IAMGOLD REPORTS HIGH GRADE INTERSECTIONS FROM THE ONGOING DELINEATION DRILLING PROGRAM ON THE SARAMACCA PROJECT, SURINAME

Similar documents
IAMGOLD REPORTS ADDITIONAL HIGH GRADE INTERSECTIONS FROM THE DELINEATION DRILLING PROGRAM ON THE SARAMACCA PROJECT, SURINAME

IAMGOLD REPORTS FURTHER HIGH-GRADE INTERSECTIONS FROM INFILL AND EXPANSION DRILLING AT SARAMACCA

IAMGOLD CONTINUES TO INTERSECT HIGH GRADES AT MONSTER LAKE

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

IAMGOLD INTERSECTS MINERALIZATION ALONG STRIKE OF THE SARAMACCA DEPOSIT AND REPORTS FIRST DRILL RESULTS FROM BROKOLONKO

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

ET and and and

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Teranga s Golden Hill Drill Program Intersects High-Grade Gold and Expands Mineralized Zones at Peksou and Ma Prospects

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

BALMORAL INTERSECTS 1,138 g/t (33 oz/ton) GOLD OVER 4.87 METRES, BUG LAKE FOOTWALL ZONE, DETOUR GOLD TREND PROJECT, QUEBEC

Detour Gold Reports Drilling Results from Lower Detour

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Toronto, Canada March 4, 2013

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Drilling Highlights: Phase II BCV Infill Drilling

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

NORTHQUEST LTD. ANNOUNCES DRILLING RESULTS FROM THE PISTOL BAY GOLD PROJECT, NUNAVUT, CANADA

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

NEWS RELEASE August 10, 2017

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

Skeena Intersects g/t AuEq over metres at Eskay Creek

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

Northern Dynasty Minerals Ltd.

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

JUNE 25, 2015 TSX: WDO

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

News Release. Infill Drilling Program

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

Highlights from the four holes announced in this news release include:

July Exploring for Canadian Gold in the Rainy River District of Ontario

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

Drilling Extending Mineralization in La Mina North Zone

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

NEWS RELEASE. March 22, 2017

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

Toronto, Canada May 7, 2015

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

Melkior retains Geologica to complete a NI report on its Launay property, Québec

KIRKLAND LAKE GOLD EXTENDS HIGH-GRADE GOLD MINERALIZATION AT MACASSA, NEW GOLD SYSTEM DISCOVERED AT DEPTH

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

April Exploring for Canadian Gold in the Rainy River District of Ontario

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

Teranga Gold s Golden Hill Drill Results Include More High-Grade Gold at Multiple Prospects

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

OSISKO INTERSECTS 37.0 g/t Au OVER 5.4 METRES AT OSBORNE-BELL Infill Drilling Continues to Confirm High-Grade

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Drilling Extending Mineralization in La Mina North Zone

Yorbeau identifies two new exciting exploration targets at the Rouyn Property

NEWS RELEASE August 8, 2018

Transcription:

TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD REPORTS HIGH GRADE INTERSECTIONS FROM THE ONGOING DELINEATION DRILLING PROGRAM ON THE SARAMACCA PROJECT, SURINAME Toronto, Ontario, March 29, 2017 IAMGOLD Corporation ( IAMGOLD or the Company ) today provided an update from its 2017 infill drilling program currently in progress at the Saramacca project, located 25 kilometres southwest of its Rosebel Gold Mine ( RGM ) in Suriname. The company is reporting assay results from the initial 29 diamond drill holes totaling 6,008 metres of the ongoing 2017 delineation program. The assay intersections including capped composites and estimated true widths are provided in Table 1 and include the following highlights: (A drill hole plan map is attached to this news release.) SMDD17-077: 60.5 metres grading 40.91 g/t Au Including: 19.5 metres grading 75.91 g/t Au SMDD17-084: 20.0 metres grading 4.26 g/t Au and 19.5 metres grading 9.66 g/t Au SMDD17-068: 16.7 metres grading 9.93 g/t Au SMDD17-091: 23.5 metres grading 7.41 g/t Au SMDD17-074: 32.6 metres grading 4.05 g/t Au and 17.75 metres grading 6.65 g/t Au SMDD17-085: 52.6 metres grading 5.33 g/t Au These drill results exceed what we expected when we acquired the rights to the Saramacca property and lead us to believe that this deposit has the potential to create significant value for all stakeholders with a vested interest in the future of Rosebel, including our shareholders and the Government of Suriname, said President and CEO of IAMGOLD Steve Letwin. Initially we were attracted to Saramacca by the prospect of finding soft gold-bearing rock, and are pleased to see soft rock extending to depths of up to 100 metres. What is now becoming Saramacca s most compelling feature is the high grades that we ve intercepted to date. We intend to declare a resource this year which would then enable us to develop our plans to bring Saramacca into the mine feed as quickly as possible. Craig MacDougall, Senior Vice President, Exploration for IAMGOLD, stated: The initial assay results from our ongoing 2017 infill diamond drilling program continue to return numerous intersections with high grades of gold over wide intervals, from both shallow oxide and deeper sulphide intervals. We are continuing to develop our geological deposit model and increase our confidence and understanding of the structures hosting the mineralization. We remain on target to complete an initial resource estimation in Q3 2017 as we have previously stated.

2017 Exploration Program Drilling to date has confirmed the presence of multiple mineralized structures within an approximately 2 kilometres long and 600 metres wide corridor. Mineralization occurs in the near surface oxidized weathering profile to depths ranging from 50 to 100 metres, as well as deeper in the primary sulphide zones and remains open along strike and at depth. In the deposit area, three mineralization styles are recognized from the drilling completed to date: breccia hosted mineralization characterized by jigsaw, crackle and matrix supported breccias; shear hosted mineralization characterized by well-developed pyritic disseminations and stringers; and irregular pyrite-quartz-carbonate veins which locally carry high gold grades. The 2017 infill drilling program is ongoing with three diamond drill rigs currently operating. The initial phase of the program will involve the completion of approximately 15,000 to 17,000 metres of diamond drilling on a nominal 50 x 50 metre infill drilling pattern to further define and confirm continuity of the key mineralized structures. Results will be incorporated into a deposit model to support an initial National Instrument 43-101 resource estimate expected for completion by the third quarter 2017. In addition, geological mapping and geophysical surveys are planned along the Saramacca structural corridor to define targets for further exploration. About the Saramacca Project The Saramacca project is strategically located approximately 25 kilometres southwest of the Rosebel Gold Mine milling facility. Mineralization is hosted in the Paramaka Formation within the lower part of the Marowijne Greenstone Belt, which is dominated by metamorphosed dacite, rhyolite, basalt and andesite lithologies in the project area. These are traversed by the regional, northwest trending Saramacca shear zone, an important deformation zone for the localization of gold mineralization. The Saramacca property has been explored since the 1990 s principally by Golden Star Resources Ltd. ( Golden Star ) and later as a joint venture between Golden Star and Newmont Mining Corporation. Much of that work focused on the discovery and delineation of Anomaly M, which was the subject of successive auger and diamond drilling programs with over 50 diamond drill holes and over 200 auger holes completed in the anomaly area. Evaluation of this work suggests an exploration target potential of between 8 and 40 million tonnes grading between 1.0 and 1.8 g/t Au for potentially 0.5 to 1.4 million contained ounces of gold. The potential quantity and grade are conceptual in nature and insufficient exploration work has been completed to date to define a mineral resource. The property will require significant future exploration to advance to a resource stage and there can be no certainty that the exploration target will result in a mineral resource being defined. On August 30, 2016, the Company signed a letter of intent with the Government of Suriname to acquire rights to the Saramacca property, with the intent of defining a National Instrument 43-101 mineral resource within 24 months. The terms of the letter included an initial payment of $0.2 million, which enabled immediate access to the property for Rosebel s exploration team to conduct due diligence, as well as access to the data from previous exploration activity at the Saramacca property. On September 30, 2016, having been satisfied with the results of the due diligence, the Company ratified the letter of intent to acquire the Saramacca property and subsequently paid $10 million in cash and agreed to issue 3.125 million IAMGOLD common shares to the Government of Suriname in three approximately equal annual instalments on each successive anniversary of the date the right of exploration was transferred to Rosebel (December 14, 2016). In addition, the agreement provides for a potential upward adjustment to the purchase price based on the contained gold ounces identified by Rosebel in National Instrument 43-101 measured and indicated resource categories, within a certain Whittle shell within the first 24 months, to a maximum of $10 million. The Saramacca project falls within the UJV area as defined in an Agreement with the Government of Suriname announced on April 15, 2013. The Agreement establishes a joint venture growth vehicle under which Rosebel would hold a 70% participating interest and the Government will acquire a 30% participating interest on a fully-paid basis. page 2 of 7

Qualified Persons and Technical Information The drilling results contained in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). The "Qualified Person" responsible for the supervision of the preparation, verification and review of the technical information in this release is Ian Stockton, MAusIMM, FAIG, Exploration Manager for IAMGOLD in Suriname. He is considered a "Qualified Person" for the purposes of National Instrument 43-101 with respect to the technical information being reported on. The technical information has been included herein with the consent and prior review of the above noted Qualified Person. The information in this news release was reviewed and approved by Craig MacDougall, P.Geo., Senior Vice President, Exploration for IAMGOLD. Mr. MacDougall is a Qualified Person as defined by National Instrument 43-101. The sampling of, and assay data from, drill core is monitored through the implementation of a quality assurance - quality control (QA-QC) program designed to follow industry best practice. Drill core (HQ and NQ size) samples are selected by the IAMGOLD geologists and sawn in half with a diamond saw at the Rosebel mine site. Half of the core is retained at the site for reference purposes. Sample intervals may vary from half a metre to one and a half metres in length depending on the geological observations. Samples are transported in sealed bags to FILAB in Paramaribo, Suriname, a representative lab of ALS. FILAB is an ISO 9001 (2008) and ISO/IEC 170250 accredited laboratory. Samples are weighed and coarse crushed to <2.5 mm, and 350-450 grams is Pulverized to 85% passing<100 μm. Samples are analyzed for gold using standard fire assay technique with a 50 gram charge and an Atomic Absorption (AA) finish. Multi-element analysis (40 elements) using ICPAES multi-acid digest is also undertaken. IAMGOLD inserts blanks and certified reference standard in the sample sequence for quality control. Samples representative of the various lithologies are collected from each drill hole and measured for bulk density at the site RGM laboratory. Forward Looking Statement This news release contains forward-looking statements. All statements, other than of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future (including, without limitation, statements regarding expected, estimated or planned gold production, cash costs, margin expansion, capital expenditures and exploration expenditures and statements regarding the estimation of mineral resources, exploration results, potential mineralization, potential mineral resources and mineral reserves) are forward-looking statements. Forward-looking statements are generally identifiable by use of the words will, should, continue, expect, estimate, believe, plan or project or the negative of these words or other variations on these words or comparable terminology. Forward-looking statements are subject to a number of risks and uncertainties, many of which are beyond the Company s ability to control or predict, that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements. Factors that could cause actual results or events to differ materially from current expectations include, among other things, without limitation, failure to meet expected, estimated or planned gold production, cash costs, margin expansion, capital expenditures and exploration expenditures and failure to establish estimated mineral resources, the possibility that future exploration results will not be consistent with the Company's expectations, changes in world gold markets and other risks disclosed in IAMGOLD s most recent Form 40-F/Annual Information Form on file with the United States Securities and Exchange Commission and Canadian provincial securities regulatory authorities. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement. About IAMGOLD IAMGOLD (www.iamgold.com) is a mid-tier mining company with four operating gold mines on three continents. A solid base of strategic assets in North and South America and West Africa is complemented by development and exploration projects and continued assessment of accretive acquisition opportunities. IAMGOLD is in a strong financial position with extensive management and operational expertise. page 3 of 7

For further information please contact: Bob Tait, VP Investor Relations, IAMGOLD Corporation Tel: (416) 360-4743 Mobile: (647) 403-5520 Laura Young, Director, Investor Relations, IAMGOLD Corporation Tel: (416) 933-4952 Mobile: (416) 670-3815 Shae Frosst, Investor Relations Associate, IAMGOLD Corporation Tel: (416) 933-4738 Mobile: (647) 967-9942 Toll-free: 1-888-464-9999 info@iamgold.com Please note: This entire news release may be accessed via fax, e-mail, IAMGOLD's website at www.iamgold.com and through CNW Group s website at www.newswire.ca. All material information on IAMGOLD can be found at www.sedar.com or at www.sec.gov. Si vous désirez obtenir la version française de ce communiqué, veuillez consulter le http://www.iamgold.com/french/accueil/default.aspx. page 4 of 7

Table 1: Diamond Drill Hole Assay Results HOLE-ID Local UTM grid Easting Northing Elevation End of Hole (m) Azimuth Dip From (m) To (m) Interval (m) True Width (m)* (Capped at 30 g/t Au)* SMDD17-068 32751 63446 881 287 215-50 169.3 186 16.7 10.8 9.93 9.38 SMDD17-069 32510 63611 877 150.0 215-50 No significant results SMDD17-070 32565 63689 874 321.2 215-55 No significant results SMDD17-071 32695 63533 886 294.0 215-50 204 212.4 8.4 5.4 1.18 1.18 SMDD17-072 32271 64062 797 258.0 215-50 165 174.9 9.9 7.1 2.30 2.30 SMDD17-073 32663 63485 894 196.5 215-50 100.5 110.5 10 6.9 3.85 3.85 SMDD17-074 32099 64426 729 354.0 215-50 0 9.5 9.5 6.5 1.57 1.57 25.5 39 13.5 9.8 0.70 0.70 232.5 239 6.5 4.8 1.13 1.13 277.4 310 32.6 22.0 4.05 4.05 317.25 335 17.75 14.4 6.65 6.65 SMDD17-075 31992 64535 714 359.0 215-50 261 268.5 7.5 6.0 1.49 1.49 SMDD17-076 31988 64270 757 90 215-50 No significant results SMDD17-077 31978 64342 750 184.5 215-51 14.5 75 60.5 30.0 40.91 15.98 including 27 46.5 19.5 9.5 75.91 22.67 including 54 70.5 16.5 8.0 53.29 24.79 SMDD17-078 31965 64497 722 241 215-47 108 119.6 11.6 7.7 2.00 2.00 199.5 205 5.95 4.1 0.64 0.64 SMDD17-079 32057 64454 726 369 215-50 265.5 282.25 16.75 13.0 7.04 5.90 SMDD17-080 31934 64453 736 163 215-47 40 49 9 6.4 1.89 1.89 SMDD17-081 32734 63421 887 200 215-50 0 8 8 5.4 1.13 1.13 153.3 168.5 15 10.04 3.24 3.24 SMDD17-082 32032 64419 734 190.5 215-50 0 7 7 4.7 1.96 1.96 180 190.5 10.5 7.0 1.73 1.73 SMDD17-083 32714 63392 893 150.5 215-50 1 13 12 8.0 1.24 1.24 97 117 20 12.8 1.51 1.51 SMDD17-084 32002 64376 742 236 215-53 3.5 19.5 16 10.0 0.66 0.66 135 155 20 8.5 4.26 4.26 163 182.5 19.5 9.0 9.66 6.37 188.5 198.4 9.9 5.3 3.66 3.66 SMDD17-085 32785 63405 889 248 215-50 0 11.5 11.5 7.5 0.95 0.95 188 240.6 52.6 30.0 5.33 5.33 SMDD17-086 32110 64182 779 186 215-50 No significant results SMDD17-087 31899 64577 706 265 215-50 69 79.5 10.5 6.7 11.35 10.5 SMDD17-088 32087 64150 794 120 215-50 No significant results SMDD17-089 31877 64545 711 135 215-50 1.5 18 16.5 9.0 3.04 3.04 SMDD17-090 32163 64084 812 150 215-47 No significant results SMDD17-091 32737 63337 904 141.8 215-50 0 23.5 23.5 15.0 7.41 7.41 SMDD17-092 31854 64514 715 75 215-50 3 9 6 3.3 2.04 2.04 SMDD17-093 31928 64527 718 136 215-50 No significant results page 5 of 7

HOLE-ID Local UTM grid Easting Northing Elevation End of Hole (m) Azimuth Dip From (m) To (m) Interval (m) True Width (m)* (Capped at 30 g/t Au)* SMDD17-094 32190 64123 793 204 215-47 No significant results SMDD17-095 32784 63318 908 151.7 215-52 0 20.5 20.5 10.2 1.35 1.35 64 80.5 16.5 11.5 1.16 1.16 136 151.7 15.7 11.0 8.32 8.32 SMDD17-098 32800 63252 913 176 215-50 0 20 20 10.9 1.56 1.56 50 59.5 9.5 5.2 1.59 1.59 79 100 21 14.5 0.62 0.62 Notes: 1. Drill hole intercepts are calculated using a 0.50 g/t Au assay cut-off and 5m minimum length 2. Capped composites are cut to 30g/t Au 3. True widths are estimated from intersected geometries page 6 of 7

Figure 1: Saramacca drill hole plan map and highlighted 2017 assay results. page 7 of 7