June 26, Federal. Commissioners: Re: CP Pursuant to. the. Pursuant to. ordering

Similar documents
El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity Report Washington Ranch Storage Facility Docket Nos. RP72-6, et al., CP79-224, and CP15-516

El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity Report Washington Ranch Storage Facility Docket Nos. RP72-6, et al.

Transcontinental Gas Pipe Line Corporation Compliance Filing in Docket No. RP05-369

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Interconnection for Wind Energy ) Docket No. RM

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 10-D

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * *

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Exhibit IV-1: Initiation of Zoning Map Amendments Case Report HEARING DATE: MAY 3, 2012

Township 34 North, Range 9 West, NMPM (NUL) Section 3: E/2

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Strata Energy, Inc.; Ross Uranium In Situ Recovery Facility; Source and

APPLICATION FOR CHANGE OF WATER RIGHT

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO

CITY OF PAPILLION PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC

SUBJECT: Adjustments to Photovoltaic and Electric Vehicle Forecasts to be Used in Southern California Edison Company's Distribution Planning

March 1, 2003 Western Snowpack Conditions and Water Supply Forecasts

Hawaii Natural Energy Institute Holmes Hall Dole Street Honolulu, Haw&ll \96a22. December 17, 1991 l ~",..: ~J~.; '-.:...

Nicor Gas Rider 6 History Gas Supply Cost Factors (Cents Per Therm) MONTH GCR (R/) UFR (S/) GCNR (T/) UFNR (U/) GC CGC DGC NCGC TSA CSBC SSCR BSA

Exhibit A Proposed Order

For personal use only

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report

REVISED UPDATED PREPARED DIRECT SAFETY ENHANCEMENT COST ALLOCATION TESTIMONY OF GARY LENART SAN DIEGO GAS & ELECTRIC COMPANY AND

PREPARED DIRECT TESTIMONY OF GREGORY TEPLOW SOUTHERN CALIFORNIA GAS COMPANY AND SAN DIEGO GAS & ELECTRIC COMPANY

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT:

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND

for Presentatic~ to the: 1978 Annual Meeting John l~. Shupe Spec; a1,4ss; s t&nt for Eneigy! echrology U. S. DE:partnient of Ener;)'

UNITED STATES DISTRICT COURT DISTRICT OF ARIZONA ) ) ) ) ) ) ) )

Department of Transportation. National Highway Traffic Safety Administration. [Docket No. NHTSA ; Notice 2]

The North American Electric Reliability Corporation hereby submits Informational Filing of the North American Electric Reliability Corporation.

Colorado PUC E-Filings System

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No MAT-02 October 7, 2014

March 5, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

Assessment of Frost Impact on Cast Iron Pipes

POLICY ISSUE (INFORMATION)

LOS ANGELES POLICE DEPARTMENT SEMI-ANNUAL PUBLIC REPORT JANUARY 1, 2010 TO JUNE 30, 2010

NUCLEAR REGULATORY COMMISSION [NRC ] Instructions for Recording and Reporting Occupational Radiation Dose Data

March 16, Ameren Illinois Company, Docket No. ER Informational Filing of Annual Formula Rate Update and True-Up

Circular No.32/2017/TT/BCT Specifying and guiding the implementation of a number of articles of the Law on Chemicals and Decree No.

Colorado s Underground Injection Control Program: Prevention and Mitigation of Induced Seismicity

Services, inc. Re: Report on Yorktown Units 1 & 2 Operations Pursuant to Order Nos and

1. CALL TO ORDER 2. ROLL CALL 3. PLEDGE OF ALLEGIANCE 4. ORAL COMMUNICATIONS (NON-ACTION ITEM) 5. APPROVAL OF AGENDA 6. EWA SEJPA INTEGRATION PROPOSAL

RAILROAD COMMISSION OF TEXAS OIL & GAS DIVISION

Request for Tenders. Community Development, Parks & Recreation Facility Snow Removal

BEFORE THE CORPORATION COMMISSION OF THE STATE OF OKLAHOMA CAUSE CD NO. APPLICANT: CONTINENTAL RESOURCES, INC.

The following information is provided for your use in describing climate and water supply conditions in the West as of April 1, 2003.

RD1 - Page 469 of 578

THE PARKE AT OCEAN PINES HOME OWNERS ASSOCIATION, INC. Policy Resolution Snow Removal Policy

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 124,067,858

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Heidemarie C. Caswell

HAMILTON COUNTY, OHIO. Office of the Board of Education Norwood City Schooll District January, To the County Auditor:

For personal use only

Report on El Paso Electric Company Weather-Related Issues in February 2011

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Re: Report on Yorktown Units I & 2 Operations Pursuant to Order No

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/14 Utilizing FERC Form 1 Data

Monitoring and Verification of CO 2 Storage in Geological Formations Sally M. Benson Lawrence Berkeley National Laboratory Berkeley, CA 94720

Seismicity and the SWD-C4A well: An ongoing UIC case study in the Denver Basin, Colorado

Testing of the Strawn Sand, White Hat 20#3, Mustang Prospect, Permian Basin, Texas

2001 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville

GeothermEx, Inc. GEOTHERMAL RESERVOIR ASSESSMENT METHODOLOGY FOR THE SCIENTIFIC OBSERVATION HOLE PROGRAM, KILAUEA EAST RIFT ZONE, HAWAII TASK 1 REPORT

GIS ADMINISTRATOR / WEB DEVELOPER EVANSVILLE-VANDERBURGH COUNTY AREA PLAN COMMISSION

Streamlined Annual PHA Plan (Small PHAs)

COGCC Underground Injection Program & Induced Seismicity

APPLICATION FOR SIMPLE CHANGE IN SURFACE POINT OF DIVERSION PURSUANT TO (3.5), C.R.S.

RESOLUTION NO. PZ Series of 2017

Statistical Series 59 Alberta Drilling Activity

Induced Seismicity Potential in Energy Technologies

Colorado PUC E-Filings System

Official Form 410 Proof of Claim

PUBLIC UTILITY COMMISSION OF TEXAS DOCKET NO

The Dayton Power and Light Company Load Profiling Methodology Revised 7/1/2017

DECREE No. 44. of the Ministry of Economy of the Slovak Republic. dated 19 February 1999,

NUCLEAR REGULATORY COMMISSION. 10 CFR Chapter 1 [NRC ] Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing

Re: Report on Yorktown Units 1 & 2 Operations Pursuant to Order No

Name of Applicant Mailing Address address Telephone Number

Update - Testing of the Strawn Sand, White Hat 20#3, Mustang Prospect, Permian Basin, Texas

Krasny license: Operational update February 2016

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * *

SEPTEMBER 1991 MONTHLY REPORT. Scientific Observation Hole (SOH) Geothermal Resource Permit: GRP TMK: :01; :02; and :32

Multivariate Regression Model Results

RHODE ISLAND EMPLOYER S INCOME TAX WITHHOLDING TABLES DRAFT 11/27/2018.

Chamorro Land Trust Commission (Kumision Inangokkon Tano' Chamoru)

Updated Core & Drill Cutting Material Sampling Procedure. Holly Naysmith April 23, 2014

Snow tyres provisions - status report

Chelwood Hills Homeowners Association 2016 Budget Approved at Annual Meeting on January 9, 2016

APPLICATION FOR CONDITIONAL ABSOLUTE WATER STORAGE RIGHT

BOARD OF COUNTY COMMISSIONERS. December 10, 1991

FINAL AESTHETICS RESOURCES STUDY PLAN. Takatz Lake Hydroelectric Project, FERC No Prepared by: City and Borough of Sitka Electric Department

PARTICIPATING ORGANISATIONS CIRCULAR

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

LEDGEWOOD BEACH WATER DISTRICT Monthly Minutes August 8, 2017

INTRODUCTION. Herman Dykstra Petroleum Engineering Consultant Concord, Calif or ni a -1 3-

1978 MSc Geology, South Dakota School of Mines and Technology Introduction to Groundwater Vistas (Groundwater Modeling) Albuquerque, New Mexico

SUMMARY OF RESEARCH; UNNAMED ROAD # $ - USGS Topo Proof Map FLPMA The use of and jurisdiction of UNNAMED ROAD # pre-dates the

Induced Seismicity Potential in Energy Technologies

FS Original Hole Ft April 26, 2016

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr.

September 17, OGC

Transcription:

June 26, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity Report Washington Ranch Storage Facility Docket Nos. RP72-6, et al., CP79-224, and CP15-516 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is filing pursuant to the requirements of the Federal Energy Regulatory Commission ("Commission") in Docket Nos. RP72-6, et al., CP79-224, and CP15-516 the semi-annual activity report for the Washington Ranch Storage Facility. Description of Proceeding Pursuant to the Commission approved Stipulation and Agreement in the Settlement of Restructuring, Rate, and Related Proceedings filed January 29, 1993 in Docket Nos. RS92-60-000, et al., EPNG's Washington Ranch Storage Facility located in Eddy County, New Mexico is operated primarily as an adjunct to EPNG's transmission system for load balancing, line pack and pressure control. Additionally, as authorized in Docket No. RP05-422-000, EPNG offers interruptible storage services under Rate Schedule ISS. Description of Items Filed Pursuant to ordering paragraph (H) of the Commission Order Approving Stipulation and Agreement Settling Proceedings and Prescribing Permanent Allocation Plan, Granting Certificates of Public Convenience and Necessity, Granting Abandonments, and Granting Adjustments issued March 26, 1981 in Docket Nos. RP72-6, et al., and CP79-224, EPNG is submitting a semi-annual activity report for the Washington n Ranch Storage Facility for the period of November 1, 2017 through April 30, 2018. This report has also incorporated additional Washington Ranch Storage Field information required by Ordering Paragraph (C) of the Commission Order in Docket No. CP15-516-000 issued August 18, 2015.

Federal Energy June 26, 2018 Regulatory Commission Filing Information EPNG is efiling this report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000. I have read these documents and the information contained therein is true, to the best of my knowledge and belief. Respectfully submitted, EL PASO NATURAL GAS COMPANY,L.L.C. By /s/ Francisco Tarin Director, Regulatory Enclosures

Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 26 th day of June, 2018. /s/ Francisco Tarin P.O. Box 1087 Colorado Springs, Colorado 80944 (719) 667-7517

Docket Nos. RP72-6, et al., CP79-224, and CP15-516 EL PASO NATURAL GAS COMPANY, L.L.C. SEMI-ANNUAL ACTIVITY REPORT WASHINGTON RANCH STORAGE FACILITY For the Period: November 1, 2017 April 30, 2018 El Paso Natural Gas Company, L.L.C. ("EPNG") is submitting this report pursuant to ordering paragraph (H) of the Commission Order Approving Stipulation and Agreement Settling Proceedings and Prescribing Permanent Allocation Plan, Granting Certificates of Public Convenience and Necessity, Granting Abandonments, and Granting Adjustments issued March 26, 1981 in Docket Nos. RP72-6, et al., and CP79-224. Unless otherwise stated, all volumes are reported using a pressure base of 14.73 psia and a temperature base of 60 F. All volumes are listed in Mcf, unless otherwise stated. The storage activity cycle covered in this report is from November 1, 2017 through April 30, 2018. 1) The daily volume of natural gas injected into and withdrawn from the storage facility. Attached as Exhibit 1 is the list of daily injection and withdrawal volumes for Washington Ranch for the November 1, 2017 through April 30, 2018 reporting period. 2) The volume of natural gas in the storage facility at the end of the reporting period. The volume of gas in the reservoir as of May 1, 2018 was 37,616,937 Mcf at 14.73 psia. 3) The maximum daily injection or withdrawal rate experienced during the activity period, and the average working pressure on such maximum days, taken at a central measuring point where the total volume injected or withdrawn is measured. Working Telemetered Data Volume (MMcf) Pressure (psia) Maximum Injection: 134.2 661.5 Maximum Withdrawal: 223.6 618.1 4) Results of any tracer program by which the leakage of injected gas may be determined. If leakage of gas exists, the report should show the estimated total volume of gas leakage, the volume of recycled gas and the estimated remaining inventory of gas in the reservoir at the end of the reporting period. No tracer surveys were conducted during the November 1, 2017 through April 30, 2018 reporting period. Washington Ranch Semi-Annual Storage Report Page 1 of 3

Docket Nos. RP72-6, et al., CP79-224, and CP15-516 EL PASO NATURAL GAS COMPANY, L.L.C. SEMI-ANNUAL ACTIVITY REPORT WASHINGTON RANCH STORAGE FACILITY For the Period: November 1, 2017 April 30, 2018 There was no indication of any gas leakage from the field/reservoir during the November 1, 2017 through April 30, 2018 reporting period. 5) Any surveys of pressures in gas wells, and the results of back-pressure tests conducted during the reporting period. No bottom-hole pressure survey was conducted during the November 1, 2017 through April 30, 2018 reporting period. Further, there were no water levels detected in observation wells. During the November 1, 2017 through April 30, 2018 reporting period, a shut-in pressure survey was conducted on April 6, 2018. Recorded pressures are attached in Exhibit 2. No back-pressure tests were conducted during the November 1, 2017 through April 30, 2018 reporting period. As the gas storage reservoir in Washington Ranch Field is not an aquifer-type reservoir, no pump-tests were performed. 6) The latest revised structure and isopachous contour maps showing the location of the wells, the location and extent of the gas bubble in the storage reservoir for aquifer-type reservoirs and in any other reservoirs of the project in which gas bubbles are known to exist, and the location of the gas-water contact if one exists. This map need not be filed if there is no material change from the map previously filed. No revisions have occurred to the structure or isopachous contour maps during the November 1, 2017 through April 30, 2018 reporting period. The location and extent of the gas bubble is not applicable for the type of reservoir which exists in the Washington Ranch Gas Storage Field. 7) For the reporting period, a summary of wells drilled, recompleted or worked-over, with subsea depth of formation and casing settings. No drilling, re-completion, or work-over activity occurred during the November 1, 2017 through April 30, 2018 reporting period. Washington Ranch Semi-Annual Storage Report Page 2 of 3

Docket Nos. RP72-6, et al., CP79-224, and CP15-516 EL PASO NATURAL GAS COMPANY, L.L.C. SEMI-ANNUAL ACTIVITY REPORT WASHINGTON RANCH STORAGE FACILITY For the Period: November 1, 2017 April 30, 2018 8) Discussion of current operating problems and conclusions. EPNG did not experience any operating problems in the Washington Ranch Storage Facility during the November 1, 2017 through April 30, 2018 reporting period. 9) Such other data or reports which may aid the Commission in the evaluation of the storage project. EPNG did not experience any activities or events that would necessitate the generation of additional reports or data for the Washington Ranch Storage Facility during the November 1, 2017 through April 30, 2018 reporting period. Washington Ranch Semi-Annual Storage Report Page 3 of 3

Exhibit 1 Reporting Period 11/1/17 to 4/30/18 El Paso Natural Gas Company, L.L.C. Daily Volumes of Natural Gas Injection into and Withdrawal from the Washington Ranch Storage Field DATE Injection Net Mcf Injection Net Dth Withdrawal Net Mcf Withdrawal Net Dth 11/1/2017 0 0 96940 102324 11/2/2017 0 0 91883 96702 11/3/2017 0 0 20289 21284 11/4/2017 36542 38437 10627 11158 11/5/2017 108608 114441 0 0 11/6/2017 9794 10344 67727 71375 11/7/2017 0 0 209488 220079 11/8/2017 0 0 127101 133272 11/9/2017 0 0 160585 168270 11/10/2017 0 0 102702 107547 11/11/2017 0 0 0 0 11/12/2017 0 0 0 0 11/13/2017 0 0 0 0 11/14/2017 0 0 0 0 11/15/2017 0 0 0 0 11/16/2017 0 0 0 0 11/17/2017 0 0 0 0 11/18/2017 23087 24300 0 0 11/19/2017 6847 7216 58333 61218 11/20/2017 0 0 101574 106306 11/21/2017 0 0 207299 216942 11/22/2017 0 0 106528 111420 11/23/2017 0 0 147952 154713 11/24/2017 0 0 108960 113906 11/25/2017 0 0 0 0 11/26/2017 0 0 0 0 11/27/2017 0 0 86380 90235 11/28/2017 0 0 133692 139702 11/29/2017 0 0 134650 140678 11/30/2017 3211 3354 168516 176022 12/1/2017 0 0 204148 213189 12/2/2017 0 0 92107 96166 12/3/2017 0 0 0 0 12/4/2017 0 0 0 0 12/5/2017 0 0 0 0 12/6/2017 0 0 0 0 12/7/2017 0 0 28391 29632 12/8/2017 0 0 68762 71745 12/9/2017 0 0 105934 110532 12/10/2017 0 0 98347 102635 12/11/2017 0 0 96462 100757 * Note that yellow highlighting indicates peak date injections/withdrawals. Exhibit 1 Page 1 of 5

Exhibit 1 Reporting Period 11/1/17 to 4/30/18 El Paso Natural Gas Company, L.L.C. Daily Volumes of Natural Gas Injection into and Withdrawal from the Washington Ranch Storage Field DATE Injection Net Mcf Injection Net Dth Withdrawal Net Mcf Withdrawal Net Dth 12/12/2017 0 0 89501 93498 12/13/2017 0 0 167317 174782 12/14/2017 0 0 112422 117410 12/15/2017 0 0 131350 137140 12/16/2017 0 0 97050 101298 12/17/2017 0 0 146804 153232 12/18/2017 0 0 138313 144345 12/19/2017 0 0 48290 50355 12/20/2017 0 0 148726 155187 12/21/2017 0 0 163215 170295 12/22/2017 0 0 155652 162373 12/23/2017 0 0 215935 225228 12/24/2017 0 0 137724 143624 12/25/2017 51925 54641 0 0 12/26/2017 18985 20042 80 84 12/27/2017 0 0 196416 205474 12/28/2017 0 0 214646 223807 12/29/2017 0 0 207828 216639 12/30/2017 0 0 109589 114205 12/31/2017 0 0 129529 134970 1/1/2018 0 0 208427 217175 1/2/2018 0 0 223674 233024 1/3/2018 0 0 201557 209937 1/4/2018 0 0 52881 55069 1/5/2018 45447 48132 0 0 1/6/2018 60389 64360 0 0 1/7/2018 0 0 0 0 1/8/2018 0 0 176839 186080 1/9/2018 0 0 216282 225588 1/10/2018 0 0 217385 226386 1/11/2018 0 0 204361 212769 1/12/2018 0 0 215128 223938 1/13/2018 0 0 199793 207939 1/14/2018 0 0 70168 73012 1/15/2018 0 0 163150 169772 1/16/2018 0 0 204245 212513 1/17/2018 0 0 215934 224645 1/18/2018 0 0 187654 195197 1/19/2018 0 0 0 0 1/20/2018 0 0 0 0 1/21/2018 0 0 0 0 * Note that yellow highlighting indicates peak date injections/withdrawals. Exhibit 1 Page 2 of 5

Exhibit 1 Reporting Period 11/1/17 to 4/30/18 El Paso Natural Gas Company, L.L.C. Daily Volumes of Natural Gas Injection into and Withdrawal from the Washington Ranch Storage Field DATE Injection Net Mcf Injection Net Dth Withdrawal Net Mcf Withdrawal Net Dth 1/22/2018 0 0 0 0 1/23/2018 0 0 0 0 1/24/2018 0 0 0 0 1/25/2018 0 0 0 0 1/26/2018 0 0 0 0 1/27/2018 0 0 0 0 1/28/2018 0 0 0 0 1/29/2018 0 0 0 0 1/30/2018 0 0 48947 50994 1/31/2018 0 0 157302 163783 2/1/2018 0 0 140604 146282 2/2/2018 0 0 189744 197344 2/3/2018 0 0 196207 204036 2/4/2018 0 0 196155 203953 2/5/2018 0 0 195764 203522 2/6/2018 0 0 181756 188927 2/7/2018 0 0 167103 173678 2/8/2018 0 0 196024 203717 2/9/2018 0 0 196471 204158 2/10/2018 0 0 138591 144000 2/11/2018 0 0 181930 189022 2/12/2018 0 0 191904 199376 2/13/2018 0 0 154449 160460 2/14/2018 0 0 146883 152585 2/15/2018 0 0 147991 153717 2/16/2018 0 0 146826 152492 2/17/2018 0 0 146791 152446 2/18/2018 0 0 146954 152601 2/19/2018 0 0 97248 100986 2/20/2018 0 0 120225 124839 2/21/2018 0 0 151764 157572 2/22/2018 0 0 148894 154576 2/23/2018 0 0 112017 116285 2/24/2018 30638 32065 28 29 2/25/2018 64119 67069 0 0 2/26/2018 0 0 0 0 2/27/2018 0 0 60317 62785 2/28/2018 0 0 147485 153598 3/1/2018 0 0 147352 153113 3/2/2018 351 364 59053 61320 3/3/2018 37923 40111 0 0 * Note that yellow highlighting indicates peak date injections/withdrawals. Exhibit 1 Page 3 of 5

Exhibit 1 Reporting Period 11/1/17 to 4/30/18 El Paso Natural Gas Company, L.L.C. Daily Volumes of Natural Gas Injection into and Withdrawal from the Washington Ranch Storage Field DATE Injection Net Mcf Injection Net Dth Withdrawal Net Mcf Withdrawal Net Dth 3/4/2018 69338 73723 11 12 3/5/2018 424 450 0 0 3/6/2018 2586 2743 20532 21454 3/7/2018 1566 1638 111239 116766 3/8/2018 0 0 32237 33821 3/9/2018 0 0 0 0 3/10/2018 0 0 0 0 3/11/2018 100004 105595 0 0 3/12/2018 1337 1415 0 0 3/13/2018 120070 127447 0 0 3/14/2018 11635 12363 0 0 3/15/2018 0 0 0 0 3/16/2018 0 0 0 0 3/17/2018 0 0 0 0 3/18/2018 0 0 0 0 3/19/2018 0 0 76465 80055 3/20/2018 0 0 98017 103030 3/21/2018 0 0 97155 101911 3/22/2018 0 0 6515 6783 3/23/2018 0 0 110154 115169 3/24/2018 0 0 41985 43812 3/25/2018 0 0 0 0 3/26/2018 0 0 126286 131446 3/27/2018 0 0 122179 127100 3/28/2018 0 0 145120 150826 3/29/2018 0 0 148213 153952 3/30/2018 0 0 147712 153339 3/31/2018 0 0 147330 152886 4/1/2018 0 0 147640 153168 4/2/2018 0 0 138600 143767 4/3/2018 0 0 0 0 4/4/2018 0 0 0 0 4/5/2018 0 0 0 0 4/6/2018 0 0 42 43 4/7/2018 0 0 1927 2003 4/8/2018 0 0 83999 87176 4/9/2018 0 0 110273 114354 4/10/2018 0 0 102777 106569 4/11/2018 0 0 12735 13204 4/12/2018 64952 68539 0 0 4/13/2018 109352 115952 0 0 * Note that yellow highlighting indicates peak date injections/withdrawals. Exhibit 1 Page 4 of 5

Exhibit 1 Reporting Period 11/1/17 to 4/30/18 El Paso Natural Gas Company, L.L.C. Daily Volumes of Natural Gas Injection into and Withdrawal from the Washington Ranch Storage Field DATE Injection Net Mcf Injection Net Dth Withdrawal Net Mcf Withdrawal Net Dth 4/14/2018 92585 98021 0 0 4/15/2018 1651 1746 61445 64923 4/16/2018 0 0 110700 116657 4/17/2018 42064 44666 0 0 4/18/2018 108377 115325 1 2 4/19/2018 132077 139400 0 0 4/20/2018 134226 141434 0 0 4/21/2018 132895 140159 1 1 4/22/2018 61064 64489 0 0 4/23/2018 0 0 80710 85160 4/24/2018 0 0 70489 74287 4/25/2018 0 0 6940 7305 4/26/2018 0 0 0 0 4/27/2018 0 0 0 0 4/28/2018 110524 116421 0 0 4/29/2018 133614 141126 0 0 4/30/2018 131432 139062 0 0 TOTAL 2059638 2176592 14875441 15507964 * Note that yellow highlighting indicates peak date injections/withdrawals. Exhibit 1 Page 5 of 5

Exhibit 2 Reporting Period 11/1/17 to 4/30/18 El Paso Natural Gas Company, L.L.C. Shut-in Wellhead Pressure Survey Survey Date - April 6, 2018 Wellhead Shut-in Well Pressure (PSIG) Name 04/06/18 WI #01 1,133 WI #03 1,200 WI #04 1,455 WI #05 1,500 WI #07 1,123 WI #10 1,157 WI #11 1,342 WI #13 1,284 WI #14 1,324 WI #16 1,143 WI #17 1,127 WI #19 1,147 WI #20 1,128 WI #21 1,133 WI #22 1,144 WI #23 1,165 WI #24 1,146 WI #25 1,232 WI #26 1,282 OBS #1 1,621 OBS #4 2,036 Maximum = 2,036 Minimum = 1,123 Median= 1,165 Average = 1,277