PRESS RELEASE. Banro Increases Oxide and Free-milling Ounces of Gold by 45%

Similar documents
PRESS RELEASE. Banro Announces a Mineral Reserve Estimate at its Namoya Gold Mine, Democratic Republic of the Congo

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

News Release. Infill Drilling Program

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference.

Highlights from the four holes announced in this news release include:

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

KIRKLAND LAKE GOLD REPORTS WIDE, HIGH-VALUE GOLD INTERCEPTS AT SWAN ZONE UP TO 200 METRES FROM CURRENT MINERAL RESERVES

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

Detour Gold Reports Drilling Results from Lower Detour

New Drilling Program Commences at Mutiny s Deflector Deposit

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

Form F3 MATERIAL CHANGE REPORT

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

Northern Dynasty Minerals Ltd.

News Release TSX:RMX NYSE AMEX:RBY November 29, 2010

GoviEx completes acquisition of African Energy s Zambian uranium assets

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE November 5, 2018

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

Goldplay President and CEO Marcio Fonseca commented

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Fortuna Updates Reserves and Resources

LUNA GOLD INCREASES MEASURED AND INDICATED RESOURCES TO 3.63 MILLION OUNCES AND INFERRED RESOURCES TO 1.04 MILLION OUNCES AT AURIZONA

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT PROVEN AND PROBABLE MINERAL RESERVES

Drilling Highlights: Phase II BCV Infill Drilling

Goldcrest Resources Ltd.

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

(416) Highlights include:

BELO SUN ANNOUNCES INFERRED RESOURCE ESTIMATE OF 356,600 OUNCES GRADING 2

Rubicon Updates Mineral Resource Statement for the Phoenix Gold Project And Evaluates Strategic Alternatives

IDAHO CHAMPION INTERSECTS 4.80 GRAMS PER TONNE GOLD OVER 5.9 METRES IN HIGHLY OXIDIZED ZONE AT THE BANER PROJECT

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

CAUTIONARY STATEMENT

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

BGM ANNOUNCES MINERAL RESOURCE UPDATE AT BARKERVILLE MOUNTAIN TO SUPPORT BONANZA LEDGE OPERATIONS

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Press Release Thunder Bay: August 2, 2018

Kalana Main Diluted Mineral Resource Estimate Above a 0.9 g/t Au Cut-off Grade 1,2

Altynalmas Gold s new upgraded and confirmed Bakyrchik East Mineral Resource Gold deposit boosts total gold resources at Kyzyl Project in Kazakhstan

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Ausgold awarded EIS grant for Jinkas deep drilling

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Wesdome Announces Interim Mineral Resource Estimate for Kiena Mine Complex and Continued Drilling Extends Kiena Deep A Zone Along Plunge

First Cobalt Extends Iron Creek 100 Metres Downdip in Central Area

Mineral reserves and resources

News Release B2Gold Announces Updated Higher Grade Gold Resource at Wolfshag Zone, Otjikoto Mine, Namibia

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

KIRKLAND LAKE GOLD REPORTS STRONG GROWTH IN MINERAL RESERVES AND MINERAL RESOURCES

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

Pershing Gold Reports a 2.24 Ounce per Ton Gold Intercept Along With Other High-Grade Gold Intercepts at Relief Canyon

Tahoe Resources Mineral Reserves as of January 1, 2018

Orsu Metals hits 2.62 g/t Au over 22.2 metres and proves higher gold grades at Zone 23, Sergeevskoe Gold Project, Russia

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Transcription:

PRESS RELEASE Banro Increases Oxide and Free-milling Ounces of Gold by 45% - Banro s total Mineral Resource now 10.18 Moz Measured & Indicated and 7.01 Moz in Inferred TORONTO, ONTARIO - (January 31, 2013) - Banro Corporation ("Banro" or the "Company") (TSX:BAA) (NYSE MKT:BAA) is pleased to provide an update of its Mineral Resource and Mineral Reserve estimates at its wholly-owned projects on the Twangiza-Namoya gold belt in the Democratic Republic of the Congo ("DRC"). Exploration drilling during 2012 at the four core projects, Twangiza, Namoya, Lugushwa and Kamituga, has resulted in positive growth in Mineral Resources and Mineral Reserves, particularly oxide and free-milling material, in line with the core strategy of the Company, whilst also ensuring the replacement of Mineral Reserves depleted thus far at the Twangiza Gold Mine. Highlights Banro s Measured & Indicated (M&I) Mineral Resource has grown to 10.18 million ounces ( Moz ) of gold, an increase of 41%, and the Inferred Mineral Resource has grown to 7.01Moz of gold, an increase of 56%. Banro s total oxide and free-milling Mineral Resource (both types of materials may be efficiently treated by heap leach and CIL methods) increased by 45%, representing 4.17Moz in the M&I category and 0.87Moz in the Inferred category. At Namoya, M&I Mineral Resources increased by 17.7% to 1.86Moz of gold, resulting in a 68.5% relative increase in the M&I Mineral Resource contained within the optimized pit to 1.50Moz. The Proven & Probable Mineral Reserve estimate for Twangiza, based on drilling and improved economic assumptions, increased by 36% to 1.54Moz At Lugushwa, the Indicated Mineral Resource consisting solely of oxide material is 0.73Moz. Lugushwa s Inferred Mineral Resource is now 4.88Moz, of which 0.40Moz consists of oxide material. During 2012, the Company made significant progress with its exploration activities at its Twangiza, Namoya, Lugushwa and Kamituga project areas, increasing the Company's Mineral Resources, specifically oxide and free-milling material at Twangiza and Namoya, which have, or soon will have, established mining infrastructure. The increase in the overall Mineral Resources is substantial and underpins Banro s strategy to build value by adding new Resources and replacing the mined ounces, commented Dan Bansah, Banro s Vice President, Exploration.

Banro s exploration update published on November 15, 2012, highlighted significant drill intersections at the properties. The exploration focused on shallow infill and extension drilling at Lugushwa, definition drilling at Namoya, delineation drilling of the east and west flanking structures at Twangiza, and exploration drilling at Kamituga. The encouraging results of the shallow infill drilling at Lugushwa facilitated the estimation of over 0.73 million ounces of high confidence Indicated oxide resources and an additional 0.40 million ounces of Inferred oxide material. This estimated oxide Resource will form the framework for Banro to undertake a preliminary economic assessment of Lugushwa s oxide material, which was rescheduled to incorporate the additional exploration data which could potentially enhance the economics of this project. In Namoya, while assessing the potential for additional Resources, definition drilling at Namoya was undertaken to improve geological confidence prior to the mine being brought into production in Q4 2013. In addition, the positive metallurgical studies of the free-milling primary material at Namoya has resulted in a 68.5% increase of the M&I Mineral Resource contained within the optimized pit (the In-pit M&I Mineral Resources ), from 0.89 million ounces to 1.50 million ounces at a grade of 1.78 g/t Au for 26.20 million tonnes of material (the Measured component of this is 22.86 million tonnes at 1.86g/t Au and the Indicated component is 3.34 million tonnes at 1.26g/t Au). These Mineral Resources, and the potential beneath the pit (Figure 1), will be the catalyst for the Namoya Phase II expansion study due for completion in 2013. The encouraging results obtained from the delineation drilling of the east and west flanking structures at Twangiza, coupled with its improved economics, has allowed for the growth in Mineral Reserves and the replacement of ounces depleted since start-up. Exploration drilling at Kamituga has confirmed the potential of a number of targets including Kibukila, Filon 20 and G22. Infill drilling of these targets will be the core business objective for Kamituga during 2013. Banro s Mineral Resources and Mineral Reserves disclosed in this press release are reported in accordance with National Instrument 43 101 (Standards of Disclosure for Mineral Projects), which incorporates by reference the CIM Definition Standards on Mineral Resources and Mineral Reserves. The Mineral Resources reported in this press release are inclusive of the Mineral Reserves component. Mineral Resource and Mineral Reserve Declaration at December 31, 2012 Table 1: Mineral Resources Tonnes Grade Gold Mine/Project Category (Mt) (g/t Au) (Moz) Twangiza (Oxide) Measured 9.51 Indicated 16.38 Measured & Indicated 25.89 2.39 0.73 1.61 0.85 1.90 1.58 Inferred 4.66 0.85 0.13 2

Twangiza (Transition & Fresh) Measured 6.29 2.21 0.45 Indicated 134.24 1.29 5.56 Measured & Indicated 140.53 1.33 6.01 Inferred 21.21 1.09 0.74 Namoya (Oxide & Free-milling) Measured 24.58 1.96 1.55 Indicated 6.36 1.52 0.31 Measured and Indicated 30.94 1.87 1.86 Inferred 6.64 1.59 0.34 Lugushwa (Oxide) Indicated Inferred 17.03 1.32 0.73 8.86 1.39 0.40 Lugushwa (Transition & Fresh) Inferred 107.60 1.34 4.48 Kamituga Inferred (Surface) 4.14 2.4 0.32 Inferred (Underground) 3.12 6.00 0.60 TOTAL MEASURED AND INDICATED 214.39 1.48 10.18 TOTAL INFERRED 156.23 1.40 7.01 TABLE 2: Mineral Reserves Mine/Project Category Tonnes Grade Gold (Mt) (g/t Au) (Moz) Twangiza (Oxide) Proven 9.98 2.36 0.76 Probable 15.60 1.56 0.78 Total Proven & Probable 25.58 1.87 1.54 Note: Rounding of numbers may result in computational discrepancies. Mineral Reserve included in Mineral Resource. 3

Mineral Resource Banro s Measured & Indicated (M&I) Mineral Resource has grown to 10.18Moz, an increase of 41%, and Inferred Mineral Resources have grown to 7.01Moz, an increase of 56%, this taking into account depletion at the Twangiza Gold Mine. The growth in the Mineral Resource is attributed to some changes in economic assumptions, which resulted in only a 22% increase of the Mineral Resource, although the main increase was as a result of significant drilling intersections. The Resource estimate discussed in this press release consists of insitu Mineral Resources at a 0.4 g/t Au cut-off falling within a US$2,000 per ounce (2011: US$1,700 per ounce) optimized pit shell. The underground Mineral Resources at Kamituga are those situated below the Mobale open pit, estimated using historical underground information at a cut-off grade of 1.5 g/t Au. The Mineral Resource estimates for Kamituga were prepared by SRK (UK) using historical data and were included in the February 2005 NI 43-101 technical report prepared by SRK (UK) for Banro. These estimates have not been updated. Banro has since 2011 carried out extensive exploration including some amount of drilling to verify the historical results. This work will be continued during 2013 for an updated estimate for Kamituga to be undertaken by December 2013. The grade tonnage curve for the Namoya In-pit M&I Mineral Resources is illustrated in Figure 2, and demonstrates that the Namoya project can be mined at a significantly higher grade than the Resource grade without impacting significantly on the contained gold. This is based on the fact that if one increases the cut-off from 0.5g/t Au to 1.00g/t Au, grades increase from 2.04g/t Au to 2.79g/t Au, with contained gold reducing by only some 12% and could even be increased above 3.0g/t Au without compromising the mine life significantly. This indicates that high-grading the deposit is a feasible option and mine planning could focus on a higher grade, lower tonnage mine design in times of a falling metal market without destroying the economics of the project. The Namoya In-pit M&I Mineral Resources at the various cut-off grades are summarized in Table 3. Mineral Reserve The Proven and Probable Mineral Reserve of Twangiza has increased by 36% from 1.13 Moz to 1.54 Moz. This 36% increase of 0.41 Moz, after mining depletion, is primarily a function of delineation drilling at Twangiza West, which resulted in increased confidence of estimated Mineral Resources, and changes in economic assumptions with improved costs from 2011 to 2012. The current open pit Mineral Reserve was estimated using a weighted average breakeven grade of 0.54 g/t Au at a gold price of US$1,500 per ounce (2011: US$1,200 per ounce). Margin dilution and ore loss were included into the estimation of Mineral Reserves. Twangiza stockpile Reserves were calculated at a cut-off grade of 0.75 g/t Au. TABLE 3: Current In-pit Mineral Resources at Various Cut-off Grades for the Namoya Project CUT-OFF Av. GOLD GRADE TONNES GRADE CONTENT (g/t Au) (Mt) (g/t Au) (Moz) 0.50 25.56 2.04 1.67 4

Mtonnes 0.75 20.26 2.41 1.57 1.00 16.24 2.79 1.46 1.25 13.34 3.15 1.35 1.50 10.96 3.54 1.25 1.75 9.18 3.91 1.15 2.00 7.86 4.25 1.07 2.25 6.81 4.58 1.00 2.50 5.93 4.91 0.94 2.75 5.16 5.25 0.87 3.00 4.56 5.56 0.82 FIGURE 2: Grade Tonnage Curve for the Namoya Project Namoya In-pit M&I Mineral Resources Grade Tonnage Curve 30.00 25.00 20.00 15.00 10.00 5.00 6.00 5.50 5.00 4.50 4.00 3.50 3.00 2.50 TONNES Av. GRADE 0.00 2.00 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25 Au cut off (g/t Au) Key Assumptions Below are the key assumptions, parameters and methods used to estimate the Lugushwa and Namoya Mineral Resources: wireframing was restricted to borehole intersections above a 0.3 to 0.5g/t Au cut-off grade for Lugushwa and 0.4g/t Au for Namoya, Twangiza East and West; 5

gold grades have been determined using Ordinary Kriging interpolation into a 3-Dimensional block model constrained by mineralization wireframes; the mineralization models were constrained within the wireframe with primary block dimensions of 20m N-S (along strike), 20m E-W (across strike) and 10m in the vertical direction; estimation used dynamic anistotropy; Datamine Studio 3TM was the modelling package; and at all times, the relationship between geology and preliminary mining and economic factors was taken into account. Drill cores for assaying were taken at a maximum of one metre intervals and were cut with a diamond saw with one-half of the core placed in sealed bags and sent to the Company's sample preparation facility in Bukavu, DRC. The core samples were then crushed down to minus 2 mm, and split with half of the sample pulverised down to 90% passing 75 microns. Approximately 150 grams of the pulverised sample was then shipped to the SGS Laboratory (which is independent of the Company) in Mwanza, Tanzania where the samples were analysed for gold by fire assay using a 50g charge. As part of the Company's QA/QC procedures, internationally recognised standards, duplicates and blanks were inserted into the sample batches. Drill core samples were respectively taken from Lugushwa, Namoya, Twangiza East and West to determine relative density measurements for the various deposits and the oxide, transitional and fresh rock components. The key assumptions used for the determination of the In-pit M&I Mineral Resources at Namoya are tabled below: Input Data Gold price Mining dilution Pay limit for high grade Stockpile ore Waste Units US$1,500 per ounce 5% at zero grade 1.0 g/t Au 0.4 g/t-1.0 g/t Au <0.4 g/t Au Mining recovery 95% Pit slopes Minus 40 to 50 degrees 6

Metallurgical recovery Oxides (88%), Transitional (84%), Fresh (80%) The Twangiza resource model was built by SRK and most recently published in a Banro press release dated March 4, 2011. Apart from the Twangiza East and West estimates, the current estimates employed the SRK model but with changes to the economic assumptions with the improved cost. For more details, refer to the technical report of Senet dated March 9, 2011 (as revised on March 24, 2011) and entitled "Economic Assessment NI 43-101 Technical Report, Twangiza Phase 1 Gold Project, South Kivu Province, Democratic Republic of the Congo", which has been filed on, and can be obtained from, SEDAR at www.sedar.com and EDGAR at www.sec.gov. Qualified Persons Mr. Andrew N. Clay, Managing Director of Venmyn Deloitte (Pty) Ltd., is the "qualified person" (as such term is defined in National Instrument 43-101) who is responsible for the Lugushwa Mineral Resource estimates disclosed in this press release. Mr. Clay has reviewed and approved the contents of this press release. Banro Vice President, Exploration, Daniel K. Bansah, MSc (MinEx), who is a Chartered Professional Member of The Australasian Institute of Mining and Metallurgy (MAusIMM(CP)) and a "qualified person" (as such term is defined in National Instrument 43-101), is responsible for the Twangiza and Namoya Mineral Resource estimates and Twangiza Mineral Reserve estimates disclosed in this press release as well as the other technical information contained in this release (including with respect to Kamituga). Mr. Bansah has reviewed and approved the contents of this press release. Banro Corporation is a Canadian gold mining company focused on production from the Twangiza oxide mine and development of three additional major, wholly-owned gold projects, each with mining licenses, along the 210 kilometre long Twangiza-Namoya gold belt in the South Kivu and Maniema provinces of the Democratic Republic of the Congo. Led by a proven management team with extensive gold and African experience, Banro's plans include the construction of its second gold mine at Namoya, at the south end of this gold belt, as well as the development of two other projects, Lugushwa and Kamituga, in the central portion of the belt. The initial focus of the Company is on oxides, which have a low capital intensity to develop but also attract a lower technical and financial risk to the Company and as such maximize the return on capital and limits the dilution to shareholders as the Company develops this prospective gold belt. All business activities are followed in a socially and environmentally responsible manner. For further information, please visit our website at www.banro.com, or contact: Simon Village, President & CEO, Tel: +44 (0) 788 405 4012, or Naomi Nemeth, Investor Relations, +1 (416) 366-9189, +1-800-714-7938, Ext. 2802 or info@banro.com, or Arnold T. Kondrat, Executive Vice-President, +1 (416) 366-2221 Cautionary Note to U.S. Investors 7

The United States Securities and Exchange Commission (the "SEC") permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Certain terms are used by the Company, such as "Measured", "Indicated", and "Inferred" "Resources", that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S. Investors are urged to consider closely the disclosure in the Company's Form 40-F Registration Statement, File No. 001-32399, which may be secured from the Company, or from the SEC's website at http://www.sec.gov/edgar.shtml. Cautionary Note Concerning Mineral Resource and Mineral Reserve Estimates The Mineral Resource and Mineral Reserve figures referred to in this press release are estimates and no assurances can be given that the indicated levels of gold will be produced. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While the Company believes that the Mineral Resource and Mineral Reserve estimates included in this press release are well established, by their nature Mineral Resource and Mineral Reserve estimates are imprecise and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. There is no certainty that Mineral Resources can be upgraded to Mineral Reserves through continued exploration. Due to the uncertainty that may be attached to Inferred Mineral Resources, it cannot be assumed that all or any part of an Inferred Mineral Resource will be upgraded to an Indicated or Measured Mineral Resource as a result of continued exploration. Confidence in the estimate is insufficient to allow meaningful application of the technical and economic parameters to enable an evaluation of economic viability worthy of public disclosure (except in certain limited circumstances). Inferred Mineral Resources are excluded from estimates forming the basis of a feasibility study. Cautionary Note Concerning Forward-Looking Statements This press release contains forward-looking statements. All statements, other than statements of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future (including, without limitation, statements regarding Mineral Resource and Mineral Reserve estimates, potential Mineral Resources and Mineral Reserves, estimates and/or assumptions in respect of future gold production, gold recoveries, costs and project economics, and the Company's exploration and development plans and objectives) are forward-looking statements. These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to the Company. Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on the Company. Factors that could cause actual results or events to differ materially from current expectations include, among other things: uncertainty of estimates of capital and operating costs, production estimates and estimated economic return; the possibility that actual circumstances will differ from the estimates and assumptions used in the economic studies of the Company s projects; failure to establish estimated mineral resources and mineral reserves (the Company s mineral resource and mineral reserve figures are estimates and no assurance can be given that the intended levels of gold will be produced); fluctuations in gold prices and currency exchange rates; inflation; gold recoveries being less than those indicated by the metallurgical testwork carried out to date (there can be no assurance that gold recoveries in small scale laboratory tests will be duplicated in large tests under on-site conditions or during production) or less than those expected following the expansion of the Twangiza plant; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; political developments in the DRC; lack of infrastructure; failure to procure or maintain, or delays in procuring or maintaining, permits and approvals; lack of availability at a reasonable cost or at all, of plants, equipment or labour; inability to attract and retain key management and personnel; changes to regulations affecting the Company's activities; the uncertainties involved in interpreting drilling results and other geological data; and the other risks disclosed under the heading "Risk Factors" and elsewhere in the Company's annual information form dated March 26, 2012 filed on SEDAR at www.sedar.com and EDGAR at www.sec.gov. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein. 8

Figure 1 Namoya cross section 9