Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Similar documents
August 20, 2018 SBB NR SBB TSX

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

November 19, 2018 SBB NR SBB TSX

555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M Nov 20, 2017 SBB NR SBB TSX

Sabina Gold & Silver Announces Results From New Gold Trend Located 15 km North of the Goose Property, Back River Gold Project

January 7, 2019 SBB NR SBB TSX

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel: (888)

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

April 26, 2012 SBB NR SBB-T

Sabina Announces More Positive Drill Results from 2012 Drilling at the Back River Gold Project, Nunavut

Highlights from the four holes announced in this news release include:

Pacific Empire Minerals Provides Copper King RC Drilling Results

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Detour Gold Reports Drilling Results from Lower Detour

DRILLING FURTHER EXTENDS MINERALIZATION AT EXETER S CASPICHE GOLD-COPPER PORPHYRY PROJECT IN CHILE

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

V Sample from C.O.D vein 15 metres southwest of V

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Probe Metals Continues to Expand Gold Zones At Val-d Or East

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Press Release Thunder Bay: August 2, 2018

MINERAL MOUNTAIN CONFIRMS PROOF OF CONCEPT IN THE HOMESTAKE GOLD BELT

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

AVINO SILVER & GOLD MINES LTD.

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

News Release. Canarc Continues to Intersect High-Grade Gold at Fondaway Canyon, Nevada, Including 3.24 Grams per Tonne Gold over 12.

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

NORTHQUEST LTD. ANNOUNCES DRILLING RESULTS FROM THE PISTOL BAY GOLD PROJECT, NUNAVUT, CANADA

NEWS RELEASE August 10, 2017

Dalradian Intersects 2.48 metres Grading g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt

Goldgroup Drilling Continues to Extend the La Paila Zone at Caballo Blanco

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Skeena Intersects g/t AuEq over metres at Eskay Creek

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

Ongoing Drilling of Kiena Deep a Zone Confirms Multiple High Grade Lenses and Extends Zone Down Dip

July Exploring for Canadian Gold in the Rainy River District of Ontario

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

Interval (meters) To (meters)

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

ET and and and

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

HIGHLIGHTS INCLUDE: ^ Includes 466g/t Au Includes 153g/t Au + Includes 45.3g/t Au

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

Toronto, Canada March 4, 2013

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

This area in SE Sullivan Gulch was never mined by previous operators

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Gungnir Resources Inc.

Drilling Highlights: Phase II BCV Infill Drilling

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

April Exploring for Canadian Gold in the Rainy River District of Ontario

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

NEWS RELEASE August 8, 2018

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

NEWS RELEASE November 5, 2018

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

(416) Highlights include:

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

(TSXV: GPLY, OTCQB: GLYXF

Transcription:

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) 998-4175 Tel: (888) 648-4218 www.sabinagoldsilver.com April 8, 2018 SBB NR 18-10 SBB TSX Sabina Gold & Silver continues to grow high grade gold zone at Llama Extension Target Drill hole 18GSE530 returns 15.67g/t Au over 23.25 m, including 32.56 g/t Au over 10.30 m Vancouver, BC Sabina Gold & Silver Corp (SBB.T), ( Sabina or the Company ) is pleased to announce the first results from the 2018 Spring exploration diamond drilling program at its 100%-owned Back River gold project ( Back River or the Project ) in Nunavut, Canada. Approximately 6,000m of planned drilling with two rigs is progressing on schedule with the objective of testing high impact targets at the Goose Property that include; Llama Extension, Umwelt Vault, the Goose Main trend and the prospective and relatively untested DIF (deep iron ) horizon. Drill hole 18GSE530 which intersected, 15.67g/t Au over 23.25 m, including 32.56 g/t Au over 10.30 m (using a 100g/t cutoff for higher grade assays), in altered and mineralized iron, follows up on last years success at the Llama Extension target where significant mineralized intersections included 9.48 g/t Au over 38.55 m in drill hole 17GSE516B (see news release September 5, 2017). The new drill hole, 18GSE530 is located approximately 60m up plunge from drill hole 17GSE516B. This high grade area of gold mineralization, located approximately 450m down plunge of the current Llama deposit resources remains open and is the focus of current Llama Extension drilling. During the 2017 exploration drilling campaign we had great success in demonstrating the tremendous growth potential that exists along the Llama gold structure stated Bruce McLeod, President and CEO. This year we will target the higher grade potential within the trend to better understand the geologic controls and overall size and tenor of the zone. The Llama underground resource area is not currently in the development plan, but as we have seen with the Umwelt Vault Zone, zones of high grade gold over significant widths at depth continue to demonstrate the potential for extended mine life and enhanced project economics.

Table 1.0 Table of Significant Drill Intercepts from Drill Hole 18GSE530 Hole Id Area Azimuth Dip Easting UTM Northing UTM Depth From (m) To (m) Length (m) Au (g/t) 18GSE530 LL 226-63 429798 7271477 771 Assays Pending Au (g/t) Capped @ 100 680.60 684.60 4.00 1.02 n/a 693.55 716.80 23.25 16.32 15.67 incl. 700.10 710.40 10.30 34.02 32.56 incl. 704.30 705.25 0.95 115.80 100.00 incl. 707.05 708.25 1.20 97.65 n/a * True widths of the intercepts reported are unknown at this time. Assays Pending Lithology ** Capping for high grade exploration assay(s) is consistent with the resource statistics employed for mineral resources related to the respective deposit areas at Back River. Llama Extension and High Grade Gold Zone The Llama Extension target represents the down plunge potential of the Llama gold structure that is outside of the currently defined resource. Extensions to the gold structure have been partially tested by drilling completed in 2017 and now with this initial drill hole in the 2018 spring drilling campaign. The gold bearing stratigraphy and structure has been shown to continue to a distance of over 500 m below or down plunge from the current resource limits or 1,275 m down plunge from the current Llama open pit limits. The Llama gold structure remains open down plunge. Drill hole 18GSE530 intersected strongly altered and mineralized silicate and oxide iron, units which comprise the Lower Formation, the geologic host to the majority of Back River gold resources. Mineralization and alteration in the drill hole is characterized by significant arsenopyrite, pyrrhotite and locally visible gold with associated significant quartz veining and strong amphibole and chlorite alteration. It is observed that the characteristics of the mineralization and alteration observed in drill hole 18GSE530 have strong similarities to that of the high-grade mineral zone intersected in drill hole 17GSE516B. Further geologic modelling and drilling will focus on better understanding the limits and controls of this zone which is open in all directions of the structure and stratigraphy as it is currently defined.

Qualified Persons The Qualified Person as defined by NI 43-101 as pertains to the Back River Project, is James Maxwell P.Geo, Exploration Manager, for the company. All drill core samples selected within the exploration program are subject to a company standard of internal quality control and quality assurance programs which include the insertion of certified reference materials, blank materials and duplicates analysis. All samples are sent to SGS Canada Inc. located in Burnaby, British Columbia where they are processed for gold analysis by 50 gram fire assay with finish by a combination of atomic absorption and gravimetric methods. Additionally, analysis by screen metallic processes is performed on select samples. SGS quality systems conform to requirements of ISO/IEC Standard 17025 guidelines and meets assay requirements outlined for NI 43-101. Sabina Gold & Silver Corp. Sabina Gold & Silver Corp. is well-financed and had approximately C$94.5million in cash and equivalents post-closing a strategic equity investment in January 2018. The Company is an emerging precious metals company with district scale, advanced, high grade gold assets in one of the world s newest, politically stable mining jurisdictions: Nunavut, Canada. Sabina released a Feasibility Study on its 100% owned Back River Gold Project which presents a project that has been designed on a fit-for purpose basis, with the potential to produce ~200,000 ounces a year for ~11 years with a rapid payback of 2.9 years (see Technical Report for the Initial Project Feasibility Study on the Back River Gold Property, Nunavut, Canada dated October 28, 2015) (the Study ). At a US$1,150 gold price and a 0.80 (US$:C$) exchange rate, the Study delivers a potential after tax internal rate of return of approximately 24.2% with an initial CAPEX of $415 million. The Project received its final Project Certificate on December 19, 2017. The Project is now in the final regulatory and licensing phase. In addition to Back River, Sabina also owns a significant silver royalty on Glencore s Hackett River Project. The silver royalty on Hackett River s silver production is comprised of 22.5% of the first 190 million ounces produced and 12.5% of all silver produced thereafter. For further in please contact: Nicole Hoeller, Vice-President, Communications: 1 888 648-4218 nhoeller@sabinagoldsilver.com Forward Looking In This news release contains forward-looking in within the meaning of applicable securities laws (the forward-looking statements ), including our belief as to the extent, results and timing of and various studies relating to engineering studies, infrastructure improvement

activities, exploration results and permitting and licensing outcomes. These forward-looking statements are made as of the date of this news release. Readers are cautioned not to place undue reliance on forward-looking statements, as there can be no assurance that the future circumstances, outcomes or results anticipated in or implied by such forward-looking statements will occur or that plans, intentions or expectations upon which the forward-looking statements are based will occur. While we have based these forward-looking statements on our expectations about future events as at the date that such statements were prepared, the statements are not a guarantee that such future events will occur and are subject to risks, uncertainties, assumptions and other factors which could cause events or outcomes to differ materially from those expressed or implied by such forward-looking statements. Such factors and assumptions include, among others, the effects of general economic conditions, commodity prices, changing foreign exchange rates and actions by government and regulatory authorities and misjudgments in the course of preparing forward-looking statements. In addition, there are known and unknown risk factors which could cause our actual results, performance or achievements to differ materially from any future results, performance or achievements expressed or implied by the forward-looking statements. Known risk factors include risks associated with exploration and project development; the need for additional financing; the calculation of mineral resources and reserves; operational risks associated with mining and mineral processing; fluctuations in metal prices; title matters; government regulation; obtaining and renewing necessary licenses and permits; environmental liability and insurance; reliance on key personnel; the potential for conflicts of interest among certain of our officers or directors; the absence of dividends; currency fluctuations; labour disputes; competition; dilution; the volatility of the our common share price and volume; future sales of shares by existing shareholders; and other risks and uncertainties, including those relating to the Back River Project and general risks associated with the mineral exploration and development industry described in our Annual In Form, financial statements and MD&A for the fiscal period ended December 31, 2016 filed with the Canadian Securities Administrators and available at www.sedar.com. Although we have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. We are under no obligation to update or alter any forward-looking statements except as required under applicable securities laws. This news release has been authorized by the undersigned on behalf of Sabina Gold & Silver Corp. Bruce McLeod, President & CEO Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M7

Tel 604 998-4175 Fax 604 998-1051 http://www.sabinagoldsilver.com

Figure 1.0 Location Map for DDH 18GSE530

Figure 2.0 Cross Section 3875N for DDH 18GSE530

Figure 3.0 Long section with selected diamond drill holes