For personal use only

Similar documents
Naltagua Copper District CHILE

For personal use only

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

For personal use only

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

For personal use only

For personal use only

For personal use only

For personal use only

Quarterly Activities Report For the Period Ended March HIGHLIGHTS

For personal use only

Drilling Commences at Telfer West Gold Project

December 2017 Quarter Activities Report

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

ASX Announcement NAKRU DRILLING AND TRENCHING INTERSECTS 11 METRES AT 2.84 G/T GOLD AND 28.4 METRES AT 1.1% COPPER

For personal use only

High Grade Gold Intercepts at Bangaba

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

******************* *******************

For personal use only

Ovoot Coking Coal Project (100%)

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

QUARTERLY ACTIVITIES REPORT

Queensland Mining Corporation Limited

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

Additional significant gold and copper intercepts obtained in Sweden

For personal use only

For personal use only

Kalman Mineral Resource Update

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

For personal use only

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

For personal use only

For personal use only

For personal use only

Bass Metals records further positive drill results & progress at 3 prospects.

ASX Announcements & Media Release

For personal use only

High-grade Gold in First Drilling Undertaken at Productora South

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE

For personal use only

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

For personal use only

Malachite Resources Limited ABN

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

For personal use only

Drilling Program Commences on Iron Oxide Copper Gold Targets

ONGAVA POLY-METALLIC PROJECT

High-grade Copper and Gold Discovered at Productora

Remaining assay results Tisová Co Au Cu Project Czech Republic

For personal use only

Alligator commences drilling of TCC4 uranium prospect in Arnhem Land, NT 4 September 2018

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

ROX DEFINES STRONG IP ANOMALIES AT PHA LUANG

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

For personal use only

Sipa Resources Limited

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

ASX Announcement. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX: AX8 HIGHLIGHTS. Market Data. Board and Management.

Victory plans gravity survey for Bonaparte after encouraging rock-chip results

High Grade Gold Drill Results Extend Buccaneer

FIRST 2 DRILL HOLES AT NAKRU-2 PROSPECT BOTH INTERSECT SIGNIFICANT HIGHER GRADE COPPER MINERALISATION

For personal use only

Commencement of Targeted RC Drilling Nabarlek Project

LOS AZULES April 2018

NEW DISCOVERIES AT THE RED OCTOBER MINE

For personal use only

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

For personal use only

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

SILVER CITY MINERALS LIMITED ABN Silver City Minerals

Significant Copper-Gold JORC Exploration Target

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

Tel: (+61-8) Mob: (+61) (0)

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2008

For personal use only

For personal use only

OYUT ULAAN COPPER GOLD PROJECT RECONNAISSANCE DRILLING RESULTS

Exploration Update: RC Drilling Commenced at Lucky Strike

Aurora Tank Gold Drilling Update

The Manager Companies ASX Limited 20 Bridge Street

Lake Resources N L, Quarterly Report, January - March 2013 LAKE RESOURCES NL QUARTERLY REPORT JANUARY MARCH 2013

For personal use only

INAUGURAL FARM IN DRILL RESULTS AT CALARIE PROJECT

GEOPHYSICAL SURVEYING COMMENCES AT ESK TROUGH

Boseto Near Mine Exploration Update. North East Plutus, South West Petra and Nexus Propsects


ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA

For personal use only

For personal use only

First Drill Hole Completed at Bluebush Zinc Project

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.

True Width (m) Carneritos to

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

Diamond and RC Drilling Completed, RAB drilling extended - RAB holes show important geology continues to the south west at the Sorpresa Project

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

INITIAL DRILLING AT CAPACETE DELIVERS ENCOURAGING RESULTS. DRILL RIG MOBILISED TO TEST LARGE BLOCK 5 TARGET AT MATA DA CORDA PHOSPHATE PROJECT, BRAZIL

Transcription:

Quarterly Activities Report September 2013 Equus Mining Limited (ASX: EQE) is pleased to report on its exploration activities in Chile, South America, and corporate developments for the quarter ended 30 September 2013. Summary of Activities EXPLORATION Yerba Project, Naltagua Copper District, Chile Hole 7 () returns the best copper intercepts to date hosted by a mixed andesiteshale package, including: 8m (true width) at 0.67% Cu from 24m to 32m 5m (true width) at 1.25% Cu from 50 m to 55m 5.4m (true width) at 1.40% Cu from 65.2m to 70.6m 21.3m (true width) at 1.23% Cu from 92.7m to 114m 13m (true width) at 0.19% Cu from 147m to 160m Surface outcrop of the same mineralization previously returned 33m at 0.88% Cu in a composite channel sample. Hole 7 copper mineralisation is east-dipping and interpreted to correlate with the sheet of mineralization incepted in Holes 1 to 4 (YB-001-D to YB-004-D) located 250 metres to the southeast. There may also be a vertical component of the mineralization in the form of hydrothermal breccia dykes that crosscut stratigraphy. This dominantly stratabound ( Manto-type ) copper mineralization is hosted by vesiculated and brecciated andesite and shale beds of the Lower Cretaceous Prado Formation. CORPORATE Extensive due diligence has been carried out on several acquisition opportunities and follow-up fieldwork is continuing in two districts.

Yerba Project, Naltagua Copper District, Chile Drilling activities during the September 2013 quarter were conducted within the Yerba Project Area located in the Naltagua Copper District, 80 kilometres by road southwest of Santiago, Chile (Figure 1). Equus commenced its inaugural diamond drilling program in early-april 2013 to test the northern-end of a 1,200m-long target zone defined by IP chargeability and resistivity anomalies, hydrothermal alteration (silica-albite-epidote-calcite) and several zones of outcropping, disseminated copper oxide in andesite of the Lower Cretaceous Prado Formation (Figure 2). Holes 1 to 4 (YB-001-D to YB-004-D) were drilled beneath and adjacent to the historic Yerba open-pit, where a composite channel sample of andesite collected from the back-wall of the pit returned 48m (apparent width) grading 1.35% Cu. The undercutting drill holes intercepted a coherent sheet of shallow, east-dipping (30 to 40 ) copper mineralisation in vesiculated and brecciated andesite (Figure 3). Hole 5 (YB-005-D), which is located on a section 180m to the south of Hole 7, intersected a broad interval of low-grade copper mineralization (40.7m true width grading 0.15% Cu) in the andesite footwall to the mineralization intersected in Hole 7. Significantly, Hole 5 did not test the same andesite layer that hosts the copper mineralization intersected in Hole 7. Hole 6 (YB-006-D) was designed to test a deep Induced Polarisation chargeability anomaly at 350m to 400m below surface down-dip of outcropping and near-surface oxide copper mineralization. However, the hole was abandoned at 289m after several days of unproductive drilling in a problematic fault zone. This deep IP target remains untested. Hole 7 () returned some of the best copper mineralization to date (Figure 4). Several shallow, east-dipping zones of copper mineralization have been intercepted in a mixed andesiteshale package (Figure 4), including: 8m (true width) at 0.67% Cu from 24m to 32m 5m (true width) at 1.25% Cu from 50 m to 55m 5.4m (true width) at 1.40% Cu from 65.2m to 70.6m 21.3m (true width) at 1.23% Cu from 92.7m to 114m 13m (true width) at 0.19% Cu from 147m to 160m

The Hole 7 mineralization is interpreted to correlate with the sheet of copper mineralization incepted in Holes 1 to 4 (YB-001-D to YB-004-D) located 250 metres to the southeast. There may also be a vertical component of the mineralization in the form of mineralized hydrothermal breccia dykes that crosscut stratigraphy. This dominantly stratabound copper mineralization is hosted by vesiculated and brecciated andesite and interflow shale beds of the Lower Cretaceous Prado Formation. Current Status of Drilling: Drilling has been suspended while the Chile Government processes Equus s application to modify its drill platform configuration. An area of only 300m by 300m of the large, 4km by 2km Naltagua copper system has been drill-tested to date and small-scale copper mining continues on land adjacent the Equus Option Area. Equus has no ownership interest in these mining operations. Since the program s commencement in April, considerable progress has been made towards better understanding the controls on copper mineralization and as a consequence, the current drilling program has been substantially modified and a greater range of targets may now be tested. Upcoming Work Work with the Chile Government to secure approval for the modified configuration of drill platforms at Yerba and for the new drill platforms proposed at Cerro Oveja and Araya (Figure 1). Construct a stratigraphic model for the thick (+1km) volcano-sedimentary sequence at Naltagua with the objective of identifying and ranking the more prospective manto horizons. Continue to assess new project opportunities with the objective of offsetting any further delays to the approval of drilling at Naltagua with drilling elsewhere in Chile. Corporate Sale of Non-Core Assets Equus is continuing negotiations concerning the sale of non-core assets, including the oil rig in the Kyrgyz Republic. Settlement of the terms of sale with one of the three parties vying for the rig is anticipated to be concluded during the December 2103 quarter.

Executive Changes Susmit Shah resigned as co-company Secretary on 18 September 2013. Susmit has held a company secretary position with the Company since 30 April 2003. Cash Equus cash reserves at 30 September 2013 stood at $1,028,000. Background Equus acquired an interest in the Naltagua Copper District (Naltagua) in Chile, South America by purchasing unlisted Australian public company Equus Resources Limited. Equus three main project areas in Chile, Yerba, Araya and Cerro Oveja, are located within the Naltagua Copper District, 80 kilometres by road southwest of Santiago and 75 kilometres by road southeast of the port city of San Antonio. These projects are well serviced by major infrastructure. The Yerba, Araya and Cerro Oveja projects show many geological similarities to the large, mantotype, Anglo American owned, El Soldado Cu-Ag deposit (200 million tonne @ 1.35% Cu) located 135 kilometres north of Naltagua. Equus holds an option to acquire 100% of a contiguous group of 14 mining licences covering an area of 18.05km2 and 75% of the known areal extent of the large Naltagua Copper System. These mining leases encompass the Yerba, Araya and Cerro Oveja project areas. Under the terms of the option agreement, Equus has the right (but not the obligation) to acquire the mining licences on an outright basis by making a payment of US$500,000 in September 2014 and a final payment of US$3.8 million in September 2015 to the licence holder. Yours sincerely Edward Leschke Managing Director

For further information please contact: Ted Leschke Managing Director Ph: +61 2 9300 3366 Email: tleschke@equusmining.com Website: www.equusmining.com Information in this report that relates to Exploration Results for Naltagua is based on information compiled by Mr Robert Perring, who is a Member of the Australian Institute of Geoscientists. Mr Perring is a consultant to and Non-Executive Director of Equus Mining Limited and has sufficient experience relevant to the style of mineralization and type of deposit under consideration and to the activities reported on to qualify as a Competent Person as defined in the 2004 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Perring consents to the inclusion of the information in this report of the matters based on information in the format and context in which it appears. Surface and Adit Sampling and Assaying: Sampling has been conducted by qualified geologists using a sample interval of 2 metres and 5 metres. Assay results have been composited (weighted arithmetic mean) to give an average grade estimate for the interval sampled. The samples were assayed for copper (and 33 other elements) by aqua regia digest ICP-ES/ICP-MS at Acme Analytical Laboratories, Santiago, Chile.

Table 1 Drill Hole Assay Summary Hole No. Project From (metres) To (metres) Interval (metres) Estimated True Width (metres) Copper (%) YB-001-D Yerba 13 52 39 39 0.63 YB-002-D including including YB-003-D YB-003-D YB-004-D YB-004-D YB-004-D YB-005-D including Yerba 22 23 34 Yerba 19 51.7 Yerba 37 84 152 Yerba 39 39 77 40 40 23.4 64 68 107 171 83 51.9 55 17 6 4.4 12.3 31 23 19 44 12.9 55 17 6 3.3 9.2 15.5 11.5 9.5 40.7 11.9 YB-006-D Yerba No Significant Results (Hole Abandoned) Including Yerba 24 50 65.2 92.7 92.7 147 32 55 70.6 114 99.4 160 8 5 5.4 21.3 6.7 13 8 5 5.4 21.3 6.7 13 0.34 0.68 1.21 0.74 0.44 0.26 0.16 0.32 0.15 0.26 0.67 1.25 1.40 1.23 2.97 0.19 Table 2 Drill Hole Information Hole No. YB-001-D (Hole 1) YB-002-D (Hole 2) YB-003-D (Hole 3) YB-004-D (Hole 4) YB-005-D (Hole 5) YB-006-D (Hole 6) (Hole 7) North WGS-84 UTM East WGS-84 UTM Zone UTM Dip Azimuth Grid - UTM Depth metres 6260781 313270 19S -60 270 325 6260775 313330 19S -75 270 361 6260775 313330 19S -50 270 121 6260775 313332 19S -50 090 196 (Abandoned) 6260888 313270 19S -60 270 220 6260871 313525 19S -80 270 289 (Abandoned) 6261068 313208 19S -60 270 160

For personal use only Figure 3: Section - Holes 1 to 4

Figure 4: Section - Hole 7