PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Similar documents
PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

JUNE 25, 2015 TSX: WDO

WESDOME ANNOUNCES HIGH GRADE GOLD DISCOVERY AT KIENA COMPLEX IN VAL D OR QUEBEC

Ongoing Drilling of Kiena Deep a Zone Confirms Multiple High Grade Lenses and Extends Zone Down Dip

Wesdome Announces Interim Mineral Resource Estimate for Kiena Mine Complex and Continued Drilling Extends Kiena Deep A Zone Along Plunge

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

V Sample from C.O.D vein 15 metres southwest of V

News Release. Infill Drilling Program

Probe Metals Continues to Expand Gold Zones At Val-d Or East

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Interval (meters) To (meters)

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

CAUTIONARY STATEMENT

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Detour Gold Reports Drilling Results from Lower Detour

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

Press Release Thunder Bay: August 2, 2018

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

Goldcrest Resources Ltd.

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

Toronto, Canada March 4, 2013

New Drilling Program Commences at Mutiny s Deflector Deposit

North American Palladium Provides Update on Lac des Iles Exploration Program

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

BGM ANNOUNCES MINERAL RESOURCE UPDATE AT BARKERVILLE MOUNTAIN TO SUPPORT BONANZA LEDGE OPERATIONS

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

(416) Highlights include:

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

Anglo Swiss Resources Inc. Files NI Gold Resource Report on the 257 Level of the Kenville Gold Mine and Expands Resource Estimate

April Exploring for Canadian Gold in the Rainy River District of Ontario

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

News Release TSX:RMX NYSE AMEX:RBY November 29, 2010

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

IAMGOLD REPORTS FURTHER HIGH-GRADE INTERSECTIONS FROM INFILL AND EXPANSION DRILLING AT SARAMACCA

IAMGOLD CONTINUES TO INTERSECT HIGH GRADES AT MONSTER LAKE

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

DENISON ANNOUNCES 2018 EXPLORATION & EVALUATION PROGRAM FOCUSED ON HIGH PRIORITY PROPERTIES

July Exploring for Canadian Gold in the Rainy River District of Ontario

Kirkland Lake Gold - Queenston Joint Venture Reports New Drill Results Including the AK and South Claims

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

Dalradian Provides Update on Norwegian Exploration Programs

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Trading Symbol: ADA TSX-V; C2Z-Frankfurt Press Release No Shares Outstanding: 104,808,584 November 1, 2006

Teranga Gold s Golden Hill Drill Results Include More High-Grade Gold at Multiple Prospects

MCEWEN MINING BLACK FOX EXPLORATION NEWS

A B C PAD A HIGHLIGHTS

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Transcription:

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011 Toronto, Ontario March 30, 2011 Wesdome Gold Mines Ltd (WDO: TSX) has initiated an aggressive exploration, development and evaluation program with the goal of increasing resources and growing production. Work will be concentrated near existing infrastructure on its wholly-owned mining/milling operations near Wawa, Ontario and Val d Or, Quebec. HIGHLIGHTS FOR 2011 o 167,000 metres of drilling - 50% Definition/delineation drilling - 50% Exploration drilling o $11.7 million drilling budget o Mishi mine construction o Dubuisson access and delineation drilling G. Mannard, VP Exploration states We hope to improve on last year s success with a bigger program this year funded from cash flow. We are focused on targets close to existing infrastructure which offer the lowest risk, lowest cost prospects to significantly expand production in the near term. WAWA CAMP Eagle River Mine Work will focus on establishing access at depth to the high grade 811 Zone in the western part of the mine (Figure 1). This access decline opens up the central portion of the mine for new drilling at depth. It will also allow for a drilling drift to be established at a depth of 700 metres, which will permit drilling of the 811 Zone to depths of 1,000 metres, starting in 2012. A total of $2.5 million is allocated to underground drilling at Eagle River in 2011. This includes 37,000 metres of delineation and definition drilling and 11,000 metres of exploration drilling. In the last 16 years, the Eagle River mine has produced 858,545 ounces of gold from 2,831,930 tonnes milled at an average recovered grade of 9.4 gau/tonne. Almost all of this production has come from depths of 500 metres or less. Limited deep drilling to date has traced the host vein structure to depths of 1,300 metres. Mishi Project The Mishi Project is located two kilometres west of the Eagle River mill. In 2011, pre-production development will culminate in initial production during the fourth quarter. The project envisions a 5-year mine life at a capital cost of $1.26 million. The current mine plan was developed to optimize existing infrastructure and minimize capital expenditures. The 2011 drilling program is budgeted at $2.0 million and involves 15,000 metres of drilling. Its purpose is to provide

in-pit definition, geotechnical and hydrogeological information; condemnation drilling for future waste pad expansion and step-out definition and expansion drilling. This work combined with mill optimization and metallurgical studies will provide the data required to examine potential for a larger mining operation, increasing mineral reserves and increasing mineral resources. In total, drilling in the Wawa Camp will total 63,000 metres at a cost of $4.5 million. VAL D OR CAMP An aggressive drilling campaign totalling 104,000 metres at a cost of $7.2 million is planned in Val d Or this year. Two thirds of the drilling will be surface and underground exploration work while the remainder will involve definition drilling. The focus is on identifying new mining areas in proximity to the Kiena mine and advancing the Dubuisson project. Kiena Mine Surface drilling totalling 25,000 metres at an estimated cost of $2.0 million is planned. The principle targets are the Northwest and Martin Zones (Figure 2). The Northwest Zone is located approximately 500 metres west of existing development on the 330 and 520 metre levels. Limited historic drilling here returned encouraging intersections of 5.28 gau/tonne over 7.9 metres corelength and 6.18 gau/tonne over 9.1 metres corelength. The purpose of the drilling will be to delineate and define the continuity of this mineralization to the extent necessary to make a development decision. The Martin Zone has been opened up on the 330 metre level, approximately 1,000 metres east of the Kiena shaft. Underground drilling and drifting demonstrates reasonable continuity and grades. The surface drilling is designed to expand resource potential at depths of 100 to 200 metres above the range of underground drill coverage. We believe potential exists to significantly expand resources above the 330 metre level and be in position to make an informed development decision. Surface drilling will also provide preliminary testing of the Cadillac Break tectonic zone in the southwest portion of the claims. This target lies immediately along strike from the neighbouring Malartic Gold Fields Mine (2.0 million ounces of former production) and the new Canadian Malartic Project of Osisko (pre-production development). This drilling is viewed as the start of a longer term effort to evaluate the previously underexplored 4.5 kilometre long stretch of the Cadillac Break, which traverses the southern portion of our property. Up to 4,000 metres of drilling is allocated for this target in 2011. Drilling is underway. Underground exploration drilling totalling 31,000 metres, at a cost of $2.5 million, will focus on the southeast extension of the S-50 Zone, the M Zone target (located between the S-50 and VC Zones) and the Martin Zone (Figure 3). Drilling of the depth extension of the S-50 is scheduled to start late in the year after development for drill access has been established. Underground delineation and definition drilling totalling 34,000 metres will focus on extending known zones to depth and replacing reserves. Work is concentrated on bringing new areas into the mine plan as development progresses and is estimated to cost $1.7 million. Dubuisson Project In March of 2010, Wesdome announced its intention to develop the Dubuisson Zone by driving a 1.0 kilometre drift east on the 330 metre level. Half of this drift was completed in 2010. A series of drilling bays are being established to provide delineation and definition drilling coverage of the deposit, its western extensions and depth extensions to 700 metres depth. This will involve 13,700 metres of drilling at a cost of $1.0 million and completion of the drifting and drill bays at an estimated cost of $1.3 million. The Dubuisson Zone is viewed as a potential source of significant incremental production at above average grade. Drilling has commenced from the first drill bay and we look forward to the seasonally unrestricted ability to systematically drill this new discovery and fully understand its potential. 2

TECHNICAL DISCLOSURE The technical content of this press release has been verified by George Mannard, P.Geo., APGO, Vice President Exploration, Marc Ducharme, P.Geo. OGQ, Chief Exploration Geologist Kiena and Ron Leber, P.Geo. OGQ, Chief Mine Geologist Kiena, who are all employees of Wesdome and Qualified Persons as per requirements of National Instrument 43-101. ABOUT WESDOME Wesdome is an established Canadian gold producer with wholly-owned mining and milling complexes located in Wawa, Ontario and Val d Or, Québec. Wesdome has been producing gold continually for 20 years on an unhedged basis and to date has produced in excess of 1.2 million ounces. The Company has 101.2 million shares issued and outstanding and trades on the Toronto Stock Exchange under the symbol WDO. For further information, please contact: Donovan Pollitt, P.Eng., CFA or George Mannard, P.Geo. President & CEO Vice President, Exploration 416-360-3743 ext 25 416-360-3743 ext 22 8 King St. East, Suite 1305 Toronto, ON, M5C 1B5 Toll Free: 1-866-4-WDO-TSX Phone: 416-360-3743, Fax: 416-360-7620 Email: invest@wesdome.com, Website: www.wesdome.com This news release contains forward-looking information which may include, but is not limited to, statements with respect to the future financial or operating performance of the Company and its projects. Often, but not always, forward-looking statements can be identified by the use of words such as plans, expects, is expected, budget, scheduled, estimates, forecasts, intends, anticipates, or believes or variations (including negative variations) of such words and phrases, or state that certain actions, events or results may, could, would, might or will be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances, management s estimates or opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements. 3

Figure 1 4

5

6