NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

Similar documents
NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Spring 2018 Drill Program

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

The Kennady North Project. Corporate Presentation H1 2018

The Kennady North Project Investor Presentation Q2 2017

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Goldsource Coal Intercepts in Saskatchewan

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

V Sample from C.O.D vein 15 metres southwest of V

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

Detour Gold Reports Drilling Results from Lower Detour

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

MARENGO RELEASES RESULTS FOR RECENT SAMPLING AND EXPLORATION DRILLING AT RIMA PROSPECT

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Interval (meters) To (meters)

Goldsource Completes Winter Drill Program At Border; 34 Holes Contain Aggregate Coal Intercepts Ranging From 10 to 100 Meters

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

North American Palladium Provides Update on Lac des Iles Exploration Program

News Release. Infill Drilling Program

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

Pacific Empire Minerals Provides Copper King RC Drilling Results

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

KIRKLAND LAKE GOLD EXTENDS HIGH-GRADE GOLD MINERALIZATION AT MACASSA, NEW GOLD SYSTEM DISCOVERED AT DEPTH

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Argonaut Gold announces San Agustín resource of 845,000 gold ounces and 28.3 million silver ounces (1,280,000 gold equivalent ounces)

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

Kelly Creek Basin. EXPLORATION UPDATE June 23, Reno Office 10 Greg Street, Suite 170 Sparks, Nevada

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

Goldcrest Resources Ltd.

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

(416) Highlights include:

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

A B C PAD A HIGHLIGHTS

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

NEWS RELEASE August 10, 2017

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

NGEX DRILLS 42 METRES OF 1.13 G/T GOLD AND G/T SILVER AT FILO DEL SOL PROJECT

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M Nov 20, 2017 SBB NR SBB TSX

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

Arctic Star Commences Exploration at the Timantti Diamond Project, Finland Home 2017 Arctic Star Commences Exploration at

August 20, 2018 SBB NR SBB TSX

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

A Discovery Company. Exploring for Canadian Diamonds

Highlights from the four holes announced in this news release include:

Transcription:

NEWS RELEASE May 23, 2018 TSX and NASDAQ: MPVD Mountain Province Diamonds Completes the Kennady North Winter Exploration Program Toronto and New York, May 23, 2018 Mountain Province Diamonds Inc. ( Mountain Province, the Company ) (TSX and NASDAQ: MPVD) today announces the completion of the winter drilling program at their Kennady North Project. The 100%-owned Kennady North Project was recently acquired through a business combination with Kennady Diamonds Inc. (see news release dated April 13, 2018). Three drill rigs have been active on the program, with one drill dedicated to delineation drilling on Faraday 2, a second drill dedicated to geotechnical drilling on the Faraday kimberlites, and the third drill testing exploration targets within the Kelvin-Faraday Corridor. A total of 38 drill holes were completed for a program total of 6,826 metres. Delineation drilling on the northwest extension of the Faraday 2 kimberlite has been completed. The northwest extension, discovered in 2017, extends the Faraday 2 kimberlite by over 150 metres, with geologic units in the inferred resource continuing into the northwest extension (see Kennady Diamonds news releases dated September 11, 2017 and March 7, 2018). The completed drilling is expected to advance the Faraday 2 pipe shell model to an inferred level of confidence. Results since the last update (see Kennady Diamonds news release dated April 5, 2018) are summarized in Table 1 below. Table 1: Faraday 2 2018 Delineation Drill Program Kimberlite Intercepts (m) End of Drill Hole DH Purpose Azimuth Inclination Hole From To Intercept* (m) KDI-18-012a Delineation/Exploration 000-90 254.33 270.52 15.18** 334 279.68 292.94 11.37** 297.36 298.34 0.45** 304.00 305.45 0.51** KDI-18-012b Delineation/Exploration 305-80 - - - 317 KDI-18-013 Delineation/Geotech 038-66 258.69 288.97 28.05** 319 KDI-18-019 Delineation/Exploration 039-67 306.83 315.45 8.62 337 322.75 323.80 1.05 330.63 331.00 0.37 KDI-18-022 Delineation 040-68 250.50 295.25 44.75 307 *Intercepts are not true widths. **Includes minor country rock intercepts. See the appendix to the news release posted on the Company s website for a plan-view drill hole map regarding the Faraday 2 delineation program.

Drill holes KDI-18-012 a&b were designed to test for continued extension of the Faraday 2 body along strike to the northwest. Vertical hole 18-012a is interpreted to have intersected the marginal zone of the kimberlite as evidenced by the regular intervals of country rock gneiss interbedded within the kimberlite. Hole 18-012b was drilled to the northwest along the projected strike of the body and did not intersect kimberlite, indicating that the pipe had changed orientation. Angled drill hole 18-019 was subsequently drilled in a northeasterly direction and it clipped the bottom edge of the body, indicating that the pipe was now likely trending to the north. Drill hole 18-013 deviated slightly and intersected the kimberlite off centre and across 28 metres compared to the 50 metre intervals achieved in adjacent delineation holes. In comparison, drill hole 18-022 hit close to the target zone for a 44.75 metre kimberlite intercept. Irrespective of minor deviations in some of the drill holes, the entry and exit pierce points will provide valuable information to advance the three-dimensional modeling of the pipe. The final hole of the geotechnical program was completed on Faraday 1-3. The hole was designed to test the geotechnical characteristics of the country rock for the purposes of open pit mine design and was not targeted to intersect kimberlite. Results are summarised in Table 2 below. Table 2: Faraday 1-3 Geotechnical Drilling Drill Hole DH Purpose Azimuth Inclination Kimberlite Intercepts (m) From To Intercept* End of Hole (m) KDI-18-017 Geotechnical 320-45 - - - 189 Dr. Tom McCandless, former director and qualified person for Kennady Diamonds and now technical advisor to Mountain Province, commented, The goal of the Faraday geotechnical program was to complete drilling that will advance the Faraday kimberlites from a scoping-level to a pre-feasibility level of confidence in terms of geotechnical analysis. In this respect the program was very successful, with all of the planned drill holes and associated geotechnical surveys, ground water sampling and other required testwork completed. Since early April, a third drill rig has been dedicated to testing geophysically-defined exploration targets located in close proximity to the Faraday and Kelvin kimberlites. A total of eight targets were tested with a total of seventeen drill holes. Kimberlite has been intersected in all holes, consisting of kimberlite sheet complexes with the longest intercept being 6.85 metres of coherent kimberlite. In every case the kimberlite sheets are intimately associated with greater zones of altered and brecciated country rock. Table 3 below summarizes the results for exploration targets drill tested to date.

Table 3: Results for exploration targets tested under Faraday Lake Drill Hole Target Azimuth Inclination Kimberlite Intercepts (m) From To Intercept* End of Hole (m) Targets Near the Faraday Kimberlites KDI-18-014a Target #18-01 000-90 34.53 35.55 1.02 165 46.20 46.31 0.11 KDI-18-014b Target #18-01 017-45 89.33 89.54 0.21 199 91.15 93.64 2.49 95.18 95.47 0.29 96.89 98.09 1.20 KDI-18-015 Target #18-01 283-45 78.87 79.18 0.31 199 91.66 97.30 5.41** KDI-18-016a Target #18-02 000-90 64.48 66.49 2.01 119 75.18 76.91 0.93** KDI-18-016b Target #18-02 220-65 61.03 61.31 0.28 131 62.00 65.37 2.29** KDI-18-016c Target #18-02 220-45 66.89 68.98 1.68** 122 79.51 82.65 3.14 KDI-18-018a Target #18-03 000-90 128.00 133.00 5.00 179 KDI-18-018b Target #18-03 341-62 192.73 193.16 0.43 269 198.02 198.79 0.77 203.61 204.13 0.52 225.27 225.77 0.50 238.64 239.66 1.02 KDI-18-020b Target #18-04 145-45 56.70 56.83 0.13 116 59.53 60.08 0.55 61.92 62.00 0.08 68.97 70.04 1.07 KDI-18-020c Target #18-04 145-71 60.22 63.28 3.06 119 KDI-18-021a Target #18-05 000-90 69.60 75.58 4.37** 126 KDI-18-021b Target #18-05 125-45 61.26 64.94 3.68 152 KDI-18-023 Target #18-06 220-76 68.00 69.00 1.00 119 KDI-18-024 Target #18-07 145-55 59.25 60.50 1.25 121 66.00 66.50 0.50 83.50 84.00 0.50

Target Near the Kelvin Kimberlite KDI-18-025 Target #18-08 135-55 37.75 45.00 6.85** 119 KDI-18-026 Target #18-08 135-55 38.00 42.50 4.50 114 *Intercepts are not true widths. **Includes minor country rock intercepts. Dr. McCandless further commented, We conducted a systematic approach to drill testing exploration targets located in close proximity to the known Faraday and Kelvin kimberlites. While only kimberlite sheets were intersected, in each case the subtle geophysical anomalies we targeted were explained by intervals of highly altered and fractured country rock immediately adjacent to the kimberlite sheets. Similarly fractured and altered country rock is associated with both the Kelvin and the Faraday pipes and we are confident that kimberlite pipes may be associated with some of the geophysical anomalies that remain to be tested. **** Mountain Province Diamonds is a 49% participant with De Beers Canada in the Gahcho Kué diamond mine located in Canada s Northwest Territories. Gahcho Kué is the world s largest new diamond mine, consisting of a cluster of four diamondiferous kimberlites, three of which are being developed and mined under the initial 12 year mine plan. Qualified Person The disclosure in this news release of scientific and technical information regarding Mountain Province s mineral properties has been reviewed and approved by Dr. Tom McCandless, P.Geo., technical advisor to Mountain Province and a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects. FOR FURTHER INFORMATION, PLEASE CONTACT: Mountain Province Diamonds Inc. David Whittle, Interim President and CEO 161 Bay Street, Suite 1410 Toronto, Ontario M5J 2S1 Phone: (416) 361-3562 E-mail: info@mountainprovince.com Caution Regarding Forward Looking Information This news release contains certain forward-looking statements and forward-looking information under applicable Canadian and United States securities laws concerning the business, operations and financial performance and condition of Mountain Province Diamonds Inc. Forward-looking statements and forward-looking information include, but are not limited to, statements with respect to estimated production and mine life of the project of Mountain Province; the realization of mineral reserve estimates; the timing and amount of estimated future production; costs of production; the future price of diamonds; the estimation of mineral reserves and resources; the ability to manage debt; capital expenditures; the ability to obtain permits for operations; liquidity; tax rates; and currency exchange rate fluctuations. Except for statements of historical fact relating to Mountain Province, certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterized by words such as anticipates, may, can, plans, believes, estimates, expects, projects, targets, intends, likely, will, should, to be, potential and

other similar words, or statements that certain events or conditions may, should or will occur. Forward-looking statements are based on the opinions and estimates of management at the date the statements are made, and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. Many of these assumptions are based on factors and events that are not within the control of Mountain Province and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking statements include variations in ore grade or recovery rates, changes in market conditions, changes in project parameters, mine sequencing; production rates; cash flow; risks relating to the availability and timeliness of permitting and governmental approvals; supply of, and demand for, diamonds; fluctuating commodity prices and currency exchange rates, the possibility of project cost overruns or unanticipated costs and expenses, labour disputes and other risks of the mining industry, failure of plant, equipment or processes to operate as anticipated. These factors are discussed in greater detail in Mountain Province's most recent Annual Information Form and in the most recent MD&A filed on SEDAR, which also provide additional general assumptions in connection with these statements. Mountain Province cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Mountain Province believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this news release should not be unduly relied upon. These statements speak only as of the date of this news release. Although Mountain Province has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Mountain Province undertakes no obligation to update forward-looking statements if circumstances or management s estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking statements to the extent they involve estimates of the mineralization that will be encountered as the property is developed. Further, Mountain Province may make changes to its business plans that could affect its results. The principal assets of Mountain Province are administered pursuant to a joint venture under which Mountain Province is not the operator. Mountain Province is exposed to actions taken or omissions made by the operator within its prerogative and/or determinations made by the joint venture under its terms. Such actions or omissions may impact the future performance of Mountain Province. Under its current note and revolving credit facilities Mountain Province is subject to certain limitations on its ability to pay dividends on common stock. The declaration of dividends is at the discretion of Mountain Province s Board of Directors, subject to the limitations under the Company s debt facilities, and will depend on Mountain Province s financial results, cash requirements, future prospects, and other factors deemed relevant by the Board.

APPENDIX Faraday 2 Delineation Program Plan-view drill hole map