Operations Management

Similar documents
References. 1. Russel et al., Operations Managemnt, 4 th edition. Management 3. Dr-Ing. Daniel Kitaw, Industrial Management and Engineering Economy

CP:

Forecasting. Dr. Richard Jerz rjerz.com

Lecture 4 Forecasting

Forecasting. Copyright 2015 Pearson Education, Inc.

Introduction to Forecasting

Chapter 8 - Forecasting

Antti Salonen PPU Le 2: Forecasting 1

Chapter 5: Forecasting

PPU411 Antti Salonen. Forecasting. Forecasting PPU Forecasts are critical inputs to business plans, annual plans, and budgets

Antti Salonen KPP Le 3: Forecasting KPP227

Forecasting. Chapter Copyright 2010 Pearson Education, Inc. Publishing as Prentice Hall

Copyright 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Operations Management

Chapter 7 Forecasting Demand

Forecasting Chapter 3

The Art of Forecasting

Lecture Prepared By: Mohammad Kamrul Arefin Lecturer, School of Business, North South University

Forecasting Using Time Series Models

15 yaş üstü istihdam ( )

Chapter 13: Forecasting

3. If a forecast is too high when compared to an actual outcome, will that forecast error be positive or negative?

Assistant Prof. Abed Schokry. Operations and Productions Management. First Semester

Based on the original slides from Levine, et. all, First Edition, Prentice Hall, Inc

Lecture Prepared By: Mohammad Kamrul Arefin Lecturer, School of Business, North South University

Every day, health care managers must make decisions about service delivery

Four Basic Steps for Creating an Effective Demand Forecasting Process

STAT 115: Introductory Methods for Time Series Analysis and Forecasting. Concepts and Techniques

Determine the trend for time series data

Forecasting. Operations Analysis and Improvement Spring

CHAPTER 18. Time Series Analysis and Forecasting

Multiple Regression Analysis

Time Series and Forecasting

14. Time- Series data visualization. Prof. Tulasi Prasad Sariki SCSE, VIT, Chennai

CHAPTER 4: DATASETS AND CRITERIA FOR ALGORITHM EVALUATION

FORECASTING COARSE RICE PRICES IN BANGLADESH

NOWCASTING REPORT. Updated: August 17, 2018

NSP Electric - Minnesota Annual Report Peak Demand and Annual Electric Consumption Forecast

Forecasting. BUS 735: Business Decision Making and Research. exercises. Assess what we have learned

NOWCASTING REPORT. Updated: September 23, 2016

Euro-indicators Working Group

QMT 3001 BUSINESS FORECASTING. Exploring Data Patterns & An Introduction to Forecasting Techniques. Aysun KAPUCUGİL-İKİZ, PhD.

NOWCASTING REPORT. Updated: May 5, 2017

Tracking Accuracy: An Essential Step to Improve Your Forecasting Process

Time Series and Forecasting

BUSI 460 Suggested Answers to Selected Review and Discussion Questions Lesson 7

peak half-hourly New South Wales

NOWCASTING REPORT. Updated: October 21, 2016

Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa. Forecasting demand 02/06/03 page 1 of 34

Time Series Analysis

Industrial Engineering Prof. Inderdeep Singh Department of Mechanical & Industrial Engineering Indian Institute of Technology, Roorkee

DEPARTMENT OF QUANTITATIVE METHODS & INFORMATION SYSTEMS

GLOBAL COMPANY PROFILE: Walt Disney Parks & Resorts What Is Forecasting? 108. Analysis 131 Seven Steps in the Forecasting

Technical note on seasonal adjustment for M0

Name (print, please) ID

NOWCASTING REPORT. Updated: July 20, 2018

Multivariate Regression Model Results

Time series and Forecasting

STATISTICAL FORECASTING and SEASONALITY (M. E. Ippolito; )

NOWCASTING REPORT. Updated: January 4, 2019

Forecasting. Summarizing Forecast Accuracy, 78. Approaches to Forecasting, 80 Qualitative Forecasts 80

CITY OF MESQUITE Quarterly Investment Report Overview Quarter Ending June 30, 2018

UNIT-IV CORRELATION AND REGRESSION

Some Personal Perspectives on Demand Forecasting Past, Present, Future

NOWCASTING REPORT. Updated: February 22, 2019

peak half-hourly South Australia

NOWCASTING REPORT. Updated: September 7, 2018

NOWCASTING REPORT. Updated: September 14, 2018

CITY OF MESQUITE Quarterly Investment Report Overview Quarter Ending September 30, 2018

Diploma Part 2. Quantitative Methods. Examiner s Suggested Answers

Ch. 12: Workload Forecasting

CHAPTER 14. Time Series Analysis and Forecasting STATISTICS IN PRACTICE:

CHAPTER 1: Decomposition Methods

Product and Inventory Management (35E00300) Forecasting Models Trend analysis

Line Graphs. 1. Use the data in the table to make a line graph. 2. When did the amount spent on electronics increase the most?

Sales Analysis User Manual

Public Library Use and Economic Hard Times: Analysis of Recent Data

A Plot of the Tracking Signals Calculated in Exhibit 3.9

NOWCASTING REPORT. Updated: November 30, 2018

peak half-hourly Tasmania

HEALTHCARE. 5 Components of Accurate Rolling Forecasts in Healthcare

NOWCASTING REPORT. Updated: April 15, 2016

7CORE SAMPLE. Time series. Birth rates in Australia by year,

CORRELATION AND REGRESSION

Available online Journal of Scientific and Engineering Research, 2015, 2(2): Research Article

Sluggish Economy Puts Pinch on Manufacturing Technology Orders

NOWCASTING REPORT. Updated: May 20, 2016

2018 Annual Review of Availability Assessment Hours

Time-Series Analysis. Dr. Seetha Bandara Dept. of Economics MA_ECON

Problem 4.1, HR7E Forecasting R. Saltzman. b) Forecast for Oct. 12 using 3-week weighted moving average with weights.1,.3,.6: 372.

Chapter 10. Correlation and Regression. McGraw-Hill, Bluman, 7th ed., Chapter 10 1

Decision 411: Class 3

YEAR 10 GENERAL MATHEMATICS 2017 STRAND: BIVARIATE DATA PART II CHAPTER 12 RESIDUAL ANALYSIS, LINEARITY AND TIME SERIES

SHORT TERM LOAD FORECASTING

Statistics for IT Managers

Decision 411: Class 3

Short-Term Job Growth Impacts of Hurricane Harvey on the Gulf Coast and Texas

The World Bank Decentralized Community Driven Services Project (P117764)

Chapter 3. Regression-Based Models for Developing Commercial Demand Characteristics Investigation

Decision 411: Class 3

Transcription:

Operations Management Chapter 4 Forecasting PowerPoint presentation to accompany Heizer/Render Principles of Operations Management, 7e Operations Management, 9e 2008 Prentice Hall, Inc. 4 1

Outline Global Company Profile: Disney World What Is Forecasting? Forecasting Time Horizons The Influence of Product Life Cycle Types Of Forecasts 2008 Prentice Hall, Inc. 4 2

Outline Continued The Strategic Importance of Forecasting Human Resources Capacity Supply Chain Management Seven Steps in the Forecasting System 2008 Prentice Hall, Inc. 4 3

Outline Continued Forecasting Approaches Overview of Qualitative Methods Overview of Quantitative Methods 2008 Prentice Hall, Inc. 4 4

Outline Continued Time-Series Forecasting Decomposition of a Time Series Naive Approach Moving Averages Exponential Smoothing Exponential Smoothing with Trend Adjustment Trend Projections Seasonal Variations in Data Cyclical Variations in Data 2008 Prentice Hall, Inc. 4 5

Outline Continued Associative Forecasting Methods: Regression and Correlation Analysis Using Regression Analysis for Forecasting Standard Error of the Estimate Correlation Coefficients for Regression Lines Multiple-Regression Analysis 2008 Prentice Hall, Inc. 4 6

Outline Continued Monitoring and Controlling Forecasts Adaptive Smoothing Focus Forecasting Forecasting In The Service Sector 2008 Prentice Hall, Inc. 4 7

Learning Objectives When you complete this chapter you should be able to : Understand the three time horizons and which models apply for each use Explain when to use each of the four qualitative models Apply the naive, moving average, exponential smoothing, and trend methods 2008 Prentice Hall, Inc. 4 8

Learning Objectives When you complete this chapter you should be able to : Compute three measures of forecast accuracy Develop seasonal indexes Conduct a regression and correlation analysis Use a tracking signal 2008 Prentice Hall, Inc. 4 9

Forecasting at Disney World Global portfolio includes parks in Hong Kong, Paris, Tokyo, Orlando, and Anaheim Revenues are derived from people how many visitors and how they spend their money Daily management report contains only the forecast and actual attendance at each park 2008 Prentice Hall, Inc. 4 10

Forecasting at Disney World Disney generates daily, weekly, monthly, annual, and 5-year 5 forecasts Forecast used by labor management, maintenance, operations, finance, and park scheduling Forecast used to adjust opening times, rides, shows, staffing levels, and guests admitted 2008 Prentice Hall, Inc. 4 11

Forecasting at Disney World 20% of customers come from outside the USA Economic model includes gross domestic product, cross-exchange rates, arrivals into the USA A staff of 35 analysts and 70 field people survey 1 million park guests, employees, and travel professionals each year 2008 Prentice Hall, Inc. 4 12

Forecasting at Disney World Inputs to the forecasting model include airline specials, Federal Reserve policies, Wall Street trends, vacation/holiday schedules for 3,000 school districts around the world Average forecast error for the 5-year 5 forecast is 5% Average forecast error for annual forecasts is between 0% and 3% 2008 Prentice Hall, Inc. 4 13

What is Forecasting? Process of predicting a future event Underlying basis of all business decisions Production Inventory Personnel Facilities?? 2008 Prentice Hall, Inc. 4 14

Forecasting Time Horizons Short-range range forecast Up to 1 year, generally less than 3 months Purchasing, job scheduling, workforce levels, job assignments, production levels Medium-range forecast 3 months to 3 years Sales and production planning, budgeting Long-range forecast 3 + years New product planning, facility location, research and development 2008 Prentice Hall, Inc. 4 15

Distinguishing Differences Medium/long range forecasts deal with more comprehensive issues and support management decisions regarding planning and products, plants and processes Short-termterm forecasting usually employs different methodologies than longer-term forecasting Short-termterm forecasts tend to be more accurate than longer-term forecasts 2008 Prentice Hall, Inc. 4 16

Influence of Product Life Cycle Introduction Growth Maturity Decline Introduction and growth require longer forecasts than maturity and decline As product passes through life cycle, forecasts are useful in projecting Staffing levels Inventory levels Factory capacity 2008 Prentice Hall, Inc. 4 17

Product Life Cycle Introduction Growth Maturity Decline Company Strategy/Issues Best period to increase market share R&D engineering is critical Sales Practical to change price or quality image Strengthen niche Internet search engines LCD & plasma TVs Xbox 360 ipods Poor time to change image, price, or quality Competitive costs become critical Defend market position Drive-through restaurants Cost control critical CD-ROMs Analog TVs 3 1/2 Floppy disks Figure 2.5 2008 Prentice Hall, Inc. 4 18

Product Life Cycle OM Strategy/Issues Introduction Growth Maturity Decline Product design and development critical Frequent product and process design changes Short production runs High production costs Limited models Attention to quality Forecasting critical Product and process reliability Competitive product improvements and options Increase capacity Shift toward product focus Enhance distribution Standardization Less rapid product changes more minor changes Optimum capacity Increasing stability of process Long production runs Product improvement and cost cutting Little product differentiation Cost minimization Overcapacity in the industry Prune line to eliminate items not returning good margin Reduce capacity Figure 2.5 2008 Prentice Hall, Inc. 4 19

Types of Forecasts Economic forecasts Address business cycle inflation rate, money supply, housing starts, etc. Technological forecasts Predict rate of technological progress Impacts development of new products Demand forecasts Predict sales of existing products and services 2008 Prentice Hall, Inc. 4 20

Strategic Importance of Forecasting Human Resources Hiring, training, laying off workers Capacity Capacity shortages can result in undependable delivery, loss of customers, loss of market share Supply Chain Management Good supplier relations and price advantages 2008 Prentice Hall, Inc. 4 21

Seven Steps in Forecasting Determine the use of the forecast Select the items to be forecasted Determine the time horizon of the forecast Select the forecasting model(s) Gather the data Make the forecast Validate and implement results 2008 Prentice Hall, Inc. 4 22

The Realities! Forecasts are seldom perfect Most techniques assume an underlying stability in the system Product family and aggregated forecasts are more accurate than individual product forecasts 2008 Prentice Hall, Inc. 4 23

Forecasting Approaches Qualitative Methods Used when situation is vague and little data exist New products New technology Involves intuition, experience e.g., forecasting sales on Internet 2008 Prentice Hall, Inc. 4 24

Forecasting Approaches Quantitative Methods Used when situation is stable and historical data exist Existing products Current technology Involves mathematical techniques e.g., forecasting sales of color televisions 2008 Prentice Hall, Inc. 4 25

Overview of Qualitative Methods Jury of executive opinion Pool opinions of high-level experts, sometimes augment by statistical models Delphi method Panel of experts, queried iteratively 2008 Prentice Hall, Inc. 4 26

Overview of Qualitative Methods Sales force composite Estimates from individual salespersons are reviewed for reasonableness, then aggregated Consumer Market Survey Ask the customer 2008 Prentice Hall, Inc. 4 27

Jury of Executive Opinion Involves small group of high-level experts and managers Group estimates demand by working together Combines managerial experience with statistical models Relatively quick Group-think disadvantage 2008 Prentice Hall, Inc. 4 28

Sales Force Composite Each salesperson projects his or her sales Combined at district and national levels Sales reps know customers wants Tends to be overly optimistic 2008 Prentice Hall, Inc. 4 29

Delphi Method Iterative group process, continues until consensus is reached 3 types of participants Decision makers Staff Respondents Staff (Administering survey) Decision Makers (Evaluate responses and make decisions) Respondents (People who can make valuable judgments) 2008 Prentice Hall, Inc. 4 30

Consumer Market Survey Ask customers about purchasing plans What consumers say, and what they actually do are often different Sometimes difficult to answer 2008 Prentice Hall, Inc. 4 31

Overview of Quantitative Approaches 1. Naive approach 2. Moving averages 3. Exponential smoothing 4. Trend projection 5. Linear regression Time-Series Models Associative Model 2008 Prentice Hall, Inc. 4 32

Time Series Forecasting Set of evenly spaced numerical data Obtained by observing response variable at regular time periods Forecast based only on past values, no other variables important Assumes that factors influencing past and present will continue influence in future 2008 Prentice Hall, Inc. 4 33

Time Series Components Trend Cyclical Seasonal Random 2008 Prentice Hall, Inc. 4 34

Components of Demand Demand for product or service Seasonal peaks Random variation Trend component Average demand over four years 1 2 3 4 Year Actual demand Figure 4.1 2008 Prentice Hall, Inc. 4 35

Trend Component Persistent, overall upward or downward pattern Changes due to population, technology, age, culture, etc. Typically several years duration 2008 Prentice Hall, Inc. 4 36

Seasonal Component Regular pattern of up and down fluctuations Due to weather, customs, etc. Occurs within a single year Number of Period Length Seasons Week Day 7 Month Week 4-4.5 Month Day 28-31 Year Quarter 4 Year Month 12 Year Week 52 2008 Prentice Hall, Inc. 4 37

Cyclical Component Repeating up and down movements Affected by business cycle, political, and economic factors Multiple years duration Often causal or associative relationships 0 5 10 15 20 2008 Prentice Hall, Inc. 4 38

Random Component Erratic, unsystematic, residual fluctuations Due to random variation or unforeseen events Short duration and nonrepeating M T W T F 2008 Prentice Hall, Inc. 4 39

Naive Approach Assumes demand in next period is the same as demand in most recent period e.g., If January sales were 68, then February sales will be 68 Sometimes cost effective and efficient Can be good starting point 2008 Prentice Hall, Inc. 4 40

Moving Average Method MA is a series of arithmetic means Used if little or no trend Used often for smoothing Provides overall impression of data over time Moving average = demand in previous n periods demand in previous n periods n 2008 Prentice Hall, Inc. 4 41

Moving Average Example Month Actual Shed Sales January 10 February 12 March 13 April 16 May 19 June 23 July 26 3-Month Moving Average (10 + 12 + 13)/3 = 11 2 / 3 (12 + 13 + 16)/3 = 13 2 / 3 (13 + 16 + 19)/3 = 16 (16 + 19 + 23)/3 = 19 1 / 3 2008 Prentice Hall, Inc. 4 42

Graph of Moving Average Shed Sales 30 28 26 24 22 20 18 16 14 12 10 Moving Average Forecast Actual Sales J F M A M J J A S O N D 2008 Prentice Hall, Inc. 4 43

Weighted Moving Average Used when trend is present Older data usually less important Weights based on experience and intuition Weighted moving average = (weight for period n) n x (demand in period n) n weights 2008 Prentice Hall, Inc. 4 44

Weights Applied Period Weighted Moving 3 Last Average month 2 Two months ago 1 Three months ago 6 Sum of weights Month Actual Shed Sales January 10 February 12 March 13 April 16 May 19 June 23 July 26 3-Month Weighted Moving Average [(3 x 13) ) + (2 x 12) ) + (10( 10)]/6 = 12 1 / 6 [(3 x 16) + (2 x 13) + (12)]/6 = 14 1 / 3 [(3 x 19) + (2 x 16) + (13)]/6 = 17 [(3 x 23) + (2 x 19) + (16)]/6 = 20 1 / 2 2008 Prentice Hall, Inc. 4 45

Potential Problems With Moving Average Increasing n smooths the forecast but makes it less sensitive to changes Do not forecast trends well Require extensive historical data 2008 Prentice Hall, Inc. 4 46

Moving Average And Weighted Moving Average 30 Weighted moving average Sales demand 25 20 15 10 Actual sales Moving average 5 Figure 4.2 J F M A M J J A S O N D 2008 Prentice Hall, Inc. 4 47

Exponential Smoothing Form of weighted moving average Weights decline exponentially Most recent data weighted most Requires smoothing constant (α) Ranges from 0 to 1 Subjectively chosen Involves little record keeping of past data 2008 Prentice Hall, Inc. 4 48

Exponential Smoothing New forecast = Last period s s forecast + α (Last period s s actual demand Last period s s forecast) F t = F t 1 + α(a t 1 - F t 1 ) where F t = new forecast F t 1 = previous forecast α = smoothing (or weighting) constant (0 α 1) 2008 Prentice Hall, Inc. 4 49

Exponential Smoothing Example Predicted demand = 142 Ford Mustangs Actual demand = 153 Smoothing constant α =.20 2008 Prentice Hall, Inc. 4 50

Exponential Smoothing Example Predicted demand = 142 Ford Mustangs Actual demand = 153 Smoothing constant α =.20 New forecast = 142 +.2(153 142) 2008 Prentice Hall, Inc. 4 51

Exponential Smoothing Example Predicted demand = 142 Ford Mustangs Actual demand = 153 Smoothing constant α =.20 New forecast = 142 +.2(153 142) = 142 + 2.2 = 144.2 144 cars 2008 Prentice Hall, Inc. 4 52

Effect of Smoothing Constants Weight Assigned to Most 2nd Most 3rd Most 4th Most 5th Most Recent Recent Recent Recent Recent Smoothing Period Period Period Period Period Constant (α) α(1 - α) α(1 - α) 2 α(1 - α) 3 α(1 - α) 4 α =.1.1.09.081.073.066 α =.5.5.25.125.063.031 2008 Prentice Hall, Inc. 4 53

Impact of Different α 225 Demand 200 175 Actual demand α =.5 150 1 2 3 4 5 6 7 8 9 Quarter α =.1 2008 Prentice Hall, Inc. 4 54

Impact of Different α Demand 225 Actual demand Chose high values of α 200 when underlying average is likely to change 175 Choose low values of Choose low values of α when underlying average is stable 150 1 2 3 4 5 6 7 8 9 Quarter α =.5 α =.1 2008 Prentice Hall, Inc. 4 55

Choosing α The objective is to obtain the most accurate forecast no matter the technique We generally do this by selecting the model that gives us the lowest forecast error Forecast error = Actual demand - Forecast value = A t - F t 2008 Prentice Hall, Inc. 4 56

Common Measures of Error Mean Absolute Deviation (MAD) MAD = Actual - Forecast n Mean Squared Error (MSE) MSE = ( Forecast Errors) 2 n 2008 Prentice Hall, Inc. 4 57

Common Measures of Error Mean Absolute Percent Error (MAPE) n 100 Actual i - Forecast i /Actual i MAPE = i = 1 n 2008 Prentice Hall, Inc. 4 58

Quarter Comparison of Forecast Error Rounded Absolute Rounded Absolute Actual Forecast Deviation Forecast Deviation Tonnage with for with for Unloaded α =.10 α =.10 α =.50 α =.50 1 180 175 5.00 175 5.00 2 168 175.5 7.50 177.50 9.50 3 159 174.75 15.75 172.75 13.75 4 175 173.18 1.82 165.88 9.12 5 190 173.36 16.64 170.44 19.56 6 205 175.02 29.98 180.22 24.78 7 180 178.02 1.98 192.61 12.61 8 182 178.22 3.78 186.30 4.30 82.45 98.62 2008 Prentice Hall, Inc. 4 59

Quarter Comparison of Forecast Error Rounded Absolute Rounded Absolute Actual Forecast Deviation Forecast Deviation Tonnage with n for with for Unloaded α =.10 α =.10 α =.50 α =.50 MAD = deviations For α =.10 1 180 175 5.00 175 5.00 2 168 = 82.45/8 175.5 = 10.31 7.50 177.50 9.50 3 159 174.75 15.75 172.75 13.75 4 For α 175 =.50 173.18 1.82 165.88 9.12 5 190 173.36 16.64 170.44 19.56 6 205 = 98.62/8 175.02 = 12.33 29.98 180.22 24.78 7 180 178.02 1.98 192.61 12.61 8 182 178.22 3.78 186.30 4.30 82.45 98.62 2008 Prentice Hall, Inc. 4 60

MSE = Quarter Comparison of Forecast Error Rounded Absolute Rounded Absolute Actual Forecast Deviation Forecast Deviation Tonnage with n for with for Unloaded α =.10 α =.10 α =.50 α =.50 For α =.10 (forecast errors)2 1 180 175 5.00 175 5.00 2 168 = 1,526.54/8 175.5 = 190.82 7.50 177.50 9.50 3 159 174.75 15.75 172.75 13.75 4 For α 175 =.50 173.18 1.82 165.88 9.12 5 190 173.36 16.64 170.44 19.56 6 205 = 1,561.91/8 175.02 = 195.24 29.98 180.22 24.78 7 180 178.02 1.98 192.61 12.61 8 182 178.22 3.78 186.30 4.30 82.45 98.62 MAD 10.31 12.33 2008 Prentice Hall, Inc. 4 61

Comparison of Forecast n Error MAPE = Quarter i = 1 Rounded Absolute Rounded Absolute Actual Forecast Deviation Forecast Deviation Tonnage with n for with for Unloaded α =.10 α =.10 α =.50 α =.50 For α =.10 100 deviation i /actual i 1 180 175 5.00 175 5.00 2 168 = 44.75/8 175.5 = 7.50 5.59% 177.50 9.50 3 159 174.75 15.75 172.75 13.75 4 For 175 α =.50 173.18 1.82 165.88 9.12 5 190 173.36 16.64 170.44 19.56 6 205 = 54.05/8 175.02 = 29.98 6.76% 180.22 24.78 7 180 178.02 1.98 192.61 12.61 8 182 178.22 3.78 186.30 4.30 82.45 98.62 MAD 10.31 12.33 MSE 190.82 195.24 2008 Prentice Hall, Inc. 4 62

Comparison of Forecast Error Quarter Rounded Absolute Rounded Absolute Actual Forecast Deviation Forecast Deviation Tonnage with for with for Unloaded α =.10 α =.10 α =.50 α =.50 1 180 175 5.00 175 5.00 2 168 175.5 7.50 177.50 9.50 3 159 174.75 15.75 172.75 13.75 4 175 173.18 1.82 165.88 9.12 5 190 173.36 16.64 170.44 19.56 6 205 175.02 29.98 180.22 24.78 7 180 178.02 1.98 192.61 12.61 8 182 178.22 3.78 186.30 4.30 82.45 98.62 MAD 10.31 12.33 MSE 190.82 195.24 MAPE 5.59% 6.76% 2008 Prentice Hall, Inc. 4 63

Exponential Smoothing with Trend Adjustment When a trend is present, exponential smoothing must be modified Forecast including (FIT t ) = trend Exponentially smoothed (F t ) + forecast Exponentially (T t ) smoothed trend 2008 Prentice Hall, Inc. 4 64

Exponential Smoothing with Trend Adjustment F t = α(a t - 1 ) + (1 - α)( )(F t - 1 + T t - 1 ) T t = β(f t - F t - 1 ) + (1 - β)t t - 1 Step 1: Compute F t Step 2: Compute T t Step 3: Calculate the forecast FIT t = F t + T t 2008 Prentice Hall, Inc. 4 65

Exponential Smoothing with Trend Adjustment Example Forecast Actual Smoothed Smoothed Including Month(t) Demand (A t ) Forecast, F t Trend, T t Trend, FIT t 1 12 11 2 13.00 2 17 3 20 4 19 5 24 6 21 7 31 8 28 9 36 10 Table 4.1 2008 Prentice Hall, Inc. 4 66

Exponential Smoothing with Trend Adjustment Example Forecast Actual Smoothed Smoothed Including Month(t) Demand (A t ) Forecast, F t Trend, T t Trend, FIT t 1 12 11 2 13.00 2 17 3 20 4 19 5 24 Step 1: Forecast for Month 2 6 21 7 31 F 2 = αa 1 + (1 - α)(f 1 + T 1 ) 8 28 F 9 36 2 = (.2)(12) + (1 -.2)(11 + 2) 10 = 2.4 + 10.4 = 12.8 units Table 4.1 2008 Prentice Hall, Inc. 4 67

Exponential Smoothing with Trend Adjustment Example Forecast Actual Smoothed Smoothed Including Month(t) Demand (A t ) Forecast, F t Trend, T t Trend, FIT t 1 12 11 2 13.00 2 17 12.80 3 20 4 19 5 24 Step 2: Trend for Month 2 6 21 7 31 T 2 = β(f 2 - F 1 ) + (1 - β)t 1 8 28 T 9 36 2 = (.4)(12.8-11) + (1 -.4)(2) 10 =.72 + 1.2 = 1.92 units Table 4.1 2008 Prentice Hall, Inc. 4 68

Exponential Smoothing with Trend Adjustment Example Forecast Actual Smoothed Smoothed Including Month(t) Demand (A t ) Forecast, F t Trend, T t Trend, FIT t 1 12 11 2 13.00 2 17 12.80 1.92 3 20 4 19 5 24 Step 3: Calculate FIT for Month 2 6 21 7 31 FIT 2 = F 2 + T 1 8 28 FIT 2 = 12.8 + 1.92 9 36 10 = 14.72 units Table 4.1 2008 Prentice Hall, Inc. 4 69

Exponential Smoothing with Trend Adjustment Example Forecast Actual Smoothed Smoothed Including Month(t) Demand (A t ) Forecast, F t Trend, T t Trend, FIT t 1 12 11 2 13.00 2 17 12.80 1.92 14.72 3 20 15.18 2.10 17.28 4 19 17.82 2.32 20.14 5 24 19.91 2.23 22.14 6 21 22.51 2.38 24.89 7 31 24.11 2.07 26.18 8 28 27.14 2.45 29.59 9 36 29.28 2.32 31.60 10 32.48 2.68 35.16 Table 4.1 2008 Prentice Hall, Inc. 4 70

Exponential Smoothing with Trend Adjustment Example Product demand 35 30 25 20 15 10 5 Actual demand (A t ) Forecast including trend (FIT t ) with α =.2 and β =.4 0 1 2 3 4 5 6 7 8 9 Time (month) Figure 4.3 2008 Prentice Hall, Inc. 4 71

Trend Projections Fitting a trend line to historical data points to project into the medium to long-range Linear trends can be found using the least squares technique ^ y ^ = a + bx where y = computed value of the variable to be predicted (dependent variable) a = y-axis y intercept b = slope of the regression line x = the independent variable 2008 Prentice Hall, Inc. 4 72

Least Squares Method Values of Dependent Variable Actual observation (y value) Deviation 1 (error) Deviation 3 Deviation 2 Deviation 5 Deviation 4 Deviation 7 Deviation 6 Trend line, y ^ = a + bx Time period Figure 4.4 2008 Prentice Hall, Inc. 4 73

Least Squares Method Values of Dependent Variable Actual observation (y value) Deviation 1 Deviation 3 Deviation 2 Deviation 5 Deviation 7 Deviation 6 Least squares method minimizes the sum of the Deviation squared errors 4 (deviations) Trend line, y ^ = a + bx Time period Figure 4.4 2008 Prentice Hall, Inc. 4 74

Least Squares Method Equations to calculate the regression variables y ^ = a + bx b = Σ xy - nxy Σx 2 - nx 2 a = y - bx 2008 Prentice Hall, Inc. 4 75

Least Squares Example Year Time Period (x) Electrical Power Demand x 2 xy 2001 1 74 1 74 2002 2 79 4 158 2003 3 80 9 240 2004 4 90 16 360 2005 5 105 25 525 2005 6 142 36 852 2007 7 122 49 854 x = 28 y = 692 x 2 = 140 xy = 3,063 x = 4 y = 98.86 xy - nxy 3,063 - (7)(4)(98.86) b = = = 10.54 x 2 - nx 2 140 - (7)(4 2 ) a = y - bx = 98.86-10.54(4) = 56.70 2008 Prentice Hall, Inc. 4 76

Least Squares Example Year Time Period (x) Electrical Power Demand x 2 xy 1999 1 74 1 74 2000 2 79 4 158 2001 The trend 3 line is 80 9 240 2002 4 90 16 360 2003 y ^ 5= 56.70 + 10.54x 105 25 525 2004 6 142 36 852 2005 7 122 49 854 Σx = 28 Σy = 692 Σx 2 = 140 Σxy = 3,063 x = 4 y = 98.86 Σxy - nxy 3,063 - (7)(4)(98.86) b = = = 10.54 Σx 2 - nx 2 140 - (7)(4 2 ) a = y - bx = 98.86-10.54(4) = 56.70 2008 Prentice Hall, Inc. 4 77

Least Squares Example Power demand Trend line, 160 y ^ = 150 56.70 + 10.54x 140 130 120 110 100 90 80 70 60 50 2001 2002 2003 2004 2005 2006 2007 2008 2009 Year 2008 Prentice Hall, Inc. 4 78

Least Squares Requirements 1. We always plot the data to insure a linear relationship 2. We do not predict time periods far beyond the database 3. Deviations around the least squares line are assumed to be random 2008 Prentice Hall, Inc. 4 79

Seasonal Variations In Data The multiplicative seasonal model can adjust trend data for seasonal variations in demand 2008 Prentice Hall, Inc. 4 80

Seasonal Variations In Data Steps in the process: 1. Find average historical demand for each season 2. Compute the average demand over all seasons 3. Compute a seasonal index for each season 4. Estimate next year s s total demand 5. Divide this estimate of total demand by the number of seasons, then multiply it by the seasonal index for that season 2008 Prentice Hall, Inc. 4 81

Seasonal Index Example Demand Average Average Month 2005 2006 2007 2005-2007 2007 Monthly Jan 80 85 105 90 94 Feb 70 85 85 80 94 Mar 80 93 82 85 94 Apr 90 95 115 100 94 May 113 125 131 123 94 Jun 110 115 120 115 94 Jul 100 102 113 105 94 Aug 88 102 110 100 94 Sept 85 90 95 90 94 Oct 77 78 85 80 94 Nov 75 72 83 80 94 Dec 82 78 80 80 94 Seasonal Index 2008 Prentice Hall, Inc. 4 82

Seasonal Index Example Demand Average Average Month 2005 2006 2007 2005-2007 2007 Monthly Jan 80 85 105 90 94 Feb 70 85 85 80 94 Mar 80 93 average 82 2005-2007 85 monthly demand 94 Apr Seasonal 90 index 95 = 115 average monthly 100 demand 94 May 113 125 131 123 94 = 90/94 =.957 Jun 110 115 120 115 94 Jul 100 102 113 105 94 Aug 88 102 110 100 94 Sept 85 90 95 90 94 Oct 77 78 85 80 94 Nov 75 72 83 80 94 Dec 82 78 80 80 94 Seasonal Index 0.957 2008 Prentice Hall, Inc. 4 83

Seasonal Index Example Demand Average Average Seasonal Month 2005 2006 2007 2005-2007 2007 Monthly Index Jan 80 85 105 90 94 0.957 Feb 70 85 85 80 94 0.851 Mar 80 93 82 85 94 0.904 Apr 90 95 115 100 94 1.064 May 113 125 131 123 94 1.309 Jun 110 115 120 115 94 1.223 Jul 100 102 113 105 94 1.117 Aug 88 102 110 100 94 1.064 Sept 85 90 95 90 94 0.957 Oct 77 78 85 80 94 0.851 Nov 75 72 83 80 94 0.851 Dec 82 78 80 80 94 0.851 2008 Prentice Hall, Inc. 4 84

Seasonal Index Example Demand Average Average Seasonal Month 2005 2006 2007 2005-2007 2007 Monthly Index Jan 80 85 105 90 94 0.957 Feb 70 85 Forecast 85 for 80 2008 94 0.851 Mar 80 93 82 85 94 0.904 Apr 90 Expected 95 115 annual demand 100 = 1,200 94 1.064 May 113 125 131 123 94 1.309 Jun 110 115 120 1,200 115 94 1.223 Jul 100 102 Jan 113 x 105.957 = 96 12 94 1.117 Aug 88 102 110 100 94 1.064 1,200 Sept 85 90 Feb 95 x 90.851 = 85 94 0.957 Oct 77 78 85 12 80 94 0.851 Nov 75 72 83 80 94 0.851 Dec 82 78 80 80 94 0.851 2008 Prentice Hall, Inc. 4 85

Seasonal Index Example Demand 140 130 120 110 100 90 80 70 2008 Forecast 2007 Demand 2006 Demand 2005 Demand J F M A M J J A S O N D Time 2008 Prentice Hall, Inc. 4 86

San Diego Hospital Trend Data Inpatient Days 10,200 10,000 9,800 9,600 9,400 9530 9551 9573 9594 9616 9637 9659 9680 9702 9724 9745 9766 9,200 9,000 Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 67 68 69 70 71 72 73 74 75 76 77 78 Month Figure 4.6 2008 Prentice Hall, Inc. 4 87

San Diego Hospital Seasonal Indices Index for Inpatient Days 1.06 1.04 1.02 1.00 0.98 0.96 0.94 0.92 1.04 0.97 1.02 1.01 0.99 0.99 1.03 1.04 0.97 1.00 0.96 0.98 Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 67 68 69 70 71 72 73 74 75 76 77 78 Month Figure 4.7 2008 Prentice Hall, Inc. 4 88

San Diego Hospital Combined Trend and Seasonal Forecast Inpatient Days 10,200 10,000 9,800 9,600 9,400 9,200 9,000 9911 9764 9265 9691 9520 9542 9949 10068 9411 9724 9355 9572 Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 67 68 69 70 71 72 73 74 75 76 77 78 Month Figure 4.8 2008 Prentice Hall, Inc. 4 89

Associative Forecasting Used when changes in one or more independent variables can be used to predict the changes in the dependent variable Most common technique is linear regression analysis We apply this technique just as we did in the time series example 2008 Prentice Hall, Inc. 4 90

Associative Forecasting Forecasting an outcome based on predictor variables using the least squares technique y ^ = a + bx ^ where y = computed value of the variable to be predicted (dependent variable) a = y-axis y intercept b = slope of the regression line x = the independent variable though to predict the value of the dependent variable 2008 Prentice Hall, Inc. 4 91

Associative Forecasting Example Sales Local Payroll ($ millions), y ($ billions), x 2.0 1 3.0 3 2.5 4 2.0 2 2.0 1 3.5 7 Sales 4.0 3.0 2.0 1.0 0 1 2 3 4 5 6 7 Area payroll 2008 Prentice Hall, Inc. 4 92

Associative Forecasting Example Sales, y Payroll, x x 2 xy 2.0 1 1 2.0 3.0 3 9 9.0 2.5 4 16 10.0 2.0 2 4 4.0 2.0 1 1 2.0 3.5 7 49 24.5 y = 15.0 x = 18 x 2 = 80 xy = 51.5 x = x/6 = 18/6 = 3 y = y/6 = 15/6 = 2.5 xy - nxy b = = =.25 x 2 - nx 2 51.5 - (6)(3)(2.5) 80 - (6)(3 2 ) a = y - bx x = 2.5 - (.25)(3) = 1.75 2008 Prentice Hall, Inc. 4 93

Associative Forecasting Example y ^ = 1.75 +.25x Sales = 1.75 +.25(payroll payroll) If payroll next year is estimated to be $6 billion, then: Sales = 1.75 +.25(6) Sales = $3,250,000 4.0 3.25 3.0 Sales 2.0 1.0 0 1 2 3 4 5 6 7 Area payroll 2008 Prentice Hall, Inc. 4 94

Standard Error of the Estimate A forecast is just a point estimate of a future value This point is actually the mean of a probability distribution 4.0 3.25 3.0 Sales 2.0 1.0 Figure 4.9 0 1 2 3 4 5 6 7 Area payroll 2008 Prentice Hall, Inc. 4 95

Standard Error of the Estimate S y,x = (y - y c ) 2 n - 2 where y = y-value of each data point y c = computed value of the dependent variable, from the regression equation n = number of data points 2008 Prentice Hall, Inc. 4 96

Standard Error of the Estimate Computationally, this equation is considerably easier to use S y,x = y 2 - a y - b xy n - 2 We use the standard error to set up prediction intervals around the point estimate 2008 Prentice Hall, Inc. 4 97

Standard Error of the Estimate y,x = y 2 - a y - b xy = n - 2 S y,x 39.5-1.75(15) -.25(51.5) 6-2 S y,x =.306 The standard error of the estimate is $306,000 in sales 4.0 3.25 3.0 Sales 2.0 1.0 0 1 2 3 4 5 6 7 Area payroll 2008 Prentice Hall, Inc. 4 98

Correlation How strong is the linear relationship between the variables? Correlation does not necessarily imply causality! Coefficient of correlation, r, measures degree of association Values range from -1 to +1 2008 Prentice Hall, Inc. 4 99

Correlation Coefficient r = nσxy - ΣxΣy [nσx 2 - (Σx) 2 ][nσy 2 - (Σy) 2 ] 2008 Prentice Hall, Inc. 4 100

y Correlation Coefficient y r = (a) Perfect positive correlation: r = +1 nσxy - ΣxΣy [nσx 2 - (Σx) 2 ][nσy 2 - (Σy) 2 ] x (b) Positive correlation: 0 < r < 1 x y y (c) No correlation: r = 0 x (d) Perfect negative correlation: r = -1 2008 Prentice Hall, Inc. 4 101 x

Correlation Coefficient of Determination, r 2, measures the percent of change in y predicted by the change in x Values range from 0 to 1 Easy to interpret For the Nodel Construction example: r =.901 r 2 =.81 2008 Prentice Hall, Inc. 4 102

Multiple Regression Analysis If more than one independent variable is to be used in the model, linear regression can be extended to multiple regression to accommodate several independent variables y ^ = a + b 1 x 1 + b 2 x 2 Computationally, this is quite complex and generally done on the computer 2008 Prentice Hall, Inc. 4 103

Multiple Regression Analysis In the Nodel example, including interest rates in the model gives the new equation: ^ y = 1.80 +.30x 1-5.0x 2 An improved correlation coefficient of r =.96 means this model does a better job of predicting the change in construction sales Sales = 1.80 +.30(6) - 5.0(.12) = 3.00 Sales = $3,000,000 2008 Prentice Hall, Inc. 4 104

Monitoring and Controlling Forecasts Tracking Signal Measures how well the forecast is predicting actual values Ratio of running sum of forecast errors (RSFE) to mean absolute deviation (MAD) Good tracking signal has low values If forecasts are continually high or low, the forecast has a bias error 2008 Prentice Hall, Inc. 4 105

Monitoring and Controlling Forecasts Tracking signal Tracking signal = = RSFE MAD (Actual demand in period i - Forecast demand in period i) ( Actual - Forecast /n) 2008 Prentice Hall, Inc. 4 106

Tracking Signal + Signal exceeding limit Upper control limit Tracking signal 0 MADs Acceptable range Lower control limit Time 2008 Prentice Hall, Inc. 4 107

Tracking Signal Example Qtr Actual Demand Forecast Demand Error RSFE Absolute Forecast Error Cumulative Absolute Forecast Error MAD 1 90 100-10 -10 10 10 10.0 2 95 100-5 -15 5 15 7.5 3 115 100 +15 0 15 30 10.0 4 100 110-10 -10 10 40 10.0 5 125 110 +15 +5 15 55 11.0 6 140 110 +30 +35 30 85 14.2 2008 Prentice Hall, Inc. 4 108

Tracking Signal Example Qtr Actual Demand Tracking Signal (RSFE/MAD) Forecast Demand Error RSFE Absolute Forecast Error Cumulative Absolute Forecast Error MAD 1 90-10/100 = -1-10 -10 10 10 10.0 2 95-15/7.5 100 = -2-5 -15 5 15 7.5 3 115 0/10 100 = 0 +15 0 15 30 10.0 4 100-10/10 110 = -1-10 -10 10 40 10.0 5 125 +5/11 110 = +0.5+15 +5 15 55 11.0 6 140 +35/14.2 110 = +2.5 +30 +35 30 85 14.2 The variation of the tracking signal between -2.0 and +2.5 is within acceptable limits 2008 Prentice Hall, Inc. 4 109

Adaptive Forecasting It s s possible to use the computer to continually monitor forecast error and adjust the values of the α and β coefficients used in exponential smoothing to continually minimize forecast error This technique is called adaptive smoothing 2008 Prentice Hall, Inc. 4 110

Focus Forecasting Developed at American Hardware Supply, focus forecasting is based on two principles: 1. Sophisticated forecasting models are not always better than simple ones 2. There is no single technique that should be used for all products or services This approach uses historical data to test multiple forecasting models for individual items The forecasting model with the lowest error is then used to forecast the next demand 2008 Prentice Hall, Inc. 4 111

Forecasting in the Service Sector Presents unusual challenges Special need for short term records Needs differ greatly as function of industry and product Holidays and other calendar events Unusual events 2008 Prentice Hall, Inc. 4 112

Fast Food Restaurant Forecast Percentage of sales 20% 15% 10% 5% 11-12 12 1-2 3-4 5-6 7-8 9-10 12-1 2-3 4-5 6-7 8-9 10-11 11 (Lunchtime) (Dinnertime) Hour of day Figure 4.12 2008 Prentice Hall, Inc. 4 113

FedEx Call Center Forecast 12% 10% 8% 6% 4% 2% 0% 2 4 6 8 10 12 2 4 6 8 10 12 A.M. P.M. Hour of day Figure 4.12 2008 Prentice Hall, Inc. 4 114