Gotthard Base Tunnel - core of the new railway line through the Alps

Similar documents
GOTTHARD BASE TUNNEL (GBT)

EXPERIENCES FROM THE GROUND PROBING IN THE GOTTHARD-BASE TUNNEL AND THEIR APPLICABILITY IN THE GIBRALTAR STRAIT CROSSING

INTERNATIONALE DES TRAVAUX EN SOUTERRAIN. ITA/AITES - Training Course TUNNEL ENGINEERING. Istanbul 2005

Hard Rock TBM Tunneling Technical Developments and Recent Experience

Deep tunnelling in hardrock with large diameter TBM: What s up? An experience from the Gotthard Base Tunnel

Gotthard Base Tunnel - Mastering surface deformations in the area of two concrete arch dams - innovative solutions

Predicting rock conditions ahead of the face

Underground Excavation Design Classification

1. Rock Mechanics and mining engineering

ISTANBUL STRAIT ROAD TUBE CROSSING

Carlos Baião Cenorgeo DESIGN AND CONSTRUCTION OF THE MACHICO-CANIÇAL CANIÇAL EXPRESSWAY TUNNELS

Challenge to the tunnel construction that supports national resilience

Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain).

Observational Methods and

Geotechnical & Mining Engineering Services

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study

RESULTS OF THE SITE CHARACTERISATION OBTAINED AT THE TARIFA EXPERIMENTAL GALLERY

1. INTRODUCTION. EXAMPLE OF SECHILIENNE ROCKFALL (France)

Figure 10. Travel time accessibility for heavy trucks

Open Access Support Technique of Horse Head in Weakly Cemented Soft Rock

Ground settlement due to shield tunneling through gravelly soils in Hsinchu

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

GIBE II TUNNEL PROJECT - ETHIOPIA - 40 BARS OF MUD ACTING ON THE TBM

U-Shaped Sediment Traps

Large deformations in squeezing ground in the Saint-Martin La Porte gallery along the Lyon-Turin Base Tunnel

REGARDING SOME DYNAMIC CHARACTERISTICS OF THE SOILS AND THE LIQUIFACTION POTENTIAL OF SANDS IN SOFIA

PRO GEO GEOTECHNICAL CONSULTANTS SHORT PRESENTATION BARCELONA, SPAIN

Hydrogeological aspects for the design of deep seated tunnels

Practical guidelines for strain burst hazard awareness for development miners

NZQA unit standard New US6 to replace and version 1 Page 1 of 5

NUMERICAL MODELLING OF THE BRUSNICE TUNNEL

1 of 35 Erik Eberhardt UBC Geological Engineering ISRM Edition

GEOLOGY, SOILS, AND SEISMICITY

Table of Contents Development of rock engineering 2 When is a rock engineering design acceptable 3 Rock mass classification

ROCK ENGINEERING AND ITS DEVELOPMENT LECTURE 1. Content

25th International Conference on Ground Control in Mining

Waterview Connection Tunnels

10. GEOTECHNICAL EXPLORATION PROGRAM

Study of Soft Rock Roadway Support Technique

Deep Mill Level Zone, PT Freeport Indonesia From Feasibility to Production. May 2016

DESIGN AND CONSTRUCTION OF LARGE

Executive Summaries for the Century City Area Tunneling Safety Report and Fault Investigation Report

Olympic Games 2014 transportation system The TBM tunnelling story

GEOLOGY OF PRAGUE ITS INTERACTION WITH THE PRAGUE METRO

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers

Roadway Support Technology with Sliding Cracking Surrounding Rock under Tectonic Stress

A new design approach for highway rock slope cuts based on ecological environment protection

The SedAlp Project: WP6: INTERACTION WITH STRUCTURES

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities

Experiences with TBM drives in the Gotthard Base Tunnel, Bodio section. Erfahrungen bei der TBM-Vortriebe im Gotthard- Basistunnel Teilabschnitt Bodio

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

TBM FOR MINING APPLICATIONS

Strong Weighting Events in Shallow Multi-seam Longwall Mining

3/8/17. #20 - Landslides: Mitigation and Case Histories. Questions for Thought. Questions for Thought

Structurally controlled instability in tunnels

Geologic Structures. Changes in the shape and/or orientation of rocks in response to applied stress

ENGINEERING GEOLOGY AND ROCK ENGINEERING

Consolidation settlements above deep tunnels in fractured crystalline rock: Part 2 Numerical analysis of the Gotthard highway tunnel case study

Coarse Sediment Traps

Scoping Calculations of TBM Advancement in Flysch and Breccias of Strait-of-Gibraltar Tunnel

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Floods 2014 a wake up call to natural hazards

Geoscientific Instrumentation in River Valley Projects

Yoshinori KAWAMURA, Oriental Consultants Global Co., Ltd.

Geology 229 Engineering Geology. Lecture 7. Rocks and Concrete as Engineering Material (West, Ch. 6)

Rock mechanics related to mining: challenges and opportunities

Real-time prediction during TBM advance.

New technologies for high-risk tunnel construction in Guiyang- Guangzhou high-speed railway

GROUND RESPONSE AND SUPPORT MEASURES FOR PIR PANJAL TUNNEL IN THE HIMALAYAS

Geotechnical Engineering and Dams

Born in Unzen The World s First Unmanned Construction of Multilayer Sediment Control Dam Using Sediment Forms Unzen Restoration Project Office

Numerical Study of Relationship Between Landslide Geometry and Run-out Distance of Landslide Mass

Introduction to Oil&Gas Well Drilling

NEW DEVELOPMENTS FOR THE DESIGN AND CONSTRUCTION OF TUNNELS IN COMPLEX ROCK MASSES

Rock & Aggregate Drop Inlet Protection

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS


WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

Yev Kontar. Illinois State Geological Survey, University of Illinois at Urbana-Champaign

Power Cavern Design & Back Analysis Using Phase 2

HARD ROCK TBMs. Levent Ozdemir. Tunneling Consultant

Geological evidences of collapse zones in TBM tunneling; a case study of Ghomroud water conveyance tunnel, IRAN

Phase II Report: Project Definition Options. Dam Safety

CHAPTER FIVE 5.0 STABILITY OF CUT SLOPES IN THE STUDY AREA. them limited by a thick canopy of vegetation and steep slope angles.

The Mine Geostress Testing Methods and Design

Shaft Sinking with Electronic detonators at the Gautrain Rapid Rail Link Project

H A R D R O C K T B M D E S I G N F E AT U R E S F O R D I F F I C U LT G R O U N D C O N D I T I O N S. Tyler Sandell The Robbins Company

Lecture # 6. Geological Structures

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

ITASCA Consulting Canada Inc.

Design and Construction of Tunnels

Characteristics on Rock Fractures Induced by Different Excavation Methods of Deep tunnels

Building on Past Experiences Worker Safety

Typical information required from the data collection can be grouped into four categories, enumerated as below.

Settlement characteristics of major infrastructures in Shanghai

Forces in Earth s Crust

TABLE OF CONTENTS LIST OF TABLES. Page

LOCATIONS OF SELECTED MITIGATION SITES IN JAPAN

CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository

Transcription:

Jornada Técnica sobre Túneles en la L.A.V. Galicia a Coruña 20 de Noviembre Gotthard Base Tunnel - core of the new railway line through the Alps Felix Amberg M. Sc. Civil Engineer Amberg Engineering Ltd. Switzerland Abstract Today, Switzerland is realising its most ambitious transalpine railway project the so-called AlpTransit Project. It is the key element of Switzerland s commitment to construct an efficient pan-european highspeed railway network. The project underlines also the political will of the Swiss people and the government to shift the transport of goods from the road to the rail for the purpose of environmental protection and sustainable development. The key piece of AlpTransit is the 57 km long Gotthard Base Tunnel. After its completion, the Gotthard Base Tunnel will be the longest railway tunnel in the world. Due to its length, the high overburden (up to 2500 m) and the complicated geology, this tunnel is regarded as the most challenging tunnel project ever undertaken in Switzerland s tunnel history. The paper reports on the Swiss transport policy and the constructional challenges of the Gotthard Base Tunnel. 1. Swiss Transport Policy In Europe, more and more people and goods are crossing the Alps. According to a study recently published by the EU Commission, the goods traffic through the Alps in 1998 were accounted to around 90 million tons by road and rail, 30% of the goods were transported through the Swiss Alps To guarantee sustainable transport in a long-term vision and to preserve the environment, the Swiss people approved in several votations the policy for the Protection of the Alpine Region from Transit Traffic. Today, Switzerland is realising its most ambitious transalpine railway project the so-called AlpTransit Project. The project underlines the political will of the Swiss people and the government to shift the transport of goods from the road to the rail for the purpose of environmental protection and sustainable development. It is also the key element of Switzerland s commitment to construct an efficient pan-european high-speed railway network. AlpTransit is the mark of quality for the new high-performance railway lines through base tunnels underneath the Gotthard and the Loetschberg mountains. The key piece of AlpTransit is 1

the 57 km long Gotthard Base Tunnel on the Gotthard axis. Due to its length, the high overburden (up to 2500 m) and the complicated geology, this tunnel is regarded as the most challenging tunnel project ever undertaken in Switzerland s tunnel history. 2. Project finance and Project Organisation The key point of Swiss Transport Policy is to shift the goods transport by road in transit through the Swiss Alps on rail for the purpose of sustainable transport development and environmental protection. To promote the combined transport and sustainable development, the Swiss government elaborated a program, which is built up on: a heavy vehicle tax, calculated on the maximum permissible weight, kilometers run, emissions and consumption of the vehicle; a road transit tax on heavy vehicle traffic through the Alps (tax on Alpine Transit); financial aids for construction of two new transalpine railways on the Gotthard axis and the Loetschberg axis for attractive transport service through the Swiss Alps. Based on the above financing plan, around 30 billion Swiss francs have be raised and invested. To manage and coordinate the design and construction works for the Gotthard Base Tunnel, special legal units AlpTransit Gotthard Ltd. and AlpTransit Loetschberg Ltd were established. 2. Planning and Construction of the Gotthard Base Tunnel The Gotthard Base Tunnel is the key object of the new transalpine railway project. The Gotthard Base Tunnel is designed as a deep level railway link to allow high-speed passenger trains to travel at speed of 250 km/h and freight trains at speed of 140 km/h through the Alps. The horizontal alignment of the Gotthard Base Tunnel is curved, having to consider the safety distances to reservoirs above the base tunnel, the height of the overburden as well as the possibility to install intermediate headings. In addition, geological conditions had to be considered in the attempt to avoid difficult geological formations or to traverse such zones at minimal expansion. Based on intensive investigations with regard to constructional aspects, traffic capacity, facility maintenance, safety, construction and operational costs, as well as comprehensive risk analysis in relation to costs and duration of the construction, the tunnel has been outlined as two parallel single-track tunnels without service tunnel, but with two multifunctional stations and with cross passages at regular intervals. At multifunctional stations, there are lateral and evacuation galleries, crossovers and technical rooms which are provided with fresh air in the case of an emergency and permit immediate escape and evacuation of passengers from the tunnel. Via crossovers, trains can change from one tube to the other. The 57 km long tunnel required special consideration in regard to an efficient construction and for a sufficient ventilation under traffic. In order to achieve an acceptable over-all construction time, intermediate points of attack were conceived. These intermediate points of attack do not 2

only fulfill functions as additional points for tunnel heading, but also as ventilation in- and outlets once the tunnel is under traffic. The intermediate points of attack have been topographically arranged to divide the tunnel into roughly equal long sections and to allow geological difficult sections to be dealt with at an earlier stage of the realisation of the tunnel. The intermediate points of attack are the following: Erstfeld: northern portal; Amsteg: a 1.2 km long horizontal access tunnel; Sedrun: two 800 m deep vertical shafts of approx. 8 m diameter, accessed through a horizontal access tunnel of approximately 1 km length, an additional shaft which extends from the head of the blind shaft to the surface will serve as ventilation during operation. A multifunctional station is situated at the foot of the blind shaft; Faido: a 2.7 km long inclined tunnel with a 13% gradient and a height difference of 330 m. A multifunctional station is situated at the end of the inclined tunnel; Bodio: southern portal. Fig. 1 shows the layout of the Gotthard Base Tunnel Faido access tunnel and multifunction station Sedrun access tunnel, shaft and multifunction station Amsteg Access Tunnel Fig.1: Layout of the Gotthard Base Tunnel The base tunnel passes through mostly crystalline rock formations which are intersected by a few narrow sediment zones. One can distinguish between three main igneous formations of crystalline rock: the Aar massif in the northern part, the Gotthard massif in the central part, and the Penninic gneiss in the south. Between the main crystalline formations, a few narrow sediment zones are embedded which were squeezed between the massifs. At the Gotthard Base Tunnel the two zones of the Piora Basin and the Tavetscher Massif have been regarded to be the most difficult zones to drive through. Therefore, it was decided at a very early stage of the project to carry out geological investigations in both zones. 3

Clavaniev zone TZM Urseren Carvera zone Piora basin North Portal Amsteg intermediate point of attack Sedrun intermediate point of attack Faido intermediate point of attack South Portal In the Tavetscher Massif investigation drillings were lowered from 1991 to 1998. The exploration works for the Piora Basin saw the construction of an investigation gallery and drillings at its end also. These investigation works started 1993 and were finished 1997. Fig. 2 illustrates the geological profile. m a.s.l. ü.m. 3000 2500 2000 1500 1000 500 Aar-Massif Gotthard- Massif Penninic gneiss zone Fig.2: Geological profile Over major sections of the tunnel, the overburden is extremely high. 35 km of the tunnel have an overburden of more than 1000 m, 20 km more than 1500 m, and 5 km reach more than 2000 m. The maximum overburden amounts up to 2300 m. In addition to the geomechanical effects of the high overburden, rock temperatures reached up to 45 C. The high rock temperatures together with heat generated by the machinery required air conditioning to be installed during tunnel construction. Most sections of the tunnel were excavated using Tunnel Boring Machines (TBM). In sections Sedrun where the rock conditions are poor, a conventional drill &blast tunnelling method was applied. Fig. 3 shows the cross section design for the TBM bored section. The tunnel lining is based on a two-shell support system secured with shotcrete and reinforced with mesh, rockbolts and, if necessary, steel supports and a membrane seal. This membrane will be attached to the vault drainage pipes with a cross-feed to the main drainage at 100m intervals. 4

Fig. 3: Standard profile of the TBM bored section 4. Material management as part of sustainable development policy Apart from the measures considered for protection of environment such as noise, water pollution and landscape, special consideration was made to the handling of the excavated materials. The concept adopted for the Gotthard Base Tunnel with respect to the material management of excavated materials represent a very important chapter of Swiss sustainable development policy. The 57 km long Gotthard Base Tunnel produced totally 24 million tons of excavated materials. Special concern was paid to the deposit of the excavated materials at a very early stage of the planning. The concept adopted is to re-utilize the excavated materials as concrete and shotcrete aggregates and put them back into the tunnel again. In this way, 25% of the excavated materials could be directly adsorbed from the tunnel site. 5. Challenges in Tunnel Construction During the construction of the Gotthard Base Tunnel several geotechnical challenges were encountered. Beside various occasions when the TBM was trapped in fault zones of different geological nature squeezing conditions and brittle failures in the form of rockbursts are to be mentioned. In the squeezing rock conditions of the Tavetsch intermediate massif a zone of approx. 1200 m length had to be crossed. The most difficult section of the entire new tunnel from the viewpoint of geology was expected to be the northern part of the Tavetsch intermediate sub-massif in the Sedrun section. It consists of a steeply inclined, sandwich-like sequence of soft and hard rock. Exploratory drillings in the early nineties indicated extremely difficult rock conditions for about 1,100 m of the tunnel. As well as compact gneiss, there are also intensively overlapping strata of schistose rock and phyllite. 5

Based on the results of the lab tests from these drillings and geotechnical models a new heading method for tunnels with an overburden of up to 1 000 m was developed. The full-face heading with extensive use of long face anchors. The excavation at the construction section Sedrun started in 2002. With regard to deformations, the geotechnical behavior of the kakiritic gneisses and slates encountered turned out to match the forecast. A rapid cessation of the deformations (occurring only some 20 to 30 m behind the face) from the perpendicular bedding made the transformation from the yielding to resistance principle easier. The cross section of the single tubes increased from about 80 m 2 up to more than 130 m 2. To counter the expected high rock pressures a full-face excavation by drill & blast with a new special support system was developed. The used support system in the TZM consisted of shotcrete, net reinforcement and flexible steel mining arches, which were installed by a support placement rig. After excavation two steel arches were inserted. Each arch consisted of eight segments which are joined together by slightly yielding connectors to form two concentric rings. They allowed a certain degree of deformation. The installed steel arches gradually closed under the rock pressure until their maximum support pressure (resistance of the support) was reached and the system transformed from yielding to resistance principle. In the resistance condition one closed steel ring consists of two overlapping TH profiles. They had the capacity to deform up to 80 cm radial deformations. The deformations occurred radially at the anticipated average magnitudes of 20 to 80 cm. The deformations in the cross section took place in a very different and asymmetrical manner. These asymmetrical deformations were reacted by corresponding additional support elements like grouted anchors. It can be concluded that the support system used in the TZM North proved itself to be effective. The average advance rates were approx. 1 m per day. The breakthrough to the construction section Amsteg in the North was in October 2007 and took place nine month ahead of schedule. The same yielding principle was also applied to the TBM drives in squeezing rock conditions. Partly the large deformations are welcome because as deformations in the ground increase, the stress around the tunnel decreases and the amount of rock support can be reduced, resulting in a more economic excavation support. Within an open type TBM and its back up, there are only certain areas where the rock support means can be applied. Therefore the rate of advance, the quantity and type of the support measures as well as the occurring deformations are inseparably interrelated and influence each other mutually. A rigid lining system would have needed very high support capacity and with a shield machine, the permissible deformations would have been too limited. Squeezing rock conditions were encountered for instance in the East and West TBM drives between Faido and Sedrun 6

Figure 4: Deformed Steel Arch - East Tube The drive of the east tube was first started with a relatively rigid rock support. Already after some meters though, the rock support was damaged (deformed steel arches, shotcrete failure, Figure ) due to deformation. The TBM had entered a totally unexpected 200 m-long zone of squeezing rock. This led to an adaptation of the rock support. A heavy but flexible support type, consisting of yielding steel arches with friction clutches, steel anchors and shotcrete with longitudinal convergence slots (with styrofoam inserts), was chosen and successfully applied. This rock support type was assuring an advance rate high enough to prevent blocking of the cutter head. Figure 5: Longitudinal Convergence Slot with Styrofoam Insert The west tube TBM was started in October 2007. It was right in December 2007, when first cracks developed in the rigidified shotcrete of the eastern tube on the level of the western TBM, about 600 m behind the face. The subsequent drive led to a failure of the rock support in the eastern as well as the western tube on a length of several hundred meters. In the eastern tube, not only the vaults were demolished, but also the pre-cast concrete blocks of the invert were heaved and torn. The transport logistics for the eastern advance could be maintained, as the invert was stable. A speed reduction was though necessary for the trains upon the deformed tracks. In the western tube, the situation was more critical. The back-up installations were in danger of jamming due to the deformation and the invert was demolished. 7

To assure the trailing of the back-up installation, the shotcrete had to be removed. In these difficult working conditions, the advance rates decreased to a minimum of 1 m/d. The average advance rate slowed down to 3 5 m/d, instead of the previous 11 m/d. Minor advance rates also increase the risk of a blocking of the TBM cutter head due to deformations. Maintenance time was thus optimized to maximize the excavation time. In order to explain these processes, extensive numerical calculations and back analyses were done. The calculation results revealed that the geological conditions were worse than originally predicted. In addition, the transition zone between an unfavorable flat rock layer and steeper layers of Lucomagno gneisses (the Chièra syncline) was located in a zone about 500 m further north with a higher overburden. Thus, higher rock pressure had to be borne by a weaker rock than predicted. Due to the difficult geological conditions, the tunnel tubes were interacting, against all expectations. The excavation works in the tubes were influencing one another. As the damages to the excavation support and the already cast invert had developed beyond an acceptable threshold and since the profile was undersized due to deformation along a considerable distance of the tunnel, a section of approx. 200 m in both tubes was subjected to remedial measures. As a consequence, a detailed action plan was developed as a guideline for the reprofiling works in the tunnel tubes. Different phases and renovation levels were defined for vault and invert, whereby the major distinction was made between a partial or a total renovation and a reinforced or a non-reinforced lining. Another specific hazard was rockburst. Rock burst is a brittle failure. The danger of rock burst exists in hard solid rock with a low joint intensity and a high overburden. This hazard scenario is typical for deep tunnels in hard rock. In the Faido section many and large rockbursts were experienced. The rockbursts were classified into 4 categories which allowed to set up conditions that guaranteed the workers safety. For the entire multifunctional station in Faido set up predictions of expected rock burts together with their intensity were made. This meant that it could be ensured that the necessary support measures were built in. Despite about 1000 smaller rockburts (mostly at the tunnel face) and some 10 larger rockbursts no accidents or injuries due to rock bursts occurred. 6. Monitoring and Risk Management Risk management is the systematic process of handling project risks. It consists in general of risk identification, risk analysis and risk responding. Risk management is not only a single event but also a continuous process during the entire project. Therefore risk monitoring and control are part of the project life cycle from project initiation to project completion. Risk management covers the handling of project threats and project opportunities. Project threats are risks which can have a negative impact on a project whereas project opportunities are risks which have a positive impact. 8

Risk Management Planning yes Risk Identification Risk Analysis Risk Responding no New Risks Risk acceptable no yes Risk Monitoring and Control Fig. 6 Risk Management Flowchart A comprehensive risk analysis was carried out to identify all possible risks at the GBT. Threats as well as opportunities including their influence on the project were disclosed. The risk analysis was discussed in detail and the mitigation measures were compiled. A special risk was identified in the form of above ground dams and reservoirs. Long time before the excavation work started large areas around the dams and the reservoirs were monitored, together with the dams as well. Due to this monitoring concept, it was possible to identify the settlement of the dams because of drainage effects of the tunneling works already at an early stage. This allowed to consolidate the ground with injections and to lower the water drainage considerably. The positive effect was that the tunneling work could be continued without any further problems to the dam structure. 9