DAWING FO EACH POPIETAY CASH CUSHION. THE SUFACE COSS SLOPE APPOACHING THE BAIE WALL AND CONTINUING ACOSS THE EQUIED SPACE SHALL NOT EXCEED A ATE OF 1 VETICAL: 10 HOIZONTAL. DAWN: evision DO NOT SCALE DAWING ECO Date ev By Chk. DEPATUE ATES: SEE DESIGN STANDADS INDEX 415 AEA SHIELDED WHEN WOK ZONE HAZADS O THE WOK AEA OCCUPY SPACE LESS THAN CLEA ZONE WIDTH AEA SHIELDED WHEN WOK ZONE HAZADS O THE WOK AEA EXTEND TO O BEYOND CLEA ZONE LIMIT CASH CUSHION IN ABSENCE OF OTHE BAIE END SHIELDING, SEE NOTATIONS AND SHEET 6 & 7 FO VAIED LOCATIONS FO WALL END UNITS AND CASH CUSHIONS DAWING: EV: ENG-FE-048 ev E, 1/22/2016

CLEA ZONE LIMIT BACK OF HAZAD O BACK OF WOK ZONE AEA INSIDE CLEA ZONE APPOACH DEPATUE LINE EXTEND BAIES 7 UNITS PAST CLEA ZONE LINE(TYP.) TANGENT/PAELLEL TO OADWAY EXTEND YODOCK BAIE WALL 7 UNITS BEYOND WOK AEA TAILING DEPATUE LINE NEA LANE LINE O NEA TAFFIC LANE IN USE. SEE 600 SEIES INDEXES FO APPLICATIONS OF TAFFIC CONTOL DEVICES. OFFSET VAIES 1 APPOACHING TAFFIC BACK OF HAZAD OUTSIDE OF CLEA ZONE CLEA ZONE LIMIT APPOACH DEPATUE LINE EXTEND BAIES 7 UNITS PAST CLEA ZONE LINE(TYP.) TANGENT/PAELLEL TO OADWAY EXTEND YODOCK BAIE WALL 7 UNITS BEYOND WOK AEA TAILING DEPATUE LINE NEA LANE LINE O NEA TAFFIC LANE IN USE. SEE 600 SEIES INDEXES FO APPLICATIONS OF TAFFIC CONTOL DEVICES. OFFSET VAIES 1 APPOACHING TAFFIC THE APPOACH DEPATUE LINE LOCATION IS DETEMINED BY THE LINE INTESECT WITH THE BACK OF THE HAZAD O THE AEA TO BE SHIELDED, HOWEVE THE INTESECT OFFSET DISTANCE IS NOT TO BE BEYOND THE CLEA ZONE LIMIT. THE DEPATUE LINE IS DETEMINED BY THE LINE INTESECT WITH THE FONT OF THE DOWNSTEAM END OF THE HAZAD O THE AEA TO BE SHIELDED. THE LENGTH OF BAIE WALL NEED IS THE DISTANCE FOM THE APPOACH DEPATUE LINE INTESECT WITH THE UPSTEAM TOE OF THE YODOCK BAIE WALL TO THE TAILING DEPATUE LINE INTESECT WITH THE DOWNSTEAM TOE OF THE YODOCK BAIE WALL. WHEE YODOCK BAIE WALL END UNITS SHALL BE LOCATED AT O OUTSIDE THE CLEA ZONE O SHIELDED BY OTHE STUCTUE, EATH EMBEDMENT O A CASH CUSHION. POPIETAY EDIECTIVE CASH CUSHIONS DESIGNED FO USE WITH TEMPOAY BAIES HAVE THE BEGINNING LENGTH OF NEED AND DEPATUE LINE INTESECT POINT INDICATED ON THE ESPECTIVE APL DAWING FO EACH POPIETAY CASH CUSHION. THE WALL OFFSET FOM THE NEA TAFFIC LANE, WALL FLAE ATE AND WALL FLAE LENGTH AE TO BE IN CONFOMANCE WITH THE ALIGNMENT CALLED FO IN THE PLANS AND THE ALIGHMENTS CALLED FO BY DEPATMENT DESIGN STANDADS SPECIFIED IN THE PLANS; IN ABSENCE OF EITHE PLAN EQUIEMENT, THE OFFSET SHALL BE DETEMINED BY THE ENGINEE, AND UNLESS OTHE FLA ATES AE APPOVED BY THE ENGINEE THE FLAE ATES TO BE APPLIED AE 1:10 FO SPEEDS < 45 mph. SEE INDEX NO. 642 FO OTHE FLAE ATES ON FEEWAY FACILITIES. THE SUFACE COSS SLOPE APPOACHING THE BAIE WALL AND CONTINUING ACOSS THE EQUIED SPACE SHALL NOT EXCEED A ATE OF 1 VETICAL: 10 HOIZONTAL. DAWN: evision DO NOT SCALE DAWING ECO Date ev By Chk. DEPATUE ATES: SEE DESIGN STANDADS INDEX 415 AEA SHIELDED WHEN WOK ZONE HAZADS O THE WOK AEA OCCUPY SPACE LESS THAN CLEA ZONE WIDTH AEA SHIELDED WHEN WOK ZONE HAZADS O THE WOK AEA EXTEND TO O BEYOND CLEA ZONE LIMIT DAWING: EV: ENG-FE-048 ev E, 1/22/2016

L (LENGTH OF NEED) X (LENGTH OF ADVANCEMENT LA) CLEA ZONE LIMIT X (LENGTH OF ADVANCEMENT A) BACK OF HAZAD O BACK OF WOK ZONE AEA INSIDE CLEA ZONE EXTEND BAIES 14 UNITS PAST CLEA ZONE LINE(TYP.) APPOACH DEPATUE LINE D(LA) D(A) APPOACH DEPATUE LINE EXTEND BAIES 7 UNITS PAST CLEA ZONE LINE (TYP.) d(la) TAILING DEPATUE LINE TAVELWAY LA TAVELWAY A. SEE 600 SEIES INDEXES FO APPLICATIONS TAFFIC CONTOL DEVICES. d(a) APPOACHING TAFFIC L (LENGTH OF NEED) X (LENGTH OF ADVANCEMENT A) X (LENGTH OF ADVANCEMENT LA) WOK ZONE EXTENDS OUTSIDE CLEA ZONE LIMIT CLEA ZONE LIMIT EXTEND BAIES 7 UNITS PAST CLEA ZONE LINE(TYP.) APPOACH DEPATUE LINE D(A) APPOACH DEPATUE LINE EXTEND BAIES 7 UNITS PAST CLEA ZONE LINE (TYP.) d(la) TAILING DEPATUE LINE TAVELWAY LA TAVELWAY A. SEE 600 SEIES INDEXES FO APPLICATIONS TAFFIC CONTOL DEVICES. DAWN: evision d(a) DO NOT SCALE DAWING ECO Date ev By Chk. APPOACHING TAFFIC LEGEND LA : LEFT APPOACH A : IGHT APPOACH DEPATUE ATES: SEE DESIGN STANDADS INDEX 415 AEA SHIELDED WHEN WOK ZONE HAZADS O THE WOK AE OCCUPY SPACE LESS THAN CLEA ZONE WIDTH AEA SHIELDED WHEN WOK ZONE HAZADS O THE WOK AEA EXTEND TO O BEYOND CLEA ZONE LIMIT DAWING: EV: ENG-FE-048 ev E, 1/22/2016

FEE STANDING UNITS (TYPE K O APPOVED POPIETAY UNIT) TYPE K O APPOVED POPIETAY TANSITION UNIT 2' CLEA TAFFIC LANE CASH CUSHION MAX. 1:12.5 7 UNITS 7 UNITS7 UNITS FEE STANDING UNITS (TYPE K O APPOVED POPIETAY UNIT) 2' CLEA 3 UNITS TAFFIC LANE MAX. 1:12.5 7 UNITS 7 UNITS7 UNITS OVELAP EFEENCE LINE YODOCK BAIE 45 MPH O LESS APPOACH SHOULDE BAIE ON UNDIVIDED FACILITIES OVELAP EFEENCE LINE YODOCK BAIE 45 MPH O LESS APPOACH SHOULDE BAIE ON DIVIDED FACILITIES LEGEND DAWN: evision DO NOT SCALE DAWING ECO Date ev By Chk. DAWING: DOT INDICATES NUMBE OF BOLT ANCHOS O STAKES OVELAP EFEENCE LINE EV: ENG-FE-048 ev E, 1/22/2016

BEGINNING LENGTH OF NEED (BLON) TYPE II TYPE II TYPE II TYPE I TYPE I TYPE I TYPE I 7 YODOCK 2001M BAIE UNITS YODOCK 2001M BAIE QuadGuard SYSTEM ATTENUATO BY ENEGY ABSOPTION SYSTEMS SHOULDE - IGHT O LEFT (IGHT SIDE SHOWN) WALL END TEATMENT 1. 2. 3. NOTES FO WALL END SHIELDING YODOCK ECOMMENDS TAPEING THE END UNITS OUTSIDE OF THE CLEA ZONE WHEN POSSIBLE. IF THIS IS NOT POSSIBLE, YODOCK ECOMMENDS THE USAGE OF THE QuadGuard ATTENUATO BY ENEGY ABSOPTION SYSTEM, NOT PEMITTED FO BIDIECTIONAL TAFFIC. CASH CUSHIONS SHALL BE INSTALLED IN ACCODANCE WITH THE MANUFACTUE'S SPECIFICATIONS AND ECOMMENDATIONS. TEMPOAY CASH CUSHIONS CAN BE EITHE NEW O FUNCTIONALLY SOUND USED DEVICES. PEFOMANCE OF INTENDED FUNCTION IS THE ONLY CONDITION OF ACCEPTANCE, WHETHE THE CASH CUSHION IS NEW, USED, EFUBISHED, PUCHASED, LEASED, ENTED, ON LOAN, SHAED BETWEEN POJECTS, O MADE UP OF MIXED NEW AND USED COMPONENTS. OPTIONAL TEMPOAY CASH CUSHIONS AE TO BE PAID FO PE LOCATION UNDE THE CONTACT UNIT PICE FO CASH CUSHION (TEMPOAY) DAWN: evision DO NOT SCALE DAWING ECO Date ev By Chk. DAWING: EV: ENG-FE-048 ev E, 1/22/2016