North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Similar documents
North American Palladium Provides Update on Lac des Iles Exploration Program

North American Palladium Signs Option Agreement for the Sunday Lake Project and Commences New Exploration Strategy

V Sample from C.O.D vein 15 metres southwest of V

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Detour Gold Reports Drilling Results from Lower Detour

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

Sudbury Platinum Discovers New Ni-Cu-PGM Mineralization at its Aer-Kidd Property

Toronto, Canada March 4, 2013

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Transition Continues to Intersect Significant Platinum-rich PGM Mineralization at Sunday Lake

Press Release Thunder Bay: August 2, 2018

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

A B C PAD A HIGHLIGHTS

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Wallbridge Completes Successful Initial Drill Program at Beschefer

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

News Release. Infill Drilling Program

Drilling Extending Mineralization in La Mina North Zone

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

CHAMPION BEAR RESOURCES

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Highlights from the four holes announced in this news release include:

DPM EXPLORATION CONFIRMS EXTENSION OF LIMESTONE HOSTED GOLD MINERALIZATION, SERBIA

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Drilling Extending Mineralization in La Mina North Zone

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

a growth oriented precious metals producer LDI Exploration Update

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

QUITO PROJECT. December Northwest Mining Association Annual Conference. Austin, Nevada BVA:TSX.V BRT: FSE

Transition Metals Acquires Advanced Stage Ni-Cu-PGM Projects

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Cove Gold Project 2201 Discovery Update, May 2014

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

Interval (meters) To (meters)

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

Transition Metals and Implats Make Platinum Discovery at Sunday Lake, Intersecting 20.2 meters grading 3.22 Combined PGM s HIGHLIGHTS

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Prophecy: Pacamayo, Paca North and El Abra Return Anomalous Silver, Zinc, Lead and Antimony Assay Results

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

EXCELLON DRILLS BROAD MINERALIZED ZONES AND EXPANDS DRILL PROGRAM ON NORTHERN FRESNILLO SILVER TREND

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Ongoing Drilling of Kiena Deep a Zone Confirms Multiple High Grade Lenses and Extends Zone Down Dip

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne

New Drilling Program Commences at Mutiny s Deflector Deposit

AuRico Metals Intersects 628m Grading 0.53 g/t Au and 0.41% Cu at Kemess East And Announces Results from Successful 2016 Drill Program

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

Transcription:

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine Toronto, Ontario, October 24, 2017 North American Palladium Ltd. ( NAP or the Company ) (TSX: PDL) (OTC PINK: PALDF) is pleased to announce positive exploration results from the Offset South Zone ( Offset South ) at its Lac des Iles mine property ( LDI or the Property ). Offset South is located adjacent to the low cost Sub-Level Shrinkage ( SLS ) mining zone and has the potential to significantly add to the resources currently being mined in that zone. The Company has also made significant progress exploring other targets on the Property and has commenced drilling on the recently added Sunday Lake property. Highlights Selected highlights for the Offset South exploration drilling program include: - Hole 17-801 intersected 7.0m of 3.08 g/t Pd (3.71 g/t of combined Pd + Pt + Au); - Hole 17-802 intersected 5.0m of 3.91 g/t Pd (4.70 g/t of combined Pd + Pt + Au); - Hole 17-803 intersected 37.0m of 3.37 g/t Pd (4.11 g/t of combined Pd + Pt + Au) including 10.0m of 6.98 g/t Pd (8.36 g/t of combined Pd + Pt + Au); - Hole 17-804 intersected 5.0m of 6.57 g/t Pd (8.07 g/t of combined Pd + Pt + Au) and 28.0m of 2.81 g/t Pd (3.42 g/t of combined Pd + Pt + Au) including 8.0m of 5.77 g/t Pd (6.88 g/t of combined Pd + Pt + Au); and, - Hole 17-805 intersected 5.0m of 3.45 g/t Pd (4.27 g/t of combined Pd + Pt + Au). We are encouraged to see the positive drill results from the Offset South Zone. This large target has the potential to significantly increase the resources currently being mined as part of the low cost SLS mining zone. We have started a follow up exploration drilling program to establish and evaluate the continuity, average grade and true thickness of the newly discovered palladium mineralization in the Offset South Zone, said Jim Gallagher, President and CEO of North American Palladium. The Offset Zone represents just one of several exploration opportunities we are evaluating at LDI. Our recent exploration programs have demonstrated that numerous opportunities exist for higher-grade underground palladium resources on the Property. Extending the life of the operation and improving the average head grades to the mill at very low capital costs remains an important strategic priority for the Company, continued Mr. Gallagher. Offset South Exploration Program Since June 2017, the Company has completed 3,050 metres in six underground exploration drill holes, targeting the southern portion of the Offset Zone. The objective of the program is to determine if the higher-grade palladium mineralization present in the central portion of the Offset Zone extends to the south of the current SLS reserves and below the shaft bottom (Figure 1). The Offset South target was not previously prioritized for exploration drilling because of the limited access for drills, uncertainties in the geology and a focus of recent programs on the Central Offset Zone. The recent deepening of the underground ramp system to below the 1000 metre level, coupled with major improvements in the three dimensional geological model for the Offset Zone, provided the impetus for the current program. Offset South drilling highlights (Table 1) indicate that the higher-grade palladium mineralization present in the Central Offset Zone continues to the south at the depths investigated (Figure 1). They also revealed that the highergrade portion of the Offset Zone changes its strike direction from north-south in the Central Offset reserves to northeast-southwest in the Offset South target area. 1

Importantly, the higher-grade palladium mineralization encountered in the new drill holes is hosted by both varitextured gabbro and relatively unaltered norite, and not by the intensely altered norite (mafic schist) that hosts the bulk of the higher-grade palladium reserves on the Property. This observation opens up the potential for future discoveries of higher-grade palladium mineralization along similar, under-explored varitextured gabbro and norite contacts on other parts of the Property. The new drilling results also indicate that the Offset South palladium mineralization maintains the same near-vertical dip shown by the Central Offset Zone reserves and remains open to the south and at depth. The Company has initiated a follow up exploration drilling program designed to establish the continuity and average grade and true thickness of the palladium mineralization in the Offset South Zone. Sunday Lake Project At Sunday Lake, located 25 km s north of Thunder Bay, a new program of geophysical surveys and diamond drilling commenced on October 16, 2017. This program is designed to: 1) Complete infill and extension drilling to determine the continuity of the currently defined Main Zone of disseminated sulfide mineralization located in the eastern part of the Sunday Lake intrusion; 2) Drill test historical borehole electromagnetic anomalies within or adjacent to the footprint of the Main Zone mineralization; and, 3) Use a combination of surface and borehole geophysics to detect massive sulfide mineralization within and external to the Sunday Lake intrusion. A total of 5,000 metres in six diamond drill holes are planned for completion in the fourth quarter (Figure 2). Other Exploration Activities Surface drilling is well advanced on the possible southern continuation of the mineralized feeder structure to the Roby and Offset zones in the Camp Lake structural block. Two of the three planned holes (3,000 metres) were completed and assay results are pending. The Company will provide further updates as significant new exploration results become available. Qualified Person The technical content of this news release was reviewed and approved by the Company s Vice-President, Exploration, Dr. Dave Peck. Dr. Peck is a Qualified Person under the meaning of National Instrument 43-101 and a Professional Geoscientist with the Association of Professional Geoscientists of Ontario, the Association of Professional Engineers and Geoscientists of British Columbia, and the Association of Professional Engineers and Geoscientists of Manitoba. About North American Palladium Ltd. North American Palladium Ltd. (TSX: PDL) (OTC PINK: PALDF) is a Canadian company with over 20 years of production at Lac des Iles mine, located northwest of Thunder Bay, Ontario. North American Palladium is the only pure play palladium producer in the world. With over 500 employees, Lac des Iles mine features a unique world class ore body and modern infrastructure, including both an underground mine and an open pit mine. For further information please contact: North American Palladium Ltd. Investor Relations Telephone: 416-360-7374 Email: IR@nap.com Cautionary Statement on Forward-Looking Information 2

Certain information contained in this news release constitutes 'forward-looking statements' and forwardlooking information within the meaning of applicable Canadian securities laws. All statements other than statements of historical fact are forward-looking statements. The words target, plan, should, could, estimate, guidance, and similar expressions identify forward-looking statements. Forward-looking statements in this news release include, without limitation: information pertaining to the Company s strategy, plans or future financial or operating performance, such as statements with respect to, long term fundamentals for the business, operating performance expectations, project timelines, tailings management plan, mining method change, production forecasts, operating and capital cost estimates, expected mining and milling rates, cash balances, projected grades, mill recoveries, metal price and foreign exchange rates and other statements that express management s expectations or estimates of future performance. Forward-looking statements involve known and unknown risk factors that may cause the actual results to be materially different from those expressed or implied by the forward -looking statements. Such risks include, but are not limited to: the possibility that metal prices and foreign exchange rates may fluctuate, the risk that the Lac des Iles mine may not perform as planned, that the Company may not be able to meet production forecasts, the possibility that the Company ma y not be able to generate sufficient cash to service its indebtedness and may be forced to take other actions, inherent risks associated with development, exploration, mining and processing including environmental risks and risks to tailings capacity, employment disruptions, including in connection with collective agreements between the Company and unions, and the risks associated with obtaining necessary licenses and permits. For more details on these and other risk factors see the Company s most recent Annual Information Form on file with Canadian securities regulatory authorities on SEDAR at www.sedar.com under the heading Risk Factors. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The factors and assumptions contained in this news release, which may prove to be incorrect, include, but are not limited to: that the Company will be able to continue normal business operations at the Mine, that metal prices and exchange rates between the Canadian and United States dollar will be consistent with the Company s expectations, that there will be no significant disruptions affecting operations, and that prices for key mining and construction supplies, including labour, will remain consistent with the Company s expectations. The forward-looking statements are not guarantees of future performance. The Company disclaims any obligation to update or revise any forward-looking statements, whether as a result of new information, events or otherwise, except as expressly required by law. Readers are cautioned not to put undue reliance on these forward-looking statements. 3

Table 1. Selected Pd, Pt, Au, Cu and Ni assay results for the June to September 2017 Offset South exploration drilling program, LDI mine property. Reported interval lengths do not represent true widths, which have not yet been estimated for this part of the Offset Zone. Hole # From (m) To (m) Length (m) Pd (g/t) Pt (g/t) Au (g/t) Cu (%) Ni (%) 17-801 179.0 183.0 4.0 3.33 0.42 0.30 0.19 0.17 " 237.0 324.0 87.0 1.76 0.22 0.17 0.07 0.08 inc. 292.0 299.0 7.0 3.08 0.36 0.27 0.11 0.10 17-802 42.0 47.0 5.0 3.91 0.35 0.44 0.13 0.12 " 316.0 320.0 4.0 3.62 0.33 0.33 0.09 0.08 " 431.0 435.0 4.0 3.40 0.30 0.07 0.04 0.09 17-803 14.0 17.0 3.0 4.23 0.39 0.19 0.14 0.11 " 165.0 170.0 5.0 4.65 0.52 0.35 0.17 0.16 " 212.0 249.0 37.0 3.37 0.49 0.25 0.10 0.11 inc. 232.0 242.0 10.0 6.98 0.86 0.52 0.22 0.20 17-804 154.0 159.0 5.0 6.57 0.80 0.70 0.30 0.23 " 176.0 201.0 25.0 2.09 0.29 0.23 0.12 0.11 inc. 183.0 192.0 9.0 3.81 0.53 0.43 0.24 0.19 and 240.0 268.0 28.0 2.81 0.34 0.27 0.07 0.10 inc. 252.0 260.0 8.0 5.77 0.66 0.45 0.13 0.16 17-805 204.0 209.0 5.0 3.45 0.45 0.37 0.18 0.15 4

Figure 1. Oblique longitudinal projection looking northwest and showing the pierce points into the newly defined Offset South Zone target plane for the six exploration drill holes discussed in this news release. The orange shaded shapes represent the current 2 g/t Pd grade shells for the Offset Zone. 5

Figure 2. Location of historical and proposed drill holes on the Sunday Lake property. 6