Trajectory options to Pluto via gravity assists from Venus, Mars, and Jupiter

Similar documents
ANALYSIS OF VARIOUS TWO SYNODIC PERIOD EARTH-MARS CYCLER TRAJECTORIES

Feasible Mission Designs for Solar Probe Plus to Launch in 2015, 2016, 2017, or November 19, 2008

DESIGN AND OPTIMIZATION OF LOW-THRUST GRAVITY-ASSIST TRAJECTORIES TO SELECTED PLANETS

Analysis of V, Leveraging for Interplanetary Missions

Some Methods for Global Trajectory Optimisation

Preliminary Design of Nuclear Electric Propulsion Missions to the Outer Planets

NEW TRAJECTORY OPTIONS FOR BALLISTIC MERCURY ORBITER MISSION. Chen-wan L. Yen

A study of trajectories to the Neptune system using gravity assists

Astrodynamics (AERO0024)

(95) CASSINI INTERPLANETARY TRAJECTORY DESIGN

NEW HORIZONS MISSION DESIGN FOR THE PLUTO-KUIPER BELT MISSION

Astrodynamics (AERO0024)

A LOW-THRUST VERSION OF THE ALDRIN CYCLER

Mission Design Options for Solar-C Plan-A

SWING-BY MANEUVERS COMBINED WITH AN IMPULSE

ABOUT COMBINING TISSERAND GRAPH GRAVITY-ASSIST SEQUENCING WITH LOW-THRUST TRAJECTORY OPTIMIZATION

New Horizons Pluto Kuiper Belt mission: design and simulation of the Pluto Charon encounter

Low-Thrust Aldrin Cycler with Reduced Encounter Velocities

Jupiter Trojans Rendezvous Mission Design

2005 AAS/AIAA Astrodynamics Specialists Conference

Shape-Based Algorithm for Automated Design of Low-Thrust, Gravity-Assist Trajectories

Astrodynamics of Moving Asteroids

DEFLECTING HAZARDOUS ASTEROIDS FROM COLLISION WITH THE EARTH BY USING SMALL ASTEROIDS

Solar Thermal Propulsion

Resonance Hopping Transfers Between Moon Science Orbits

PATHFINDING AND V-INFININTY LEVERAGING FOR PLANETARY MOON TOUR MISSIONS

Solar Orbiter Ballistic Transfer Mission Analysis Synthesis

A Study of the Close Approach Between a Planet and a Cloud of Particles

The escape speed for an object leaving the surface of any celestial body of mass M and radius d is

PLANETARY MISSIONS FROM GTO USING EARTH AND MOON GRAVITY ASSISTS*

Propulsion Technology Assessment: Science and Enabling Technologies to Explore the Interstellar Medium

IAC-04-Q.2.a.05 BASELINE DESIGN OF NEW HORIZONS MISSION TO PLUTO AND THE KUIPER BELT

ISAS MERCURY ORBITER MISSION TRAJECTORY DESIGN STRATEGY. Hiroshi Yamakawa

Launch Period Development for the Juno Mission to Jupiter

Optimal Gravity Assisted Orbit Insertion for Europa Orbiter Mission

A N A LYSIS O F A B ROA D CL ASS O F E A RT H-M A RS C Y CLE R T R AJE C T O RIES

Mission Trajectory Design to a Nearby Asteroid

Swing-By Maneuvers for a Cloud of Particles with Planets of the Solar System

Newton s Legacy. 1- accelerate to break free of Earth. Rocket Science: How to send a spacecraft to Mars

Mission Architecture Options For Enceladus Exploration

Design of a Multi-Moon Orbiter

Orbital Dynamics and Impact Probability Analysis

ANALYSIS OF CHEMICAL, REP, AND SEP MISSIONS TO THE TROJAN ASTEROIDS

John Dankanich NASA s In-Space Propulsion Technology Project November 18, 2009

Flight and Orbital Mechanics

NEW HORIZONS 2. New Horizons: A Journey to New Frontiers

SOLAR PROBE PLUS MISSION DESIGN OVERVIEW AND MISSION PROFILE

Toward a Standard Nomenclature for Earth Mars Cycler Trajectories

ASTRIUM. Interplanetary Path Early Design Tools at ASTRIUM Space Transportation. Nathalie DELATTRE ASTRIUM Space Transportation.

Interstellar Exploration Through Repeated External Acceleration

Deployment of an Interstellar Electromagnetic Acceleration System

Enabling Low Cost Planetary Missions Through Rideshare Opportuni;es

MAE 180A: Spacecraft Guidance I, Summer 2009 Homework 4 Due Thursday, July 30.

Tutorial on STOUR-LTGA and SIT: Finding an Initial Guess for GALLOP

Method for Rapid Interplanetary Trajectory Analysis using V Maps with Flyby Options

TRAJECTORY DESIGN OF SOLAR ORBITER

Comparison of Performance Predictions for New Low- Thrust Trajectory Tools

Results found by the CNES team (team #4)

Powered Space Flight

+ (38 yr) 1 yr. = 742 mo. 1 yr The number of days in 742 months is

What is the InterPlanetary Superhighway?

OPTIMISATION COMPETITION

Efficient Mission Design via EXPLORE

Interplanetary Mission Opportunities

Astromechanics. 6. Changing Orbits

ASE 379L Space Systems Engineering Fb February 4, Group 1: Johnny Sangree. Nimisha Mittal Zach Aitken

Louise Prockter Applied Physics Laboratory, Johns Hopkins University Barry Goldstein Jet Propulsion Laboratory, California Institute of Technology

Aerocapture Implementation of NASA s Neptune Orbiter With Probes Vision Mission

DEFLECTION MISSIONS FOR ASTEROID 2011 AG5

IAC-14.C4.4.4 Page 1 of 8

ASEN 5050 SPACEFLIGHT DYNAMICS Interplanetary

Europa Exploration: Challenges and Solutions

Enceladus Probe Mission Design Using Titan Aerogravity-Assist

Powered Earth Mars Cycler with Three-Synodic-Period Repeat Time

Mitigation of Restrictions in Planetary Missions by using Interplanetary Parking Orbits and Aeroassist

TRAJECTORY SENSITIVITIES FOR SUN-MARS LIBRATION POINT MISSIONS

AN ASSESSMENT OF MULTIPLE SATELLITE-AIDED CAPTURE AT JUPITER

Interplanetary Trajectory design for Rosetta and Solar Orbiter

A STUDY OF POWERED SWING-BY. Antonio Fernando Bertachini de Almeida PRADO

Guidance Strategy for Hyperbolic Rendezvous

Trajectory Code Validation Slides

NEW HORIZONS PLUTO APPROACH NAVIGATION

Nm kg. The magnitude of a gravitational field is known as the gravitational field strength, g. This is defined as the GM

Patched Conic Interplanetary Trajectory Design Tool

The Richard H. Battin Astrodynamics Conference

PRELIMINARY MISSION DESIGN FOR A CREWED EARTH-MARS FLYBY MISSION USING SOLAR ELECTRIC PROPULSION (SEP)

The optimization of electric propulsion (EP) trajectories for interplanetary missions is a quite difficult

Lesson 11: Orbital Transfers II. 10/6/2016 Robin Wordsworth ES 160: Space Science and Engineering: Theory and ApplicaCons

Planetary Protection Trajectory Analysis for the Juno Mission

OPTIMAL MANEUVERS IN THREE-DIMENSIONAL SWING-BY TRAJECTORIES

LAUNCH OPTIONS FOR MARS NETWORK MISSIONS USING SMALL SPACECRAFT. Walter K Daniel'

Orbit Design for General Relativity Experiments: Heliocentric and Mercury-centric Cases

Planetary Defense Conference 2013 IAA-PDC

Development of Methods for Rapid Electric Propulsion System Design and Optimization

SURVEY OF GLOBAL OPTIMIZATION METHODS FOR LOW- THRUST, MULTIPLE ASTEROID TOUR MISSIONS

Overview of Astronautics and Space Missions

ROBOTIC MARS EXPLORATION TRAJECTORIES USING HALL THRUSTERS

ONE CLASS OF IO-EUROPA-GANYMEDE TRIPLE CYCLERS

Initial Results of a New Method for Optimizing Low-Thrust Gravity-Assist Missions

Escape Trajectories from the L 2 Point of the Earth-Moon System

Transcription:

Copyright 1996, American Institute of Aeronautics and Astronautics, Inc. AIAA Meeting Papers on Disc, 1996, pp. 400-410 A9634751, NGT-51129, AIAA Paper 96-3614 Trajectory options to Pluto via gravity assists from Venus, Mars, and Jupiter Jon A. Sims Purdue Univ., West Lafayette, IN Andrew J. Staugler Purdue Univ., West Lafayette, IN James M. Longuski Purdue Univ., West Lafayette, IN AIAA/AAS Astrodynamics Conference, San Diego, CA, July 29-31, 1996, Collection of Technical Papers (A96-34712 09-12), Reston, VA, American Institute of Aeronautics and Astronautics, 1996, p. 400-410 We use analytic and numeric techniques to assess trajectory options for the Pluto Express science spacecraft to be launched early in the next decade. These techniques have been shown to be highly efficient and thorough. The constraints placed on the Pluto Express trajectory for this study are severe (total flight time to Pluto of 12 years or less using a Delta-class launch vehicle with no upper stage). In addition, no gravity assists involving the Earth are permitted. Using the aforementioned techniques, we found suitable trajectories with launch windows before, near, and after the date of the baseline launch. We also discovered several asteroid flyby opportunities for the baseline mission and for a backup trajectory. (Author) Page 1

AIAA-96-3614-CP TRAJECTORY OPTIONS TO PLUTO VIA GRAVITY ASSISTS FROM VENUS, MARS, AND JUPITER Jon Andrew Sims* Andrew James Staugler,t and James Michael Longuski* School of Aeronautics

reached at which a single flyby can no longer turn the Voo parallel to Vv, and the single flyby curve in Figure 1 leaves the solid curve. The final aphelion radius then reaches a maximum and decreases. Multiple (n) Venus flybys increase

Vinf(km/a): a.00 3.50 4.00 4.50 03/10/09 : O3/09/ 11 : 03/08/14 : 03/07/ 17 - ^03/06J 19 : : (d 03/05/22 : T3

be due to the inability of STOUR to do VOQ leveraging.

Table 1 Trajectory Characteristics Table 1 Trajectory Characteristics (continued) Trajectory Launch Perihelion Perihelion Venus 1 Manuever Perihelion Venus 2 Jupiter Pluto I EVVJP 4/3/2002 8/10/2002 5/23/2003 6/15/2003 1/14/2004 9/11/2004 10/2/2004 2/7/2006 4/3/2014 [2+AV-VGA] C 3 = 14.77 km 2 /s 2 0.696 AU 0.696

Table

Table 2 Trajectories to Pluto Using the Delta 7925 (Flight Time: 12 years) Trajectory Number Trajectory Type Launch Date C 3 (km 2 /s 2 ) AVp L (km/s) AVjjAV (m/s) Injection Margin (kg) I II III IV V VI VII VIII IX X VVJ VVJ VVJ VVJ VVJ VVVJ VVVJ VMVVJ VMVVJ VVVJ 4/3/2002 4/3/2002 5/11/2002 5/13/2002 7/17/2002 7/20/2002 7/29/2002 8/9/2002 8/14/2002 8/23/2002 14.8 13.2 12.9 14.5 26.6 12.7 14.3 18.2 20.2 16.9 3.500 3.595 3.613 3.452 2.534 3.781 4.040 3.336 3.108 3.159 200 200 200 200 200 250 250 300 300 250 52.0 54.4 55.5 68.4 80.7-1.1-106.0 10.2 33.0 87.0 Earlier Launch Dates Having found trajectories satisfying our initial constraints,

Table 3 Examination of Flight Time to Pluto Table 5 Baseline Trajectory Characteristics Traj. No. Launch Date TOF (yrs) C 3 (W/s 2 ) AV PL (km/s) Rad. a (flj) Baseline EVVVJP [2+ A V- VGA, 4+ A V- VGA] I II III 4/3/02 4/3/02 4/5/02 4/3/02 4/5/02 4/6/02 5/11/02 5/12/02 5/13/02 12..0 11,.0 10.0 12.0 11.0 10.0 12.0 11.0 10.0 14.77 14.59 14.32 13.24 13.26 13.30 12.92 13.06 13.26 3..50 3.,82 4.,32 3.,60 4.,02 4.,68 3.,61 3..88 4,,31 9.2 7.1 5.1 12.2 9.5 6.9 9.4 7.3 5.3 Launch Perihelion Venus 1 Maneuver Perihelion Venus 2 Maneuver Perihelion Venus 3 Jupiter 3/9/2001 7/21/2001 8/29/2001 3/20/2002 11/6/2002 11/25/2002 1/23/2004 5/14/2005 6/1/2005 7/11/2006 C 3 = 15.89 km 2 /s 2 0.605 AU (min) Voo = 8.72 km/s AV IV 5/13/02 5/14/02 5/15/02 12.0 11.0 10.0 14.53 14.59 14.69 3,.45 3,.85 4.48 12.5 9.7 7.1 Pluto 3/10/2013 V 7/17/02 7/19/02 7/20/02 7/19/02 12.0 11.0 10.0 10.0 26.63 26.16 25.99 25.81 2..53 2,.73 3.04 4.03 6.9 5.3 3.8 5.0 IX 8/14/02 8/14/02 8/14/02 12.0 11.0 10.0 20.24 20.38 20.49 3.11 3.61 4.43 19.2 15.0 11.0

Table 7 Potential Asteroid Flybys on the Final Venus-Venus

trajectory has a launch date in July 2002 (sixteen months after the baseline), and an excellent launch opportunity exists