Slope s Design for Quarry s Remediation Using Ground Materials of Piraeus Subway Excavation

Similar documents
SUPPORT MEASURES EFFECTIVENESS DURING THE EXCAVATION OF SYMBOL MOUNTAIN S TUNNEL

Deformation And Stability Analysis Of A Cut Slope

(Refer Slide Time: 01:15)

Landslide FE Stability Analysis

City, University of London Institutional Repository

International Journal of Modern Trends in Engineering and Research

J. Paul Guyer, P.E., R.A.

Ch 4a Stress, Strain and Shearing

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Geological Engineering Problems in Major Construction Projects

Estimation of the Hydroconsolidation Susceptibility of the Anthropogenic Fill of the Historical Center of Thessaloniki, Greece

Instability of slopes along the Nymphopetra to Strymonas section of the Egnatia Highway in N Greece

Landslide Granice in Zagreb (Croatia)

Instability Investigate of Sarney dam abutments, under seismic loading

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet.

IGC. 50 th INDIAN GEOTECHNICAL CONFERENCE PSEUDOSTATIC SEISMIC ASSESMENT OF SLOPES AND ITS REMEDIATION

Slope stability analysis limit equilibrium or the finite element method?

Slope Stabilization for Coal mining In Prabumulih District, South Sumatera Province, Indonesia

Compute the lateral force per linear foot with sloping backfill and inclined wall. Use Equation No. 51, page 93. Press ENTER.

Landslide stability analysis using the sliding block method

LECTURE 28. Module 8 : Rock slope stability 8.3 WEDGE FAILURE

Influences of material dilatancy and pore water pressure on stability factor of shallow tunnels

Stability Analysis of Hongsa Coal Mine s Pit Walls, Xaignabouli Province, Laos PDR. Thanachot Harnpa* Dr.Schradh Saenton**

Surface Processes Focus on Mass Wasting (Chapter 10)

Reinforced Soil Structures Reinforced Soil Walls. Prof K. Rajagopal Department of Civil Engineering IIT Madras, Chennai

Slope Stability. loader

Colluvium in the Appalachian Plateau Physiographic Province. Richard E. Gray, PG, Hon.D.GE, Dist.M.ASCE & SME, Hon.M.AEG

STABILITY ANALYSIS OF EARTH DAM SLOPES SUBJECTED TO EARTHQUAKE USING ERT RESULTS INTERPRETATION

BACKFILL AND INTERFACE CHARACTERISTICS

Chapter 5 Shear Strength of Soil

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

Soil Mechanics. Chapter # 1. Prepared By Mr. Ashok Kumar Lecturer in Civil Engineering Gpes Meham Rohtak INTRODUCTION TO SOIL MECHANICS AND ITS TYPES

Stability Analysis of A Railway Trench By Using Stereographical Projection

TWO DIMENSIONAL MODELING AND STABILITY ANALYSIS OF SLOPES OVERLAYING TO SHAHID RAGAEE POWER PLANT

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

Module 9 : Foundation on rocks. Content

SLOPE STABILITY OVERVIEW Thursday, July 19, 2007 Copyright 2007 SoilVision Systems Ltd. R M. F s BASIC THEORY

Prevention and remediation of rockslide at left portal of north tunnel of Da Nang Qu ang Ngai expressway in Quang Nam, Vietnam

Geology 12 FINAL EXAM PREP. Possible Written Response Exam Questions

Assessment Slope Stability Based on Deformation

CONSIDERATION OF SOIL PROPERTIES FOR STABILITY ANALYSES OFPADMA AND JAMUNA RIVERBANK

Back Analysis of the Lower San Fernando Dam Slide Using a Multi-block Model

SLOPE FAILURE SLOPES. Landslides, Mudflows, Earthflows, and other Mass Wasting Processes

Theory of Shear Strength

Prediction of landslide run-out distance based on slope stability analysis and center of mass approach

NAME HOMEWORK ASSIGNMENT #3 MATERIAL COVERS CHAPTERS 8, 9, 10, 11

APPLICATION OF COMPOSITE CLAY AS CORE MATERIAL IN EARTHFILL EMBANKMENT DAMS

Geotechnical Properties of Soil

PRINCIPLES OF GEOTECHNICAL ENGINEERING

The effect of discontinuities on stability of rock blocks in tunnel

Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method. S. Soleymani 1, A. Akhtarpur 2

Theory of Shear Strength

CE 4780 Hurricane Engineering II. Section on Flooding Protection: Earth Retaining Structures and Slope Stability. Table of Content

INTI COLLEGE MALAYSIA

Probabilistic Analysis of Physical Models Slope Failure

Distribution of pore water pressure in an earthen dam considering unsaturated-saturated seepage analysis

Finite element fault rupture propagation modelling in the Corinth Canal Greece


2 Aggregates in Indiana


Kinematic Analysis Underground Wedges

Variations in the Rus Formation

EXTENSION OF A HOTEL IN POIANA BRASOV ON AN INCLINED SLOPE

Problems with Landslide Stabilization of Dukat in the Road Vlora Saranda

High-Precision Strength Evaluation of Rock Materials and Stability Analysis for Rockfill Dams

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

R.SUNDARAVADIVELU Professor IIT Madras,Chennai - 36.

Tipologia e dimensionamento estrutural das fundações de Torres de Linhas de Alta Tensão em diferentes condições geotécnicas

Mass Wasting. Revisit: Erosion, Transportation, and Deposition

GG 454 March 19, EFFECTIVE STRESS AND MOHR-COULOMB FAILURE (26)

Seismic Analysis of Siri Dam Using Pseudo-Static Approach

1. Rock Mechanics and mining engineering

AB Engineering Manual

Probability - James Bay Case History

Chapter 6 Sedimentary and Metamorphic Rock

Back Analysis of Slope Failure Using Finite Element with Point Estimate Method (FEM-PEM)

Landslide Hazard Assessment Models at Regional Scale (SciNet NatHazPrev Project)

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

VALLIAMMAI ENGINEERING COLLEGE

NATURAL SOIL DEPOSITS

ROCK MASS CHARACTERISATION IN ENGINEERING PRACTICE

Sediment and sedimentary rocks Sediment

Probabilistic slope stability analysis as a tool to optimise a geotechnical site investigation program

Understanding Earth Fifth Edition

The Effect of Soil Cracks on Cohesion and Internal Friction Angle at Landslide

Shear strength model for sediment-infilled rock discontinuities and field applications

Figure 1: Cross section of the embankment area. 1

Geology 101. Reading Guides for Chapters 5 and 14 Weathering: the Breakdown of Rocks (p. 142)

SHEAR STRENGTH OF SOIL

Sedimentary Rocks. Rocks made of bits & pieces of other rocks.

River Bank Erosion of the Surma River Due to Slope Failure

Developing an Analytical Method to Study Vertical Stress Due to Soil Arching During Tunnel Construction

IGC. 50 th. 50 th INDIAN GEOTECHNICAL CONFERENCE

Rock slope stability planar shear failure

Lecture 12: Slope Stability

Rock Material. Chapter 3 ROCK MATERIAL HOMOGENEITY AND INHOMOGENEITY CLASSIFICATION OF ROCK MATERIAL

Chapter 11 10/30/2013. Mass Wasting. Introduction. Factors That Influence Mass Wasting. Introduction. Factors That Influence Mass Wasting

EFFECTS OF WATER-LEVEL VARIATION ON THE STABILITY OF SLOPE BY LEM AND FEM

INTEGRATED INVESTIGATION TO LOCATE A WASTE DISPOSAL AREA

Transcription:

Slope s Design for Quarry s Remediation Using Ground Materials of Piraeus Subway Excavation 242 M. Chatziangelou, B. Christaras, K. Botsou, and Em. Malliaroudakis Abstract Chaidari-Piraeus subway is the under construction line of Athens subway extension driving to Piraeus city. At subway s beginning, metamorphic rocks are placed, which are replaced by sedimentary formations driving to Piraeus city. Taking into account that TBM will be used for underground excavations, the above geological excavation products will adopt soil characteristics. So, circular sliding are expected on the excavation products deposits. The present paper investigates and suggests the appropriate safety slope geometry of deposits using them for remediation of quarries. The Chamilothoris quarry, which is placed at Koridalos city, near the constructions, is used as an example of proposed geometry application. Taking into account slope stability of deposits, terraces from 3.5 to 5 m height, lower downstairs and higher upstairs, inclined from 30 to 60, where dips increase from downstairs to upstairs, so as geometry approaches the sliding circle, are proposed to be constructed. Also, enough space somewhere at the upper stages and down stairs is indispensable in order to accept the pieces which may fall because of erosion or weathering. Also, deposits materials with poor mechanical properties are proposed to be placed downstairs, where the slope is formed by small inclinations. Cohesive materials are proposed to be placed upstairs. Excavation products which consists of no cohesive materials, are ought to be placed at the center of quarry, so as they do not influence on slope stability. Furthermore, drainage layers with dip of 15, lengthen 15 m are also proposed to be put on every terrace. Keywords Slope design Quarry Piraeus subway Slope stability Remediation 242.1 Introduction M. Chatziangelou B. Christaras (&) Department of Geology, Aristotle University of Thessaloniki, Thessaloniki, Greece e-mail: christar@geo.auth.gr M. Chatziangelou e-mail: mcha@geo.auth.gr K. Botsou 7, Kirillou and Methodiou St. Kalamaria, Thessaloniki, Greece Em.Malliaroudakis J&P-AVAX Group, 16 Amarousiou-Halandriou Street, 151 25, Marousi, Greece Chaidari-Piraeus subway is the under construction line of Athens subway extension driving to Piraeus city. The excavated geological formations consist of metamorphic rocks in Chaidari area, while in Piraeus city the geomaterials consist of sedimentary formations. Taking into account that TBM was used for that underground excavations, the above excavation products adopt soil characteristics (Kumar and Samui 2006). The present paper investigates the use of deposits for quarries remediation. For this reason, it suggests the appropriate safety slope geometry using Chamilothoris quarry as example. G. Lollino et al. (eds.), Engineering Geology for Society and Territory Volume 5, DOI: 10.1007/978-3-319-09048-1_242, Springer International Publishing Switzerland 2015 1269

1270 M. Chatziangelou et al. 242.2 Properties of Geological Formations The geological formations during subway s excavation are going to be meta-sandstone, claystone, marl, siltstone, schist, serpedinite, limestone, marley limestones, silt, loose soil, conglomerates, sand and sandstones. Along subway s excavation metamorphic formations are met at Chaidari area, placed, while sedimentary formations are found in Piraeus city. The contact between Metamorphic and sedimentary formations is met in Maniatika area. The geomechanical properties (Craig 2005) and the percent of the geological formations appearance are showed on Table 242.1. 242.3 Initial Consideration Taking into account that TBM is used for the subway s excavation, the excavated rock mass is destroyed and soiled. So, the deposits of geological formations of Pireaus subway excavation behave as soil which means that the potential failures of the formed slopes are circular sliding. Thus, in order to analyze the stability of the slopes (Bishop and Morgenstern 1960), of the remediated products, the balance of a critical circular sliding surface, which is cut into a numerous sliding slides with the same width, is examined using Bishop Method (Bishop 1955). The lowest prices of friction angle and cohesion, in addition to average of the prices of dry density are used, so as the conclusions may approach reality. 242.4 Slopes Stability Investigation 242.4.1 General Data See Table 242.1. Eight groups of geological formations are distinguished, in order to investigate the more suitable geometry of the slopes. The minimum geomechanical properties of dry density, cohesion and angle of friction are appeared on Table 242.2. Slope stability is estimated using different slope geometry, taking into account the percent of geological formations appearance and the excavated formations course (Abramson et al. 2002). So, slopes with heights of 24, 28, 29, 32 and 33 m are investigated. The dips of terraces are supposed to be the same of all terraces, between 30 and 60 (Berilgen 2006), or to be different of every terrace between 15 o and 90 o. The heights of the terraces are supposed to be the same of all terraces 2, 3 or 4 m, or they are different for every terrace from 1.5 to 5 m. The width of the terraces is taking into account from 1 to 6 m. Also the terraces plates are examined as horizontal or inclined. The most representative cases are shown on Table 242.3. 242.4.2 Investigation Conclusions Taking into account the above investigation, the factors, which increase slope stability, are; Cohesive materials Decrease of terraces height from upstairs to downstairs Geometry which approaches the sliding circle Table 242.1 Geomechanical properties and percent of geological formations appearance along Piraeus subway excavation Geological formation Type Percent of total appearance (%) c(kpa) φ( ) Dry density (kn/m 3 ) Meta-madstone Clayey schist AS-PH 14.5 003 50 17 30 19 26 Meta-madstone AS-SL 3 00 74 20 30 16 26 Meta-madstone Meta-sandstone AS-STL 16 004 48 20 30 17 24 Claystone ΝG-MS 2 0012 35 20 30 13 24 Mar madstone NG-ML 5.5 35 82 25 30 16 23 Meta-sandstone Schistolite AS-ST 12.5 00 26 25 40 18 27 Meta-madstone Clayey schist Meta-sandstone AS-PHS 0.5 19 25 17 30 19 24 Serpendinite OPH 6 20 46 25 45 13 21 Limestone K 8.5 0 5 >35 Marl, Marley limestone NM-MK 9 6 107 25 35 16 22 Silt and siltstone PT-SM 7 5 214 20 30 15 18 Loose soil SW 1 15 20 15 Conglomerates PT-CN 1 20 30 23 Sand PT-SD 2 18 177 20 30 15 19 Marl, siltstone, claystone NM-MS 7.5 6 107 25 30 14 22 Sand stone, Claystone NM-ST 4 20 30 18 23

242 Slope s Design for Quarry s Remediation Using Ground Materials of Piraeus Subway Excavation 1271 Table 242.2 Minimum geomechanical properties of geological groups Geological group γ(kn/m 3 ) c(kn/m 2 ) φ( ) 1 22 3 17 2 20 0 20 3 20 4 20 4 18 12 20 5 19 35 25 6 22 0 25 7 17 20 25 8 21 19 17 Terraces inclined less than 60 o Formation of a middle terrace with two dips Creation of a wider level spot, so as enough space is created somewhere at the upper stages, in order to accept the pieces of upstairs 242.4.3 The Most Suitable Geometry Taking into account the above factors, that increase slope stability, the most suitable geometry of slope s design for quarry s remediation using ground materials of Piraeus subway excavation, is succeeded by; Terraces from 3.5 to 5 m high, lower downstairs and higher upstairs Terraces inclined from 30 to 60, where dips increase from downstairs to upstairs The second terrace, under the foot of the slope, inclined 15 o, increasing the restrained forces and forming a safe surface for accepting the material, which may fall from upstairs because of weathering or erosion. The sixth terrace, under the foot of the slope, is 6 m wide, so as it can accept the upper weathered material. Terraces are preferred to be 4 m wide, so as they may retain weathering material. Geometry approaches the sliding circle. Deposition of materials with poor mechanical properties downstairs, where the slope is formed by small inclinations. Deposition of cohesive materials with best mechanical properties upstairs. 242.5 Example of Application on Chamilothoris Quarry s Remediation The Chamilothoris quarry is placed at Koridallos area of Attica department. The location is near the construction works of Piraeus subway, so the quarry may be suitable for excavation material deposition (Fig. 242.1). Taking into account the above investigation of slope geometry and material deposition, the remediation of quarry can be achieved by eight terraces, which the height will be from 3.5 to 10 m increasing the slope angles from 30, downstairs to 60, upstairs. Near the foot of the slope, the inclination of the second terrace will be 16, so as the restrain powers will be enhanced, and it can also be a safe plate that can accept the eroded material or the pieces may fall from superior terraces. The width of the terraces is chosen to be 4 m for the following two reasons; the first one is the acceptability of the weathered material and the second one is the preservation of enough space for coming ways. In order the quarry s geometry approaches the sliding circle; the width of the fifth terrace is chosen to be 2.5 m. Finally, the width of the sixth terrace is better to be 6 m, so it can increase the stability, being a plate which can accept the weathered material from the above terraces. As the deposition of materials concerns, the materials with poor mechanical properties is proposed to be placed downstairs, where the dips of terraces are small, and cohesive materials are proposed to be placed upstairs, where the terraces are sheer. So, materials of group 1, like meta-madstone or clayey schist, with cohesion more than 3 kpa, friction angle more than 17 and apparent weight of 22 kn/m 3, can be deposited at the bottom of the quarry. Under the materials of group 1, materials of group 3, like meta-madstone or metasandstone, with cohesion more than 4 kpa, friction angle more than 20 and apparent weight of 20 kn/m 3 are proposed to be placed. On the middle of the slope, material of group 4, like clayey stone, with cohesion more than 12 kpa, friction angle more than 20 and apparent weight of 18 kn/m 3, can be placed. Just above this formation, it can be deposited cohesive materials of group 5, like marl or mudstone, with cohesion more than 35 kpa, friction angle more than 25 and apparent weight of 19 kn/m 3. Finally, on the upper terraces, can be placed materials of lower mechanical properties than the previous group, which cohesion may be at least 20 kpa, the friction angle may be at least 25 and the apparent weigh may be about 17 kn/m 3. These properties are described by material of group seven, like serpendinite (Figs. 242.2, 242.3). Materials of group 8 will be excavated far away from Chamilothoris quarry, so they did not considered on our predictions. Non cohesive materials, of groups 2 and 6, are not proposed to be placed on the external slopes, but they can be placed at the center of the quarry, between the slopes, so as their low mechanical properties don t influence slope stability. In order to estimate the safety factor of the slopes of the quarry, 411 sliding cases are investigated for every slope. Taking into account the proposed geometry and deposition, the radius of critical circle on unsaturated conditions is calculated 66,286 m and the safety factor 1,112 (Siddique

1272 M. Chatziangelou et al. Table 242.3 The most representative slope geometry of the investigation o 40 45 o Material 6 Material 2 SF = 0,5 Stable slope, 24 m high, with cohesive materials, which geometry approaches the sliding circle Slope 20 m high, which the upper terrace is formed by two dips 6th terrace 45 o 35 o 4th terrace 6th terrace 45 o 35 o 40 o 35 o Slopes, 24 m high, consist of terraces, which are formed by two dips SF = 1,5 SF = 1,6 Slope 29m high Slope 28m high Slope 23m high SF = 0,02 (saturated) SF = 1,1 (unsaturated) SF = 0,5 SF = 1 (saturated) SF = 1,2 (unsaturated) Slopes lower than 30 m, which their geometry approaches the sliding circle material 7 material 5 material 4 SF = 0 (saturated) material 3 material 1 SF = 0,9 (unsaturated conditions) Slope 32 m high with terraces inclined 30 o Small unstable sliding circle on saturated conditions of a stable slope, 33 m high, which geometry approaches the sliding circle and it is formed with level spots (a) Material 8 (b) (c) SF = 0,8 (unsaturated conditions) SF = 0,8 (unsaturated conditions) SF = 0,9 (unsaturated) (continued)

242 Slope s Design for Quarry s Remediation Using Ground Materials of Piraeus Subway Excavation 1273 Table 242.3 (continued) Slopes, 32 m high, is formed with different cases of geometry and materials SF = 1,1 (saturated) SF = 1,2 (unsaturated) SF = 1,3 (saturated) SF = 1,4 (unsaturated) Different geometrical formations of a slope 33 m high, which consists by homogenous and cohesive material (a) (b) Material 2 SF = 0,9 (unsaturated) SF = 1,7 (saturated) SF = 1,8 (unsaturated) (a) Slope, 33 m high, with cohesive and no cohesive materials, (b) Slope with cohesive materials only (a) Material 6 (b) Material 2 SF = 0,2 (unsaturated) SF = 1,5 (unsaturated) (a) The slope, 33 m high, is formed by terraces of 2 m width, and (b) the slope, 33 m high, is formed with level spots. Material 6 Material 2 SF = 0,7 (unsaturated) SF = 0,5 (unsaturated) Slope, 33 m high, with dips of terraces bigger at the middle than upstairs or downstairs

1274 M. Chatziangelou et al. Fig. 242.1 Location of Chamilothoris quarry Geological group 4 Geological group 3 Geological group 1 Fig. 242.2 Deposition design and draining beddings arrangement for slope with height of 33 m Fig. 242.3 Chamilithori s quarry

242 Slope s Design for Quarry s Remediation Using Ground Materials of Piraeus Subway Excavation 1275 Fig. 242.4 Critical sliding circle of slope with height of 33 m on unsaturated conditions R = 66.286m SF = 1.112 Geological group 7 Geological group 5 Geological group 4 Geological group 3 Geological group 1 Fig. 242.5 Small failure of the slope with height of 33 m on saturated conditions Geological group 7 R = 28.2m Geological group 5 Geological group 4 SF = 0.017 Geological group 3 Geological group 1 et al. 2005) (Fig. 242.4). Actually, the safety factors of the most critical sliding circles are up to 1.4, although there are some cases where the safety factor is higher than 1.4. On saturated conditions, circular failure is estimated at the upper part of the first terrace. The radius of the critical sliding circle is calculated 28.2 m and the safety factor is 0.017 (Fig. 242.5). The safety factors of the most critical sliding circles are up to 1.2, although there are some cases where the safety factor is higher than 1.2. That means sliding may occur where the load of the slope is increased because of the presence of the water. Draining beddings inclined 15, lengthen 15 m, on every terrace can direct the water out of the slope (Fig. 242.2). 242.6 Conclusions Taking into account that TBM is used for the subway s excavation, the excavated rock mass is destroyed and soiled. So, the deposits of geological formations of Pireaus subway excavation behave as soil. That means the failures of the sliding of the slopes, which are formed by excavation materials, are circled. In order to investigate the suitable geometry of slopes stability, eight groups of geological formations, with different mechanical characteristics, were distinguished, according to excavation formations. Slope stability was estimated using different slope geometry, taking into account the percent of geological formations appearance and the excavated formations course. The most suitable geometry of slope s design for quarry s remediation using ground materials of Piraeus subway excavation is succeeded by; Terraces from 3.5 to 5 m height, lower downstairs and higher upstairs Terraces inclined from 30 to 60, where dips increase from downstairs to upstairs Designing of enough space somewhere at the upper stages and downstairs, in order to accept the pieces which may fall because of erosion or weathering. Geometry approaches the sliding circle.

1276 M. Chatziangelou et al. Deposition of materials with poor mechanical properties downstairs, where the slope is formed by small inclinations. Deposition of cohesive materials with best mechanical properties upstairs. Use of cohesive material at the slopes and no cohesive materials at the middle of the quarry The above investigation is applied on Chamilothoris quarry s remediation. The radius of slopes critical circle in unsaturated conditions is calculated 66,286 m and the safety factor 1.112. Actually, the safety factors of the most critical sliding circles are between 1.1 and 1.4, although there are some cases, where the safety factor is higher than 1.4. In saturated conditions, circular failure is estimated at the upper part of the first terrace. The radius of the critical sliding circle is calculated 28.2 m and the safety factor is 0.017. The safety factors of the most critical sliding circles are up to 1.2, although there are some cases where the safety factor is higher than 1.2. That means sliding may occur where the load of the slope is increased because of the presence of the water. The sliding may be deterred by draining beddings inclined 15, lengthen 15 m, on every terrace, which they can direct the water out of the slope. References Abramson KW, Lee TS, Sharma S, Boyce GM (2002) Slope stability and stabilization methods. Wiley, New York, pp 712, Nash, 1987 Berilgen M (2006) Investigation of stability of slopes under drawdown conditions. Computers and Geotechnics, Elsevier 2006. www. Elsevier.com Bishop AW (1955) The use of the slip circle in the stability analysis of slopes. Geotechnique, Great Britain 5(1):7 17 Bishop AW, Morgenstern N (1960) Stability Coefficients for Earth Slopes. Geotechnique 10(4):129 150 (Institution of Civil Engineers, London) Craig RF (2005) Craig s soil mechanics. Spon Press, Taylor and Francis Group, London, New York Kumar J, Samui P (2006) Stability determination for layered soil slopes using the upper bound limit analysis. Geotech Geol Eng J 24:1803 1819 (Springer Publications) Siddique A, Safiullah AMM, Ansary MA (2005) An investigation into embankment failure along a section of a major highway. In: Proceeding of the 16th international conference on soil mechanics and geotechical engineering, vol 1 5, pp 979 983