Kalana Main Diluted Mineral Resource Estimate Above a 0.9 g/t Au Cut-off Grade 1,2

Similar documents
Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

New Drilling Program Commences at Mutiny s Deflector Deposit

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

News Release. Infill Drilling Program

Avnel Reports 11.7 g/t Au over 16 m in the first results of its 2016 Drilling Programme at Kalanako

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

PRESS RELEASE. Banro Announces a Mineral Reserve Estimate at its Namoya Gold Mine, Democratic Republic of the Congo

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Fortuna Updates Reserves and Resources

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT PROVEN AND PROBABLE MINERAL RESERVES

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Tahoe Resources Mineral Reserves as of January 1, 2018

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference.

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

GoviEx completes acquisition of African Energy s Zambian uranium assets

KIRKLAND LAKE GOLD REPORTS WIDE, HIGH-VALUE GOLD INTERCEPTS AT SWAN ZONE UP TO 200 METRES FROM CURRENT MINERAL RESERVES

Lalor Project Disclaimer

KIRKLAND LAKE GOLD REPORTS STRONG GROWTH IN MINERAL RESERVES AND MINERAL RESOURCES

(416) Highlights include:

Goldplay President and CEO Marcio Fonseca commented

ASX ANNOUNCEMENT 21 MARCH 2011

MILLENNIUM MINERALS LIMITED

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Orezone s Bomboré Gold Project Reaches World Class Size

Renard Diamond Project Mineral Resource Update. Companion Materials to the Stornoway October 14, 2015 Renard Technical Report

LUNA GOLD INCREASES MEASURED AND INDICATED RESOURCES TO 3.63 MILLION OUNCES AND INFERRED RESOURCES TO 1.04 MILLION OUNCES AT AURIZONA

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Form F3 MATERIAL CHANGE REPORT

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

PRESS RELEASE. Banro Increases Oxide and Free-milling Ounces of Gold by 45%

MINERAL RESERVES AND MINERAL RESOURCES SUMMARY TABLE MINERAL RESERVES

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

BGM ANNOUNCES MINERAL RESOURCE UPDATE AT BARKERVILLE MOUNTAIN TO SUPPORT BONANZA LEDGE OPERATIONS

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Mineral reserves and resources

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

BELO SUN ANNOUNCES INFERRED RESOURCE ESTIMATE OF 356,600 OUNCES GRADING 2

Mineral reserves and resources

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Underground Activities Temporarily Suspended at the Phoenix Gold Project; Rubicon to Enhance its Geological Model and Develop an Implementation Plan

Brookfield Place Tel: (416) Bay Street, Suite 3630 Fax: (416) FOR IMMEDIATE RELEASE February 7, 2012

ASX announcement 16 May 2016

Mineral reserves and resources

MINERAL RESERVES AND MINERAL RESOURCES SUMMARY TABLE MINERAL RESERVES

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

2016 Annual Mineral Reserve and Resource Statement

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

News Release B2Gold Announces Updated Higher Grade Gold Resource at Wolfshag Zone, Otjikoto Mine, Namibia

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

Highlights from the four holes announced in this news release include:

Coeur Mining Provides Silvertip Exploration Update

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

Replacement: Material Increase to Tuzon Resource

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Wesdome Announces Interim Mineral Resource Estimate for Kiena Mine Complex and Continued Drilling Extends Kiena Deep A Zone Along Plunge

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT

NEWS RELEASE November 5, 2018

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Rubicon Updates Mineral Resource Statement for the Phoenix Gold Project And Evaluates Strategic Alternatives

Northern Dynasty Minerals Ltd.

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

Altynalmas Gold s new upgraded and confirmed Bakyrchik East Mineral Resource Gold deposit boosts total gold resources at Kyzyl Project in Kazakhstan

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

GOLDEN STAR DOUBLES INFERRED MINERAL RESOURCES AT WASSA UNDERGROUND GOLD MINE

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

Alamos Gold Reports Mineral Reserves and Resources for the Year-Ended 2018

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Goldcrest Resources Ltd.

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C Form 6-K

Detour Gold Reports Drilling Results from Lower Detour

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

A B C PAD A HIGHLIGHTS

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

InZinc Intersects 6.8m of 16.5% Zinc Focuses on Western Expansion of High Grades at West Desert Project

Transcription:

Avnel Reports that Measured plus Indicated Resource Increases to 2.81 Million Ounces of Gold at a Diluted Grade of 2.85 g/t at Kalana Main Deposit at $1,100/oz ST. PETER PORT, GUERNSEY, OCTOBER 5, 2015 Avnel Gold Mining Limited ( Avnel or the Company ) (TSX:AVK) is announcing an updated Mineral Resource estimate ( MRE ) for the Kalana Main Project in south-western Mali. The Company is also announcing that the completion of the Definitive Feasibility Study ( DFS ) and approval of the Environmental and Social Impact Assessment ( ESIA ) are expected by the end of the first quarter of 2016. Highlights: Measured plus Indicated ( M+I ) Mineral Resource of 2.81 million ounces at a diluted grade of 2.85 g/t Au for the Kalana Main deposit at a gold price of $1,100 per ounce 46% of the M+I Mineral Resource classified as Measured DFS scheduled for completion by the end of the first quarter of 2016 ESIA approval expected by the end of the first quarter of 2016 Kalana Main Diluted Mineral Resource Estimate Above a 0.9 g/t Au Cut-off Grade 1,2 Mineral Resource Tonnes Grade Contained Gold Classification (Mt) (g/t Au) (Moz) Measured 13.6 2.92 1.28 Indicated 17.0 2.80 1.53 Measured + Indicated 30.6 2.85 2.81 Inferred 01.3 2.93 0.12 1 Mineral Resources are disclosed on a total project basis at 100%. Avnel owns an 80% equity interest in SOMIKA, the Malian company that owns the Kalana Exploitation Permit. 2 Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. I am delighted to report that the M+I Mineral Resource for the Kalana Main deposit has increased to 2.81 million ounces at a diluted grade of 2.85 grams per tonne. With this new resource, the Kalana Main Project stands out as one of West Africa s highest grade, multi-million-ounce, open-pit development projects with significant exploration upside, stated Howard Miller, Avnel s Chairman and CEO. The increase to the Mineral Resource is a direct result of the drill program that we completed last quarter. In addition to demonstrating the continuity of mineralisation and improving confidence in the geological model, this drilling has upgraded a significant portion of the Inferred Mineral Resource and added to the Mineral Resource by defining new zones of mineralisation and extensions to known vein packages. This drilling also defined thick corridors of lower grade mineralisation that are being reassessed as part of the DFS to determine if they are amenable to a lower cost bulk mining approach. The DFS remains on track for completion by the end of first quarter of 2016 and we continue to expect for the updated Mineral Resource to positively impact several key performance indicators. For example, it is worth noting that within the M+I Mineral Resource that approximately 730,000

- 2 - ounces are contained within the favourable saprolite and saprock horizons at an average diluted grade of 3.05 grams per tonne. This is expected to generate high gold production at lower mining and processing costs in the initial years of the DFS s mine plan. In parallel with the DFS, we are preparing a new ESIA that will satisfy the requirements of the Equator Principles with the intention of pursuing international financing. The public participation process for the ESIA is nearing completion and we plan to submit the draft ESIA for review by the Malian authorities in December. Following the review period, we will submit the final ESIA for approval in early 2016, which we anticipate receiving by the end of the first quarter of 2016. The Kalana Exploitation Permit was awarded to Avnel in 2003 and pursuant to our Foundation Agreement with the Government of Mali, the only significant approval required to develop new mines is an ESIA. Kalana Main September 2015 Mineral Resource Estimate Kalana Main In Situ Mineral Resource Estimate The September 2015 MRE is based upon information from a total of 170,080 m of drilling from 989 holes. Information added to the database since the March 2015 MRE includes 28 diamond drill holes, 137 RC drill holes, and 16 combined RC-diamond drill holes that were drilled in 2015. A comparison between the September 2015 in situ MRE and the March 2015 in situ MRE for the Kalana Main deposit is presented in the following table: Total in situ Mineral Resources for the Kalana Main Deposit September 2015 MRE vs. March 2015 MRE 1,2,3 (100% Project Basis Reported Above a 0.9 g/t Au Cut-off Grade) September 2015 MRE 4 ($1,100/oz Au) March 2015 MRE 5 ($1,100/oz Au) Change (%) Resource Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Category (Mt) (g/t Au) (Moz) (Mt) (g/t Au) (Moz) (%) (%) (%) Measured 09.0 4.24 1.23 - - - - - - Indicated 10.9 4.19 1.46 14.5 4.52 2.11 (25% (7%) (31%) M + I 19.9 4.21 2.69 14.5 4.52 2.11 37% (7%) 27% Inferred 00.8 4.59 0.11 01.8 5.28 0.31 (56%) (13%) (65%) 1 Mineral Resources are disclosed on a total project basis at 100%. Avnel owns an 80% equity interest in SOMIKA, the Malian company that owns the Kalana Exploitation Permit. 2 Some figures in this table may not compute due to rounding and truncation. 3 Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. 4 A summary of the in situ September 2015 MRE is presented in Table 1 at the end of this news release. 5 A summary of the in situ March 2015 MRE is presented in Avnel s Annual Information Form ( AIF ) for the year ended 2014. The increase to the in situ Mineral Resource is largely attributable to the expansion of the pit shell as a result of the inclusion of new mineralisation that was defined in the 2015 drill program. In addition to demonstrating the continuity of mineralisation and improving confidence in the geological model, this drilling resulted in an increase to the Mineral Resource by defining new zones of mineralisation, extensions to known vein packages, and thick corridors of lower grade sub-vertical mineralisation, albeit often at a lower average grade than the core of the Kalana Main deposit.

- 3 - For example, the inclusion of the thick corridors of lower grade mineralisation into the Mineral Resource contributed to a reduction in the average grade of the deposit relative to prior estimates. These corridors are typically defined by sub-vertical veins that overprint the primary, shallow dipping, high-grade quartz vein packages. This is significant because it has resulted in longer composites of mineralisation, albeit at a lower average grade, compared to other portions of the deposit. As a result, these corridors are being reassessed as potential bulk tonnage targets that may be amenable to lower cost bulk mining methods relative to the selective mining approach previously envisioned. Consequently, bulk mining in these portions of the deposit has the potential to offset the localised reductions in grade and positively impact the waste-to-ore ratio and other key performance indicators in the DFS. The upgrading of a portion of the Inferred Mineral Resource also contributed to the increase in the M+I Mineral Resource. Furthermore, 46% of the M+I Resource is classified as Measured and demonstrates a significant increase to the overall confidence in the Mineral Resource. An updated MRE statement for the Kalana Project is presented in Table 1 at the end of this news release. A map of the Kalana Exploitation Permit is presented in Figure 1. Kalana Main Diluted Mineral Resource Estimate An important contribution to the Mineral Resource estimation process since the Preliminary Economic Assessment for the Kalana Main Project (the PEA ) is an improvement to the estimation of dilution. The addition of estimated local dilution compared to the global dilution assumption of 50% utilised in the PEA has resulted in the exclusion of some lower grade and narrow mineralisation with the diluted grades falling below the 0.9 g/t Au cut-off grade. As detailed in the tables below, the pit-constrained diluted M+I Mineral Resource above the diluted cut-off grade is currently estimated at 30.6 million tonnes at a diluted grade of 2.85 g/t Au containing 2.81 million ounces with an estimated global dilution of 54%: Kalana Main Measured Mineral Resource Dilution Estimate as at 30 September 2015 1,2,3 Resource Tonnes Resource Grade Internal Dilution External Dilution Grade Internal Dilution Grade External Dilution Diluted Tonnes Diluted Grade Contained Gold (Mt) (g/t Au) (%) (%) (g/t Au) (g/t Au) (Mt) (g/t Au) (Moz) Measured 09.0 4.24 21% 24% 0.40 0.28 13.6 2.92 1.28 Indicated 10.9 4.19 19% 31% 0.40 0.31 17.0 2.80 1.53 M + I 19.9 4.21 20% 28% 0.40 0.30 30.6 2.85 2.81 Inferred 00.8 4.59 20% 40% 0.36 0.49 01.3 2.93 0.12 1 Mineral Resources are disclosed on a total project basis at 100% as at 30 September 2015. Avnel owns an 80% equity interest in SOMIKA, the Malian company that owns the Kalana Exploitation Permit. 2 Some figures in this table may not compute due to rounding and truncation. 3 Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. A breakdown of the diluted Mineral Resource by classification and oxidation state is presented in the following table:

- 4 - Kalana Main Deposit Diluted Mineral Resource Above a 0.9 g/t Au Cut-off Grade 1,2,3 Tonnes Grade Contained Gold (Mt) (g/t Au) (Moz) MEASURED MINERAL RESOURCE Saprolite 02.7 3.11 0.27 Saprock 01.0 3.63 0.12 Fresh 09.9 2.80 0.89 TOTAL 13.6 2.92 1.28 INDICATED MINERAL RESOURCE Saprolite 02.6 2.86 0.24 Saprock 01.1 2.80 0.10 Fresh 13.4 2.78 1.20 TOTAL 17.0 2.80 1.53 MEASURED + INDICATED MINERAL RESOURCE Saprolite 05.3 2.99 0.51 Saprock 02.1 3.21 0.22 Fresh 23.2 2.79 2.08 TOTAL M+I 30.6 2.85 2.81 INFERRED MINERAL RESOURCE Saprolite 0.16 2.51 0.01 Saprock 0.03 2.08 0.00 Fresh 1.11 3.02 0.11 TOTAL 1.30 2.93 0.12 1 Mineral Resources are disclosed on a total project basis at 100% as at 30 September 2015. Avnel owns an 80% equity interest in SOMIKA, the Malian company that owns the Kalana Exploitation Permit. 2 Some amounts in this table may not compute due to rounding and truncation. 3 Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The Kalana Main deposit s diluted M+I Mineral Resource of 2.81 million ounces combined with the 0.04 million ounces of Indicated Mineral Resource from historic tailings (0.7 million tonnes at a grade of 1.75 g/t Au) results in a total M+I Mineral Resource of 2.85 million ounces (31.3 million diluted tonnes at a diluted grade of 2.82 g/t Au). Mineral Resource Classification All Mineral Resources are classified as Measured, Indicated, or Inferred Resources in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ( CIM ) Standards on Mineral Resources and Reserves, Definitions, and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council. Classification of parts of the Mineral Resource was applied based upon data quality, confidence in the geological interpretation, and grade and geological variability. Parts of the resource model classified as a part of the Mineral Resource exceed a diluted cut-off grade of 0.9 g/t Au and fall within a Whittle4X evaluation shell that was used to test for the reasonableness of economic extraction. Classification was applied based on data quality, confidence in the geological interpretation, grade and geological variability, and confidence in the grade-tonnage estimates. Those parts of the

- 5 - resource model classified as a part of the Mineral Resource exceed a diluted cut-off grade of 0.9 g/t Au and are contained within a Whittle4X evaluation shell that was used to test for the reasonableness of economic extraction. Areas informed by drill data with a maximum spacing of approximately 35 m, where the geological and grade continuity have been well established, and were estimated with a minimum of eight samples have been classified as Measured Resource. Areas informed by 25 m by 50 m spaced drilling (approximate dimensions), where there is a reasonable level of confidence in the geological and grade estimate, and were estimated with a minimum of eight samples have been classified as Indicated Resource. The small amount of Inferred Resource is the remainder of the Mineral Resource estimate contained within the Whittle shell. Areas where there is no informing data, that contain lower grade material that is outside of the mineralised interpretation, or are not contained within the Whittle shell are not classified as a part of the Mineral Resource. Kalana Main DFS and ESIA On Track for the First Quarter of 2016 The Company continues to expect that the DFS for the Kalana Main Project will be completed by the end of the first quarter of 2016 as engineering related to the process plant, infrastructure, and mine design is well advanced. In parallel with the DFS, the Company is preparing a new ESIA to satisfy the requirements of the Equator Principles with the intention of pursuing international financing for the construction of an open pit mine at Kalana Main. The ESIA is being prepared to conform to the requirements of the International Finance Corporation s Performance Standards, the World Bank Group s Environment, Health, and Safety guidelines, and other financial institutions that are signatories to the Equator Principles. The requisite baseline environmental, health and safety, and socio-economic studies for the ESIA were completed during the second quarter of 2015. The formal Public Participation Process for the ESIA has commenced and is expected to conclude in December 2015. The draft ESIA and other associated documentation, including a draft Community Resettlement Action Plan for a portion of the Village of Kalana, is scheduled to be submitted to the Malian authorities in December 2015. Following the review of the draft ESIA, the Company expects to submit the final ESIA for approval in early 2016. Accordingly, the Company continues to anticipate receiving approval of the ESIA and a new Environmental and Mining Permit by the end of the first quarter of 2016. The Kalana Exploitation Permit was awarded to Avnel in 2003 with an initial term of 30 years and pursuant to the Company s Foundation Agreement with the Government of Mali, the only significant approval required to develop new mines is an ESIA. As a result of these activities, the Kalana Main Project is expected to be sufficiently advanced for the Company to consider a construction decision during 2016, subject to receipt of a positive DFS, approval of the ESIA from the Malian authorities, and the availability of project financing. Qualified Persons The Mineral Resource estimates reported in this news release were prepared by Mr. Ivor Jones, (BSc. Hons), MSc, FAusIMM, CP Geo., of Denny Jones Pty Ltd., who is an independent Qualified Person as defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-

- 6-101"). All Mineral Resources reported have been prepared in accordance with the CIM Standards on Mineral Resources and Reserves, Definitions, and Guidelines. Mr. Jones has reviewed and approved the contents of this news release. Mr. Allan Earl, Associateship in Mining Engineering, FAusIMM of Snowden Mining Industry Consultants is an independent Qualified Person as defined by NI 43-101. Mr. Earl has reviewed and approved the contents of this news release. Mr. Roy Meade, BSc (Honours) Mining Engineering and Professional Engineer (UK), President of Avnel Gold Mining Limited is a Qualified Person as defined by NI 43-101. Mr. Meade has reviewed and approved the contents of this news release. Dr. Olivier Féménias, MSc, PhD, EurGeol 1115, Vice-President, Geology for Avnel Gold Mining Limited is a Qualified Person as defined by NI 43-101. Dr. Féménias has reviewed and approved the contents of this news release. ABOUT AVNEL GOLD Avnel Gold is a TSX-listed gold mining, exploration and development company with operations in south-western Mali in West Africa. The Company s focus is to develop its 80%-owned Kalana Main Project from a small underground mine into a low-cost, open-pit mining operation. The Company is also advancing several nearby satellite deposits on the 387 km 2 30-year Kalana Exploitation Permit. On March 31, 2014, the Company reported a Mineral Resource estimate and the results of a Preliminary Economic Assessment ( PEA ) prepared by Snowden Mining Industry Consultants. The PEA outlines a 14-year open-pit mine life at the Kalana Main Project recovering 1.46 million ounces of gold at an average on-site all-in sustaining cost of $577 per ounce with an initial capital cost of $149 million. Utilising a gold price of $1,110 per ounce and a 10% discount rate, the PEA reported a net present value ( NPV ) of $194 million after-tax and imputed interest, and an internal rate of return ( IRR ) of 53% on a 100% project basis. The Company is now advancing the project to Definitive Feasibility, which is scheduled to be completed in the first quarter of 2016. For further information, please contact: Howard Miller CEO and Chairman Phone: +44 207 589 9082 UK Mobile: +44 07768 696129 Canadian Mobile: +1 (416) 726 8174 Email: howard@hbmiller.co.uk Jeremy Link Vice-President, Corporate Development Phone: +1 (647) 692-5460 Email: jlink@avnelgold.com www.avnelgold.com No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.

- 7 - CAUTIONARY STATEMENTS Preliminary Economic Assessment The Kalana Main Preliminary Economic Assessment ( PEA ) is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorised as Mineral Reserves; thus, there is no certainty that the economic benefits indicated in the PEA will be realised. The PEA is subject to a number of assumptions, including, among others that an Environmental and Social Impact Assessment ( ESIA ) will be completed within the required timeline, all required permits will be obtained in a timely manner, the company will continue to have the support of local community, a constant regulatory environment and no material increase occurs to the estimated costs. The Kalana Main PEA is based upon an 8.54 million tonne Indicated Mineral Resource grading 4.53 g/t Au containing 1.25 million ounces and a 2.09 million tonne Inferred Mineral Resource grading 3.76 g/t Au containing 0.25 million ounces utilising a cut-off grade of 0.9 g/t Au. The PEA also includes 0.66 million tonnes of tailings grading 1.80 g/t Au that are classified as an Indicated Mineral Resource. Investors are cautioned not to assume that all or any portion of the Mineral Resource will ever be converted into a Proven and Probable Mineral Reserve. The NI 43-101-compliant technical report for the PEA and the Mineral Resource Estimate was prepared by Allan Earl, Executive Consultant, and Ivor Jones, Executive Consultant, of Snowden Mining Industry Consultants, each of whom are independent Qualified Persons, as defined in NI 43-101. The PEA was filed on SEDAR (www.sedar.com) on March 31, 2014. Forward-Looking Statements This news release includes certain forward-looking statements. All statements, other than statements of historical fact, included in this release, including the future plans and objectives of Avnel Gold, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Avnel Gold s expectations include, among others, risks related to international operations, the actual results of current exploration activities, conclusions of economic evaluations and changes in project parameters as plans continue to be refined as well as future prices of gold and silver, as well as those factors discussed in the section entitled Risk Factors in Avnel Gold s Annual Information Form, which is available on SEDAR (www.sedar.com). Although Avnel Gold has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Non-IFRS Measures On-site All-in Sustaining Cost Per Ounce is a non-gaap and non-ifrs measure that does not have a standardised meaning prescribed by GAAP or IFRS and there may be some variation in the method of computation to other similarly titled measures of other gold mining companies. In the PEA, Snowden defines All-in Sustaining Cost as mine site cash operating costs, which includes costs such as mining, processing, administration, but excludes non-site costs (transport and refining of metals and royalties), plus sustaining capital costs, which includes community and environmental costs, plus closure costs. These costs are then divided by the number of ounces of expected production to arrive at On-site All-in Sustaining Cost Per Ounce.

Figure 1: Kalana Exploitation Permit

Table 1: Kalana Project in situ Mineral Resources Statement (30 September 2015) Kalana Project in situ Mineral Resource Statement as at 30 September 2015 (100% Project Basis Reported at a 0.9 g/t Au cut-off utilising a $1,100/oz gold price) Tonnes Grade Contained Gold (Mt) (g/t Au) (Moz) MEASURED MINERAL RESOURCES Kalana Main 09.0 4.24 1.23 Total 09.0 4.24 1.23 INDICATED MINERAL RESOURCES Kalana Main 10.9 4.19 1.47 Kalana Main Tailings 00.7 1.75 0.04 Total 11.6 4.04 1.51 MEASURED + INDICATED MINERAL RESOURCES Kalana Main 19.9 4.20 2.69 Kalana Main Tailings 00.7 1.75 0.04 Total 20.6 4.12 2.73 INFERRED MINERAL RESOURCES Kalana Main 00.8 4.59 0.11 Kalanako 00.4 5.33 0.07 Total 01.2 4.83 0.18 Notes on Mineral Resources: 1. The Kalana Main pit and the historic Kalana Main tailings Mineral Resource estimates are as at 30 September 2015. The Kalanako pit Mineral Resource estimate is as at 19 March 2015. Mineral Resources are disclosed on a total project basis at 100%. Avnel Gold owns an 80% equity interest in SOMIKA, the Malian company that holds the Kalana Exploitation Permit. 2. The determination of pit-constrained Mineral Resources at Kalana Main are based upon a gold price of $1,100 per ounce and a 1.2 million tonne per annum mining operation; pit slope angles ranging from 32 degrees in saprolite to 55 degrees in fresh rock; estimated bulk mining cost beginning at surface ranging from $2.26 to $2.57 per tonne mined (averaging $3.10 for the selected pit); estimated processing, grade control incremental ore costs, mining overheads, and G&A costs ranging from $22.38 to $30.32 per tonne of ore; and a range of gold recoveries averaging 94%. 3. Unless stated otherwise, tonnages are metric tonnes and are rounded to the closest 0.0 million tonnes, grades are rounded to the closest 0.00, and contained gold rounded to the closest 000 and are reported as troy ounces. All reported grades and tonnes are prior to dilution. Mineral Resources for the Kalana Main deposit are reported following depletion from historical production. 4. Mineral Resources for the Kalana Main and Kalanako deposits are reported above a cut-off grade of 0.9 g/t Au and were estimated by Ivor W.O. Jones, who is recognised as a Qualified Person for the purposes of NI 43-101. No cut-off has been applied to the tailings as all tailings are proposed to be treated. Grades were estimated using Multiple Indicator Kriging (MIK), with the exception of the historical tailings grade, which is estimated from historical production. 5. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, marketing, or other relevant factors. These Mineral Resources are reported using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council. 6. The quantity and grade of reported Inferred Resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Mineral Resources as an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category.