BLACK PLATINUM ENERGY LTD

Similar documents
Exploring Eastern Africa. East Africa Oil and Gas Summit, 2014 March 2014

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

For personal use only. Pan Pacific Petroleum NL Excellence in Oil and Gas Conference 12th March 2014

Hydrocarbon Potential of the Marginal Fields in Niger Delta Oza Field, a case study*

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Kelly Creek Basin. EXPLORATION UPDATE June 23, Reno Office 10 Greg Street, Suite 170 Sparks, Nevada

Karoon Awarded Exploration Permit EPP46 in Australia s Most Active Exploration Province, the Ceduna Sub Basin, Great Australian Bight

Tesorillo Project Presentation Spain. June 2013

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

PRESENTATION BUILDING VALUE IN ARGENTINA Las Aguilas Overview

For personal use only

KEY PETROLEUM COMPANY UPDATE AND PERTH BASIN EXPLORATION STATUS

FAR builds on solid foundations

Emily-1 First Exploration Well in PEL-182

Hardy Oil and Gas plc. ("Hardy" or "the Company") Publication of Technical Evaluation

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Update - Testing of the Strawn Sand, White Hat 20#3, Mustang Prospect, Permian Basin, Texas

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

For personal use only

Exploring Eastern Africa. Africa Oil and Gas Conference October 2014

Unconventional Natural Gas A Brief Review for Instituto Petroquimica Argentina

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

REGIONAL GEOLOGY IN KHMER BASIN

WAIN BLOCK KUTAI BASIN EAST KALIMANTAN

Testing of the Strawn Sand, White Hat 20#3, Mustang Prospect, Permian Basin, Texas

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

POSITIVE RESULTS FROM FIRST PHASE OF CORE DRILLING AT JEFFERSON PROJECT, SOUTH CAROLINA FOR NEAR-SURFACE GOLD MINERALIZATION

OTTO AT A GLANCE COMPANY OFFICERS. By E-Lodgement

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

Implications of the Rabat Deep 1 exploration well on the prospectivity of the surrounding area

Tim Carr - West Virginia University

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Bohrkernbearbeitung. SolarWorld Solicium I Zinnwald-Lithium-Project I German Day I PDAC Convention I March 3, 2015

PERTH BASIN OPERATIONS UPDATE

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

For personal use only. COMPANY PRESENTATION June, 2012

Goldsource Completes Winter Drill Program At Border; 34 Holes Contain Aggregate Coal Intercepts Ranging From 10 to 100 Meters

For personal use only

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

Swala Energy Limited

Significant Oil Discovery at Narina- 1

V Sample from C.O.D vein 15 metres southwest of V

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Prophecy: Pacamayo, Paca North and El Abra Return Anomalous Silver, Zinc, Lead and Antimony Assay Results

Coeur Mining Provides Silvertip Exploration Update

THE LEBANESE OFFSHORE : PROSPECTIVE HYDROCARBON POTENTIAL

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

For personal use only

For personal use only

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Phoenix South-3 drilling update 09 August 2018

Relinquishment Report

5 ORIGINAL HYDROCARBONS IN PLACE

Highlights from the four holes announced in this news release include:

August 20, 2018 SBB NR SBB TSX

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Cove Gold Project 2201 Discovery Update, May 2014

AGM Presentation 26 November 2014 MD Kevin Wilson. Investor Update Augu013

For personal use only

Press Release Thunder Bay: August 2, 2018

ASX announcement 16 May 2016

Relinquishment report P.1190 & P Blocks: 204/13, 204/14b

Photo: Jean Laforest, Qiqavik Property, Nunavik

Exploration Potential

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

Greenfields Petroleum Corporation

CONTANGO ORE, INC. Contango ORE Announces Results of 2012 Exploration Program

Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR

Serica Energy (UK) Limited. P.1840 Relinquishment Report. Blocks 210/19a & 210/20a. UK Northern North Sea

For personal use only

Rare Earth project update

Asiamet Drilling Further Extends BKM Mineralisation

Hague and London Oil Plc

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

Summary Overview of PGM Mineralized Zones at the North End of the River Valley Deposit near Sudbury, Ontario

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Valuation Early Stage Exploration Projects

HIGHLIGHTS INCLUDE: ^ Includes 466g/t Au Includes 153g/t Au + Includes 45.3g/t Au

Renard Diamond Project Mineral Resource Update. Companion Materials to the Stornoway October 14, 2015 Renard Technical Report

EAST BLINA-1 UPDATE RIG CONTRACT EXECUTED

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

GROWTH OPTIMIZATION INNOVATION PEOPLE

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

Zama Discovery Interim Update. 13th July 2017

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

COOPER BASIN DRILLING TO EVALUATE UNCONVENTIONAL POTENTIAL

BK Copper Project Strong Copper Results Confirm and Extend BKM

Transcription:

Black Platinum Energy Ltd ( BPE or the Company ) Announces a Material Increase in the Discovered Dara East Gas Field Resources and Upside Potential Resources in Nearby Features Dara East Assessed Gas Resource BPE recently updated its Third Party resource assessment for the discovered Dara East Gas Field. Third Party, LR Senergy, assessed the P50 GIIP volume for the Dara East Gas Field at 1,495 Bscf. This fifty-percent increase from the previous 2015 LR Senergy analysis is based on an in depth review of the data from the Dara-1 and Dara-3 wells to investigate additional gas bearing reservoirs, a reevaluation of existing 3D seismic, including reprocessing and re-interpretation of select seismic lines and detailed review of all well data associated with the offshore East Natuna basin. The gas encountered in the Dara East Gas Field is found in fine grained Pliocene sands deposited in a shallow marine environment at between 800-1800 mmd. In 2000, Total drilled the Dara-1 well, which encountered gas bearing sands in the Upper and Lower Pliocene. In 2012, BPE drilled the successful Dara-3 well, which confirmed low CO 2 gas in the Upper Pliocene and established commercial flow rates. The Dara-1 and -3 wells encountered a fine grained clastic reservoir containing gas at the primary Upper Pliocene (UP) 1A sand level. The UP-1A sands contain a significant proportion of the Gas Initially-In-Place (GIIP) and are essentially a coarsening upwards section, consistent with an offshore bar or dune. The GIIPs for the individual Dara East Gas Field reservoirs, reported in Billions of standard cubic feet of gas (Bscf), are presented below. Reservoir Gas Initially-In-Place (Bscf) Low Best High UP-1A 397 635 943 UP-1B 30 65 140 UP-3 69 107 160 UP-4 63 103 157 UP-6A 66 110 179 UP-9 135 225 349 LP-6 130 251 446 Total 890 1,495 2,374 LR Senergy re-assessed the recoverable portion of the GIIP volumes based on conceptual development plans, reservoir rock and fluid characteristics and deliverability of the reservoirs to the planned wellbores. The ranges of Technical Recoverable Volumes (TRV) are presented below. Dara East Gas Field Estimated Gas TRV Range Phased Development Reservoir GIIP Recovery Factor Raw TRV Net TRV (Bscf) (%) (Bscf) (Bscf) 3) Low Best High Low Best High Low Best High Low Best High UP-1A 397 635 943 70 80 85 278 508 802 UP-1B 30 65 140 70 80 85 21 52 119 UP-3 69 107 160 40 50 60 28 54 96 UP-4 63 103 157 40 50 60 25 52 94 UP-6A 66 110 179 25 30 40 17 33 72 LP-6 130 251 446 75 85 90 98 213 401 TOTAL 890 1,495 2,374 52 61 67 466 911 1,584 364 809 1,482 Note: that recovery factors in the above table are based on a preliminary field development plan and may not represent the geologic recovery factors of individual reservoirs. The inert content of the gas to be developed varies between sands from 1-12% CO 2 and 0-9% N 2. The Dara East gas resource is a dry gas and contains no known liquids based on testing. The average www

produced gas composition is reasonably constant with approximately 5% CO 2 and 5% N 2. The above resources do not include the potential of any undrilled or untested reservoirs in the existing Dara East Gas Field or potential resources in the adjoining Dara North/Northeast and Dara West features. Dara East Assessed Upside Potential The Dara East Gas Field area contains additional exploration potential in undrilled reservoirs. LR Senergy has assessed the upside potential of these Pleistocene (PL), Upper Pliocene (UP) and Lower Pliocene (LP) objectives and have determined the GIIP volumes for them. Volumes have been assessed probabilistically; applying the observed ranges in area and estimations regarding the pay thickness, porosity, gas saturation and gas expansion factor. Presently, as these objectives have not been drilled, the volumes would include the unknown proportions of any nonhydrocarbon gas (i.e. CO 2, N 2 ). Dara East Upside The results from the LR Senergy assessment are presented in the table below. DARA EAST ADDITIONAL PROSPECTIVITY Upside Upper Pliocene, Lower Pliocene & Pleistocene PL-20 12 26 57 31 PL-23 11 24 54 29 PL-38 5 11 24 13 UP-1B Area 2 18 37 79 44 UP-2 9 23 64 32 UP-8 Area 1 15 33 74 40 UP-8 Area 2 127 281 624 341 UP-10 133 298 659 360 LP-1A 187 272 394 284 LP-2 to -6 107 165 254 175 TOTAL 623 1,171 2,284 1,349 Dara North/Northeast and Dara West Assessed Upside Potential Additional exploration potential has been assessed for Dara North/Northeast and Dara West areas by LR Senergy. Volumes have been assessed probabilistically; applying the observed ranges in area and estimations regarding the pay thickness, porosity, gas saturation and gas expansion factor. Presently, as these objectives have not been drilled, the volumes would include the unknown proportions of any nonhydrocarbon gas (i.e. CO 2, N 2 ).

Dara North/Northeast Upside The results from the LR Senergy assessment are presented in the below table. DARA NORTH/NORTHEAST PROSPECTIVITY Upside Lower Pliocene LP-1A N 255 369 536 385 LP-1A NE 51 74 107 77 LP-1B N 286 415 598 431 LP-1B NE 176 255 370 266 LP-1C N 104 224 481 267 LP-1C NE 28 61 132 73 LP-1D N 72 155 332 185 LP-1E N 85 183 393 219 LP-1F N 59 128 278 153 TOTAL 1,115 1,863 3,228 2,057 Dara West Upside The results from the LR Senergy assessment are presented in the below table. DARA WEST PROSPECTIVITY Upside Upper Miocene & Lower Pliocene LP 477 1,024 2,174 1,216 UM-1 to UM-9 2,896 6,156 13,320 7,397 UM-10 to UM-12 424 903 1,955 1,085 TOTAL 3,798 8,083 17,448 9,698 Forward Plans BPE is finalizing the work with LR Senergy to update its previous issued Preliminary Plan of Development for the Dara East gas field to reflect the above resource results and other designs/changes, including a pipeline commercial solution or FLNG. This study is available for review with future Partners/Investors and the Indonesian Government. Larry Luckey, Acting CEO of BPE commented: The updated resource numbers continue to confirm that the discovered Dara East Gas Field and surrounding reservoirs and acreage is a major resource for the Company, and is of significant importance to the Government of Indonesia. BPE intends to identify potential Partners/Investors who can jointly exploit the Dara East Gas Field and work with the Government of Indonesia on an optimal plan to begin development & production which will hopefully initiate further activity by other Companies in the greater East Natuna basin to replace declining production in the West Natuna basin.

Gary Christenson, Non-Executive Director of BPE commented: The results of the thorough technical work on the Dara East Gas Field (and surrounding reservoirs and acreage) clearly demonstrate the low CO2 gas resource potential in the Pleistocene and Pliocene reservoirs and the commercial viability of the greater East Natuna area. The strategic location to S.E. Asian gas markets combined with the shallow water and reservoir depths will facilitate an aggressive low cost development scenario. The Dara East Gas Field and surrounding features have been significantly de-risked by BPE and offer a great opportunity for future Partners and Investors to participate in potentially the next biggest gas producing basin in S.E. Asia. Facts Dara East Gas Field is located in the North Sokang PSC BPE signed the North Sokang PSC in 2010. The PSC has a 30 - year term which will expire on 25 th November 2040 and a 40% after-tax contractor take. Shallow water depths of around 110 meters with benign metocean conditions; Large 4-way structures with minimal trap and structure risks; Pliocene clastics of 500-1,800 meters depth; Multiple stacked sandstone reservoirs of 3 to 25 meters each and 20-30% porosity; Massive gas kitchen and proven migration into structures; Gas in the Upper Pliocene and younger reservoirs has <2% CO2 while gas in the older reservoirs varies from <5% to >80% CO2; Extensive 3D and 2D seismic fully processed and interpreted; Full regional geology study completed; Full petrophysics interpretation (saturation height, fluid contacts, etc.); Full geophysics interpretation (structural, depth, seismic inversion, rock property, model-based post-stack elastic inversion); Static reservoir modelling has been completed on Dara East Gas Field (facies modelling, porosity thresholds, reservoir & fluid characteristics, well deliverability, material balance, recovery factors, and production profiles).

12 March 2018 For further information, please contact: Larry Luckey, Chief Financial Officer and Head of Investor Relations at larry.luckey@blackplatinumenergy.com Disclaimer: Certain statements in this press release are forward-looking statements. Specifically, this press release may contain forwardlooking statements relating to management s approach to operations, estimates of future sales, production and deliveries, business plans for drilling and development, estimated amounts and timing of capital expenditures, anticipated operating costs, royalty rates, cash flows, financing, transportation plans and capacity, anticipated access to infrastructure or other expectations, beliefs, plans, goals, objectives, assumptions and statements about future events or performance. The reader is cautioned that the assumptions used in the preparation of such information, although considered reasonable by BPE at the time of preparation, may prove to be incorrect. Actual results achieved during the forecast period will vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors. Such factors include, but are not limited to: general economic, market and business conditions; industry capacity; competitive action by other companies; fluctuations in oil and gas prices; the results of exploration and development drilling and related activities; the uncertainty of estimates and projections relating to productions, costs and expenses; uncertainties as to the availability and costs of financing; fluctuations in currency exchange rates; the imprecision in reserve estimates; risks associated with oil and gas operations; such as operational risks in exploring for, developing and producing crude oil and natural gas, risks and uncertainties involving geology of oil and gas deposits; the weather in the Company s area of operations; the ability of suppliers to meet commitments; changes in environmental and other regulations; actions by governmental authorities including changes in laws and increases in taxes; decisions or approvals of administrative bodies; risks in conducting foreign operations (for example, political and fiscal instability or the possibility of civil unrest or military action in countries); the effect of acts of, or actions against international terrorism, and other factors, many of which are beyond the control of BPE. There is no representation by BPE that the actual results achieved during the forecast period will be the same in whole or in part as those forecast.